Loading...
HomeMy WebLinkAbout20120487 Ver 1_More Info Received_20120615Strickland, Bev From: Witherspoon, Lauren Sent: Friday, June 15, 2012 10:22 AM To: Strickland, Bev Subject: FW: Marsh Creek PCN Revised Sheets DWQ 12 -0487 Attachments: Marsh Creek PCN—Page 6_Updated.pdf; Marsh Creek PCN—Page 8_Updated.pdf For laserfiche file 12 -0487. Thanks, Ic Lauren Witherspoon NC Division of Water Quality- Surface Water Protection Section - Raleigh Regional Office 3800 Barrett Drive, Raleigh, NC 27609 (919) 791 -4251 (office) (919) 788 -7159 (fax) E-mail correspondence to and from: this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties. From: Brian Oschwald [ mai Ito: boschwaId (a)thewootencompany.com] Sent: Wednesday, June 13, 2012 3:34 PM To: Witherspoon, Lauren Cc: 'Brower, Aaron'; Brian Johnson Subject: Marsh Creek PCN Revised Sheets Lauren, As discussed this morning, I have attached sheets 6 and 8 of the PCN Application. I made a slight revision to the Buffer Impact Summary before I submitted them, but did not relay this information to the application as well. The application and the charts now match. If you need any additional information or have any more questions, please feel free to give me a call. Thanks, 3�f �� 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ® Yes ❑ No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Beason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 Gravity Sewer 25,957 3 (2 for Catawba) 77,871 Zone 2 Gravity Sewer 1.5 6f. Total buffer mitigation required: 50,777 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). The City of Raleigh has elected to restore approximately 27,094 square feet of abandonded Zone 1 Neuse Riparian Buffer. This square footage has been subtracted from the required Zone 1 mitigation. The remainder of the mitigation (50,777 sq. ft.) will be mitigated by payment into a private mitigation bank, EBX. 6h. Comments: See Pre - Construction Notification spreadsheets that are attached to this application Page 8 of 11 PCN Form — Version 1.3 December 10, 2008 Version have been identified, but not listed in the stream impacts table. These eight stream impacts are labeled on Exhibits 1 through 5, which have been included with this application. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T N/A 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 N/A K Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ❑ Tar - Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) impact Stream name mitigation (square feet) (square feet) or Temporary T required? B1 ®P ❑ T Trenching for Gravity Sewer Marsh Creek ® Yes ® No 27,804 52,525 B2 ®P ®T Trenching for Gravity Sewer UT to Marsh Creek ® Yes ® No 5,136 2,727 B3 ❑ P ®T Trenching for Gravity Sewer Marsh Creek ❑ Yes ® No 714 558 6h. Total buffer impacts 33,654 55,810 6i. Comments: See Pre - Construction Notification spreadsheets that are attached to this application D. Impact Justification and Mitigation Page 6 of 11 PCN Form — Version 1.3 December 10, 2008 Version