Loading...
HomeMy WebLinkAbout20071050 Ver 4_401 Application_20120612t O�O� W A7'F9QG .� b1 -I oso- Uq Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 I=" Page 1 of 12_ Pre - Construction Notification C Form A Apphcant Information 1 Processing 1 a Type(s) of approval sought from the Corps ® Section 404 Permit ❑ Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 14 or General Permit (GP) number 1 c Has the NWP or GP number been venfied by the Corps? ®Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? if so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ❑ No 1g is the project located in any of NC s twenty coastal counties if yes answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project NCSU Centennial Campus Greenway 2b County Wake 2c Nearest municipality / town Raleigh 2d Subdivision name NCSU Centennial Campus 2e project T I P or state T I P EL 5100 PA JUN 3 Owner Information 3a Name(s) on Recorded Deed State of North Carolina (for North Carolina State Universe d DB 10522 PG 842 DB 4812 PG 0071 R 3b Deed Book and Page No 3c Responsible Party (for LLC if applicable) Charles Leffler Vice President of Business & Finance 3d Street address Holladay Hall B Campus Box 7201 3e City state zip Raleigh NC 27695 3f Telephone no 919 515 -2155 3g Fax no 919 515 5121 3h Email address charles_leffler @ncsu edu Page 1 of 12_ 4 Applicant Information (if different from owner) 4a Applicant is ® Agent ❑Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name Amy Mackintosh 5b Business name (if applicable) Reynolds & Jewell 5c Street address 3441 Leonard Street 5d City state zip Raleigh NC 27607 5e Telephone no 919 781 6067 5f Fax no 5g Email address mackintosh amy @gmad com Page 2 of r?— B Project Information and Prior Project History 1 Property Identification 1 a Property identification no (tax PIN or parcel ID) 0793521758 0793051169 Wetland Impact Locations Latitude 35 7611 1 b Site coordinates (in decimal degrees) Longitude 78 6724 S1 &S2 Stream H (DD DDDDDD) (DD DDDDDD) 1c Property size Trail comdor wetland delin area = 7 34 Overall project -786645 357591 area = 36 35 AC 2 Surface Waters 357589 2a Name of nearest body of water (stream river etc) to Walnut Creek 27 34(4) 357601 proposed project Wetland 3 2b Water Quality Classification of nearest receiving water C NSW 2c River basin Neuse 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The project site is an existing grassed sanitary sewer easement and adjacent wooded floodplain on NCSU s Centennial campus The trail comdor runs along the north side of Walnut Creek which lies outside the project area except for about 65 at the approach to the existing box culvert under Lake Wheeler Rd 3b List the total estimated acreage of all existing wetlands on the property 0 757 Ac within wetland delineation comdor for trail 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 554 LF within the wetland delineation comdor for the trail 3d Explain the purpose of the proposed project Multi use trail for pedestnan/bike transportation recreation and educational uses on NCSU s Centennial campus and connections to the City of Raleigh trail system along Walnut Creek The two trail segments in this project will fill in missing links in the trail between the existing City greenway at Lake Wheeler Road (east end of the project) and existing sidewalks and greenway connections at Avent Ferry Rd (west end of the project) 3e Describe the overall project in detail including the type of equipment to be used Construction of approx 5180 LF of paved multi purpose trail — primarily asphalt within the existing sewer easement using standard earthmoving and paving equipment The trail will cross two unimportant perennial streams in the Lake Wheeler segment Culvert pipes will be added for these crossings These crossings are located within the sewer easement where the streams are already lined with nprap and /or piped The trail will connect to an existing trail that ends in an existing pedestrian box culvert under Lake Wheeler Rd The approach to this box culvert runs right along the Walnut Creek top-of bank for approx before connecting to the existing culvert wing wall A new concrete retaining wall is proposed to extend the existing wing wall and retain the trail edge This wall will follow the alignment of the existing creek bank for approx 10 before diverging landward to follow the trail alignment SAW-2012-0521 NCSU Centennial Campus Greenway Stream and Wetland Impact Locations Impact Feature Longitude Latrtude S1 &S2 Stream H -786673 357608 S3 & S4 Stream G -786645 357591 S5 & S6 Walnut Cr -786644 357589 Wl Wetland 1 -786647 357601 W2 Wetland 3 -786829 357673 W3 Wetland 4 -786847 357677 W4 Wetland 5 -786851 357680 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the pasty ®Yes F] No ❑Unknown Comments Wetlands submitted to Corps with this PCN State stream determination for buffers — see below 4b If the Corps made the jurisdictional determination what type Preliminary[—] Final of determination was made? 4c If yes who delineated the jurisdictional areas'? Name (if known) Lauren Witherspoon (DWQ) — stream det Agency /Consultant Company Steven Ball Soil & Environmental Consultants — current Other wetland delineation (attached) 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation State stream determination — 01/05/2012 5 Project History 5a Have permits or certifications been requested or obtained for ®Yes ❑ No Unknown this project (including all prior phases) in the past 5b If yes explain in detail according to help file instructions Greenway project Phase 1 DWQ # 07 1050 See attached certifications 6 Future Project Plans 6a Is this a phased projects ® Yes ❑ No 6b If yes explain After this project the Walnut Cr Trail will be complete through Centennial Campus except for 1) permanent trail alignment in place of the proposed temporary access route at the east end of the Trailwood segment (this work will be coordinated with future development plans for the adjacent lease site) and 2) connection across Walnut Creek to the City s greenway trailhead at Trailwood Rd Proposed Impacts Inventory Impacts Summary 1 a Which sections were completed below for your project (check all that apply) Wetlands ® Streams tributaries ® Buffers Open Waters ❑ Pond Construction Page 4 of 12- Mi-LI Cl- - % /.... -- 4 7 f1......- .1.... 4A '%AAA % /.......... Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non -404 other) (acres) Temporary Riprap W1 P ® ❑ T dissipator culvert & associated fill for ❑ Yes ® Corps 0 003 trail crossing No DWQ between Wetlands 2A & 2B (LWR) W2 ®P ❑ T Fill and culvert for trail crossing of Yes corps 0 021 wetland 3 (TW) ®No ®DWQ W3 ®P ❑ T Fill and culvert for trail crossing of ❑ Yes ® Corps 0 010 wetland 4 (TW) ® No ® DWQ W4 ®P ❑ T Fill and culvert for mg of ®Nos ®Corps 0 071 wetland 5 (TW) ® DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 0 105 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non -404 width (linear Temporary (T) (INT) other) (feet) feet) Pipe culvert and associated fill and nprap dissipator S1 ®P ❑ T (24 LF existing pipe removed 30 LF LWR Unnamed ® PER ® Corps 3 6 LF new pipe added tributary H ❑ INT ® DWQ net 30 nprap channel removed 30 added — no net change S2 ❑ P ® T Tem sediment &re osion LWR Unnamed ® PER ® Corps 3 12 control measures tributary H ❑INT ®DWQ 42 LF Pipe culvert and associated fill S3 ®P ❑ T New nprap dissipator replaces LWR Unnamed ❑ PER ® Corps 4 42 existing nprap tributary G ❑INT DWQ channel lining — no net change Page S o( 12 S4 ❑ P ®T Temporary sediment & erosion LWR Unnamed ❑ PER ® Corps 4 8 control tributary G ❑ INT ® DWQ measures 17 LF retaining S5 ®P ❑ T wall along creek bank extending Walnut Cr ® PER ® Corps 28 17 existing tunnel ❑ INT ® DWQ wing wall to retain trail edge Coffer dam for construction of ® PER ® Corps 100 S6 P TX retaining wall at Walnut Cr INT ® DWQ 28 sf tunnel approach 3h Total stream and tnbutary impacts 85 If N Comments New crossing at Tributary H will replace an existing crossing in order to move the trail crossing further away from Walnut Creek 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑P ❑T 02 ❑P 03 OP 04 ❑P ❑T 4f Total open water impacts 4g Comments 5 Pond or Lake Constructwn If pond or lake construction proposed the complete the chart below 5a 5b 5c 5d 5e Pond ID Proposed use or purpose of Wetland Impacts (acres) Stream Impacts (feet) Upland (acres) number pond Floode d Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If ID yes permit no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction Page - 315 o� 19. M^kf r.,..,., % /.... -- A 7 n.......,,, L... 4n nnn0 % /..... .... 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ® Neuse ❑ Tar Pamlico ❑ Other- Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) or impact Stream name mitigation (square feet) (square feet) Temporary required? 61 ®P ❑ T Trail LWR Tnb G & Walnut ❑ Yes 1216 construction Creek ® No 62 ❑ P ® T LW Tnb G& Walnut L:] Yes 3441 revegetation ® No 133 ® P ❑ T gTrail constr LWR Tnb H & Walnut Creek ® Nos 1970 SF4 B4 P X T () Trading LWR Tnb H & Walnut ❑ Yes 2322 revegetation Creek ® No ❑ Yes 65 (X)P T consTrail Walnut Creek ® No 9987 Grading 66 P (X)T & Walnut Creek ®Nos 15962 revegetation ❑ Yes 137A (X)P T consTrail Lake Raleigh ® No 494 676 P (X)T revegetation Grading Lake Raleigh 0 Yes 148 ❑ Yes 68A (X)P T construction TW Tributary C ® No 938 560 B88 P (X)T Grading & revegetation TW Tributary C ® Yes No 560 320 139A (X)P T Trail construction TW Tributary A ❑oeS 772 992 139B P (X)T revegetation on 9 TW Tributary A ❑ Yes X No 259 276 6h Total buffer impacts 11 478 28 739 61 Comments D Impact Justification and Mitigation 1 Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Main trail follows existing cleared sewer line corridor Spur trail uses existing service drive through floodplain and between existing wetlands Trail alignment and grading avoids Zone 1 of the NRB of Walnut Creek except where necessary to access the existing trail culvert under Lake Wheeler Rd Crossings of tributary streams are approximately perpendicular Trail generally matches existing grades (as required in floodway) except at crossings with minor elevation in low areas to achieve trail drainage Crossing at tributary H is relocated further away from Walnut Creek than existing culvert location 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Grading and construction is limited to a narrow corridor required for trail construction and associated grading All grading for Page 8 of ftS ?oF 11. main trail is within clear sewer easement and is needed to allow trail to drain without raising trail elevation in floodway Sediment/erosion control measures will be used to avoid impacts to wetlands and waters adjacent to project 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? X Yes ❑ No 2b If yes mitigation is required by (check all that apply) DWQ ® Corps c If yes which mitigation option will be used for this project? Mitigation bank Payment to in lieu fee program Permittee Responsible Mitigation Complete if Using a Mitigation Bank a Name of Mitigation Bank b Credits Purchased (attach receipt and letter) Fype Fuantity c Comments Complete if Malung a Payment to In lieu Fee Program a Approval letter from in lieu fee program is attached Yes b Stream mitigation requested linear feet c If using stream mitigation stream temperature warm cool cold d Buffer mitigation requested (DWQ only) 0 square feet e Riparian wetland mitigation requested acres f Non riparian wetland mitigation requested 0 acres g Coastal (tidal) wetland mitigation requested 0 acres h Comments Complete if Using a Penmittee Responsible Mitigation Plan a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Through the successful completion of the CVM and Lake Wheeler Stream and Buffer Restoration Project the University was granted permission to bank unused credits for future projects The amount of available mitigation credits is currently 350 LF of stream credit The Urnvensity intends to use these credits for any mitigation required for the Greenway project Page 9 -e€ H of la, Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes ® No b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone c Reason for impact Od Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) h Comments Page Wrf"" 944-) 0- E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? if no explain why Comments Project is well under 20% impervious and involves minimal amounts ❑ Yes ® No of storm drainage piping Slopes are flat and most of the proposed pipes discharge into very flat areas within the floodplain where discharge flow will be diffuse 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 45 % 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why The impervious surface is below the threshold requiring a Stormwater Management Plan and does not concentrate flow 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? Raleigh ❑ Phase II ® NSW 3b Which of the following locally implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? T[:] Yes ❑ No Page +i- eH3-)o o f 18L r%^kl ff........ \ /...... -- 4 71'\..........1.... 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /stateAocal) funds or the ®Yes ❑ No use of public (federal /state) land? 1 b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter) ® Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the -fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility No wastewater will be generated from this project Page k2-uh 3 I I* t a rims ff..— \ /..... -- 4 7 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat 5b Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ® Raleigh 5c If yes indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 9/15/2011 Letter from USFWS 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitats I ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 9/15/2011 Letter from USFWS 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Previous correspondence from SHPO regarding Centennial Campus projects 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 -year floodplain? ® Yes ❑ No 8b If yes explain how project meets FEMA requirements Trail grades will match existing grades in floodway and /or balance cut and fill No structures are proposed 8c What source(s) did you use to make the floodplain determination? FIRM Panel # 3720079300J Amy Mackmtosh A4e� �130�20/ Applicant/Agents Printed Name Date Applicant/Agent s Signature (Agents signature is valid only if an authonzation letter from the applicant is provided Page 43 of is 19L061.,1- J 0 d p O ON Am � to W H W C/) z o w W Uj J 1 Q 1- V) Z _ Q �Z° o = W W O z u 3°vW a O U W W O;,M')Id IbINN �5N � 24 V O� �0 �t II '� :7 d a a o° 0 00 0 0 oa o ° °o ° � o 0 o° 0 0 a ° Z o� 2 �, 2N11 civ2ja QYOr' O IS ❑ np C-15 o /� Q h 0 ) ❑� // /�� ° 4 Q 4 q o 1� U �dU U O 1S �OUlIQpU� pp � o h o CL Z 0 u, O N 0 W 2 W V) O 0 �3 I..L 06 1� W J W w z Q Z J J_ V LU Q J Q ,W LL v / W z) w 0— z LU G � V) < CL CL cn :�E Q U —' —1 0 Q �f Z U LU Z LU U >O V 0 0 d opIDDA oa o�¢�40 o fi gQ,�p �� �O 9 ll�n o II % °dp T a d ° o / O� �0 �t II '� :7 d a a o° 0 00 0 0 oa o ° °o ° � o 0 o° 0 0 a ° Z o� 2 �, 2N11 civ2ja QYOr' O IS ❑ np C-15 o /� Q h 0 ) ❑� // /�� ° 4 Q 4 q o 1� U �dU U O 1S �OUlIQpU� pp � o h o CL Z 0 u, O N 0 W 2 W V) O 0 �3 I..L 06 1� W J W w z Q Z J J_ V LU Q J Q ,W LL v / W z) w 0— z LU G � V) < CL CL cn :�E Q U —' —1 0 Q �f Z U LU Z LU U LU 00 LU cLL 00 0-M will E 0 in 2 � � ■ � . w _° Q m }c E E o o-- f5z6 § / / \\\ 9(.�! o -E� ] MF c {< °�. k�|)� EG - e! •e # ^« 62E { o 7m E (;®�: ka� \) /d§ / | |§ƒ Q / ZE R § dc �k 2 - -/ , »S� \ �E Laid 0 \ \ P4 2 z 2 \§ , �fk �$� ;;. Vi )� ) k �� : ��� j O � k k \\ `' / { §§ � § � L k 7§ Z }c E E o o-- f5z6 § / / \\\ 9(.�! o -E� ] MF c {< °�. k�|)� EG - e! •e # ^« 62E { o 7m E (;®�: ka� \) /d§ / | |§ƒ 06 L C m r C 7 E W 2 E ry _ E d u :3`m „°C,o E�n0 W D O W Q C" 'o m w LL O = r t c p l6 O C= W W Z o E ~= a hoC aEa !s� `T U `. m-00 C E$' pg _ W m t p = v Z o g� �L z C 0� E ELL o� ° o 6 0 _ x C� _ W Q 0 ti ° r ao y E., W C `S p?%6f� . 0:3 p 1L Z 0 OJ z o °°= N t' 4 10 Zp« �' U 3 n e� d lO F T O. o O i �Z v� a, >F �a V 'E' p J C ! m LL d �?a v via i3m° W W TILL jU p Dl U s �3m E W pp qq gg o U. 0 Q° a 9 0 5 a e ti c ff -x ® c OU E fA C3 n C m v M e to �s H w w LL 0 o F o w F VK o w LL 4. H w w LL 0 o F o w o w LL O �i O O O s N Q � w W N o Y4 y® Q e ahry w 4. Ow- IM, A 40"AW l* MCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Bewevy Eaves Perdue Charles Wakild RE Dee Freeman Governor Director Secretary April 4. 2012 NC State University Design & Construction Services Attn: 1."rnn Swank Administrative Services Building 3, Suite 3(x0 Campus Box 7216 2701 Sullivan Drive Raleigh, NC 27695 NBRRO#124W Wake County Determirtation Type: Buffer Call Isolated or EIP Call Neese (I 5A NCAC 2B 0233) F- 1 EpherneraVIntermittenUPerennial Determinaliort 0 Tar-Pamlico (15A NCAC 213.0259) i �1 ❑ Isolated Wetland Determination ❑ Jordan (15A NCAC 28 -0267) Project Name: Location/Directions: Subject Stream: Centennial Campus Greenway Greenway between Arent Fem Road and Lake Wheeler Road WalmA Creek Date of Determination: 115/12 Ftaiure Not Subject Subject t Start(,O Stop*, Soil Survey USGS Topo A B P X X X X C I X X D E X E E X X IF P X X X G I X X H P X X X I X N Orc hC 1V=V;V Noah Carolina Div mion 4 A atcr QtWih, Raleigh %*,onal Office 'I'mr1bee Water Protection Phone (919) 7914.V) Custoom Smwe !(Hemet *WvtnC*a*rqtkak4Y'Orq 1629 Mail ScvviLv Ceaw Rakcsgk NC 1629 FAX 1919) 57147)9 1-977-62W148 An Eq" C CttRU µAllrrrrsa5ve 40m Empbrw - 50% Reupcie&M Pcd Cavwnw Pow _ Wake County Page 2 of 2 Not Evaluated I I I IX I I IX IX •EIfP = Ep hemeruUlntermatent, Perennial Explanation. The feature(s) listed above has or have been tocated on the Soil Surrey of Wake County, North Carolina or the most recent copy of the USES Topographic neap at a 124,0O0 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that quality it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the LS Army Corks of Engineers an&or to the Division of Water Quality This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or frown the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Karen Higgins. DWQ WeBSCaPe Unit. 16-50 Mail Service Center, Raleigh, NC 27699. If you dispute the Director's determination you may Gk a petition for an administrative bearing. You must file the petition with the Offxe of Administrative Hearings within sixty (60) days of the receipt of this notice of decisin. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office boars. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00 am and 5;00 Pm, except for official state holidays. To request a bearing, send the original and one (1) copy of the petition to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27691 -6714, The petition may also be faxed to the attention of the Ufftce of Administrative Hearings at (919) 733 -3478, provided the original and one (1) copy of the document is received by the Office of Administrative Hearings within five (5) days following the date of the fax transmission. A copy of the petition most also be served to the Department of Natural Resources, c/o Mary Penny Thompson, General Counsel, 1601 Mail Service Center, Raleigh, NC 27699-1601. This determination is final and binding unless, as detailed above, you ask for a bearing or appeal within sixty (60) days. The owner /future owners should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 4041401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Office) at (919) -733 -1786, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554 -4884. Respectfully, i� Lauren Witherspoon Environmental Senior Specialist cc. WeBSCaPe - 1650 Mail Service Center RRO"SWP File Copy 1 1,9 112 2VO 400 SM Few J N Wai ►? w�-- � � n *" a n �% l5 V'2 ? *- ,-- ov, 1� _ biz on NO Q t -. 4w M FoO WAKE COUNTN MSR,Maps: Print Send To Prig l 1 Sack To MSt Maps OWnge to !1x27 Print Size .._ _ ZUSM _RaW North QW011 sa, United • Show Grid Lines es 01 Jul 1988 rJV.-9 :• IL','- w Page I of I 10 1 ,r s t y Jrt Y a f l�\w l Opd- S. -•1 a S q _� 4. {.. y .} t 100, anal .as X00 200 r I-age courtesy of the US. Geaiugicai Survey ;?.� 2010 Microsoft Corparaton. Tenors of Use Privacy Statement http:/imsa maps.conVPrintimage.aspx?T =2 &S= l I &Z =I 7 &X= 1 773& Y =9401 &W=I &qs = %... V6/201, MSRMaps: Print Send To Printer t, Back To MSR Maps Change to I U1 7 Print Size Show Grid Lines ZUSG.S Raleigh, North Carolina, United States 01 Jul 1%8 4, kx� 2010 MI-osoft comorarjor. Pape I of I Change to Landscape Image courtesy of the u.S. Geo"icai survey Terms of Use Privacy Statement 0 http:,''msrmaps.comj,Printlmage.aspx'Tl'=2 &S=11&Z=17&X=1777&Y=9899&W=I&qs--=°,�.-. F6,2012