Loading...
HomeMy WebLinkAboutMemo_DOD MS4 Post Construction_20210218ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director U U (1 I : L Ul DATE: February 18, 2021 �EQ NORTH CAROLINA Environmental Quality TO: Department of Defense NPDES MS4 Permittees DEMLR Stormwater Staff ,V�FROM: Brian Wrenn, Director CC: DEMLR Stormwater Permitting Program File SUBJECT: Notice of Post -Construction Requirements for Department of Defense NPDES MS4 Permittees The purpose of this memorandum is to provide the following notice to permitted National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer Systems (MS4s) that are owned and operated by the U.S. Department of Defense (DOD). DOD MS4s that do not already review, approve, and enforce Post -Construction permit applications within their own jurisdictions are required to develop and implement a Post -Construction program by October 1, 2023. This memo will not result in any changes for those DOD MS4s who currently implement their own compliant Post -Construction program throughout their MS4 permitted area. However, DOD MS4s who do not currently implement a Post -Construction program will need to develop the ability to do so. This will require completing the tasks summarized in Table 1. The status of these tasks shall also be included in the appropriate MS4 permit annual reports. Table 1: Requirements for DOD MS4 Post -Construction Program Development Task Deadline 1. Incorporate the four tasks and deadlines below into the May 31, 2021 required MS4 Stormwater Management Plan (SWMP). 2. Select the Post -Construction program(s) to implement and December 31, 2021 notify DEMLR of selection (see below). 3. Establish local authority to review, approve, and enforce the October 1, 2022 selected Post -Construction program. 4. Staff the Post -Construction program and/or execute October 1, 2022 appropriate implementation contracts, agreements, etc. D E Q173]�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH CAROLINA � oepanmem of enmmnmemm Quail� 919.707.9200 S. Fully self -implement a compliant Post -Construction program. October 1, 2023 In the 20 Coastal Counties, DEQ implements stormwater management requirements in accordance with 15A NCAC 02H .1019. However, 15A NCAC 02H .1019(1)(a) states that "this Rule shall be implemented by local governments and other entities within the 20 Coastal Counties that are required to implement a Post -Construction program as a condition of their NPDES permits." This currently applies to the following DOD MS4 permits: • NCS000290 Camp Lejeune Marine Corps Base • NCS000335 Seymour Johnson Air Force Base • NCS000314 Marine Corps Air Station Cherry Point Outside of the twenty coastal counties, the requirements for post -construction in NPDES and Urbanizing Areas are established in 15A NCAC 02H .1017(1) which states, "The requirements of this Rule shall be implemented by permittees, delegated programs, and regulated entities in accordance with Rule .0151 of this Subchapter and Rule .1016 of this Section." This currently applies to DOD MS4 permit: • NCS000331 Fort Bragg and Camp MacKall 2