Loading...
HomeMy WebLinkAbout20202010 Ver 1_DWR Pre-Filing Meeting Request Form_20210219DWR Pre-Fil ing Meeting Req u est Form Contact Name * Contact Email Addre ss * Proje ct Owne r * Proje ct Name * Proje ct County * Owne r Addre ss:* Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* Please give a couple of dates you are available for a meeting. Sean Farrell scfarrell@ncdot.gov NCDOT Division 3 Highway Unit SR 1707 Panther Creek Maintenance Excavation and Pipe Replacement Duplin City Castle Hayne State / Province / Region NC Postal / Zip Code 28429 Country USA Street Address 5501 Barbados Blvd. Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Joanne Steenhuis Proposed maintenance excavation of existing stream channel of White Oak Branch (C;Sw, Stream Index 18-74-18-1) where it crosses SR 1707 Panther Creek Road in Duplin County. Crossing is located approximately 0.38 miles south of NC 11. Lat: 35.053042, Long:- 77.790635. Existing (2) 36" x 50' CAPs to be replaced with (1) 95" x 67" x 50' CAAP w/ HW. Attached Pre-Filing package contains vicinity map, aerial map, and field sheet with elevations of stream channel obtained in the field. 12/29/2020 12/30/2020 Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature * Submittal Date 12/31/2020 SR1707-PreFilingPackage.pdf 816.46KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 12/23/2020