Loading...
HomeMy WebLinkAbout20120600 Ver 1_CAMA Permit Application_20120615Beverly Eaves Perdue Governor PW �l 2 0120600 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Braxton C Davis Director Dee Freeman MEMORANDUM TO Ms Cyndi Karoly 2012 Env Biological Supervisor DENR WATER QU,,LITY Division of Water Quality Wetlands Unit Wetlands & � wvatex Branch FROM Doug Huggett Respond to Doug Huggett Major Permits Processmg Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE 13 June 2012 SUBJECT CAMA Application Review APPLICANT James M Beasley PROJECT LOCATION Project site is 4 designated log removal sites in the Chowan River in Hertford Bertie Chowan & Gates Counties from near Coleram in Berke County north to near Mintonsville in Gates County The extraction site is located near Harrellsville off Beasley Farm Road off Swam Mill Road (SR 1441), adjacent the Wiccacon River off the Chowan River in Hertford County North Carolma PROPOSED PROJECT Applicant proposes to retrieve f2 submerged logs per day from 4 sites within the Chowan River totaling 3 square miles, & extract them at a site on the Wiccacon River using low impact methods of a diver & flotation devices attached to the logs for their commercial log salvage operation from November 1 to February 14 of any year Please indicate below your position or viewpoint on the proposed project and return this form by 3 July 2012 Please contact Kim Hedrick at 252 948 -3936 if you have any questions regarding the proposed project When appropriate, in depth comments with supporting data are requested REPLY This office has no objection to the project as proposed Signed This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated See attached This office objects to the proposed project for reasons described in the attached comments Date 943 Washington Square Mall Washington NC 27889 Phone 252 946-6481 1 FAX 252 948 -0478 Intemet wvww nccoastaimanagement net An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturally 2 ®'246 DIVISION OF COASTAL MANAGEMENT 00 FIELD INVESTIGATION REPORT APPLICANTS NAMES James Beasley David Farrow and Bruce Shepherd 2 LOCATION OF PROJECT SITE 4 designated log removal sites in the Chowan River in Hertford Bertie Chowan & Gates Counties from near Colerain in Berke County north to near Mintonsville in Gates County The extraction site is located near Harrellsville off Beasley Farm Road off Swam Mill Road (SR 1441) adjacent the Wiccacon River off the Chowan River in Hertford County North Carolina Photo Index (Site 1) —2006 142 7836 J9 2000 142 -1652 P18 1995 142 -1497 R21 State Plane Coordinates X 2 678 000 Y 921 000 GPS Rover File F060713A Mintonsville Quad (lower left corner) 3 INVESTIGATION TYPE CAMA and Dredge & Fill 4 INVESTIGATIVE PROCEDURE Date of Site Visit (extraction site) — 7 June 2012 Was Applicant Present — No 5 PROCESSING PROCEDURE Application Received — 6 June 2012 Office — Washington 6 SITE DESCRIPTION (A) Local Land Use Plan — Hertford Bertie Chowan, & Gates Counties Land Classification From LUP — Conservation (water & land) (B) AEC(s) Involved EW PTA & ES PTS (C) Water Dependent Yes (D) Intended Use Commercial Log Salvage Operations (E) Wastewater Treatment Existing — None Planned — None (F) Type of Structures Existing — Extraction site has gravel access road & irngation pad located within ES PTS AEC & T -head pier structure within EW, PTA Planned — None (G) Estimated Annual Rate of Erosion N/A Source — N/A 7 HABITAT DESCRIPTION [AREA] (D) (E) (F) Total Area Disturbed Primary Nursery Area Water Classification ±1920 acres ( ±83 635,200 W) (boundary area of 4 project sites) No B NSW (Chowan River) C NSW (Wiccacon River) Open NO PROJECT SUMMARY The applicant proposes to retrieve ±2 submerged logs per day from 4 sites within the Chowan River totaling 3 square miles & extract them at a site on the Wiccacon River using low impact methods of a diver & flotation devices attached to the logs for their commercial log salvage operation from November 1 to February 14 of any year James Beasley David Farrow and Bruce Shepherd (Creek Reach Salvos) Chowan River & Wiccacon River Hertford Bertie Chowan & Gates Counties Project Setting James Beasley David Farrow and Bruce Shepherd under project name Creek Reach Salvos (CRS) have submitted the attached application for a CAMA and Dredge & Fill Major Permit to retrieve ±2 submerged logs per day from 4 sites within the Chowan River totaling 3 square miles and extract them at a site on the Wiccacon River using low impact methods of a diver and flotation devices attached to the logs for their commercial log salvage operation from November 1 to February 14 of any year There are 4 proposed sites for salvaging logs from the Chowan River along an f7 5 mile stretch of the river The 4 sites are located from Coleram Beach to just north of Holiday Island and they are comprised of two 1 square mile areas and two 0 5 square mile areas The Chowan River is ±1 mile to t1 7 miles wide over the project areas and the water depths range from 10' to 30' at the proposed log retrieval sites The project extraction site is located at Beasley Farms property at the end of Beasley Farm Road off Swain Mill Road (SR 1441) adjacent the Wiccacon River off the Chowan River near Harrellsville in Hertford County North Carolina On the eastern side of the property a gravel access leads to a landing area on an oxbow of the Wiccacon River to a concrete pad with irrigation mtake equipment and a T head pier structure There is an ±1 8' wide area of upland just east of the pier structure that will serve as the extraction site The mouth of the Wiccacon River is f5 miles north of the most northern Site 4 and the extraction site is ±5 7 miles upstream of the mouth of the Wiccacon River The river is ±200' wide at the extraction site There are no known SAV s located within the proposed 4 project sites of the Chowan River nor at the extraction site within the Wiccacon River Vegetation at the extraction site on the Wiccacon River is mowed native grasses and weeds adjacent the gravel access hardwood swamp species immediately east of the site and native hardwoods and pines on high bank west of the site The elevation at the extraction site is approximately l' above normal water level (NWL) and raises in elevation to ±15' to ±20' The Chowan River is classified B NSW and the Wiccacon River is classified C NSW by the Environmental Management Commission The Chowan River in the area of the 4 proposed sites for log salvage operations is designated as joint anadromous fish spawning area (AFSA) waters by the Marine Fisheries Commission and Wildlife Resources Commission The Chowan River in this area is closed to shellfishing There are no documented archaeological sites within the Chowan River at the proposed salvage sites nor at the extraction site on the Wiccacon River Project Description The applicant proposes the removal of 10 inch diameter or greater logs from the Chowan River at 4 sites from November 1 to February 14 of any year with active permits A diver with the use of dive flags will be used to select log(s) secure a lag screw into the log and attach flotation devices consisting of 35 gallon lift barrels to be filled with air to float logs to the James Beasley David Farrow and Bruce Shepherd (Creek Reach Salvos) Chowan River & Wiccacon River Page 2 of 2 surface The logs will be towed by boat up the Chowan River to the extraction site on the Wiccacon River and a flag buoy will mark the end of the log during towing No more than two 18' to 25' boats will be used in any given day for the log salvage operations At the extraction site in the Wiccacon River a 280 HP tractor will be used with a cable attaching a metal skid to be placed under the front of each log to pull them out of the water onto uplands It is anticipated that t2 logs will be taken from the Chowan River bottom during a day s work of proposed log salvage operations The applicants are targeting cypress and pine logs for sale for custom interiors of boats and houses Anticipated Impacts There will be some short term turbidity during salvage procedure around each log as it is being floated from the Chowan River bottom to the surface No upland development is proposed under this application There are no proposed impacts to wetlands or SAV for this project Kimberly Hedrick —12 June 2012 May 29, 2012 Ms Kim Kedrick Mr Davis Moye The intention of the Creek Reach Salvos (CPS) group is to obtain a permit from the Department of Cultural Resources (DCR) for exclusive salvage right in locating and retrieving submerged logs from selected removal sites in the Chowan River Logs of ten (10) in diameter or greater are the targets for retrieval from a working depth range of ten (10) to thirty (30) feet deep and one hundred (100) feet from the main channel from November 1, to February 14th (See attached representative river cross section cutaway) Location of operations for salvaging sunken old growth logs to be carried out from the selected site(s) Jun Beasley is one of the three principals in Creek Reach Salvos (CRS), and farms land bordered by the Wiccacon Creek Irrigation for the farm is pumped from the creek landing The landing has been in use for several generations with a docking facility The Wiccacon is a tributary approximately 5 miles upriver of the proposed log savage site Once the logs have been floated to the near surface, a towing harness and line are used to move the logs by boat to the Beasley's farm The lift bags are plastic barrels used for floatation in the transport of logs to retrieval sites Leading end of logs placed in a metal skid at landing for placement on the property bank The log is then moved up the bank for outside storage Salvage procedure to be completed with 2 on -site retrieval boats (see photograph), diver swimming down to the log, selecting an appropriate one, securing a lag screw into the log, attaching floatation devices, inflating devices and floating log free and within reach of the surface without significant disturbance of the bottom Rates and location of sediment settlement depends on existing current Visibility in the proposed logging area is approximately 4 6 inched and log location varies between the channel and edges of this water Based on weather conditions, approximately two (2) logs may be retrieved daily with this methodology The presence of any other cultural material encountered during the protect will be reported promptly Sincerely, op� Dlz,4 &LIP-0— W-T904 Creek Reach Salvos rI� I MWI APPLICATION for Major Development Permit (I1kat ravf=W 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1 Primary Applicanttr Landowner Information Business Name Business Name Protect Name (d applicable) MI Applicant 1 First Name �AM2 S Agentl Contractor 2 First Name MI Last Name 3 ea,s Itl� Mailing Address Applicant 2 Rat Name AV ` d PO Box MI P Last Name Fr rro VJ ZIP C. Phone No 1 ext Phone No 2 ext FAX No Contractor # If additional applicants please attach an additional page(s) with names ttsted Street Address (if different from above) Mailing Address State PO Box 38 C � c°1� State N�- ZIP Country Phone No 251325- lf(z3 � VZ No 413 1146 Street Address (if different from above) l 3 R � Pcr City U to State ZIP 2'7q;Z�- Email 2 Agent/Contractor Information Business Name Agent/ Contractor 1 First Name MI Last Name Agentl Contractor 2 First Name MI Last Name Mailing Address PO Box City State ZIP Phone No 1 ext Phone No 2 ext FAX No Contractor # Street Address (if different from above) City State ZIP Email <Fonn continues on backer Form DCM MP 1 (Page 2 of 4) APPLICATION for Major Development Permit 3 Project Location County (can be multiple) ygTr_.) Street Address State Rd # �r -4� ►c �IcI�Fo A no].Ake- of A Subdivision Name City State Tip Nod- 'le_ AwlJ& 11VA A l,'J� Phone No Lot N ) (if many attach adddronal page with hst) ext. NA Ail 1.k.AAe, b Name of body of water nearest to proposed project a In which NC river basin is the project located? «OWaW 4 )j c Is a water body identified in (b) above natural or manmade? d Name the closest major water body to the proposed project site Natural []Manmade []Unknown / ' 'rya e Is proposed within city limits or planning jurisdiction? ;70 f if applicable list the planning junnsdichon or city limit the proposed OYes work falls within t At I�tibIQ- 4 Site Descnptfon a Total length of shoreline on the tract (fQ b Sae of entire tract (sq It) L A& App 11' c Size of individual lot(s) , , n Me+ A rill _ _�L�f[- d Approximate elevation of tract abo a NHW (normal high water) or NWL (normal water level) (If many lot sires please attach addrtro I page with a list) []NHW or []NWL AM e Vegetation on tract MITI f,A- f Man -made features a uses now on tract A l,'J� g Identify and describe thd existing land uses adjacent to the proposed project site rarro•% h How does local govemnT&t zone the tract? i Is the proposed project consistent with the applicable zoning? (Attach zoning comp ance certificate if applicable) OYes []No NA I Is the proposed activity part of a4f urban waterfront redevelopment proposal? OYes EgNo k Hasa professional archaeological assessment been done for the tract? if yes attach a copy []Yes No 13NA If yes by whom? I Is the proposed project located in a National Registered Historic District or does it involve a []Yes MNo []NA National Register listed or eligible propertp cForm continues on next page> Form DCM MP 1 (Page 3 of 4) APPLICATION for Major Development Permlt m (i) Are there wetlands on the sde? ❑Yes 9No (a) Are there coastal wetlands on the site? O/No Oyes (m) If yes to either (i) or (u) above has a delineation been conducted? []Yes ❑No (Aftachdocumentabon if available) n Describe existing wastewater treatment facilities Not lxWpi o Describe existing drinking water su ply source p Describe existing sto764 ter man t or treatment systems I 61 M 5 Achinties and Impacts a Will the project be for commercial public or private use? IOCommercial ❑PubtictGovemment ❑Private/Commundy b Give a brief description of purpose use and daily operations of the prgect oompleq rgt6e_ o¢ -i'� P ro J�'F 15 fo J` CAT Smolt c Describe the proposed construction methodology types of construction equipment to be used during construction the number of each type of equipment and where it is to be stored No OCC , 1'3 tom- P ro�P,ts`�' 'rk— FV'P MUV� US(�d GonsiSS Of z kook s1 anr� on+: ckN beere. S43D_q- dr. e- 20 hp d Ust all development activities you propose No+ Apohcol* e Are the proposed actiw'es main j rice of an pVstmg project, new work or both? f What is the approximate total disturb and area resulting from the proposed project? ❑Sq Ft or ❑Acres g Will the proposed project encroach on any public easement public accessway or other area ❑Yes Wo ❑NA that the public has established use of? h Describe location and type of existing and proposed discharges to waters of the state NO At S &n C..5 I i Will wastewater or stormwater be d6harged into a wetland? []Yes NNo []NA If yes will this discharged water be of the same salinity as the receiving water? []Yes ❑N ❑NA j Is there any mitigation proposed? ❑Yes Nho ❑NA If yes attach a mitigation proposal <Form continues on back> Form DCM MP 1 (Page 4 of 4) APPLICATION for Major Development Permit 6 Addiftonallnformahon In addilion to this completed appbcabori form (MP 1) the foUowbrg items below d applicable must be submitted in order for the apprigUon package to be complete Items (a) — (t) are always applicable to any major development appWabon Please consult the application instruction booldet on how to properly prepare the reginred items below a A protect narrative rj f e b An accurate dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the proposed project Is any portion already complete? If previously authorized work dearly indicate on maps plats, drawings to distinguish between work completed and proposed c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site S a J d A copy of the deed (with state application only) or other instrument under which the applicant claims true to the affected properties e The appropriate application fee Check or money order made payable to DENR S f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Phone No Address Na � Name Phone No Address Nance Phone No Address g A list of previous or federal permits issued for work on the project tract include permit numbers permittee and issuing dates AAstate IYam- h Signed consultant or agent authorization forth d applicable L 1 T 1 i Welland delineation if necessary ` 1u j A signed AEC hazard notice for projects in oceanfront inlet areas! (Must be signed by property owner) Nhf APO k A statement of compliance with the N C Environmental Policy Act (N C G S 113A 1 10) if necessary if the pyqect involiek expenditure of public funds or use of public lands attach a statement documenting compliance with the North Carolina Environmental Policy Act 1 7 CeMficabon and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application The project will be subject to the conditions and restrictions contained in the permit I certify that I am authorized to grant and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating infortnabon related to this permit application and follow -up monitoring of the project I further certifyy that the information provided in this application is truthful to the best of my kno edge Date ] Z� f Pint Name Signature PI D�CM e indicate application attachments pertaining to your proposed project MP 2 Excavation and Fill information ❑DCM MP 5 Bridges and Culverts ❑DCM MP 3 Upland Development ❑DCM MP-4 Structures Information Form DCM MP 2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for LAMA Major Permit Form DCM MP 1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental Information Describe below the purpose of proposed excavation and /or fill activities All values should be given in feat 7 EXCAVATION a .amount of material to be excavated from below NHW or NWL in cubic yards (i) Does the area to be excavated include coastal wetlands /marsh (CW) submerged - aquatic vegetation (SAV) shell bottom (SS) or other wetlands (WL)7 If any boxes are checked provide the number of square feet affected ❑CW ❑SAV OSB OWL ❑None (ii) Describe the purpose of the excavation in these areas t- DISPOSAL OF EXCAVATED MATERIAL b Type of material to be excavated d High- ground excavation in cubic yards 1-ucation of disposal area b Dimensions of disposal area section not applicable section not aonlicable (1) Do you claim title to disposal area-7 d (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA (ii) If no attach a letter granting permission from the owner (ii) If yes where? (1) Does the disposal area include any coastal wetlands /marsh (CW) submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of disposal in these areas f () Doe the disposal include any area in the mat -r? ❑Yes ❑No ❑NA (ii) if yes how much water area is affected? Access Channel Other (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock (excluding NWL Breakwater shoreline stabilization Length d Q Width d Avg Existing NA NA Depth 0 Final Project f:::J NA NA Depth - G 7 EXCAVATION a .amount of material to be excavated from below NHW or NWL in cubic yards (i) Does the area to be excavated include coastal wetlands /marsh (CW) submerged - aquatic vegetation (SAV) shell bottom (SS) or other wetlands (WL)7 If any boxes are checked provide the number of square feet affected ❑CW ❑SAV OSB OWL ❑None (ii) Describe the purpose of the excavation in these areas t- DISPOSAL OF EXCAVATED MATERIAL b Type of material to be excavated d High- ground excavation in cubic yards 1-ucation of disposal area b Dimensions of disposal area section not applicable section not aonlicable (1) Do you claim title to disposal area-7 d (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA (ii) If no attach a letter granting permission from the owner (ii) If yes where? (1) Does the disposal area include any coastal wetlands /marsh (CW) submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of disposal in these areas f () Doe the disposal include any area in the mat -r? ❑Yes ❑No ❑NA (ii) if yes how much water area is affected? f� v t t r�^a v !10 1� yy �3 Wo �v 41 J a �a I\ I d l i r tu ............. r 4 �v 41 J a �a I\ I d l i r 3 0 �L 2'7 o l! M---u 1 a S� J_ 1 1- Location 0305106I ON 076"42 05`9 ?W NAD 27 W CCN C0IU (: l= O Caption Potential site to remove submerged logs E M4M0�� r, Magnetic Dedmabon 111 {A1 wy i 1 E� E I t ap" 41 _ of 1�4 1! ir b- "` � It -!``r r ro p-r �