Loading...
HomeMy WebLinkAbout20071334 Ver 2_More Info Received_20090615ColeJenest & Stone Shaping the Environment Realizing the Possibilities Land Planning Landscape Architecture Civil Engineering Urban Design 200 South Tryon Street Suite 1400 Charlotte NC 28202 P 704 376 1555 f 704 376 7851 u i www colejeneststone com Date Reference Attention Company We Are Transmitting Charlotte Raleigh Wilmington TRANSMITTAL June 7 2012 4008 — Piedmont Town Center (DWQ Permit #07 1334v2) D � 401/Wetlands Unit JU N 5 2U12 DEN WATEN OUroLITY Weband North Carolina Department of Environment an Natural Resources — Division of Water Quality 1650 Mail Service Center Raleigh North Carolina 27699 1650 ® Herewith ❑ Under Separate Cover Copies Dated Description 1 03/09/12 Civil Set — City of Charlotte Approved 1 03/09/12 Engineering Calculations 1 01/21/09 North Carolina Department of Environment and Natural Resources (NCDENR) — Division of Water Quality (DWQ) Stormwater Management Plan Approval 1 01/28/08 NCDENR DWQ — 401 Approval 1 07/31/08 NCDENR DWQ — North Carolina Ecosystem Enhancement Program Invoice Paid 1 02/11/11 US Army Corps of Engineers — NW39 — Re Verification Permit 1 06/07/12 Remarks Letter 1 12/08/08 Stormwater Management Plans — Appro ved Transmitted ❑ Mail ® Overnight ❑ Courier ❑ Hand Delivery ❑ Pick Up Via ❑ For Approval ® For Your Use ❑ As Requested ❑ For Review Remarks The attached are for your records Please call with any questions By Chris J Todd PE Project Manager smm/N cc Mr Benjamin L Collins — CR Mr R Elam Hall — CR Ms Susan G Freyler RLA — CJS + P SUSKP120 4008 Co e51 d 2012 T i Of Oh N( M Nt LW) 5 h t Land �lannin' Landsca'e Architecture Civil I Engineering Urban Design Engineerin, services'nvided I i n Charlotte and I Raleigh offices M7de fnm foV, host -c nsumer fiber. ColeJenest & Stone Shaping the Environment Realizing the Possibilities Land Planning Landscape Architecture Civil Engineering Urban Design D m to 200 South Tryon Street Suite 1400 Charlotte NC 28202 Charlotte P 704 376 1555 f 704 376 7851 www colejeneststone com Raleigh Wilmington June 7 2012 401/Wetlands Unit North Carolina Department of Environment and Natural Resources — Division of Water Quality 1650 Mail Service Center Raleigh North Carolina 27699 1650 Re 4008 — Circle South Park (Formerly Piedmont Town Center) (DWQ Permit #07 1334v2) To Whom It May Concern Enclosed is the final package for the referenced project Mr Alan Johnson with North Carolina Department of Environment and Natural Resources — Mooresville requested we forward the enclosed documentation to you for your records Included are the various approval letters the original Stormwater Management Plans approved by your office and the currently approved Construction Documents permitted by the City of Charlotte Project construction is expected to begin by July 1 2012 Please call us with any questions or concerns Best regards CO JEgEST & NE P A ® Chrs J Todd Project Manager smrr� Enclosure cc Mr Benjamin L Collins — CR Mr R Elam Hall — CR Ms Susan G Freyler RLA — CJS tend Iannin� iEn�7ineerinol services orwiWerl in Char,lette and R5le-igh sf ices Mad nsumer fifer. 0� `9 ► 0 �G / � r Mr Eric Jaegers Crescent Resources LLC 400 South Tryon St Suite 1300 Charlotte NC 28201 103 Subject Piedmont Town Center ',,1ichael F Easley Governor William G Ross Jr Secretary North Carolina Department of Environment and Natural Resources @ DO FNR�1��wAli—f--_-amR 1 5 2012 QUALITY - APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr Jaegers Coleen H Sullins Director Division of Water Quality January 28 2008 DWQ# 07 1334V2 Mecklenburg County You have our approval in accordance with the attached conditions and those listed below to fill 06 acre of wetland and to impact 290 linear feet (If) of unnamed stream to Little Sugar Creek in order to construct the development in Mecklenburg County as described in your application received by the Division of Water Quality (DWQ) on December 10 2008 After reviewing your application we have determined that this project is covered by Water Quality General Certification Number 3705 which can be viewed on our web site at http //h2o enr state nc us /ncwetlands /index html) The General Certification allows you to use Nationwide Permit Number 39 once it is issued to you by the U S Army Corps of Engineers Please note that you should get any other federal state or local permits before proceeding with your project including those required by (but not limited to) Sediment and Erosion Control Non Discharge and Water Supply Watershed regulations The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification This approval is only valid for the purpose and design that you described in your application If you change your project you must notify us in writing and you may be required to send us a new application for a new certification If the property is sold the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions In addition to the requirements of the certification you must also comply with the following conditions 1 The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced 2 Culverts placed in streams /wetlands shall be Installed in the dry Immediately upon completion of the Installation water flow shall be returned to its natural course Existing stream dimensions (Including the cross section dimensions pattern and longitudinal profile) must be maintained (or restored via constructed benches) above and below locations of each culvert if any of the existing pipes are or become perched the appropriate stream grade shall be re established or If the pipes Installed in a perched manner the pipes shall be removed and re Installed correctly 3 Mitigation must be provided for the proposed impacts as specified in the table below We understand that you wish to make a payment to the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement This has been determined by the DWQ to be a suitable method to meet the mitigation requirement Until the EEP receives and clears your check (made payable to DENR — Ecosystem Enhancement Program Office) no impacts specified in this Authorization Certificates Shall occur 1�pith Carolina ,vaAM1711y North Carolina Division of Water Qualitv 610 East Center Ave Suite .301 Mooresville NC 28115 Phone (704) 663 1699 Customer Service Intenet ncwaterqul qty org FAX (704) 663 6040 1 877 62.E 67,8 An Equal Oppor unity /Afirmative Acton Employer-50/ Recycled /10 / Pos Consumer Paper The EEP should be contacted at (919) 733 5205 if you have any questions concerning payment into a restoration fund You have 60 days from the date of this approval to make this payment For accounting purposes this Authorization Certificate authorizes payment to the EEP to meet the following compensatory mitigation requirement 4 Use of native vegetation and other soft stream bank stabilization techniques must be used where practicable instead of riprap or other bank hardening methods If riprap is necessary it shall not be placed in the streambed unless approved by the DWQ 5 Storm water discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations scouring or erosion of the stream banks 6 A final, written storm water management plan (including a signed and notarized Operation and Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd Suite 250 Raleigh NC 27604 or local governing authority) within 60 days of the issuance of the 401 Water Quality Certification The storm water management plan shall be approved in writing by this Office before the impacts specified in this Certification occur You have the option of using the Express Review Program for expedited approval of these plans If you propose to use the Express Review Program remember to include the appropriate fee with the plan The storm water management plan must include construction plans specifications storm water BMP worksheets and supporting calculations The storm water best management practices are required to be appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NC DENR Storm water Best Management Practices Manual These facilities must be designed to treat the runoff from the entire project unless otherwise explicitly approved by the Division of Water Quality Also before any permanent building is occupied at the subject site the facilities (as approved by this Office) shall be constructed and operational and the storm water management plan (as approved by this Office) shall be implemented The structural storm water practices as approved by this Office as well as drainage patterns must be maintained in perpetuity No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality 7 No waste spoil solids or fill of any kind shall occur in wetlands waters or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notification application All construction activities associated with this project shall meet and /or exceed those requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual and shall be conducted so that no violations of state water quality standards statutes or rules occur 8 Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable If placement of sediment and erosion control devices in wetlands and waters is unavoidable they shall be removed and the natural grade restored within two months of the date the Division of Land Resources has released the project 9 Upon completion of the project the applicant shall complete and return the enclosed Certificate of Completion form to the 401/Wetlands Unit of the NC Division of Water Quality 10 Continuing Compliance The applicant (Crescent Resources LLC) shall conduct all activities in a manner so as not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state Compensatory ti Mitigation Required .a River and Sub basin, Number Stream 290 feet Catawba 03050103 Wetlands acres Waters (acres) 4 Use of native vegetation and other soft stream bank stabilization techniques must be used where practicable instead of riprap or other bank hardening methods If riprap is necessary it shall not be placed in the streambed unless approved by the DWQ 5 Storm water discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations scouring or erosion of the stream banks 6 A final, written storm water management plan (including a signed and notarized Operation and Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd Suite 250 Raleigh NC 27604 or local governing authority) within 60 days of the issuance of the 401 Water Quality Certification The storm water management plan shall be approved in writing by this Office before the impacts specified in this Certification occur You have the option of using the Express Review Program for expedited approval of these plans If you propose to use the Express Review Program remember to include the appropriate fee with the plan The storm water management plan must include construction plans specifications storm water BMP worksheets and supporting calculations The storm water best management practices are required to be appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NC DENR Storm water Best Management Practices Manual These facilities must be designed to treat the runoff from the entire project unless otherwise explicitly approved by the Division of Water Quality Also before any permanent building is occupied at the subject site the facilities (as approved by this Office) shall be constructed and operational and the storm water management plan (as approved by this Office) shall be implemented The structural storm water practices as approved by this Office as well as drainage patterns must be maintained in perpetuity No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality 7 No waste spoil solids or fill of any kind shall occur in wetlands waters or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notification application All construction activities associated with this project shall meet and /or exceed those requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual and shall be conducted so that no violations of state water quality standards statutes or rules occur 8 Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable If placement of sediment and erosion control devices in wetlands and waters is unavoidable they shall be removed and the natural grade restored within two months of the date the Division of Land Resources has released the project 9 Upon completion of the project the applicant shall complete and return the enclosed Certificate of Completion form to the 401/Wetlands Unit of the NC Division of Water Quality 10 Continuing Compliance The applicant (Crescent Resources LLC) shall conduct all activities in a manner so as not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated or that further conditions are necessary to assure compliance DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H 0507(d) Before codifying the certification DWQ shall notify the applicant and the US Armv Corps of Engineers provide public notice in accordance with 15A NCAC 2H 0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H 0504 Any new or revised conditions shall be provided to the applicant in writing shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act and shall also become conditions of the 404 Permit for the project If you do not accept any of the conditions of this certification you may ask for an adjudicatory hearing You must act within 60 days of the date that you receive this letter To ask for a hearing send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings 6714 Mail Service Center Raleigh N C 27699 6714 This certification and its conditions are final and binding unless you ask for a hearing This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act It you have any questions please teiepnone Mr Alan uohnson in the Mooresville Regional Ofrice at'04 663 1699 or Ms Cyndi Karoly in the Central Office in Raleigh 919 733 9721 Sincerely for Coleen H Sullins Attachment Certificate of Completion cc Army Corps of Engineers Asheville Ian McMillan Wetlands Unit Central Files File Copy Mora Daneille MACTEC 2801 Yorkmont Rd Ste 100 Charlotte 28208 f 1 ii O�O� W FRQ co r > 'A0 7-4h. —I Bevei ly Eaves Purdue Govemot Dee Freeman Secretary North Carolina Department of Environment and Natural Resources January 21 2009 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr Eric Jaegers Crescent Resources LLC 400 South Tryon Street Suite 1300 Charlotte NC 28201 103 Subject Property Piedmont Town Center STORMWATER MANAGEMENT PLAN APPROVAL Dear Mr Jaegers Coleen H Sullins Dnector Division of Water Quality DWQ Project # 07 13342 Mecklenburg County �Am r7 �►JN t 5 2012 aENF� Vb'r T �t ,1UALITY On January 28 2009 the Division of Water Quality (DWQ) issued a 401 Water Quality Certification to fill 0 06 acre of wetland and to impact 290 linear feet of an unnamed tributary to Little Sugar Creek in order to construct the Piedmont Town Center in Mecklenburg County In order to meet Condition 6 of the 401 Certification for this project a stormwater management plan dated December 18 2009 was received by the DWQ on December 19 2008 This revised stormwater management plan has been revrewed and satisfies the stormwater management conditions of the 401 Water Quality Certification The stormwater treatment system which includes one wet detention pond and the signed and notarized Operation and Maintenance Agreements dated December 10 2008 as approved by this Office and the drainage patterns depicted on the plan sheets must be maintained in perpetuity No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality All stormwater management conveyances detention and treatment structures shall have maintenance access and at least 10 foot drainage easement on each side to allow for the ability to maintain the structures to perform corrective actions and shall provide protection of the structures from potential alterations by future property owners This letter completes the review of the DWQ under Section 401 of the Clean Water Act If you have any questions please contact me at 919 715 3425 Sincerely clr 4-5 Annette Lucas PE 401 Oversight/Express Review Permitting Unit AMLIaml N0 Carolind 401 Oversight/Express Review Permitting Unit d vufkra�i; 1650 Mail Service Center Raleigh North Carolina 27699 1650 2321 Crabtree Boulevard Suite 250 Raleigh North Carolina 27604 Phone 919 733 1786 / FAX 919 733 6893 / Internet linp h cnr t,itt m u nc%% tnd An Equal Opportunity /Affirmative Action Employer – 50/ Recycled /10/ Post Consumer Paper cc USACE Asheville Regulatory Field Office DWQ Mooresville Regional Office Mora Daneille MACTEC 2801 Yorkmont Road Suite 100 Charlotte CN 28208 Matt Matthews File Copy Central Files i ii oi►I- JdUgctb January 21 2009 Page 2 of 2 Filename 071334v2PiedmontTownCenter (Mecklenburg)_SW_Approve r I 9-P --- vP!" f 'rt c ,-h oil U S ARMY CORPS OF ENGINEERS a stogy s WILMINGTON DISTRICT FEB 1 1 2011 Action ID SAW 2007 -03999 360 County Mecklenburg USGS Quad Charlotte East GENERAL PERMIT (REGIONAL AND NATIONWIDE) VER FAMIOMN -- Property Owner / Authorized Agent Crescent Resources, LLC, Att'n Eric Jaegers Address 400 South Tryon St. Suite 1300 Charlotte, NC 28201 Telephone No Size and location of property (water body road name /number town etc ) Piedmont Town Center - Phase II located on an 8 acre tract at the Carnegie Business Center on the west side of Carnegie Boulevard, near Charlotte Description of protects area and activity Impact 290 LF of a UT- Little Sugar Creek and 0 01 acre of wetlands for the purpose of accomodating the construction of an off line detention pond MITIGATION In order to compensate for impacts to 290 linear feet of stream, the permittee shall make pavment to the North Carolina Ecosystem Enhancement Program ( NCEEP) in the amount determined by the NCEEP, sufficient to perform the restoration of 290 linear feet of warm water stream in the Catawba River Basin, Cataloging Unit 03050103 Construction within jurisdictional areas on the property shall begin only after the permittee has made full payment to the NCEEP and provided a copy of the payment documentation to the Corps that it agrees to accept responsibility for the mitigation work required, in compliance with the MOU bet`veen the NCDENR and the Corps of Engineers, Wilmington District, dated November 4, 1998 Applicable Law ® Section 404 (Clean Water Act 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act 33 USC 403) Authorization Regional General Permit Number Nationwide Permit Number 39 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order a restoration order and/or appropriate legal action This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified suspended or revoked If prior to the expiration date identified below the nationwide pernut authorization is reissued and/or modified this verification will remain valid until the expiration date identified below provided it complies with all requirements of the modified nationwide permmt If the nationwide permit authorization expires or is suspended revoked or is modified such that the activity would no longer comply with the terms and conditions of the nationwide permit activities which have commenced (i a are under construction) or are under contract to commence in reliance upon the nationwide permit will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit s expiration modification or revocation unless discretionary authority has been exercised on a case by case basis to modify suspend or revoke the authorization Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification You should contact the NC Division of Water Quality (telephone (919) 733 1786) to determine Section 401 requirements For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA) prior to beginning work you must contact the N C Division of Coastal Management This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal State or local approvals/permits If there are any questions regarding this verification any of the conditions of the Permit or the Corps of Engineers regulatory program please contact Steve Chapin at 828 271 7980 Corps Regulatory Official Steve Chapin Date January 8, 2008 Expiration Date of Verification March 18, 2012 S i,C The Wilmington District is committed to providing the highest level of support to the public To help us ensure we continue to do so please complete the attached customer Satisfaction Survey or visit http //www saw usace army mil /WETLANDS /index html to complete the survey online Determination of Jurisdiction A ❑ Based on preliminary information there appear to be waters of the US including wetlands within the above described project area This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 33 1) B ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act Unless there is a change in the law or our published regulations this determination may be relied upon for a period not to exceed five years from the date of this notification C ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344) Unless there is a change in the law or our published regulations this determination may be relied upon for a period not to exceed five years from the date of this notification D ® The. jurisdictional areas within the above described project area have been identified under a previous action Please reference Jurisdictional determination issued 3/4/03 Action ID 200330539 Basis of Jurisdictional Determination The site contains wetlands as determined by the USACE 1987 Wetland Delineation Manual and is adjacent to stream channels that exhibit indicators of ordinary high water marks The stream channels on the property are unnamed tributaries to Little Sugar Creek which flow into Sugar Creek which flows into the Catawba River and ultimately flows to the Atlantic Ocean through the Little Sugar Creek> Sugar Creek> Catawba River system which is a Section 10 navigable in fact waterway Appeals Information (This information does not apply to preliminary determinations as indicated by paragraph A above) Attached to this verification is an approved, jurisdictional determination If you are not in agreement with that approved. jurisdictional determination you can make an administrative appeal under 33 CFR 331 Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form If you request to appeal this determination you must submit a completed RFA form to the following address District Engineer Wilmington Regulatory Program Attn Steve Chapin Project Manager 151 Patton Avenue Room 208 Asheville North Carolina 28801 In order for an RFA to be accepted by the Corps the Corps must determine that it is complete that it meets the ciiteria for appeal under 33 CFR part 3315 and that it has been received by the Division Office within 60 days of the date of the NAP Should you decide to submit an RFA form it must be received at the above address within 60 days from the Issite Date below * *It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence ** Corps Regulatory Official Steve Chapin Issue Date January 8, 2008 Expiration Date Five years from Issue Date SURVEY PLATS FIELD SKETCH WETLAND DELINEATION FORMS PROJECT PLANS ETC MUST BE ATTACHED TO THE FILE COPY OF THIS FORM IF REQUIRED OR AVAILABLE Copy Furnished COLEJENEST & STONE, P A ,EC osystem e M1 e i I t TiT PROGRAM REVISED INVOICE July 31 2008 Eric laegers Crescent Resources LLC 4000 S Tryon St Suite 1300 Charlotte NC 28201 Protect Piedmont town Center County Mecklenburg DWQ# 07 1334 v 2 COE# 2007 03999 360 EEP # ILF 2005 1465 Location Catawba 03 You have elected to satisfy the compensatory mitigation requirements of the Section 401 /404 /CAMA permit(s) issued for the above referenced project through payment of a fee to the North Carolina Ecosystem Enhancement Program ( NCEEP) In accordance with 15A NCAC 2H 0500 the amount you owe is based upon the 2008 09 Fee Schedule and has been calculated as follows (Please note payment for wetlands is calculated in increments of 0 25 acres) If you have any questions concerning this payment please call Kelly Williams at (919) 716 1921 Habitat Type Riparian Wetlands Non riparian Wetlands Coastal Wetlands Stream Buffer (Zone I and II) Invoiced Amount 0 acres 0 acres 0 acres 290 linear feet 0 square feet TOTAL AMOUNT DUE if paid within 60 days Fee Schedule x $ 59 600 00 x $ 43 000 00 x $ 146 615 00 X $ 32300 x $ 096 Cost $93 670 00 _ $ $93,67000 If payment is not received within 60 days of the date of this invoice it will expire Note that your permit(s) may require payment before this date Subsequent invoices will be based on the fee schedule in effect on the date they are issued Please send a check payable to NCEEP for the Total Amount Due to the appropriate address below and enclose a copy of this invoice US Mail NCDENR Ecosystem Enhancement Program 1652 Mail Service Center Raleigh NC 27699 1652 Physical Address (for other delivery services) NCDENR Ecosystem Enhancement Program 2728 Capital Boulevard Suite 1H 103 Raleigh NC 27604 Please note that a payment made to NCEEP is not reimbursable unless a request for reimbursement is received within 12 months of the date of the receipt Any such request must be accompanied by letters from the permitting agencies stating that the permit and/or authorization have been rescinded If the account name on the check is not the same as the permit holder s name, Tease include a signed statement by the hermit holder that the check is being written on behalf of, and with full knowledge and authorization o£ the permit holder YOU MUST BE IN POSSESSION OF THE PAYMENT RECEIPT FROM NCEEP PRIOR TO COMMENCING THE ACTIVITIES AUTHORIZED BY THE DEPARTMENT OF ARMY 404 PERMIT AND /OR THE 401 WATER QUALITY CERTIFICATION cc Cyndi Karoly NCDWQ Wetlands /401 Unit Steve Chapin USACE Asheville Thelma Hemmingway USACE Wilmington Alan Johnson NCDWQ Mooresville _ 1�P.StDY ,Danielle Moral agent PfrDtP.Gt .jtG{.tf'i �,� NCDENR North Carolina Ecosystem Enhancement Program 1652 Mad Service Center Raleigh NC 27699 1652 / 919 715 0476 / www nceep net 4 ColeJenest & Stone Land Planning Landscape Architecture Civil Engineering Urban Design 200 South Tryon Street Suite 1400 Charlotte North Carolina 28202 P+ 704 376 1555 f+ 704 376 7851 Circle SOuth Park CJS # 4008 CALCULATIONS FOR: EROSION CONTROL STORM DRAINAGE ANALYSIS STORM WATER DETENTION & WATER QUALITY DATE 11 21 11 REV 03 09 12 Itp S fo1?-V 0;?-4 Tt�.� ' L SEAL r" �s c ,W, _ p c c 1a3 }a r t r r L 4t� Charlotte Raleigh Wilmington CARO i� ESS1O �y SE r 5 03 ���i EIR 111110\ 09 12 TABLE OF CONTENTS Ch I tte Circle South Park Ral gh CJS PROJECT NO 4008 +ColeJenest wlm gton DATE 11 21 11 BY RBH & Stone REVISED XX XX XX RVW C, T Land Planning + Landscape Architecture + Civil Engineering + U ban Design DESCRIPTION Summary Erosion Control Time of Concentration Skimmer Basin with Riser Storm Drainage Analysis Pipe Network Diagram (StormCAD) Storm Analysis Table (StormCAD) Rip Rap Apron Stormwater Detention & Water Quality Hydrologic Analysis Curve Numbers Drainage Area Maps Soils Map Detention Worksheet (Charlotte only) Network Diagram (HydroCAD) Detention Analysis (HydroCAD) Master Network Summary Design Storms Summary TC Calculations CN Calculations Pond Volumes Stage Storage Table Outlet Structures Flotation Wet Pond Storage Elevation Data Char Meck Water Balance Post Construction Control / Detention Worksl SECTION 1 2 3 4 EROSION CONTROL TIME OF CONCENTRATION Ch loft Circle at South Park R I gh CJS PROJECT NO 4008 ColeJenest W Im gto DATE 11 21 11 BY RBH & Stone REVISED xx xx xx RVW CJT Land Planning + Landscape Architecture + Civil Engineering + Urban Design BASIN #1 TIME OF CONCENTRATION PRE DEVELOPMENT Pre development Flow Phase One Type Sheet Flow Length 100 ft N Value 024 from tables Sloe 005 ft/ft Com uted T 10 Minutes Pre development Flow Phase Two Type Shallow Concentrated Flow Surface u Length 165 ft u= unpaved p= paved Sloe 00303 ft/ft Velocity 281 ft/sec Computed T 0 016 hr or = 0 96 Minutes Pre development Flow Phase Three I Typ e Open Channel Flow ILength 296 ft lVelocify 5 ftlsec assumed Computed T 0 016 hr or 10 Minutes Pre development Total Flow Summary I Time of Concentration Total Tc 119 Minutes Lag Time T LAG = 72 Minutes T LAG =0 6 x T c JITLAGO 012 Hours BASIN #1 TIME OF CONCENTRATION POST DEVELOPMENT Post development Total Flow Summary Time of Concentration Total T, 5 0 Minutes I Lag Time T zac = 3 0 Minutes TLAG=06xTc 11TLAGo 0 05 Hours SEDIMENT BASIN CALCULATIONS Q Ch Circle at South Park ColeJenest CJS PROJECT NO 4008 & Stone DATE 1121111 BY RBH u d r 9 v "ArO C i E-y 9 um 9 REVISED xxxxxx I RVW CJT DRAINAGE AREA 1 SKIMMER TYPE BASIN DESIGN WITH RISER (BASIN 9 STG 3) NCDENR? IF Yes Type 1 DRAINAGE AREAS /REQD STORAGE ESTIMATED BASIN SIZE RECTANGULAR Total drainage area (TDA) 175 ac Length(ft) Wtdth(tt) Disturbed area DA 58 ac Bottom 118 55 R d sediment storage 1800xTDA 31661 2 c/ To 142 79 BAS1N CONFIGURATION Proposed sediment depth 4 ft Depth of flow over spillway 2 ft Bottom elevation of basin 637 msl Sediment Storage elevation 641 ms1 Spillway crest 641 msl L62 of Berm 643 ms1 SPILLWAY DESIGN 1 Skimmer DESIGN FLOW Q CIA Drawdown Time Com osite sal coefficient C = 06 Area A = 17 5 ac 10 yr storm rainfall Intensity 1 = 5 561 Whir Computed flow from site Q = 58 5 cfs Tc measured to be 119 Minutes (12 Minutes used) SKIMMER DESIGN 1 Skimmer 2 Skimmers Drawdown Time 2 days 2 days Skimmer Size 6 4 Orifice Size 6 0 In 4 0 in 244875 46483 641 PLANNED BASIN SIZE REFER TO EROSION CONTROL P Elev Area SF Cumulative Volume CF 837 43455 0 638 89503 8848 639 231060 22676 640 244875 46483 641 258541 71824 642 00 0 x 0 0 { { } 0 0 TE 0 0 2 days 0 0 This table contains naximum drainage lolumes for a given Skimmer size and irawdown period The orifice area is :alculated by dividing the provided storage volume )y the corresponding =actor The factors are taken from the table and Nere generated assuming a constant head The diameter of the onfice s calculated by 2 (J(Area /3 14)) SPILLWAY DESIGN BASIN EFFICIENCY Sediment storage required 315612 cf Sediment storage provided 71623 7 cf OKAY Surface area required 26449 2 sf Surface area provided 258541 sf OKAY This table contains naximum drainage lolumes for a given Skimmer size and irawdown period The orifice area is :alculated by dividing the provided storage volume )y the corresponding =actor The factors are taken from the table and Nere generated assuming a constant head The diameter of the onfice s calculated by 2 (J(Area /3 14)) SPILLWAY DESIGN FAIRCLOTH SKIMMER DESIGN TABLE RISER/EMERGENCY SPILLWAY DESIGN Composite soil coeff dent C = t - k, 00P 1 CF drained Drawdown Factor 10 r -storm rainfall Intensity, y = 1� a is 561,1n/hr CF drained Drawdown Factor 1 5 Skimmer 1728 1 day 960 4 Skimmer 18267 1 day 1454 { { } 3456 2 days 1920 - 'vl 102 3s�ft a Y 36534 2 days 2908 u -X635 01 5184 3 days 2880 54803 3 days 4362 ten fh of ex ose`d outlet pipe) - 6912 4 days 3840 Buo anc =1 4381 Ibs 72000 4 days 5816 12096 7 days 6720 IftT, 127869 7 days 10178 2 Skimmer 3283 1 day 1123 5 Skimmer 32832 1 day 1642 6566 2 days 2246 65664 2 days 3283 9849 3 days 3369 98496 3 days 4926 13132 4 days 4492 131328 4 days 6568 22982 7 days 7861 229824 7 days 11491 2 5 Skimmer 5500 1 day 1144 6 Skimmer 51840 1 day 1814 11000 2 days 2304 103680 2 days 3628 16500 3 days 3432 155520 3 days 5442 22000 4 days 4576 307360 4 days 7256 38500 7 days 8064 362880 7 days 12701 3 Skimmer 9744 1 day 1382 8 Skimmer 97978 1 day 1987 19547 2 days 2765 195956 2 days 3974 29322 3 days 4146 293934 3 days 5961 39096 4 days 5528 391912 4 days 7948 68415 7 days 9677 658846 7 days 13909 This table contains naximum drainage lolumes for a given Skimmer size and irawdown period The orifice area is :alculated by dividing the provided storage volume )y the corresponding =actor The factors are taken from the table and Nere generated assuming a constant head The diameter of the onfice s calculated by 2 (J(Area /3 14)) SPILLWAY DESIGN DESIGN FLOW (0-CIA) 4 RISER/EMERGENCY SPILLWAY DESIGN Composite soil coeff dent C = t - k, 00P 1 Ris_e`r pipe diameter's Y54 In Depthaofflow ° �r2jtt ��t Flow throu ti riser 137 cfs OKAY k ArWA = ,175rac ? 10 r -storm rainfall Intensity, y = 1� a is 561,1n/hr Com uteri f1o`w from site 2Q2 = — 58 5,icfsl ''"`i I _71- L i , ConUactor to Install rmanent riser structure as shown on lansr ti- r -1 t - aBARRELIDESIGN�- i w a u e r Barrel diameter 36 J1W � I '?- "'t v k i s Hoyr through barreli too cfs r^ T(Note Flow determined u Ing ouu t control nd pipe W% fiillji rp L i N � i —11,1BARREL /S_OKAY- { { } Basel sloe ff/ff _ 7 -?o 02 sWft M -J Babel Ian fh ft - 'vl 102 3s�ft a Y Barrel Invert ini 9 _ 7837 r Barrel Invert out Y u -X635 01 _ iCONCRETErANCHOR SIZE 4-,F ten fh of ex ose`d outlet pipe) - ` - 10 k _ sort -1 Safe factorx r 12 e Buo anc =1 4381 Ibs dAnchdr width -7 ft Re ulre'd Volume of Anchor =_ a 57 8 W r { $Anchor L"nth 3 l 7 IftT, t Actua1iVolumeofAachor=-- r t 735X1 ILA ,k c AnchoreThkkness tj 15 ft ` k t OKAY r i t STORM DRAINAGE ANALYSIS N omk N er r V w0 W Y d d i W y 0 \/ ,_Hww Mi a E V W r LL� Mx W 3 O 0 M fn Q v v jd a� 10 0 v V v� > 1t!0 ^ CUtN v ttE U� {�UtJ 0 d �= 1 IdN :sit W tiVo, >7 O a0+ v w t7C� iNi- n 010^ !ylC� J � Nnoo i a n ""ply 1 Nn� 'QS to M C ft r vU s�� f M 7L _ itC i 0 ►Ci CL Xy 0.— YJ I� v y S & 3 LVOI � e 3 e n _O �C M W 1vg w3:3N gl O t0 m 5= e M O tN 0 W v' t � 1. O O � mU L,d4� f rE wn IM`Q Ftyif4y � IC.�Cv fy CZ 0. O �N !"0 O Z rs IN CD O CO co O O O O M to to 00 00 00 00 00 N N to IT N N O rNi M .y 00 00 00 cn N .4 Ln M Ln M N V~' N O N I� M 00 00 00 O N .r Ln tk0 M 0% LL 1 N 01 4 0 41 V, Ln O 41 MD o 01 fn 00 cn L-, M n en LMO tip L tM 0 %DD to to tto .� N N O N M O � Ln M0 00 00 07 07 � 1.4 V- Ln t to %00 t D %00 %DD %DD t0 V' O tD M O C %00 LO t0 t0 O t0 to t0 tto O L0 N N O N M q V V, tD M O tD O V0 ' co Ln Vim' t0 l0 W lD Ln N O^ ^ O^ O O O^ O O Cl O O O^ O O^ O O O O O O O O O O O Ln 1-4 Ln O M N O n M ,-i M .�-� M-f . Lt j .1 N M M M M M M M M O O O O O O O O 0 0 0 0 CO 0 0 0 C C C C C C C C N O I +"� CO 4�1 N -4 Ln 0 tD en LO rn t0 t0 Ln Ln Ln tD t0 t0 to t0 t0 tD 00 .4 to t0 V' V' M N M O N O Ln 01 N N M M M M M M M M to t0 t0 0 tD t0 t0 t0 to tD LO %00 v-1 V' O^ co %00 00 %D M M M N O .i O .-4 O .-4 M 41 Ln M Ln N Ln N n Go 000 Otl0 M 00 O t0 t0 N N .� M -4 N Ln .4 ri LD Ln O Ln Ln LOn 00 Ln co Ln 00 Ln N Ln O O O O O O O O O O O O O O O O 00 00 00 00 0o Oo 00 00 O O O O O O O O 00 O1 w w N Ln .ti M .--f N Ln +-+ +A 14 t0 Ln O Ln co LOn LLnn vi l0n toil Ln M Q Q \ Q O %00 o 001 N Q Q Q Q Q Q rn .� O Ln M N 3 = 0^0 m O] m m 0] _ n t0 UY V' M N } = lb m M M m m ce LY w 0) c%j cow H _ m 0W(L w� J w N U O V) N CD 0) to ID LO LO A 0 N d t NQ r C O to �m co 0 O L d CI 20 N W S U 0 C N N N N 5 !A c �O _ T C am m E U E T co N U r 0 c 0 t O lu m m U Q N � O a0 e '- A J O zt W N O N N p n N N x X N O a O 7 O N N n V N CD O(OD 7 n� 3 N N ' 3,c vy ,y mod 5n O O. 8 *9 �o aQ N N O � 1° 0,CD V �. CA c0 N C D CD m C N N O v C N m m -o°mn 03 fO -t N fD N ANN M W N M .N.. 9 N 0 N �D �f N 0 i /\ V N /% N r r r r O H 1 E ho O H 1 O O N _0 /i i Q O H cc rr ryy w^ W 0 W 3 V N LL'1 N N M O C O W � N F � N Uoa J W N N W M N W 0 0 N W V t0 .-4 N N N O N W N W n N M O -4 N t0 W tO N N N t0 W t0 O1 co 01 Ln Ln .4 t0 t0 N Ln N m .-1 W V' r1 O N -4 V- LD N W M N W N +�-1 N .--1 tD n V' W .-4 Ln n 01 Ot V' W M n m m .-4 O m W N m N i 0 � � O m ^ aF W O O O O tp tp O 0 M n In W t0 Ln M M M M M y N O W n N N M W 0 0 0 0 0 0 0 N O O %D O O O O N V' O Qt M n O W O� W Ln M co co M W V M O M N t0 M n M W to O O O O O In n t0 W tD O Ln M N a U �. •� � m i^ �' 0 0 0 0 W W M o O N N N In G o m m t0 M M O M o M N W o N M I N t0 W o 0 0 0 o O W t0 o 0 -1 0 o O M O O O1 W M V' O 01 M n 0 0 0 V' W N W W O o to M o o" LO N W O ^ aa� �-' Ln M O O O O O N N W O LO O O M M Cl) N o M V' M M N M M V' M M M M V- N N M M M Ln N N M V' V- V- V- V' V' M M M M M M W W W V- Ln M Ln -4 -4 t! -1 V- n O Ln 01 V- 01 N N Ln 01 N M M M o N .-L r4 Ln N N LO Ln Ln n 01 t0 N N Ln t0 N M r1 to W O W 01 V- r'1 O Ln 01 N n W Ol N 01 01 N O 01 Ln t0 V• o N W ON M V- N V- M W n N V- M O w Ln n 01 N Ln t0 O J O .1 .-4 O .4 V- 01 N N W ~ O W t0 Ln o W N .y .� .-1 O O .-1 r1 r-1 01 Ol N 01 to t0 t0 W W o '4 ri r-1 r1 O O o t0 Ln v V" M N Ln V' '-1 n to W O to� M M tip LSO LD� %D W tWO %D LD W M M� kD M M M M to w w w w tW0 Lop tD w M M�� T (� w w tWp tW0 tW0 LWO %00 W S C C G^ 01 01 O V' O r-1 W .� .-i V' V' V- r-1 V- V' V' V' �-4 W t0 V' W t0 O et Ot O O OL t0 0 M o O M W O M +4 -4 O V- O O N M N O O O W t0 N 01 �-1 �--� �--� W 01 �--� �--� '4 �-+ N t0 f� O n t0 O L0 +--� V' V' +--� M t0 Ln M O W Ln O M Ot 01 M N K M I� !vn Ln M -1 0V0- M V- N .-� r Ln Ln Ln V' V' Ln Ln Ln Ln r-I N 00 W W .� t0 LO t0 t0 Ln Ln Ln m o N N t0 Ln M N Ln M M w Ln tD t0 t0 t0 t0 M W t0 t0 tD t0 tD t0 tp tD LO t0 t0 t0 t0 t0 M M t0 W � M C7 t0 t0 t0 LO LO t0 %D t0 t0 t0 t0 t0 LO W %D W W t0 W W U y C .-1 w CO W r-1 W O M Ln W V' -i Ln W M 01 W N O M t0 Ln M n t0 Ln W n co Ul n V' N t0 r4 W N t0 W M Ln W Ln Ln O1 t0 01 t0 .-1 Ln -4 01 N to M O W N Ln M 01 .-1 .-1 Ln V' M T t0 .-4 M O tD M N 01 Ln M O O N t0 M W N V- t0 W t0 O aj W Ln Ln Ln Ln VNi tWO t�D M M M tm0 tw0 tko 00 two w Lw0 w 00 w to � w two two I M I M M � ID %00 t00 %D tW0 VD %DD t%0 tip W LSO tD j. C7 E t%0 %D %D %D t0 %00 LWD S J C C M Cl ON O V- r4 Ln W V' V- IT V' V- *-1 V- V- 4 Ln N O t0 O V t0 V- tD 01 O o ON LO tD .--1 o O Ln W O N .-1 r1 O V' O t0 M M N O O W W t0 r-1 ON r-1 .-4 .A . 01 .-4 .-4 W M W O N O� W N M +--1 T V' +-1 M t0 N M O W Ln o m 01 O1 M n Ln W pp ^ p y Ln Ln M r4 co V- M N Ln V- Ln Ln Ln Ln r Ln Ln V- r-1 N 01 VWV�� m Ln .� V' Ln o tD to tD Ln Ln -4 O1 M N N t0 M M N Ln M Ln Ln Ln Ln t0 tD t0 t0 t0 Ln Ln l0 M tD w LSO kD %0 M tko w D to Ln w two two 00 � M Ln LvA tD w 00 two 00 W W to to ttoo tD 0 W W W t0 tp t0 tO t0 t0 t0 t0 t0 tD tp t0 t0 tp W tD t0 t0 t0 t0 t0 tD t0 W W W W W W W W W w 4 N- N o O-4 N o 0 0 0 0 0 0 0 M T .^-I N .-,-1 tp O O O Ln O O O O O o O M M N N Ln M 0 0 0$� O Ln N O CD g -4 o 0 0 o O o O o 0 o O o 0 o O o 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -4 Ln o o O o 0 o O Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl O O o 0 0 0 0 Cl 0 0 0 0 o O o 0 0 o O o o O o 0 .. y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 0 o O o 0 0 O1 N N .q t0 W LO Ln O t0 O W t0 01 Ln O W W W N Ln W ^ C .--1 N V Ol M V ­1 V- N N Ln W W 01 .-1 N '-1 o .-1 01 Ln W V- .-1 tD N -4 -4 M N V' N r4 V' N .� N ri V- V- -4 N M N N M Q �--1 N .-1 V' N N Ln M -4 V- -4 V- M V' V- W M N oil C v v (O L/f al M M M M M N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N M M M M M M N •--L . i rl r1 rl .-4 -4 ri rd -1-4 .-1 -4 r1 rl -1 r4 H -4 .-1 rl -4 •-4 -4 r1 -4 •4 .--1 H r-L ri -4 . 4 -4 e-1 -4 -4 r4 ri ri r-1 r1 . q -4 -, "4 C o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 f C C O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M C 10 N � N + U V U V U U V U L L U U U L L U U V L L L L L U U t L L U U U U U U U U V V U V U U U U V V U Ltp 0 In C C C� C C C C C C C C C C C _ C C Cc C C C C C C C C C C C C C C C C C 7 n N v In In Ln W W N N N O O O O O N N N o o N N N N N N N N N V- O N N co W O -4 -4 -4 H V' r4 �4 r4 W W -4 .-a ,-4 W 00 +-4 .4 .--1 W W W W W .-1 .-4 W W W .-4 .-i .-1 .-4 r1 r-1 .-1 rl r-1 r1 r1 N M V' V' V' r1 r1 O m In O N F- m V- Ln V- O Ln N .A N r1 V' tD O co M t0 W W -1 W Ln V- Ln V' o 0 Ln .--1 M 01 o co M 0 0 Ln W O 01 Ln .-1 O M o V' M L U 01 O n Ln O Ln N N N -4 Ln N r4 r1 O V- n n N -4 O Ln o M 0 W r4 -q N Ln O n o M o W Ln o W -4 W O tD N N t0 E G� 30 0 01 N M 01 W N r1 r-1 0 o O +--i ri o VWV-- W N 01 Ln M VWV�� W O -4 +-4 O O o 01 0 M M M M N r4 M .-4 VWV�� VMV�� 01 N M M to � � � M M M W ttoo %W0 tk0 ttoo tko LkO L%O too W w W W tk0 to tko tko W L%O LSO W W t0 to tD t0 tk0 t0 LO L�0 t%0 m N IH C v >>� N > 0 i3 N V- Ln V- O W M N N N n V- V' t0 n W t0 t0 Ln Ln N M Ln M +-1 V- O 01 Ln v LM N O W r1 0 0 Ln W O V- Ln .4 O M O M .-1 n O Ln O Ot Ln N V' N O1 Ln N V- r1 W V- Ln W M M O M t0 M .--1 LO N 01 n V- O N N M o W Ln O W t0 to W .-4 O O C 02 E 7 t' m > t"' r4 O 01 n M Ol W W �--i �--L O O o m-1 .-� O O 01 N 01 Ln Ln LVn- W W -4 .--1 -1 0 0 0 0 01 N Ln Ln M M N M N O n V- O o � � M M M %00 t%0 LSO %D %00 %00 tk0 tk0 t00 LWO LSO to � M M M M M %D %DD tWo kD tD %DD to LWD Lko tko two ttoo two L%O to t%0 tD M M N 0) T > c G v %DD t�D CO c T � N T C C ^ 3^ M M .-1 4m T r1 to Ln O t0 W N t0 � O V' M �-1 W O N m N t0 N N N N O1 V- Ln N N V- N 7 N O L, Ln M t0 t0 O Ln 1-4 01 N o N n O N N O 0 M .-1 W t0 N o W M N 01 W 0\ O O n W Ln M M .--1 M 01 .4 t0 eY W t0 -4 N N N V- t0 01 o m E ,� U 0 V1 Ln Ln M N t0 N -4 M r4 O r1 -4 0 0 0 r-1 M Ln r-1 H o O O O O N O o -4 O N -4 -4 V' V- M N M o N N W N M -4 o O U (�x LL M rl r�4 .�-I W �Of�. . E Ll P-F, N In N M O t0 V- W LO W W t0 01 t0 O .--1 01 W N N .4 V' N �-�1 W V' N M W -4 M V' M N W .-1 O Ln N Ln r1 N N Ln Ln tD 0 co N Ufp^ o VM- M LLn OM1 v, LLnn V N V' LNn M co Ln T M N N co N V, N OW1 OW1 � M LLn V' t00 V' LOn LOn v, en M LNn v- 0a1 Oo1 � M M OW1 OW1 COLL �.\i LL v ^ 3 yL M O1 M M M Ln M M M Ln m In N M N M tp 1- N M O N N t0 M W M N V' t0 Ln W W W 01 W 01 n M t0 O O to O M M W W M Ln M tD Ol N Ln M n �--1 V' .-i M .-'1 V' n M W n M V' n 01 V' n 01 W co .--I .-1 V' W M N m v Ln 01 m o Ln Ln O M �--i N N O o o �--1 r1 0 0 �-i �--1 N O O O O O M M o 0 0 0 e-1 v--I r1 +-1 N N M M M M N N J LL v� N N Ln w w E C ^ O O O O O O O O O O o O O O O O O O O o O o o O O O O O O O O O O O O O O O O O O o O O O O O O O O O O O O O O O O o O O O O O O O o o O O o O O o O O O O O o O O O O o O O O O O O O v 3 3 LL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 o O o 10 O O O O -4 O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O1 01 -4 .-i rl 0 0 O O O O .-1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 V' N N N O Ln E 0 3 T 0 0 0 0-1 0 0 0 0 0 0 o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O Ln oN ai o N Q O In N� OD LL Ln -iO Q E t0 ^ M O1 Ln N N m m M .-1 Ln m m N N .-1 M r1 N M W -4 00 O 01 N t0 M W M +-1 'T M W M W W W 01 M O t0 N W O O M O M M N W M M M t0 01 N Ln M n -4 V' r-1 M V- n M W N M V- n 4M V- N 01 W W -4 .-1 V- t0 M M M N M Ol O O D C m O Ln Ln Ol N �-4 N N o o o +-1 .-4 o o .--I .--1 N O o o 0 o M M 0 0 0 0 .--1 .-1 .-I r-I N N M M M M V- Ln to 01 m N o LL v E U N n ON V- V- o ^ O O O O O O O o 0 0 0 0 0^ o O^ O m 0 0 N 0 0 ^ ^^ O ^ O O Ln N .-+ 01 O^ M M M o W Ln Q Q O Ln O O O O Ln 0 o Ln O O O Q O O Q O Ln 0 o LO o O Q Q Q o Q o 0 V- M N Q N 01 Q n n W N n z I- -- �+ N Z Z O N 0 0 0 0 n 0 0 n O O o Z o O Z O W O o W o O-- o O O n N n Ln to Z Z O O O O O o �. .--� O .--1 .--1 +� .-+ o -4 -4 O �--1 r1 r-1 H r-I r1 O r4 .-I O �-1 ri Z .4 Z .--1 .-I O O o Z O O Z O- ►C1 E m i. N n n O W M ^ 01 n m N .4 M N W ^ Ln v ^ Ln W m Ln m O V- ^ ^ ^ m ^ Ln N Ln o Ln LO v^ O Ln Ln N W tD Q Q V- M M Ln M O 01 t0 V- t0 V- N m Q Ln M Q v n M M N V- M Q Q Q Q Q Q a V- V- M W W �--1 M m -4 r-1 O O r'1 O Z Z O O O O O O O O O o 0 0 0 Z O O --o 0 0 0 0 0 0 Z v Z O Z o 0 0 .-4 N Z O Ln 0 0 0 0 0 0 O O o O O O O O O O O O O O o 0 o O O o O O U - O O O O O O O O .z O- U N Z M M N _q N '~ M N t0 W n t0 m 'q -4 O-4 N N W N -4 N -4 r1 N O -4 -4-1 -4 _q 1--4 1 1N4 m T M N r-I M� U y '- n. O O m J J J J J J J J J J J J J m m Xx S Co xx S O W X U W Z U o lA m m m Q Q U 0 0 U U U U U U U U U U 0 0 W Q W U m 0 0 no 0 0 0 0 On 0 0 0 m LL LL LL LL LL LL LL N N O Z M Q M N r1 O O r-1 N 01 W N t0 Ln V- M V- M N .-4 N 05 N 01 W n t0 Ln .--1 .-4 .-i .-1 M N N N r1 M N +1 N rl .4 r-1 .-1 r-1 .--0 .-1 t0 m q M N .-4 Ln U m m m m m D J J J D J J J J D J J D J J J O J J O J J J J J J J J J J J J J J m m x = m m O d' p.' L] Q O 04 U W= U U m m m m Q U O O D U U U U U U U U U O O W W W U U O O O O O O O O 6 6 0 0 0 0 LL LL LL LL LL LL LL to 0 v H .. N P P P P O H L O H aI N N i Q E O I� N V H u x L6 3 V O v �. m tD N m m O O O h, 4 N 1 Ln O Ln 01 O tD h v M h .1 N Ln tM0 v I N m !OA M O 01 10 h Ln t0 tD v 10 v M W W Ln In h h b y tD 00 Ln N O W 00 /D Ln M O .1 N Ln M ^ LA N M h m r4 Ln m t0 .1 .-a 11 r1 r4 . q -4 M M Ln t0 Ln � m h h M LA 7 Q v a.. L^ N 0. ^ m v O 01 N m tD W t0 O O O 01 M m tD m O N O N" t0 O O W W M O W Ln W O Ln M O O m Ln I. O o LM M tD h M Ln v W .1 m t0 N O " Ln h Ln O V' 01 M N N N h Ln O O 00 N Ln h h M o Ln W Ln .1 V' oo .1 M O Ln W M t0 V OF) W M M M t0 V• Ln t0 M M N N .1 N N .� .--� N �' M M M M t0 tr t0 Ln Ln 01 W h In N N N M M M O V t0 M M 01 tD W tD o 0 0 01 M 01 V- o O N O 0 O O O tD O o N 0 Ln g m 0 0 0 m Ln v 0 0 m m M O M- h Ln N -4 W r N M h m h N M O o N O o h m O o O M 0 0 -1 Ln o h o W Ln 0 01 11 M M m W" v h M M v Ln t0 v t0 tD fn M N N N M M M V' M M M V- M M M t0 Ln Ln T h v M Ln M N N M M M Ln V• V' U w ^ O M N ON1 N LMn n 00 Lhn 000 O -4 r w M M N Ln N %DD N 01 too Ln n 001 N N M w n V .M-1 M O th0 w v- O v LLn N-4 J O " Ln M M 01 W h V' N .4 O O m W W h to 01 O .1 O +1 N .1 m t0 N to W 01 01 h Ln h m 01 .1 M N N N N N 01 01 m m W W m m Ln In Ln Ln m Ln c� r Ln Ln Ln Ln %0 tD Ln Ln Ln Ln Ln U1 Ln In Ln Ln Ln Ln tD tD tD t0 tD 10 t0 Ln Ln Ln � ip � t0 10 10 0 10 0 w 0 0 10 t0 t0 t� t� t� t0 t0 to t0 10 tD t0 t0 10 tD t0 t0 t0 t0 t0 0 0 t0 t0 t0 t0 t0 W W t0 t0 t0 t0 c O a .� 1 C O. I .4 Ln O V' O m Ln O O O O O O o 0 v O O Ln O Ln O O Ln O O Ln O O 00 m N m h 00 N M 00 M M N M Ln Ln 01 01 01 M Ln h .-L O o O Ln Ln O O Ln O O Ln h o t, Ln Ln m O O F, Ln Ln .� -4 m .1 01 " 01 h h 0% m M m 00 00 p ^ e Ln t0 t0 Ln .-� N O Ln V' N N .� -1 01 00 �+ N Ln T Ln W tD N O O r+ Ln Ln Ln Ln M Ln Ln V' Ln Ln Ln Ln tD Ln M M tto � tto t%0 %00 tk0 � tto LD a t%0 %DD tk0 %DD w two 1w0 00 `�w w ttoo t00 t00 t0D t00 t00 t00 VD tto ta0 100 Im two t00 1w0 t00 t00 t00 t00 tto W tk0 t00 t00 u ^ c tD O 01 Ln M 01 o M 01 -q W W co h M t0 Ln - t0 g M .1 N Ln t0 00 O tD 01 Ln h 01 Ln V' o Ln M Ln T 01 h 01 N Ln 01 V' Ln N V' O .1 h N M 00 O V- o M 10 M tD M M N M -1 Ln h h V' Ln O O N N N M 6 V' N 01 y ^ .1 t0 V' M M tD T +� M M ti 01 W 10 Ln N O O 01 O1 W h t0 01 O N .1 N M N ti 01 N h W -1 .1 O h 01 01 01 N M N N N N N 01 01 01 100 wwwtm0wwwwwww � � wwwwtWDtk0t0Dwwwwt00t m0wwwwwlOD%0%DDtm0tW0tm0tW0www C fl h Ln Ln N W O Ln Ln 0 0 0 0 0 0 0 0 0 Ln Ln Ln Ln O O O Ln O Ln 00 O O Ln 01 V Q h h O M 00 M M M M V' N p ^ a C ^ �� h m m M .1 Ln h +1 0 O O Ln Ln o O Ln o V' h h h Ln Ln Ln 01 Ln h Ln Ln Ln W .1 O M 01 01 O h h 01 01 01 Ln t0 00 Ln to t0 tD Ln Ln .1 N O Ln v N N r-1 .-1 01 M M Ln Ln Ln tD t0 tD N to rl Ln 10 tD M Ln Ln V' V' to Ln Ln Ln Ln Ln Ln M WW���W���wwwwwwIwwwwwto��Wwkotokokokokokoko�toko������W� w E' RRE, O O O O o N 0 Ln O �--1 0 0 0 0 0 .1 M M N Ln r-L .-+ Ln V' -1 X 0 0 0 Ln V' O W h 0 0 0 'O O O fn o 0 01 O .-I r-1 .1 .1 N v N - .-1 .1 .1 - .� .1 W -i Ln Ln Ln N N Ln Ln +1 o .1 O O V' N t0 O O .1 -, .1 .1 .-L .1 M -, � t0 O _1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .1 .-L x 0 0 0 0 0 0 0 0 0 0 0 0 0 0 in.. o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .. O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M V' -1 O h r4 h h tD V' 00 O 01 V' t0 M W 01 M V' N V' �1 t0 Ln V' Ln h -q h h O W W Cl h V' h 01 h t0 N 01 h C M M N M h v- Ln 1D Ln Ln M N Ln Ln 00 tD .-L N +1 N M V' M Ln M N N .1 N W h V' Ln M M N .-i N N N J v N N N N M M M M M M M M M M M M M N N N N N N N N N M M M N N M M M M M M N N N N N N N N N C e-1 -4 .-1 r1 ti r-1 . 4 . 4 .--4 . 4 r 4 . 4 .-1 r l .-1 .- 4 r1 r 4 . 4 H rA r-1 . 4 r l r4 r 4 e 4 r1 e 4 r1 r-1 •-1 N r1 14 r-1 r4 r-1 r1 -4 ri r-I o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c c o 0 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c m c LT p y O L L L L L L L L L L L L L L L L L L L L L L L L L L L L L V L L u u u u u u u u u u u u u V L =.r- L L L L L u u u L L u u u u u u L L V u u L V V L +� c u u c c c c c c c c c c c c c c u u u u u u u u c c c u u c c c c c c u u c c c u c c u c c c c c c c c c =_ rq c c c c c c O4 O O O -1� N N -4 ti ti •11 -1.1 v V' V V' v V' v V" V' v v W W W W W W W W v W W .-1 .�-I W W W .N-1 W E M 0C1 n %00 v O w ONO N Lon 001 Lon h Ohl 01 O-4 M 000 -i 000 ti N N M w m V" -1 n doo � Oho V' W tD N 0a1 n q, n W LNn Ln 9 F wwwwwww www��wwwwwwwwwwww�kotokowwwwww c 3 0 M W V .-4 O h t0 M N V O O O- h M W W t0 W M N h W O m N M M M m v Ln h M M t0 N Ln o t0 M .1 O t0 N 01 01 N V' 01 V' t0 O M h M In h h 00 h 0 W O W .-� N N O N h W W h t0 W M t0 01 h V' O 01 h 01 O W O t' N_ h M N O W m M N m 00 h t0 t0 Ln M W 01 N O N N N .-� 01 N h m O 0 h Ln W M W .1 N N N .1 .1 .1 01 W 01 � w�towwwww � �� wwwko�wwwwwwwwwwwwwtowtowwwwww D u ^ +-+ 01 h h W Ln tD V 0 co 01 N M 00 .1 t0 M r-1 Ln v 01 N t0 h N 01 00 h N V M N h �Q O Ln O1 t0 m -i r .--1 M t0 r4 N Ln N o o ff O O-1 N V' M V' 0\ N V' -1 •1 W t0 to � .1 N N N .-�L N N O Ln 01 M M 01 Ln v M N Ln o 0 O 0 0 N en XV QLL m �1 N h h N N N N �1 �--1 �1 .1 N N N -4 1-1 W v u 01 00 V- 10 tD N .i N h m t0 m W V' V' M v O o W V' Ln W 0 M M h h h M M 01 IT M t0 O L, M 01 t0 M O co h O ^ V Lc ^c O tp .--L M Z& Ln r-1 W 0 h t0 W W M M M� tD N r1 01 0 W N M h �--1 O h 01 co t0 O h 01 .--I r o M �1 h t0 01 h Ln M .1 V' �1 h Ln M V' h h h h 00 00 00 h N .1 N r-I M M M h +1 M Ln -4 M Ln .-1 Ln W Ln t0 h r-1 V' Ln a LL v a - 3 N O N V' M h Ln O 01 M N N 00 h M O Ln M 01 tD Ln 01 h M r+ .-L r1 Ln M N O O V' Ln 01 T r1 N Ln W tD W N M h In N Ln W .1 t0 h tD V' V" o M M 01 01 00 00 M M t0 N M h O O 00 V" -1 M CO M M 10 .1 N h h o N V' M 01 N -1 S-- p h o 0 V' Ln t0 tD 00 W m 01 01 M M M V' O o 0 0 0 0 0 0 -i 0 0 co 01 .1 N en O O 1 ri 0 .1 N O LL v iLv' h h h h h h h h 00 00 00 h .1 r1 E C ^ O O O O O O O O o O o O O O O O O O O O O O O O o O O O O O O O O O O O O O O O O O O O O O O O o O O O o O O O O O O O O O o O O O O O O o O O O O O O O O O O O o O O O O O o O O d 3 3 oM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 0 0 0 o O o 0 0 0 0 0 0 0 0 o O o 0 0 0 0 m O o 0 0 0 .-. r+ .1 .1 -4 -4 -4 O o 0 0 0 0 o 0 0 0 0 1 0 0 01 01 0 0 0 0 0 0 0 0 0 0 0 0 0 Ln o 0 0 0 -4 .4 .1 -4 -4 .1 .1 .1 .1 .-1 00 0 0 0 0 0 0 0 0 0-1 0 0 01 01 0 0 0 0 0 0 0 0 0 0 0 o 0 h O o 0 0 ^ ^ ^ ^ ^ ^ ^ ^^^ ^ 0 0 0 0 0 0 0 0 0 0 0^ o o Ln Ln 0 0 0 0 0 o 0 0 0 0 0 0 0 o\ Q E jp O N V' M h V O M M .1 N h h N 01 V M M W Ln 01 h M .4 .-1 .-1 m M N O -1 m Ln m y r-+ N In W t0 N M h o N W W .1 m t0 m M M m N N W h h W M M t0 N M h O O W r O M W M 01 t0 .1 N h h O N V' 00 M 01 N .1 ^ M c 3 O O O .1 v v m Ln h h h W W N N N V 0 0 0 0 0 0 r4 -1 0 0 0 0 o N M .1 N M o 0 _I .1 _I O_4 N O U ^ O O^ �--1 h ^ ^ ^ ^ ^ ^ ^ ^^ O o 0^ O x 0 0^ M 01 D O O M .1 h v W O O N O O ^ O Q O o Q h a Q Q Q Q Q Q Q Q O 0 0 Q o 0 0 0 Q N m O O Q Q a Q m .1 .-1 M O 00 01 O O h O O 0 Z O O .Z t0 tD Z Z Z Z Z v v v Z O O O Z O O O O Z In h h O O h Z h W t0 t0 O 01 h o Z O v Z O O O O ._. ... v .-i .1 .1 .1 .-� .1 .� O O O .-a .1 O 0 O O O .-i o O aS 5 L0 E ^ ^ .1 W ^ t0 v W ^ ^ ^ ^ ^ ^ ^ N m -4 ^ -4 N .1 .1 M h Ln m M W ^ m Ln m � m M M t0 v ^ V' Q M V- a M .1 v Q Q Q a a Q Q Q Q W m Ln Q v m Ln v a N W 0 V- .1 Ln Q .1 W h N Ln V- N Q Ln Q Q N N Q N 0p a Z a Q a Z Z Z Z Z Z Z Z v tO o O Z 0 0 0 0 Z N 0 0 0 .1 d• Z M O O .1 O O O O Z O Z --o O O O O o 0 0- 0 O O O O O O O O O o 0 0 0- 0 0 d m � w d Z V' N .01 .W1 .M1 r, .1 Oj 01 co h t0 Ln [}1' M N Ln h N W N M N N O O W tD m o 0„a0 ry ,-1 d .N-I .M-1 .Mi .�-L In .W.1 .�-1 .W1 Oa0 OQ0 m J J m m m 2 S 2 S 2 S S= S m S 2 O 2 O J J O S 2 m m m m 2 m S m m m m m J O S O J _L J O Uo� W U U U x x x x x_ x r x U z x U z U d' w Uz: z C, U U U z U z U U U U U w U x U w w w V) T LLaaaaaQ aaaQaaaa aaa aaQaQaaaaaaaLLLLLL.aaaaaaQaa000 a) O Z .1 O V' M N m W h tD M y M N M Ln tD .1 O 01 W h N V' M M Q m U Lan tmn LUn Qai Om1 OU1 W h m N O m CO r1 L N N N N N M M N N N M M M M tD 0 -4 -4 +1 �-4 .4 -4 00 -4 -1 W O J J= m m m 2 S S 2 S 2 S 2 S _L J J O J J J J O m m -i J m 2 m m m m J m m J O J J J -1 U U o' w U x U U U U w U U o' U 0Y 0�0� 0Y W LL Q Q Q Q a Q Q Q Q a Q Q Q a Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q LL LL LL a a a a a a Q a Q 0 N h N N M O C O N N F- '- N Uoa w. J W Ln U O fA T LU N a�i Q U�C O 10 7 0) O n O N -a L) 0 N 20 (� ayi � Lo 3 x U O C O N N w E !n c aTi � T C C N a m O U O N n N U N r 0 �n ON CA O O O L H L 0 r O L v H y�o cow N � l0 U p O_ LU J W N co Q U 0 y T w c N m N + NQ L) (1) om co N F -0() t� �r am m� aNi � U O C N .2 aEi 5 m = T 0 N T 0a mE 0 U _ 0 E d CO n N U N N O d N ON � O N_ O � RIPRAP CALCULATIONS Ch I if Madison Square @ Northlake ¢ 19n CJS PROJECT NO 4026 *ColeJenest w Im 9t DATE 112111 BY RBH & Stone REVISED XX XX XX RVW CJT L d PI g L d cap Arch t t Cry I E g g U b 0 sig FESIHW # DIA DIA 010 Tallwater Depth Aron Length Aron Width d50 Stone A ron Class 4 In ft CFS Tw feet La Feet Wa Feet Size In Thickness In 16 R HW 1 42 in 35 ft 44 CFS 070 ft 37 ft 47 It 8 in 16 in B R HW 9 15m 13 ft 1 CFS 025 ft 10" 13 ft 0 In 10 A P HW 1 36 in 30 R 59 CFS 060 ft 41 ft 50 It 17 in 34 In 2 A HW f 48 In 40 ft 95 CFS 050 ft 49 ft 61 ft 26 In 52 in 2 XXX 0 in 0 0 R 0 CFS 000 ft #DIV/01 #DIV /01 #DIV /01 #DIV /01 #DIV /01 XXX 0 In 0 0 ft 0 CFS 000 ft #DIV101 #DIV /01 #DIV /01 #DIV /01 #DIVIOt XXX 0 in 0 0 If 0 CFS 000 ft #DIV /01 #DIV 101 #DIV/01 #DIV /01 #DIV 101 XXX O In 00 ft 0 CFS 000 ft #DIV /01 #DIV /01 #DIV101 #DIV 101 #DIV101 XXX O In 00 ft 0 CFS 000 ft #DIV /O! #DIV 101 #DIV101 #DIV101 #DIV101 NOTES Apron Lenth IF TW <Do /2 La =(1 Bq /(Do^ 5)) +7Do IF TW>Do /2 La= (3q 1(Do^ 5)) Apron Width If TW <Do 12 Wa = 3Do + La If TW > Do /2 Wa = 3Do+ 0 4La Class dso = 0 0161TW x (q)1 33 Apron Thickness Minimum 10 q =Unit Discharge In cfs per foot of width Filter fabric layer is to be used on all outlets Riprap apron thickness designed to be 2 times the d50 when using filter fabric (3 times without) RIP RAP GRADATION PER NCDOT SPECIFICATIONS RIP RAP CLASS MINIMUM MIDRANGE MAXIMUM (IN) IN) (IN) A 2 4 6 B 6 a 11 1 6 10 16 2 1 9 1 14 1 23 STORMWATER DETENTION & WATER QUALITY HYDROLOGIC ANALYSIS Ch rl t[e Circle South Park *ColeJenest R legh CJS PROJECT NO 4008 Wdm ngton DATE 112111 BY VKH & Stone REVISED 01 11 12 RVW CJT Land Planning + Landscape Architecture + Civil Engineering + Urban Design DRAINAGE AREAS SOIL TYPES (see attached drainage area map) BPredeveloped Drainage Area = 1780 acres 0 027813 sq miles Drainage Area= 1778 acres 0 027781 sa miles (see attached soils map) Basin #1 Area % I Soil Type I Hydrologic Soil Group 20 CUB I B 50 IUB ( CID 20 WuD I D 008 00 i I CURVE NUMBER Predeveloped CN BASIN #1 Cover T e % Im erwo Area ac %Total !m Area CN Wtd CN Woods /Grass Combination (good B 0 146 008 00 58 48 Woods /Grass Combination (good C) 0 116 065 00 72 469 Woods /Grass Combination (good D) 0 474 027 00 79 21 0 Total 100 178 078 00 98 727 Total 1778 Use CN = 73 Postdeveloped CN BASIN #1 Cover Type % lm ervio Area ac % Total IMP Area CN Wtd CN Grass HSG B 0 095 005 000 61 33 Grass HSG C 0 17 010 000 74 71 Grass HSG D 0 127 007 000 80 57 Impervious HSG B 100 1386 078 1386 98 764 Total 1778 13 86 924 11 H Use CN = 92 — / /Obi cb to O cu cu Lo o cu LO W / t 3 °N° V) i 00 a CL o Nt ASSEMBL ST 4-J y aJ pr al: U < / �\�� \\ \ \�� \ �� III �__ \ \t #� ♦f ii / /i�� —�' \'� ' � t � 1. �� {f{ i ' 1�/ \�� d J _lam- '_llj� � � _�_ ' =- __�%%�/ ���- I ; �� i a� / / ' � ♦-- ►�' 1 ( leg MOM iA �' /�i ice- ��i /i � •'r r� /i"% f „f � /� � % /// / !"/ %'i �- / //� � es � tea♦/ l t �� / ���, hio ., . c_ II T sa teu wd rc a m /v /n nn c n a Hn 6mo a 4 Qn \ wn\jaiemuuorc�6uuaau 6u \Qnn 1 n cncl bon J CL ° J \ \ Xl > 1 CL Ai� ASoE L E ST /I 1 / \I PM a TOE r O W SZ CL oe ri lz SA o ` Rb- MR I � �Ica %// "✓'`" ! ,,,.� -,rte �.� .�, ` "'" "� �.�- E \�, +� €\ € { � ' // /� \�\ \ � � I1' € i \\/ � � I l J ! t ��,,�` /k( k/� /�i ..^. t_f�i E ""►. r !E "�I i € �I i�� J ! \1 AW %f 0 0 M Lo 0 o u Lf' W U y o 00 N 0 v 00 0 0 0 z (i O CL U u L O 0 V v u u v � U U N d= T ka AeXwd QT >T 0 Tn>IC> /nT An -,4r n cn Hn'6nno cnA a�n\ a Mw mc16 as 6 \a n vcnct I ii tIa tI 1 UC�dR r-'�7j1 �: � i l H it � � iil tt i Xti. T• 11t l' , _ Al, �l 9 S aI E u City of Charlotte Land Development Division Post Construction Controls / Detention Worksheet The following sections help to provide information on volume and peak controls for the site Attach BMP Inset tables and Design Procedure Forms for each BMP to show that each is sized appropriately per the design requirements Description Attach bi detention plans and M W(+1 M f4 "'M11y devi(or m e'm sto rymOmer d ete.�-h �-� PonoQ Skca J Corn •h-cd Post - d,�l e l c wl e.►-vrt f1c-w -�-r 50 Yea. - s-izrr m NW e l PwoseO P o noL oil So r e_Ce tV e,,S -C) TW ol.e -+w'vi e J o PM&A -f, , V3 r' k W� I l b e- PRE - DEVELOPED SUMMARY R eAn a-yd Tow A- Ce4vtf r Basin area 17 1&0 Q-C re-S ac (Delineated on attached drainage area map) Time of Concentration, Tcpre ?-I (o min (Based on the SCS Method) (Tc path shown on attached map) Reference 3 9 6 of the Charlotte Mecklenburg Storm Water Design Manual — SCS Travel Time Curve Number, Cnpre °7 3 POST - DEVELOPED SUMMARY Basin area 13.718� ac (Delineated on attached drainage area map) Time of Concentration, Tcpost min (Based on the SCS Method) (Tc path shown on attached map) Reference 3 9 6 of the Charlotte Mecklenburg Storm Water Design Manual — SCS Travel Time Runoff Coefficient Rv 075 Water Quality Volume WQv (ac ft) 1 ( I Curve Number, Cnpost q 2 Curve Number CNpost(modified) 9 Ff Channel Protection Volume CPv (ac ft) a. to 2; CPv Release Rate (cfs) 0 %,A S DETENTION SUMMARY Computer Method Used* *Land Development Plan Review Staff will Section 12 6 This suniniary is to accompany CAD v all detention submittals using HEC 1 for compliance with the City of Chat lotle Zoning Oi drnance detention analysis and is not intended to replace that i equirennent Note 2 yeat slot in is i egrured only for sites i equm ed detention pet Chapter 12 of the zoning oi drnance If a domist? eatrr analysis has been petfoi nred submit complete justification for the results Revised October 2010 Page 1 of 3 Pre (cfs) Post (cfs) Routed (cfs) Elevation (Comments) I N/A 9,D -7 (o I (o &44 40 1 yr N/A -1555 $ OK b.4 1 199 2 yr q, 31 5$ -7 $ g� (44 91 10 yr Rq 3& 9(, 73 BS' 39 04(0 12 25 yr 1t 0 12 1 15 91 35 93 64 (0 7 2 50 yr +9 7(o 1201 10 4(o O4 X04 7 11 100 yr N/A 144 (o s &A 7 39 Note 2 yeat slot in is i egrured only for sites i equm ed detention pet Chapter 12 of the zoning oi drnance If a domist? eatrr analysis has been petfoi nred submit complete justification for the results Revised October 2010 Page 1 of 3 PRE DEVELOPED SUB BASIN CALCULATIONS Sub basin Name /Level 1 (Coordinate with attached drainage area map) Type of Flow Travel Length (ft) Sloe ( %) Mannmgs (n) Time (min) Sheet Unpaved too 5 D 2 g S$ Sheet Paved II (o ' —'�- Shallow Conc (Unpaved) 4o5 5 ^ W LAD Shallow Conc (Paved) 7 9 2, 1 0 2-7 Channel Channel �^ '� 57 Pipe Pipe f 09 77 -3(10 TOTAL N/A N/A N/A Tc pre = .2 t Acreage Land Use Sod Type Hydrologic Group CN Weighted CN (A g /r 1 I Are ) (CN) V2o rays g S$ 47,5 II (o ' G 72 4 &92 34 `' W LAD D 7 9 2, 1 0 2-7 Channel D 8-0 57 Pipe CNPre = 73 POST DEVELOPED SUB BASIN CALCULATIONS Sub basin Name /Level A (Coordinate with attached drainage area map) )K ksS1A,IrYI e Y%11 h I L- cJ min Type of Flow Travel Length (ft) Slope ( %) Mannmgs (n) Time (min) Sheet Unpaved Sheet Paved 095 (-I Vass Shallow Conc (Unpaved) S3 1 -7 Gras Shallow Conc Paved C- -71 7 ) 2-7 Channel D 8-0 57 Pipe CNP °s1= 92 TOTAL N/A N/A N/A Tc pwt= 5 ` Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (A g /r 1 1 A ) (CN) 095 (-I Vass S3 1 -7 Gras C- -71 7 ) 2-7 Cara D 8-0 57 CNP °s1= 92 Revised October 2010 Page 2 of 3 y }yf Syr ayt STORAGE / DISCHARGE CALCULATIONS *(If applicable) Complete Underground Storage Volume Table Elevation Underground * Above Ground Total Ace Volume (cf) (Above and Underground) Acc Volume for all Structures (co Area (sq ft) Inc Volume (co Acc Volume (co (0 412 75 ---- !off 4 0 2 �,O 12 1562 216(:;� PPv &AA 5 O (cfs) (ft) 0 3,4 1 4 012 4 012 - \NQv (A-700 S(. Dia 59 '74-(, 75 5 825 58-.-)-5 - C..Pv Area Cw= outlet pipe /struct) go Length pond) Ft Stage Discharge Co= orifice coefficient Cw = weir coefficient Orifice Area unit shall be square feet (sf) Elevation / Orifice 1 Orifice 2 Weir I Weir 2 /Em Outlet Emergency Total Q Stage A 3 In 3o xto In x Ft Spillway Control Pipe Spillway (cfs) (ft) 642 -75 Inv &44 WInv foSo Inv (Controlled by S(. Dia (Tree flow out of Area Area Cw= outlet pipe /struct) go Length pond) Ft Co= Co= 20 Ft "'I IS Inv (,3S S Inv Inv Cw= Co= Cw= 81 0 20da 7 44 �. .— -- S C)T- s (04 (0 12 o 2-5LF5 .ZT 10 cis -- -- —' 2,9' ST S 4 (o 72- 0 2_7 cfs 33 69 A 35 9's S (047 I I 1 0 21 cT s 36 614G 1 9 7a &R , 4(o rA c Cc derground Storage Volume Table (If applicable) N%A ProvitsAdditional storage volume tables if more structures are used i Elevation Acc Volume (cf) Unde nd Structure # Length (ft) Size /dia (ft) Upper inv Lower inv Slope ( %) Acc Volume (cf) Underground Structure # Length (ft) Size /dia (ft) per inv Low v Slope °/ Acc Volume (co Underground Structure # Length (ft St a (ft) Upper inv Lower inv Slope ( %) Acc Vo a (cf) Un ound Structure # Length (ft ) Size /dia (ft ) Upper inv Lower inv Slope ( %) Revised October 2010 • �i CRARLOM ENGINEERING & PROPERTY MANAGEMENT Land Development Division 600 East Fourth Street Charlotte North Carolina 28202 2844 Telephone 704/336 6692 Fax 704/336 6586 landpermits charmeck org Page 3 of 3 Fil r ti R t a S «t! Design Procedure Form Wet pond k �' WET POND FEASIBILITY 1 Is the use of a wet pond appropriate? 2 Confirm other design criteria and applicability PRELIMINARY HYDROLOGIC CALCULATIONS 3 Compute WQP water quality volume requirements Compute Runoff Coefficient R„ Compute WQ„ Volume requirements 4 Compute WQP peak flow Compute modified SCS curve number Compute CP„ Compute S (maximum retention) Compute 1 yr 24 hr total rainfall depth Compute Qd (runoff volume) Compute CP„ (chnnnel protection volume) Estimate tc (time of concentration) Estimate q Compute approximate storage volume 6 Compute release rates Compute WQ, release rate Compute CP„ release rate 7 Compute site hydrologic input parameters Development Conditions Area CN (SCS curve number) Adjusted CN (curve number adjusted for 1 inch storm) Time of concentration STORM WATER DETENTION BASIN DESIGN 8 Pretreatment volume VOlpre = Acres of Impervious Area(0 2 )(1 /12 ) 9 Compute Permanent Pool Volume and Water Quality Extended Volume Compute WQ„ /PP„ Compute PP„ Size extended detention — pool volume is greater of WQP or CP„ 10 Conduction grading and determine storage available for permanent pool (and WQ„ ED volume if applicable) NOTES Rv= 075 WQ, � acre ft WQP = 0 l (A cfs CN = q_ S =0$.-2- Rainfall Depth = 1 $ 1 inches Qd= 2 J$mches CP„ =_ acre ft a (-'& tc = 0 093 hours q„ = — cfs /mi2finch Storage volume= ,Q 6A acre ft WQ Release Rate = 0 134. cfs C.P Release Rate = 0, g9 -i cfs Pre developed Post developed 17 90 acres 1779 acres 73 92 73 —IL- 0:3(o hours 0 093 hours WQpre = 0 23 acre ft WQ, /PP„ = 0 A 0 PP„ = 2 ? acre ft ED Pool Volume = 2 (-g acre ft Prepare an elevation storage table and curve using the average area method for computing volumes Elevation I Area I Average Area eAA 50 a (,9 &47oo 0 75 Depth I Incremental I Cumulatn Volume Volume Volume above Permanent Pool acre ft p P PV its WQV ;2 q (v I CPv 12 WQ Orifice Computations' Average ED release rate Release Rate = 0 13 (-cfs # Average head h = (ED elev — Permanent pool elev) / 2 h= ! O ft Area of orifice from orifice equation Q = CA(2gh)05 A = 4. o-7 tf Diameter = 2 2S in 13 Compute release rate for CP control and Establish CPv elevation WSEL = 647 D ft Release rate Average head h = CPv elev — Permanent / 2 Release Rate = 0 g 9 gcfs h = 2 o ft pool elev� o z Area or orifice from onfce equation Q = CA(2gh) A = 19 03 if , v, Diameter= 4 1.2- m 14 Calculate Qp release rate and water surface elevation 4 Set up a stage storage discharge relationships y Peak stage for (WQv) the 1 inch 6 hour storm Peak Stage = 4M 40 ft , f Peak stage for (CPv) the 1 yr 24 hour storm Peak State = A!! L4 ffl ft Peak Qio — Undeveloped Qio,ndev = ;Z9 3 cfS Peak Qjo — Developed Quo .dev = 2& WS cfS r Peak Q25 — Undeveloped Q25 -undev = -*(> Q cfS Peak Q25 — Developed Q25.dev = 3s R3cfs ? Size emergency spillway calculate 50 year WSEL and set top of embankment elevation WSELso = 64711 ft a Embankment Elevation = 060 ft 15 Investigate potential wet detention basin hazard Notes classification 16 Assess maintenance access and safety features 17 Attach landscaping plan �t Mecklenburg County WQ Pond Ch I tt R I igh Circle at South Park W Im gt CJS PROJECT NO 4008 & Sto ne nest DATE 102811 BY VKH &Sto REVISED XX XX XX RVW RMB land Plan ng La dscape A ch tecture C I Eng ee ng U ban Des gn Mecklenburg County BMP Design Manual July 2007 BASE DATA Total Drainage Area to Pond = 17 78 Acres Post Developed Impervious Area = 13 86 jAcres or 78 0 % CN = 92 WATER QUALITY VOLUME (WQv) Rv = runoff coefficient (Runoff/Rainfall) WQv = Water Quality Volume 1 inch /6 hour water quality control I = % Impervious { Simple Method Schueler) JRv = 0 05 + 0 009(1) WQv = 10 RvA 12 Rv= 075 WQv = 1 11 Ac Ft 48508 Cubic Feet Required WQv = 0 75 inches of runoff I Modified Curve Number (CNm) I CNm = Modified Curve Number P= rainfall in inches (use 1 0) WQv =Water Quality Volume in inches (1 ORv) ( Simple Method Schueler) CNm= 1000![10 +5P +10WQv 10((WQv) "2 +1 26WQvP) "O 5 CNm = 98 Page 1 of 1 Mecklenburg County WQ Pond +ColeJenest Ch 1 tt Circle South Park "' I9" W lm 9t CJS PROJECT NO 4008 &Stone DATE 112111 BY VKH REVISED 0111121 RVW qjj_jj La d PI g to dw p A ht t C HE g i g U b 0 ig Mecklenburg County BMP Design Manual July 2007 BASE DATA Total Drainage Area to Pond = 1778 Acres Post Developed Impervious Area = 1386 Acres or 78 0 % CN = 92 WATER QUALITY VOLUME (WQv) Rv = runoff coefficient (Runoff/Rainfall) WQv = Water Quality Volume 1 inch/6 hour water quality control I = % Impervious ( Simple Method Schueler) Rv = 0 05 + 0 009(1) WQv = 10 RvA 12 Rv= 075 WQv = 111 Ac Ft 48508 Cubic Feet Required WQv = 0 75 Inches of runoff CHANNEL PROTECTION VOLUME (CPv) CPv = channel protection volume (1 yr 24 hr channel protection control) Q = accumulated runoff volume Inches P = accumulated rainfall (potential maximum runoff) inches S =potential maximum soil retention inches = (10001CN) 10 CN = SCS Curve number WQv = 1 11 Ac Ft S= 082 P = 2 58 inches Q = (P 0 2S)A2 ! P +0 8S) Q = 1 81 inches CPv = Q(1112)(A) CPv = 2 68 Ac Ft Page 1 of 4 RELEASE RATES Release Rate for WQ control Water quality control volume is to be released over a 4 day duration beyond the center of rainfall (96 hours plus 3 hour period) WQ Release Rate = 0136 cfs Release Rate for CP control Channel protection control volume is to be released over a 24 hour period beyond the center of rainfall CP Release Rate =® cfs FOREBAY VOLUME Size wet forebay to treat 0 2 Inch /impervious area 0 31 ac ft provided PERMANENT POOL VOLUME Design the permanent pool volume so that WQv /PPv = 0 4 PPv = 2 78 Ac Ft Designed permanent pool elevation = 642 75 Page 2 of 4 DA (ac) Imp Area Forebay Volume (ac ft) Inlet 178 139 023 Inlet 00 00 000 Inlet 3 00 00 000 PERMANENT POOL VOLUME Design the permanent pool volume so that WQv /PPv = 0 4 PPv = 2 78 Ac Ft Designed permanent pool elevation = 642 75 Page 2 of 4 ELEVATION TO HOLD WQv Refer to Storage Elevation Data Chart WQv Elevation = ORIFICE SIZING FOR WATER QUALITY VOLUME Avg extended detention release rate cfs Avg Head = (WQv Elev Perm Pool Elev) 12 L9 R Use orifice equation Q = CA(2gh )"0 5 A= Q1(C 2gh) "0 5) A = 4 351 in "2 A = ¶ d "2)14 d = ((A 4)11) "0 5 d = 2 35 inches Page 3 of 4 ELEVATION TO HOLD CPv Refer to Storage Elevation Data Chart CPv Elevation = 647 00 ORIFICE SIZING FOR CHANNEL PROTECTION VOLUME Avg extended detention release rate = ®cfs Avg Head = (WQv Elev Perm Pool Elev) 12 = ft Use orifice equation Q = CA(2 h) "0 5 A= Q!(C (2gh) "0 5) A = 18448 In "2 A=($ d "2)!4 d = (A 4)11) "0 5 d= 4 85 inches Page 4 of 4 Water Quahty Pond & Stone +ColeJenest 7;g. L d PI g L dsc p A h t t C 1E g g U Circle South Park CJS PROJECT NO 4008 EVK DATE 1121111 BY REVISED 01 11 12 RVW BMP Basin Stora a Elevation Data Elevation Area (sf) Area ac Inc Vol ac ft) Total Accum Vol ac ft) Accum Det Vol (ac ft) Notes 63200 793 002 0 000 63300 2879 007 0 042 0 042 63400 5319 012 0 094 0136 63500 8468 019 0158 0 295 63600 9713 022 0209 0 503 63700 11086 026 0 239 0 742 63800 12556 029 0 271 1 013 63900 14182 033 0 307 1 320 64000 15928 037 0 346 1 666 64100 17846 041 0 388 2054 64200 19746 045 0 431 2 485 64225 20724 048 0116 2 601 64276 24654 057 0 260 2 862 000 PPv 64326 28903 066 0 307 3169 031 64400 29397 067 0 502 3 671 081 64450 29980 069 0 341 4 012 115 WQv 64500 30069 069 0 345 4 356 1 49 64600 32554 076 0 719 5 075 221 64700 32746 076 0 750 5 825 296 CPv 64800 32947 1 076 1 604 7 328 447 Required PPv =1 278 jac ft Design Permanent Pool Elevation =1 642 75 WQv =1 1 11 ac ft Elevation to hold Water Quality Volume =1 64460 CPv = 268 Jac ft Elevation to hold Channel Protection Volume = 64700 Page 1 of 1 TIME OF CONCENTRATION Circle at South Park CJS PROJECT NO 4008 TE 102811 BY VKH VISED xx xx xx RVW RMB BASIN #1 TIME OF CONCENTRATION PRE DEVELOPMENT Ch I He leg +ColeJenest W Inn ngt & Stone Land Planning + Landscape Archrtectu e + Civil Eng neer ng + Urban Design Pre development Flow Phase One 11Computed Type Sheet Flow Length 100 ft N Value 024 from tables Slo e 0 015 Wft T 16 2 Minutes Pre development Flow Phase Two Type Shallow Concentrated Flow Surface u Length 405 ft u= unpaved p= paved Sloe 0 054 ft/ft Velocity 3 75 ft/sec Computed T 0 03 hr or 1 8 Minutes Pre development Flow Phase Three I Type Open Channel Flow ILength 1087 ft Velocrt 5 Wsec assumed Computed T 0 06 hr or 3 6 Minutes Pre development Total Flow Summary Time of Concentration Total Tc 216 Minutes Lag Time Tu1G = 130 Minutes T LAG =0 6 x T c 11 TLAe = 022 Hours BASIN #1 TIME OF CONCENTRATION POST DEVELOPMENT Post development Total Flow Summary Time of Concentration Total Tc _ 5 0 Minutes Lag Time T SAC - 3 0 Minutes TLAG =06xT� TLAC= 005 Hours Pre DA1 Pre DA Post DA1 � liasln #1 Post DA 1 Basin #1 Subcat Reach on Link Drainage Diagram for 010912 Wet Pond Prepared by {enter your company name here} Printed 1/912012 HydroCADO 9 00 s/n 05796 0 2009 HydroCAD Software Solutions LLC Circle @ SouthPark 010912 Wet Pond Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment numbers) 1 460 58 Woods /grass comb Good HSG B (Pre DA1) 0 950 61 DA 3 grass HSG B (Post DA1) 11 600 72 Woods /grass comb Good HSG C (Pre DA1) 1 700 74 DA 1 grass HSG C (Post DA1) 4 740 79 Woods /grass comb Good HSG D (Pre DA1) 0 270 80 DA 2 grass HSG D (Post DA1) 1 000 80 DA 3 grass HSG D (Post DA1) 9 950 98 DA 1 impervious HSG C (Post DA1) 3 430 98 DA 2 impervious HSG D (Post DA1) 0 480 98 DA 3 impervious HSG B (Post DA1) 35 580 TOTAL AREA Circle @ SouthPark 010912 -Wet Pond Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 3 Soil Listing (ail nodes) Area Soil Subcatchment (acres) Goup Numbers 0 000 HSG A 2 890 HSG B Post DA1 Pre DA1 23 250 HSG C Post DA1 Pre DA1 9 440 HSG D Post DA1 Pre DA1 0 000 Other 35 580 TOTAL AREA Circle @ South Park 010912 -Wet Pond Prepared by {enter your company name here) Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 4 Pipe Listing (all nodes) Line# Node In Invert Out Invert Length Slope n Diam/VVidth Height Number (feet) (feet) (feet) (ft/ft) (inches) (inches) 1 Basin #1 63580 63500 800 00100 0 012 360 00 Circle @ SouthPark 010912 -Wet Pond Charlotte 24 hr 1 yr Charlotte 24 hr 1 yr Rainfall =2 58' Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 5 Time span =0 00 100 00 hrs dt =0 05 hrs 2001 points Runoff by SCS TR 20 method UH =SCS Reach routing by Stor Ind +Trans method Pond routing by Stor Ind method Su bcatchment Post DA1 Post DA 1 Runoff Area =17 780 ac 77 95% Impervious Runoff Depth =1 77 Tc =5 0 min CN =92 Runoff =45 55 cfs 2 619 of SubcatchmentPre DA1 Pre DA Runoff Area =17 800 ac 0 00% Impervious Runoff Depth =0 61 Tc =21 6 min CN =73 Runoff =9 59 cfs 0 907 of Pond Basin #1 Basin #1 Peak Elev =644 89 Storage =61 682 cf Inflow =45 55 cfs 2 619 of Outflow =8 08 cfs 2 300 of Total Runoff Area = 35 580 ac Runoff Volume = 3 526 of Average Runoff Depth = 119 6105% Pervious = 21 720 ac 38 95% Impervious =13 860 ac Circle @ SouthPark 010912 Wet Pond Charlotte 24 hr 1 yr Charlotte 24 hr 9 yr Rainfall =2 58 Prepared by {enter your company name here} Printed 1/9/2012 HvdroCAD® 9 00 s/n 05796 © 2009 HvdroCAD Software Solutions I I C Pans R Summary for Subcatchment Post DA1 Post DA 1 [49] Hint Tc <2dt may require smaller dt Runoff = 45 55 cfs @ 11 99 hrs Volume= 2 619 of Depth= 1 77 Runoff by SCS TR 20 method UH =SCS Time Span= 0 00 100 00 hrs dt= 0 05 hrs Charlotte 24 hr 1 yr Charlotte 24 hr 1 yr Rainfall =2 58 Area (ac) CN Description 1 700 74 DA 1 grass HSG C 9 950 98 DA 1 impervious HSG C 0 270 80 DA 2 grass HSG D 3 430 98 DA 2 impervious HSG D 1 000 80 DA 3 grass HSG D 0 950 61 DA 3 grass HSG B 0 480 98 DA 3 impervious, HSG B 17 780 92 Weighted Average 3 920 22 05% Pervious Area 13 860 77 95% Impervious Area Tc Length Slope Velocity Capacity Description min feet ft/ft ft/sec cfs 50 Direct Entry, 5 Minute Tc u 3 0 LL Subcatchment Post DA1 Post DA 1 Hydrograph Time (hours) ❑ Runoff Circle @ SouthPark 010912 -Wet Pond Charlotte 24 hr 1 -yr Charlotte 24 hr 1 -yr Rainfall =2 58' Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment Pre DA1 Pre DA Runoff = 9 59 cfs @ 12 24 hrs Volume= 0 907 of Depth= 0 61 Runoff by SCS TR 20 method UH =SCS Time Span= 0 00 100 00 hrs dt= 0 05 hrs Charlotte 24 hr 1 yr Charlotte 24 hr 1 yr Rainfall =2 58 Area (ac) CN Description 1 460 58 Woods /grass comb Good HSG B 11 600 72 Woods /grass comb Good HSG C 4 740 79 Woods /grass comb, Good, HSG D 17 800 73 Weighted Average 17 800 100 00% Pervious Area Tc Length Slope Velocity Capacity Description 216 Direct Entry, See MasterCALC u 3 0 LL Subcatchment Pre DA1 Pre DA Hydrograph Time (hours) ❑ Runoff Circle @ SouthPark 010912 -Wet Pond Charlotte 24 hr 9 yr Charlotte 24 hr 1 yr Ratnfall =2 58 Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 8 Summary for Pond Basin #1 Basin #1 Inflow Area = 17 780 ac 77 95% Impervious Inflow Depth = 1 77 for Charlotte 24 hr 1 yr event Inflow = 45 55 cfs @ 1199 hrs Volume= 2 619 of Outflow = 8 08 cfs @ 12 24 hrs Volume= 2 300 of Atten= 82% Lag= 15 1 min Primary = 8 08 cfs @ 12 24 hrs Volume= 2 300 of Routing by Stor Ind method Time Span= 0 00 100 00 hrs dt= 0 05 hrs Peak Elev= 644 89 @ 12 24 hrs Surf Area= 29 578 sf Storage= 61 682 cf Plug Flow detention time= 1 111 0 min calculated for 2 300 of (88% of inflow Center of Mass det time= 1 052 1 min ( 1 856 3 804 2 ) Volume Invert Avail Storage Storage Description #1 63200 161 571 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf Area Voids Inc Store Cum Store (feet) (sq ft) ( %) (cubic feet) (cubic feet) 63200 793 00 0 0 63300 2 879 00 0 0 63400 5319 00 0 0 63500 8 468 00 0 0 63600 9 713 00 0 0 63700 11 086 00 0 0 63800 12 556 00 0 0 63900 14 182 00 0 0 64000 15 928 00 0 0 64100 17 846 00 0 0 64200 19 746 00 0 0 64225 20 724 00 0 0 64274 24 600 00 0 0 64275 24 654 1000 246 246 64325 28 903 1000 13 389 13 636 64400 29 397 1000 21 863 35 498 64500 29 601 1000 29 499 64 997 64600 32 554 1000 31 078 96 075 64700 32 746 1000 32 650 128 725 64800 32 947 1000 32 847 161 571 _Device Routing Invert Outlet Devices #1 Primary 63580 36 0 Round Culvert L= 80 0 RCP square edge headwall Ke= 0 500 Outlet Invert= 635 00 S= 0 0100 / Cc= 0 900 n= 0 012 Concrete pipe finished #2 Device 1 64275 2 3 Vert Orifice /Grate C= 0 600 #3 Device 1 64450 30 0 W x 6 0 H Vert Orifice /Grate X 4 00 C= 0 600 #4 Device 1 64650 2 0 long x 0 65 rise Notch Weir X 3 00 2 End Contraction(s) #5 Device 1 64715 5 0 long x 0 50 rise Sharp Crested Rectangular Weir X 4 00 2 End Contraction(s) Circle @ SouthPark 010912 Wet Pond Charlotte 24 hr 9 yr Charlotte 24 hr 1 yr Rainfall =2 58' Prepared by (enter your company name here) Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 9 Primary OutFlow Max =7 94 cfs @ 12 24 hrs HW =644 89 TW =634 00 (Fixed TW Elev= 634 00 ) t— =Culvert (Passes 7 94 cfs of 93 75 cfs potential flow) 2= Orifice /Grate (Orifice Controls 0 20 cfs @ 6 88 fps) 3= Orifice /Grate (Orifice Controls 7 74 cfs @ 2 00 fps) 4 =Notch Weir ( Controls 0 00 cfs) =Sharp Crested Rectangular Weir( Controls 0 00 cfs) 3 0 LL Pond Basin #1 Basin #1 Hydrograph Time (hours) ❑ Inflow ❑ Primary Circle @ SouthPark 010912 Wet Pond Charlotte 6 hr 2 yr Charlotte 6 hr 02 yr Rainfall =2 28' Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Paye 10 Time span =0 00 100 00 hrs dt =0 05 hrs 2001 points Runoff by SCS TR 20 method UH =SCS Reach routing by Stor Ind +Trans method Pond routing by Stor Ind method SubcatchmentPost DA1 Post DA 1 Runoff Area =17 780 ac 77 95% Impervious Runoff Depth =1 49 Tc =5 0 min CN =92 Runoff =58 67 cfs 2 209 of SubcatchmentPre DA1 Pre DA Runoff Area =17 800 ac 0 00% Impervious Runoff Depth =0 45 Tc =21 6 min CN =73 Runoff =9 31 cfs 0 672 of Pond Basin #1 Basin #1 Peak Elev =644 91 Storage =62 480 cf Inflow =58 67 cfs 2 209 of Outflow =8 88 cfs 2 001 of Total Runoff Area = 35 580 ac Runoff Volume = 2 880 of Average Runoff Depth = 0 97 6105% Pervious = 21 720 ac 38 95% Impervious = 13 860 ac Circle @ SouthPark 010912 -Wet Pond Charlotte 6 hr 2 yr Charlotte 6 hr 02 -yr Rarnfalf =2 28 Prepared by (enter your company name here) Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment Post DA1 Post DA 1 [49] Hint Tc <2dt may require smaller dt Runoff = 58 67 cfs @ 3 15 hrs Volume= 2 209 of Depth= 1 49 Runoff by SCS TR 20 method UH =SCS Time Span= 0 00 100 00 hrs dt= 0 05 hrs Charlotte 6 hr 2 yr Charlotte 6 hr 02 yr Rainfall =2 28 Area (ac) CN Description 1 700 74 DA 1 grass HSG C 9 950 98 DA 1 impervious HSG C 0 270 80 DA 2 grass HSG D " 3 430 98 DA 2 impervious HSG D 1 000 80 DA 3 grass HSG D 0 950 61 DA 3 grass HSG B _ 0 480 98 DA 3, impervious, HSG B 17 780 92 Weighted Average 3 920 22 05% Pervious Area 13 860 77 95% Impervious Area Tc Length Slope Velocity Capacity Description _ (min) (feet) (ft/ft) (fUsec) (cfs) 50 Direct Entry, 5 Minute Tc 58 67 cfs 55 50 45 40 v 35 30 LL 25 �� 20 15 10 5 0 0 5 Subcatchment Post DA1 Post DA 1 Hydrograph Charlotte 6 -hr 2 -yr Charlotte 6 -hr 02 -yr Rainfall =2 28" Runoff Area =17 780 ac Runoff Volume =2 209 of Runoff Depth =1 49" Tc =6 0 men CN =92 40 45 50 55 60 65 70 75 80 85 90 95 100 Time (hours) ❑ Runoff Circle @ SouthPark 010912 Wet Pond Charlotte 6 hr 2 -yr Charlotte 6 hr 02 yr Rainfall =2 28 Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 sin 05796 © 2009 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment Pre DA1 Pre DA Runoff = 9 31 cfs @ 3 43 hrs Volume= 0 672 of Depth= 0 45 Runoff by SCS TR 20 method UH =SCS Time Span= 0 00 100 00 hrs dt= 0 05 hrs Charlotte 6 hr 2 yr Charlotte 6 hr 02 yr Rainfall =2 28 Area (ac) CN Descnotion 1 460 58 Woods /grass comb Good HSG B 11 600 72 Woods /grass comb Good HSG C 4 740 79 Woods /grass comb, Good, HSG D 17 800 73 Weighted Average 17 800 100 00% Pervious Area Tc Length Slope Velocity Capacity Description _ (min) (feet) (ft/ft) (ft/sec) (cfs) 216 Direct Entry See MasterCALC Subcatchment Pre DA1 Pre DA Hydrograph 9 31 cfs s 0A Charlotte 6 -hr 2 -yr Charlotte 6 -hr 02 -yr 8 Rainfall =2 28" Runoff Area =17 800 ac 6 Runoff Volume =0 672 of 5 LL Runoff Depth =0 45" 4 Tc =21 6 min 3 CN =73 2 I . �. a Time (hours) ❑ Runoff Circle @ SouthPark 010912 -Wet Pond Charlotte 6 hr 2 yr Charlotte 6 hr 02 yr Rainfall =2 28 Prepared by {enter your company name here} Printed 1/9/2012 HydroCADO 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 13 Summary for Pond Basin #1 Basin #1 Inflow Area = 17 780 ac 77 95% Impervious Inflow Depth = 149 for Charlotte 6 hr 02 yr event Inflow = 58 67 cfs @ 3 15 hrs Volume= 2 209 of Outflow = 8 88 cfs @ 3 57 hrs Volume= 2 001 of Atten= 85% Lag= 25 0 min Primary = 8 88 cfs @ 3 57 hrs Volume= 2 001 of Routing by Stor Ind method Time Span= 0 00 100 00 hrs dt= 0 05 hrs Peak Elev= 644 91 @ 3 57 hrs Surf Area= 29 584 sf Storage= 62 480 cf Plug Flow detention time= 1 273 5 min calculated for 2 001 of (91 % of inflow) Center of Mass det time= 1 262 0 min ( 1 471 1 209 0 ) Volume Invert Avail Storage Storage Description #1 63200 161 571 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf Area Voids Inc Store Cum Store (feet) (sq ft) ( %) (cubic feet) (cubic feet) 63200 793 00 0 0 63300 2 879 00 0 0 63400 5 319 00 0 0 63500 8 468 00 0 0 63600 9 713 00 0 0 63700 11 086 00 0 0 63800 12 556 00 0 0 63900 14 182 00 0 0 64000 15 928 00 0 0 64100 17 846 00 0 0 64200 19 746 00 0 0 64225 20 724 00 0 0 64274 24 600 00 0 0 64275 24 654 1000 246 246 64325 28 903 1000 13 389 13 636 64400 29 397 1000 21 863 35 498 64500 29 601 1000 29 499 64 997 64600 32 554 1000 31 078 96 075 64700 32 746 1000 32 650 128 725 64800 32 947 1000 32 847 161 571 Device Routing Invert Outlet Devices #1 Primary 63580 36 0 Round Culvert L= 80 0 RCP square edge headwall Ke= 0 500 Outlet Invert= 635 00 S= 0 0100 / Cc= 0 900 n= 0 012 Concrete pipe finished #2 Device 1 64275 2 3 Vert Orifice /Grate C= 0 600 #3 Device 1 64450 30 0 W x 6 0 H Vert Orifice /Grate X 4 00 C= 0 600 #4 Device 1 64650 2 0 long x 0 65 rise Notch Weir X 3 00 2 End Contraction(s) #5 Device 1 64715 5 0 long x 0 50 rise Sharp Crested Rectangular Weir X 4 00 2 End Contraction(s) Circle @ SouthPark 010912 Wet Pond Charlotte 6 hr 2 yr Charlotte 6 hr 02 yr Rainfall =2 28 Prepared by {enter your company name here} Printed 1/9/2012 HydroCADO 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 14 Primary OutFlow Max =8 75 cfs @ 3 57 hrs HW =644 91 TW =634 00 (Fixed TW Elev= 634 00 ) L =Culvert (Passes 8 75 cfs of 93 92 cfs potential flow) 2= Orifice /Grate (Orifice Controls 0 20 cfs @ 6 92 fps) 3= 0rifice /Grate (Orifice Controls 8 55 cfs @ 2 07 fps) 4 =Notch Weir ( Controls 0 00 cfs) =Sharp Crested Rectangular Weir( Controls 0 00 cfs) 3 0 LL Pond Basin #1 Basin #1 Hydrograph Time (hours) FIT-In-fl-ow--k 0 Pnmary Circle @ SouthPark 010912 -Wet Pond Charlotte 6 hr 10 yr Charlotte 6 hr 10 yr Rainfall =3 72 Prepared by (enter your company name here) Printed 119/2012 HydroCAD® 9 00 s/n 05796 0 2009 HydroCAD Software Solutions LLC Paae 15 Time span =0 00 100 00 hrs dt =0 05 hrs 2001 points Runoff by SCS TR 20 method UH =SCS Reach routing by Stor Ind +Trans method Pond routing by Stor Ind method Subcatchment Post DA1 Post DA 1 Runoff Area =17 780 ac 77 95% Impervious Runoff Depth =2 85 Tc =5 0 min CN =92 Runoff =96 73 cfs 4 219 of SubcatchmentPre DA1 Pre DA Runoff Area =17 800 ac 0 00% Impervious Runoff Depth =1 33 Tc =21 6 min CN =73 Runoff =29 36 cfs 1973 of Pond Basin #1 Basin #1 Peak Elev =64612 Storage =99 967 cf Inflow =96 73 cfs 4 219 of Outflow =28 38 cfs 4 010 of Total Runoff Area = 35 580 ac Runoff Volume = 6 192 of Average Runoff Depth = 2 09 61 05% Pervious = 21 720 ac 38 95% Impervious = 13 860 ac Circle @ SouthPark 010912 Wet Pond Charlotte 6 hr 10 yr Charlotte 6 hr 10 yr Rainfa11=3 72 Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 sin 05796 C 2009 HydroCAD Software Solutions LLC Page 18 Summary for Pond Basin #1 Basin #1 Inflow Area = 17 780 ac 77 95% Impervious Inflow Depth = 2 85 for Charlotte 6 hr 10 yr event Inflow = 96 73 cfs @ 3 15 hrs Volume= 4 219 of Outflow = 28 38 cfs @ 3 38 hrs Volume= 4 010 of Atten= 71 % Lag= 14 1 min Primary = 28 38 cfs @ 3 38 hrs Volume= 4 010 of Routing by Stor Ind method Time Span= 0 00 100 00 hrs dt= 0 05 hrs Peak Elev= 646 12 @ 3 38 hrs Surf Area= 32 577 sf Storage= 99 967 cf Plug Flow detention time= 654 4 min calculated for 4 010 of (95% of inflow) Center of Mass det time= 647 6 min ( 851 9 204 2 ) Volume Invert Avail Storage Storage Description #1 63200 161 571 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf Area Voids Inc Store Cum Store (feet) (sq ft) ( %) (cubic feet) (cubic feet) 63200 793 00 0 0 63300 2 879 00 0 0 63400 5 319 00 0 0 63500 8 468 00 0 0 63600 9 713 00 0 0 63700 11 086 00 0 0 63800 12 556 00 0 0 63900 14 182 00 0 0 64000 15 928 00 0 0 64100 17 846 00 0 0 64200 19 746 00 0 0 64225 20 724 00 0 0 64274 24 600 00 0 0 64275 24 654 1000 246 246 64325 28 903 1000 13 389 13 636 64400 29 397 1000 21 863 35 498 64500 29 601 1000 29 499 64 997 64600 32 554 1000 31 078 96 075 64700 32 746 1000 32 650 128 725 64800 32 947 1000 32 847 161 571 Device Routing Invert Outlet Devices #1 Primary 63580 36 0 Round Culvert L= 80 0 RCP square edge headwall Ke= 0 500 Outlet Invert= 635 00 S= 0 0100 P Cc= 0 900 n= 0 012 Concrete pipe finished #2 Device 1 64275 2 3 Vert Orifice /Grate C= 0 600 #3 Device 1 64450 30 0 W x 6 0 H Vert Orifice /Grate X 4 00 C= 0 600 #4 Device 1 64650 2 0 long x 0 65 rise Notch Weir X 3 00 2 End Contraction(s) #5 Device 1 64715 5 0 long x 0 50 rise Sharp Crested Rectangular Weir X 4 00 2 End Contraction(s) Circle @ SouthPark 010912 -Wet Pond Charlotte 6 hr 10 yr Charlotte 6 hr 10 yr Rainfall =3 72 Prepared by (enter your company name here) Printed 1/9/2012 HydroCAD® 9 00 sin 05796 © 2009 HydroCAD Software Solutions LLC Page 19 Primary OutFlow Max =28 35 cfs @ 3 38 hrs HW =646 12 TW =634 00 (Fixed TW Elev= 634 00 ) L = Culvert (Passes 28 35 cfs of 101 06 cfs potential flow) 2= Orifice /Grate (Orifice Controls 0 25 cfs @ 8 71 fps) 3= OrificelGrate (Orifice Controls 28 10 cfs @ 5 62 fps) =Notch Weir ( Controls 0 00 cfs) =Sharp Crested Rectangular Weir( Controls 0 00 cfs) 10196 73 cfs 1 001 rG 90 85 80 75 65 60 55 0 50 ° 45 40 28 25 20 15 10 Pond Basin #1 Basin #1 Hydrograph Inflow Area =17 780 ac Peak Elev =646 12' Storage= 99,967 cf 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 1 Time (hours) ❑ Inflow ❑ Primary Circle @ SouthPark 010912 Wet Pond Charlotte 6 hr 25 yr Charlotte 6hr 25 yr Rainfall =4 38 Prepared by {enter your company name here) Printed 1/9/2012 HydroCADO 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Paae_20 Time span =0 00 100 00 hrs dt =0 05 hrs 2001 points Runoff by SCS TR 20 method UH =SCS Reach routing by Stor Ind +Trans method Pond routing by Stor Ind method Subcatchment Post DA1 Post DA II Runoff Area =17 780 ac 77 95% Impervious Runoff Depth =3 49 Tc =5 0 min CN =92 Runoff =115 94 cfs 5164 of SubcatchmentPre DA1 Pre DA Runoff Area =17 800 ac 0 00% Impervious Runoff Depth =1 81 Tc =21 6 min CN =73 Runoff =4012 cfs 2 678 of Pond Basin #1 Basin #1 Peak Elev =646 72 Storage =119 405 cf Inflow =115 94 cfs 5164 of Outflow =35 93 cfs 4 955 of Total Runoff Area =35 580 ac Runoff Volume = 7 843 of Average Runoff Depth= 265 6105% Pervious = 21 720 ac 38 95% Impervious =13 860 ac Circle @ SouthPark 010912 Wet Pond Charlotte 6 hr 25 yr Charlotte 6hr 25 yr Rarnfall =4 38 Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment Pre DA1 Pre DA Runoff = 40 12 cfs @ 3 35 hrs Volume= 2 678 of Depth= 1 81 Runoff by SCS TR 20 method UH =SCS Time Span= 0 00 100 00 hrs dt= 0 05 hrs Charlotte 6 hr 25 yr Charlotte 6hr 25 yr Rainfall =4 38 Area (ac) CN Descnotion 1 460 58 Woods /grass comb Good HSG B 11 600 72 Woods /grass comb Good HSG C 4 740 79 Woods /grass comb Good HSG D 17 800 73 Weighted Average 17 800 Rainfall =4 38" 100 00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 216 Direct Entry, See MasterCALC Subcatchment Pre DA1 Pre DA Hydrograph 4012 38 cfs Charlotte 6 -hr 38 25 -yr Charlotte 6hr 25 -yr 34 3a Ftg Rainfall =4 38" 28 Runoff Area =17 800 ac 24 Runoff Volume =2 678 of 20 Runoff Depth =1 81" 18 16: Tc =21 6 min 14 12 CN =73 10: a 6 4 t 0 5 10 115 20 25 30 35 40 45 50 55 60 65 70 75 80 86 90 95 100 Time (hours) ❑ Runoff Circle @ SouthPark 010912 -Wet Pond Charlotte 6 hr 25 yr Charlotte 6hr 25 yr Rainfall =4 38 Prepared by (enter your company name here) Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 0 2009 HydroCAD Software Solutions LLC Page 23 Summary for Pond Basin #1 Basin #1 Inflow Area = 17 780 ac 77 95% Impervious Inflow Depth = 3 49 for Charlotte 6hr 25 yr event Inflow = 115 94 cfs @ 3 10 hrs Volume= 5 164 of Outflow = 35 93 cfs @ 3 33 hrs Volume= 4 955 of Atten= 69% Lag= 13 4 min Primary = 35 93 cfs @ 3 33 hrs Volume= 4 955 of Routing by Stor Ind method Time Span= 0 00 100 00 hrs dt= 0 05 hrs Peak Elev= 646 72 @ 3 33 hrs Surf Area= 32 691 sf Storage= 119 405 cf Plug Flow detention time= 536 3 min calculated for 4 953 of (96% of inflow) Center of Mass det time= 533 0 min ( 733 8 200 7 ) Volume Invert Avail Storage Storage Description #1 63200 161 571 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf Area Voids Inc Store Cum Store (feet) (sq ft) ( %) (cubic feet) (cubic feet) 63200 793 00 0 0 63300 2 879 00 0 0 63400 5 319 00 0 0 63500 8 468 00 0 0 63600 9713 00 0 0 63700 11 086 00 0 0 63800 12 556 00 0 0 63900 14 182 00 0 0 64000 15 928 00 0 0 64100 17 846 00 0 0 64200 19 746 00 0 0 64225 20 724 00 0 0 64274 24 600 00 0 0 64275 24 654 1000 246 246 64325 28 903 1000 13 389 13 636 64400 29 397 1000 21 863 35 498 64500 29 601 1000 29 499 64 997 64600 32 554 1000 31 078 96 075 64700 32 746 1000 32 650 128 725 64800 32 947 1000 32 847 161 571 Device Routing Invert Outlet Devices #1 Primary 63580 36 0 Round Culvert L= 80 0 RCP square edge headwall Ke= 0 500 Outlet Invert= 635 00 S= 0 0100 / Cc= 0 900 n= 0 012 Concrete pipe finished #2 Device 1 64275 2 3 Vert Orifice /Grate C= 0 600 #3 Device 1 64450 30 0 W x 6 0 H Vert Orifice /Grate X 4 00 C= 0 600 #4 Device 1 64650 2 0 long x 0 65 rise Notch Weir X 3 00 2 End Contraction(s) #5 Device 1 64715 5 0 long x 0 50 rise Sharp Crested Rectangular Weir X 4 00 2 End Contraction(s) Circle @ SouthPark 010912 Wet Pond Charlotte 6 hr 25 yr Charlotte 6hr 25 yr Rainfall =4 38 Prepared by {enter your company name here} Printed 119/2012 HydroCADO 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 24 Primary OutFlow Max =35 81 cfs @ 3 33 hrs HW =646 71 TW =634 00 (Fixed TW Elev= 634 00 ) L =Culvert (Passes 35 81 cfs of 104 41 cfs potential flow) 2= 101rifice /Grate (Orifice Controls 0 27 cfs @ 9 47 fps) 3= Orifice /Grate (Orifice Controls 33 69 cfs @ 6 74 fps) =Notch Weir (Weir Controls 1 85 cfs @ 1 50 fps) =Sharp Crested Rectangular Weir( Controls 0 00 cfs) Pond Basin #1 Basin #1 Hydrograph FO-1 n-fl o—w 115 94 CfS ❑ Primary 120 Inflow Area =17 780 ac 110 Peak Elev =646 72° 100 90 J Storage= 119,405 cf 60 ys 70. 0 60 50 35193 cfs 20 10 10 15 20 25 30 35 40 45 50 55 60 65 70 75 60 65 90 95 1 Time (hours) Circle @ SouthPark 010912 Wet Pond Charlotte 6 hr 50 yr Charlotte 6hr 50 yr Rainfall =4 92 Prepared by {enter your company name here} Printed 1/9/2012 HvdroCAD® 9 00 s/n 05796 © 2009 HvdroCAD Software Solutions LLC Page 25 Time span =0 00 100 00 hrs dt =0 05 hrs 2001 points Runoff by SCS TR 20 method UH =SCS Reach routing by Stor Ind +Trans method Pond routing by Stor Ind method SubcatchmentPost DA1 Post DA 1 Runoff Area =17 780 ac 77 95% Impervious Runoff Depth =4 01 Tc =5 0 min CN =92 Runoff =129 90 cfs 5 943 of SubcatchmentPre DA1 Pre DA Runoff Area =17 800 ac 0 00% Impervious Runoff Depth =2 22 Tc =21 6 min CN =73 Runoff =48 76 cfs 3 290 of Pond Basin #1 Basin #1 Peak Elev =647 11 Storage =132 323 cf Inflow =129 90 cfs 5 943 of Outflow =46 04 cfs 5 734 of Total Runoff Area = 35 580 ac Runoff Volume = 9 233 of Average Runoff Depth = 311 6105% Pervious = 21 720 ac 38 95% Impervious = 13 860 ac e Circle @ SouthPark 010912 Wet Pond Charlotte 6 hr 50 yr Charlotte 6hr 50 yr Rainfall =4 92 Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment Post DA1 Post DA 1 [49] Hint Tc <2dt may require smaller dt Runoff = 129 90 cfs @ 3 10 hrs Volume= 5 943 of Depth= 4 01 Runoff by SCS TR 20 method UH =SCS Time Span= 0 00 100 00 hrs dt= 0 05 hrs Charlotte 6 hr 50 yr Charlotte 6hr 50 yr Rainfall =4 92 Area (ac) CN Description 1 700 74 DA 1 grass HSG C 9 950 98 DA 1 impervious HSG C 0 270 80 DA 2 grass HSG D 3 430 98 DA 2 impervious HSG D 1 000 80 DA 3 grass HSG D 0 950 61 DA 3 grass HSG B 0 480 98 DA 3, impervious HSG B 17 780 92 Weighted Average 3 920 22 05% Pervious Area 13 860 77 95% Impervious Area Tc Length Slope Velocity Capacity Description Amin) (feet) (ft/ft) (ft/sec) (cfs) 50 Direct Entry, 5 Minute Tc 129 90 cfs 130 120 110" 100 90 u 80 E 0 70 a 80 50 40 30 20 10 0 0 5 10 15 20 Subcatchment Post DA1 Post DA 1 Hydrograph Charlotte 6 -hr 50 -yr Charlotte 6hr 50 -yr Rainfall =4 92" Runoff Area =17 780 ac Runoff Volume =5 943 of Runoff Depth =4 01" Tc =5 0 min CN =92 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Time (hours) ❑ Runoff Circle @ SouthPark 010912 -Wet Pond Charlotte 6 hr 50 yr Charlotte 6hr 50 yr Rainfall =4 92 Prepared by (enter your company name here) Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment Pre DA1 Pre DA Runoff = 48 76 cfs @ 3 34 hrs Volume= 3 290 of Depth= 2 22 Runoff by SCS TR 20 method UH =SCS Time Span= 0 00 100 00 hrs dt= 0 05 hrs Charlotte 6 hr 50 yr Charlotte 6hr 50 yr Rainfall =4 92 Area (ac) CN Description 1 460 58 Woods /grass comb Good HSG B 11 600 72 Woods /grass comb Good HSG C 4 740 79 Woods /grass comb Good HSG D 17 800 73 Weighted Average 17 800 Rainfall =4 92" 100 00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 216 Direct Entry, See MasterCALC Subcatchment Pre DA1 Pre DA Hydrograph 48 76 cfs Charlotte 6 -hr 45 50 -yr Charlotte 6hr 50 -yr 40 Rainfall =4 92" 35 Runoff Area =17 800 ac 30 Runoff Volume =3 290 of U. 25 Runoff Depth =2 22" 20 Tc =21 6 min 15 CN =73 10 0 5 10 15 20 25 30 36 40 45 50 55 60 65 70 75 80 86 90 9�5 Time (hours) p Runoff Circle @ SouthPark 010912 -Wet Pond Charlotte 6 hr 50 yr Charlotte 6hr 50 yr Rainfall =4 92 Prepared by {enter your company name here) Printed 1/9/2012 HydroCADO 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 28 Summary for Pond Basin #1 Basin #1 Inflow Area = 17 780 ac 77 95% Impervious Inflow Depth = 4 01 for Charlotte 6hr 50 yr event Inflow = 129 90 cfs @ 3 10 hrs Volume= 5 943 of Outflow = 46 04 cfs @ 3 30 hrs Volume= 5 734 of Atten= 65% Lag= 12 1 min Primary = 46 04 cfs @ 3 30 hrs Volume= 5 734 of Routing by Stor Ind method Time Span= 0 00 100 00 hrs dt= 0 05 hrs Peak Elev= 647 11 @ 3 30 hrs Surf Area= 32 768 sf Storage= 132 323 cf Plug Flow detention time= 471 2 min calculated for 5 734 of (96% of inflow) Center of Mass det time= 466 0 min ( 666 0 200 0 ) Volume Invert Avail Storage Storage Description _ #1 63200 161 571 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf Area Voids Inc Store Cum Store (feet) (sq ft) ( %) (cubic feet) (cubic feet) 63200 793 00 0 0 63300 2 879 00 0 0 63400 5 319 00 0 0 63500 8 468 00 0 0 63600 9 713 00 0 0 63700 11 086 00 0 0 63800 12 556 00 0 0 63900 14 182 00 0 0 64000 15 928 00 0 0 64100 17 846 00 0 0 64200 19 746 00 0 0 64225 20 724 00 0 0 64274 24 600 00 0 0 64275 24 654 1000 246 246 64325 28 903 1000 13 389 13 636 64400 29 397 1000 21 863 35 498 64500 29 601 1000 29 499 64 997 64600 32 554 1000 31 078 96 075 64700 32 746 1000 32 650 128 725 64800 32 947 1000 32 847 161 571 Device Routing Invert Outlet Devices #1 Primary 63580 36 0 Round Culvert L= 80 0 RCP square edge headwall Ke= 0 500 Outlet Invert= 635 00 S= 0 0100 / Cc= 0 900 n= 0 012 Concrete pipe finished #2 Device 1 64275 2 3 Vert Orifice /Grate C= 0 600 #3 Device 1 64450 30 0 W x 6 0 H Vert Orifice /Grate X 4 00 C= 0 600 #4 Device 1 64650 2 0 long x 0 65 rise Notch Weir X 3 00 2 End Contraction(s) #5 Device 1 64715 5 0 long x 0 50 rise Sharp Crested Rectangular Weir X 4 00 2 End Contraction(s) V. Circle @ SouthPark 010912 Wet Pond Charlotte 6 hr 50 yr Charlotte 6hr 50 yr Rainfall =4 92 Prepared by {enter your company name here} Printed 1/9/2012 HydroCAD® 9 00 s/n 05796 © 2009 HydroCAD Software Solutions LLC Page 29 Primary OutFlow Max =45 95 cfs @ 3 30 hrs HW =647 11 TW =634 00 (Fixed TW Elev= 634 00 ) L = Culvert (Passes 45 95 cfs of 106 59 cfs potential flow) 2= Orifice /Grate (Orifice Controls 0 29 cfs @ 9 94 fps) 3= Orifice /Grate (Orifice Controls 36 94 cfs @ 7 39 fps) 4 =Notch Weir (Weir Controls 8 72 cfs @ 2 55 fps) L—S=Sharp Crested Rectangular Weir( Controls 0 00 cfs) Pond Basin #1 Bann #1 Hydrograph ,so 129 90`cfs Inflow Area =17 780 ac 120 Peak Elev =647 11' 10 Storage= 132,323 cf ,00 90 so a 70 LL 46 04 cfs ❑ Inflow mary p P r FLOTATION CALCULATIONS Circle at South Park ,JS PROJECT NO 4008 TE 102811 BY VKH VISED xx xx xx RVW RMB CONSTRAINTS Weight of Concrete 150 lbsff A3 Weight of Water 624 ibs/f A3 Safety Factor (S F) 125 Height of structure 13 ft Structure thickness 4 in Outlet box width 5 It Weight of outlet structure(Ws) ® cn I u R I gh W IM 9t ColeJenest & Stone Land Planning + Landscape Architecture + Civil Engineering + Urban Design Ws = (width + thickness x 4) x thickness x height x weight of concrete = Weroht of water displaced Ww = (width + 2 x thickness) ^2) x Weight of waterx height= 2604853 lbs Size Base Wb = (S F x Ww) WS= 18694 Ibs Foohno_ size Required concrete = Wb / Weight of concrete = 125 cuft Assume base is 6 wider than extenor box width and minimum thickness is 8 Thickness of base = 328 It Length = 667 ft Width = 667 ft Thickness = 3 28 It 13867 lbs