Regarding the Notice of Violation NOV-2021-PC-0025
I have been in contact with Lily Kay as I am a little confused if we are under the
right permit. We are a distribution center, not a metal fabricator. Ms. Kay has
been kind enough to help assist me to ensure we are indeed under the right
permit or if we need to see about moving to a Transit and Transport permit.
In effort to explain the failure, we had a personnel change back in 2016.
Unfortunately, the transfer of knowledge didn't happen. I apologize for the error
and I will work to get everything corrected and submitted to you in the 60 days
as required.
Regarding the analytical testing, I have all the tests that we have had since
2014. It appears we have only been doing it once a year. I will go online and
submit the testing that we have as required no later than tomorrow 2/19/21. We
will work with Pace analytical on the semi-annual testing. They are sending a
quote to do the testing for us, so we do not get behind in the future.
The annual permit should be paid by ACH transfer no later than 2/19/21.
I assure you this has priority attention and we will bring everything up to code
Yours sincerely ,
Cheryl Garretson
SHEQ Coordinator
Atlas Copco Compressor North American Service Center
Atlas Copco Compressors North American Service Center
11313 Steele Creek Rd Tel.: 1.704.504.6963
Charlotte, NC 28273 Email: Cheryl.garretson@atlascopco.com
w .atlascooco.com