HomeMy WebLinkAbout20202010 Ver 1_DWR Pre-Filing Meeting Request Form_20210219DWR Pre-Fil ing Meeting Req u est Form
Contact Name *
Contact Email Addre ss *
Proje ct Owne r *
Proje ct Name *
Proje ct County *
Owne r Addre ss:*
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
Please give a couple of dates you are available for a meeting.
Sean Farrell
scfarrell@ncdot.gov
NCDOT Division 3 Highway Unit
SR 1707 Panther Creek Maintenance Excavation and Pipe Replacement
Duplin
City
Castle Hayne
State / Province / Region
NC
Postal / Zip Code
28429
Country
USA
Street Address
5501 Barbados Blvd.
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Joanne Steenhuis
Proposed maintenance excavation of existing stream channel of
White Oak Branch (C;Sw, Stream Index 18-74-18-1) where it crosses
SR 1707 Panther Creek Road in Duplin County. Crossing is located
approximately 0.38 miles south of NC 11. Lat: 35.053042, Long:-
77.790635. Existing (2) 36" x 50' CAPs to be replaced with (1) 95" x
67" x 50' CAAP w/ HW. Attached Pre-Filing package contains vicinity
map, aerial map, and field sheet with elevations of stream channel
obtained in the field.
12/29/2020
12/30/2020
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature *
Submittal Date
12/31/2020
SR1707-PreFilingPackage.pdf 816.46KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
12/23/2020