Loading...
HomeMy WebLinkAbout20201902 Ver 1_SITE PLAN_20210216Strickland, Bev To: Meagan Jolly Subject: RE: [External] Re: Cambridge commons 20-1902 ikr2k vEr6upow w -- 1 DWR Division of Water Resources Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax:(704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Meagan Jolly [mailto:meaganjolly@wetlands-waters.com] Sent: Tuesday, February 16, 2021 11:00 AM To: Johnson, Alan <alan.johnson@ncdenr.gov> Subject: [External] Re: Cambridge commons 20-1902 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Attached file has overall site plan These are itemized impacts: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-004, width (linear Temporary (T) (INT)? other) (feet) feet) S1 SPOT 36' RCP Culvert T-3 ❑ PER ® INT ® Cups ❑ DWQ 3 935 S2 SPOT Riprap Apron T-3 ❑ PER ® INT ® Corps ❑ DWQ 3 14 S3 SPOT Bank stabilization T 1 ® PER ® Corps 6 90 (riprap) ❑ INT ❑ DWQ S4 ® P ❑ T Bank stabilization T 1 ® PER ® Corps g 112 (nprap) ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Caps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impnch 309 3i. Comments: Proposed permanent stream impacts total approximately 309 LF for culvert placement. bank stabilization, and nprap energy dissipation. Proposed permanent loss of stream channel totals approximately 93.5 LF. Meagan Jolly 704.681.3479 www.wetlands-waters.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. Thank you for your cooperation and consideration. On Tue, Feb 16, 2021 at 10:12 AM Johnson, Alan <alanJohnsonkncdenr.gov> wrote: You didn't include an overall site plan .... just a crossing and your zoom in for impacts isn't clear. Either cropped to tight or cut off during copying. The span with riprap is considered and impact, plus I think you have a typical culvert installation? DWR Division of Water Resources Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 3. SrreamlmpacLL It there are perennial a burnishers stream Wall hint uM1rq temporary Imrycb) proposed on this else, then compete this question for all stream sil impecW. M 3G. 3c. X 3e. 3f. 3g. Stream impact Tyye of lmpa Barrel name Postal Type of Jurisdiction Average Impact number (PER)or (Cape.e0a, 10 anal length Permanent lPla Imam DWD—rerW05, wkM (lirear Tempamy Rl play? Other) (ears) feet) S1 ®POT WRCP Culvert T-3 ❑PER ®Cap 3 935 EIRT El "a S2 E P Q T Rlaap Aprar TJ D E PER IRT E Cap ❑DWD 3 16 S3 E P D T Bank sbbiizatlgn T 1 E PER E Cap S W (ripiap) ❑ Ill ❑ "a Sa EPDT Bonk traditional T1 EPER Oconee9 112 (fail ❑IRT DDWD SS DPDT DPER [I Cents C] kill ❑DWD SS D P D T ❑ PER ❑ cape ❑INT ❑DWD A Tood steam and tribulary impale 309 N Comments: Proposes Permanent steam impacts total approdrnotdy 309 LF for current placement, bank stadlcatlgn, aM tribal enel eis9phon. Proposed permarearat loss 0 small Nenrel Was appirwinnabil 9351F. 3 11 !I `tiF. � Ie ��MAIRS 41, nu ue,[� � � MC GflIYH - �� _3 TRACT' �.ur�,. .wa (PHASE I) TRACT A (PHASE 2, AC. HATCHED)G�'/ w } SYw Yg6Y XYw.sew.)�gaL"I M 0=1mm..L..mmMW.w. pwYnbi Ywn gsl.Laatl iupPIN T1MgInVw. Sewn MY Y TYIYgVM Rw�.p. InW-Atea' 1)w- s 10 (CwO.-w110 k'�b P)m)o"Irfm Ym pyq-nm �p1 lure) T..IP).sm T (Yq) +q) Sl ®POT b'RCPCUNM T3 ®fnP ❑L 9 0s VOPOT RpeP �pa� Td ®Cap LWp 0 1. &T®POT 0)heYpiv PM0R T.1 0 ❑GWO4 SROPOT Xok i-1 m :ceps 0 112 OpYps SEOPOT ❑Cap❑L SSOPOT Cap❑iW fi.TaW.tl 1M.u�e1)p)Y 9N Y. pmMY: PFOp.OpM.9nF.ee W1 YM'm k1W.MOrewgYNBLFIaWN)1(/Yb^).. eHlYpYtlWn,.tlrlpglrrt0y JWpllm,