Loading...
HomeMy WebLinkAboutNCC206015_Modification Review_20210222Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 2/22/2021 8:49:30 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 2/22/2021 9:39:15 AM (Construction COC ADD TO FILE Review- NCC206015) • The task was assigned to Georgoulias, Bethany. The due date is: February 25, 2021 5:00 PM 2/22/2021 8:49 AM Y . Ta4M1 NORTH CAPOLINA EnYlrenmemf& Qualay Certificate of NCC206015 Coverage (COC) Enter the Certificate of Coverage Ninber (use capital letters) No.* Information associated with this permit: Project Name Louisburg 115kV Capacitor Bank Address 480 West River Road, Louisburg, NC County Franklin Latitude 36.1008 Longitude-78.3177 Permittee Listed Duke Energy Progress, LLC Legally Responsible Alan Lewis Individual NC Reference No. NCG01-2020-6015 E&SC Plan ID Original NOI Tracking No. F RANK-2021-014 39951 Date COC Issued* 01/04/2021 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed r Multiple Reasons (List) Addional We inforrration (e.g., new Site Contact details). If lots are being added, please include specific lot nunbers. Explanation Limits of disturbance were expanded to 19.5 AC to accommodate grounding wire installation and additional danger tree clearing You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form Supporting Upload Supporting Documentation (Pevised E&SCApproval, rose -Out Doc, etc.) Documentation FRANK-2021-014_20210221_LOA.pdf 266.39KB Mist be FDFfornat North Carolina General Statute 143-215.6B (i) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). � I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual r Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature AZAA) IV �CJ-T Type Name* Alan Lewis Title * Manager Substation Engineering Organization* Duke Energy Progress, LLC Date * 02/22/2021 Email Address* alan.levas@duke-energy.com En -ail for confirmation Telephone Number* 919-546-7451 Contact nunber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email esteffens@dewberry.com (Optional) Additional email for confirmation Original Permittee alan.lewis@duke-energy.com Email Original Site Contact reuben.jones@duke-energy.com Email Review Date 02/22/2021 Rescinded Since Submitted? Request Date 20210222 Formatted Review Date 20210222 Formatted