Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
100036_30 day poa_20210219
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 10-36 Facility Name: Funston Certified Operator Name Marc Green County: Brunswick Operator Number: AWA 988054 t. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID 5pillway(Y or N): Level(inches). Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Finisher Sow 18 19 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolurne and PAN content of waste to be pumped and hauled is reflected in section ill tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. A Jeff Earp Phone: 910-876--5686 Facility Owner/Manager (print) Date: 2/19/2021 Facility Owner/Manage (signature) 16 PoA (30 Day) 2/21/00 Il. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 Finisher line m = 790.5 lb PAN 2. Structure ID: Lagoon 2 Sow line m = 1296.1 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line rn = lb PAN n. lines 1 +2+3+4+5+6= 2086.6 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD- DO NOT LIST FIELDS TO WHICH PAN CANNr)T RP APPI mn ni 11Q1tir. T1sEc zn neV DGQinn o. tract # p. field # q. crop r. acres s. remaining IRR- Z PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 9 Small Grain 12.32 50.00 616.0 Sept -April 2982 10 Small Grain 27.07 50.00 1353.5 Sept -April 11 Fescue 12.73 161.00 2049.5 Aug -July State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4019.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2086.6 lb. PAN PoA (30 Day) 2/21100 x. Crop's remaining PAN balance (line v from section III) = 4019.0 lb. PAN y. Overall PAN balance (w - x) _ -1932 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is avai for pumping if needed. PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelidentifier (ID). Lagoon 1 Finisher 2_ Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a, current liquid level according to marker 18.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 20.4 inches c. line b - line a (inches in red zone) = 2.4 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 83538 ftz e. line c112 x line d x 7.48 gallons/W 124973 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design I 180 days g. volume of waste produced according to structural design 94644.4 ft3 h. current herd # 1710 certified herd # 1710 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period f. current waste analysis dated 1 12/30/2020 m. ((lines e + k)I1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 94644 ft' © ft3 73791.9 ft3 209984 gallons 2.36 1 Ibs11000 gal. 790.5 lbs. PAN PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon 2 Sow 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 19.0inches b. designed 25 yr./24 hr. storm & structural freeboard 20.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 169437 ft2 e. line c112 x line d x 7.48 gallons/W 105616 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 294486 W h. current herd # 3100 certified herd #1 2900 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4_ Total PAN to be land applied during draw down period I. current waste analysis dated 1 12/30/2020 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 314795 W giW 1120313�3I1 ft3 542435 gallons 2,00 Ibs/1000 gal. 1296.1 lbs. PAN PoA (30 Day) 2/21100