HomeMy WebLinkAbout20201902 Ver 1_SITE PLAN_20210216Strickland, Bev
To: Meagan Jolly
Subject: RE: [External] Re: Cambridge commons 20-1902
ikr2k vEr6upow
w --
1
DWR
Division of Water Resources
Alan D Johnson — Senior Environmental Specialist
NC Dept. of Environment & Natural Resources (NCDENR)
Division of Water Resources - Water Quality Regional Operations
610 East Center Ave., Suite 301, Mooresville, NC 28115
Phone: (704) 235-2200 Fax:(704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
From: Meagan Jolly [mailto:meaganjolly@wetlands-waters.com]
Sent: Tuesday, February 16, 2021 11:00 AM
To: Johnson, Alan <alan.johnson@ncdenr.gov>
Subject: [External] Re: Cambridge commons 20-1902
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Attached file has overall site plan
These are itemized impacts:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non-004,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 SPOT
36' RCP Culvert
T-3
❑ PER
® INT
® Cups
❑ DWQ
3
935
S2 SPOT
Riprap Apron
T-3
❑ PER
® INT
® Corps
❑ DWQ
3
14
S3 SPOT
Bank stabilization
T 1
® PER
® Corps
6
90
(riprap)
❑ INT
❑ DWQ
S4 ® P ❑ T
Bank stabilization
T 1
® PER
® Corps
g
112
(nprap)
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Caps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h. Total stream and tributary impnch
309
3i. Comments:
Proposed permanent stream impacts total approximately 309 LF for culvert placement. bank stabilization, and nprap energy
dissipation.
Proposed permanent loss of stream channel totals approximately 93.5 LF.
Meagan Jolly
704.681.3479
www.wetlands-waters.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual
or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any
dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by
return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. Thank you for
your cooperation and consideration.
On Tue, Feb 16, 2021 at 10:12 AM Johnson, Alan <alanJohnsonkncdenr.gov> wrote:
You didn't include an overall site plan .... just a crossing and your zoom in for impacts isn't
clear. Either cropped to tight or cut off during copying.
The span with riprap is considered and impact, plus I think you have a typical culvert
installation?
DWR
Division of Water Resources
Alan D Johnson — Senior Environmental Specialist
NC Dept. of Environment & Natural Resources (NCDENR)
Division of Water Resources - Water Quality Regional Operations
610 East Center Ave., Suite 301, Mooresville, NC 28115
Phone: (704) 235-2200 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
3. SrreamlmpacLL
It there are perennial a burnishers stream Wall hint uM1rq temporary Imrycb) proposed on this else, then compete this
question for all stream sil impecW.
M
3G.
3c.
X
3e.
3f.
3g.
Stream impact
Tyye of lmpa
Barrel name
Postal
Type of Jurisdiction
Average
Impact
number
(PER)or
(Cape.e0a, 10
anal
length
Permanent lPla
Imam
DWD—rerW05,
wkM
(lirear
Tempamy Rl
play?
Other)
(ears)
feet)
S1 ®POT
WRCP Culvert
T-3
❑PER
®Cap
3
935
EIRT
El "a
S2 E P Q T
Rlaap Aprar
TJ
D
E
PER
IRT
E Cap
❑DWD
3
16
S3 E P D T
Bank sbbiizatlgn
T 1
E
PER
E Cap
S
W
(ripiap)
❑
Ill
❑ "a
Sa EPDT
Bonk traditional
T1
EPER
Oconee9
112
(fail
❑IRT
DDWD
SS DPDT
DPER
[I Cents
C]
kill
❑DWD
SS D P D T
❑
PER
❑ cape
❑INT
❑DWD
A Tood steam and tribulary impale
309
N Comments:
Proposes Permanent steam impacts total approdrnotdy 309 LF for current placement, bank stadlcatlgn, aM tribal enel
eis9phon.
Proposed permarearat loss 0 small Nenrel Was appirwinnabil 9351F.
3
11
!I
`tiF.
�
Ie
��MAIRS 41,
nu ue,[�
� �
MC GflIYH
-
�� _3
TRACT'
�.ur�,.
.wa
(PHASE I)
TRACT A
(PHASE 2,
AC.
HATCHED)G�'/
w
} SYw Yg6Y
XYw.sew.)�gaL"I M 0=1mm..L..mmMW.w.
pwYnbi Ywn gsl.Laatl
iupPIN
T1MgInVw.
Sewn MY
Y
TYIYgVM
Rw�.p.
InW-Atea'
1)w-
s
10
(CwO.-w110
k'�b
P)m)o"Irfm
Ym
pyq-nm �p1
lure)
T..IP).sm
T
(Yq)
+q)
Sl ®POT
b'RCPCUNM
T3
®fnP
❑L
9
0s
VOPOT
RpeP �pa�
Td
®Cap
LWp
0
1.
&T®POT
0)heYpiv PM0R
T.1
0
❑GWO4
SROPOT
Xok
i-1
m :ceps
0
112
OpYps
SEOPOT
❑Cap❑L
SSOPOT
Cap❑iW
fi.TaW.tl 1M.u�e1)p)Y
9N
Y. pmMY:
PFOp.OpM.9nF.ee W1 YM'm k1W.MOrewgYNBLFIaWN)1(/Yb^).. eHlYpYtlWn,.tlrlpglrrt0y
JWpllm,