HomeMy WebLinkAbout20061013 Ver 3_Stormwater Plans_20070521 1 1 1 1 1 1 1 1 HORVATH ASSOCIATES CIVIL ENGINEERS PLANNERS LANDSCAPE ARCHITECTS ?'x.p ot, - io?3 Glenn View Station Stormwater Management Plan Extended Detention Wetland And Level Spreader Design P 1@ 15 U E] MAY 2 1- 2001 )ENK - ER QUALITY North Carolina Tennessee O TL01 " ;t STO ?d!MATERBRANCH 16 Consultant Place, Suite 201 537 Market Street Suite LL20 Durham, NC 27707 Chattanooga, TN 37402 p 919.490.4990 / f 919.490.8953 p 423.266.4990 / f 423.266.5700 F- XP 06 -t?t3 vB GLENN VIEW STATION STORMWATER MANAGEMENT PLAN - EXTENDED DETENTION WETLAND AND LEVEL SPREADER DESIGN Glenn View Station Geer Street and Glenn School Road Durham, North Carolina Horvath Associates Project Number: 0667 January 16, 2007 Revised March 15, 2007 Revised May 17, 2007 Prepared for: S Realty 2361 S. Centennial Avenue Aiken, South Carolina 29803 Phone: (803) 649-1411 Prepared by: Horvath Associates, PA Engineers - Planners - Landscape Architects P.O. Box 51806 Durham, North Carolina 27717 (919) 490-4990 i GLENN VIEW STATION ' EXTENDED DETENTION WETLAND DESIGN 1 General Description Glenn View Station is a proposed 51.35 acre shopping center. It is located south of and 1 adjacent to Interstate 85, north of Geer Street and west of Junction Road. It is located in the F/J-B watershed protection district and the Neuse River Basin. The developer has 1 chosen the `high density' option and the site will exceed 24% impervious with 85% TSS removal and the impervious percentage is to remain below 70%. And extended detention wetland will provide 85% TSS removal and will satisfy a 401 permit as issued by North 1 Carolina Division of Water Quality (NC DWQ). A level spreader is planned to provide sheet flow into the Neuse Buffer. This level spreader is proposed for new impervious area associated with the widening of East Geer Street. 1 Revisions A stormwater management plan was previously approved under DWQ Project # E06- 1 1013. This stormwater management plan included design of an extended detention wetland to treat the entire shopping center for 85% TSS removal. The wetland has been altered per City of Durham Stormwater Services comments in a number of ways. Two additional PVC siphon openings will be provided in the side of the riser. These siphon openings will be installed in six-inch increments below the original 1 siphon. They will initially be capped, but will be installed such that caps can easily be removed in the event that it is determined that the normal pool of the wetland needs to be lowered. This satisfies the City of Durham requirement that the siphon of an extended ' detention wetland be designed and constructed such that its elevation may be raised or lowered. A vegetative buffer planting plan is provided along the edge of the wetland where the berm is not in place. This buffer also follows City of Durham requirements. 1 The surface area of the wetland has been increased. It was necessary to increase the surface area in order to provide adhere to City of Durham's requirements for freeboard in 1 the passage of the runoff resulting from the 100-year rainfall event. Enlargement of the surface area of the wetland should serve to improve the functionality of the wetland for water quality purposes. Additionally, the overall impervious area draining to the wetland 1 is reduced due to alterations made in the site plan. The proposed emergency spillway was previously to be lined with `Pyramat' geotextile 1 liner. Per City of Durham Stormwater Services request, this spillway will now be lined with concrete. 1 Water Quality The extended detention wetland is designed per North Carolina DWQ Best Management Practices Manual (BMP Manual, April, 1999). All aspects of the design follow this manual including the required surface area, volume of detention of the 1-inch rainfall, and discharge of the water quality storm over a 2-5 day period. Wetland grading also follows NC DWQ requirements. The vegetation plan follows NC ' DWQ and City of Durham requirements. Wetland Construction and Outlet Structure Design. The proposed wetland berm qualifies as a class `A' berm per City of Durham requirements. Design of the wetland conforms closely to City requirements. The ' ` " ' RCP barrel. A O-ring diameter primary outlet structure consists of a 48" riser and a 30 concrete cradle and seepage diaphragm will serve to support the outlet structure system ' and reduce the potential for failure of the berm due to seepage. The emergency spillway is set to the 25-year water surface elevation and the wetland is routed assuming that entire primary outlet structure is clogged and the wetland is filled to the crest of the riser of the primary outlet structure. Routing in this manner provides 1.56 feet of freeboard to the `design' top of berm when routing the runoff from the 100-year rainfall event. The design top of berm is 346.94. The top of berm called out on the ' construction plans is 347.50'. The constructed elevation is to allow for 5% settlement of the berm. This spillway is a 90' long broad-crested weir and is to be lined with concrete or concrete cellular block. A geotechnical engineer is required to supervise construction of the berm and soil compaction tests are required for asbuilt sign-off. Numerous other specific instructions ' are detailed on the construction drawings. ' Peak Flow Detention The extended detention wetland will serve a dual purpose by detaining the peak flow resulting from the 1-, 2- and 10-year rainfall events below that of the pre-development condition. The Summary of Results details the pre- and post-development peak flows and also summarizes the peak inflow, outflow, water surface elevation and freeboard of ' each rainfall event that is routed. Level Spreader Design ' A level spreader is provided where new impervious surfaces will be introduced due to the widening of East Geer Street. This level spreader is designed per NC DWQ latest Level Spreader design guidelines. It is a bypass system, which discharges the 1-inch/hour rainfall through a small pipe into a forebay and subsequently into the level spreader. The 1 ' surface area of the forebay is based upon 0.2% of the impervious area draining to the level spreader. ' The level spreader will be constructed by cutting a relatively flat area into the side of the slope outside of zone 2 of the Neuse Buffer. A grass filter strip will be planted ' immediately downstream of the level spreader. Runoff will pass across the level spreader and then the grass slope before it discharges into the buffer. The length of the level spreader is based upon a composite of 13 ft/cfs for the approximate 20-foot grass slope ' and 65 ft/cfs for the 50-foot Neuse buffer. A worksheet accompanies this report, which illustrates the design dimensions of the entire level spreader system. 1 Methodology • Pre- and post-development peak flows and routing of the extended detention ' wetland is accomplished using HydroCAD Version 7.10. The SCS Method is utilized and SCS Curve Numbers are based upon the USDA Soil Survey (Map #18), which indicates the site is almost exclusively Hydrologic Soil Group `D' ' soils. ' • Time of concentration is calculated within HydroCAD using SCS TR55 segmental approach. Values such as Manning's `n' values are based upon widely accepted general averages and the cover conditions observed on the site. • '- Details of wetland design are based on City of Durham "Reference Guide for Development". 1 1 1 1 1 1 1 1 1 1 1 1 Wetland Design Summary of Results GLENN VIEW STATION 1-Year Pre- and Post-development Peak Flow Summary John E. Schrum, P.E. 3/15/2007 Post- Pre- Post- development Drainage development development Peak Flow with Detention Point Peak Flow Peak Flow Detention % Change Required? # cfs cfs cfs % 1 106.42 209.21 99.41 -6.6% Yes 2-Year Pre- and Post-development Peak Flow Summary Pre- Post- development Drainage development development Peak Flow with Detention Point Peak Flow Peak Flow Detention % Change Required? [#] [cfs] [cfs] [cfs] % 1 149.93 269.04 146.02 -2.6% Yes 10-Year Pre- and Post-development Peak Flow Summary Pre- Post- I U51- development Drainage development development Peak Flow with Detention Point Peak Flow Peak Flow Detention % Change Required? [#] [cfs] [cfs] [cfs] /G 1 289.40 452.16 286.70 -0.9% Yes Wetland Routing Summary Constructed To of Berm = 347.50 ft Design To of Berm = 346.94 ft Emergency Spillway Crest = 344.40 ft Return Period ea Inflow ea Outflow ea WSE Freeboard* ears cfs [Cfs] [01 ft 1 131.16 22.50 342.26 4.68 2 160.28 44.07 342.64 4.30 10 245.76 83.43 343.63 3.31 25 294.83 86.46 344.17 2.77 100 370.27 324.83 345.43 1.51 *Note: Freeboard is measured from the 'Deisgn Top of Berm'. 1 WETLAND DESIGN AND FLOW CALCULATIONS u 1 0 DWQ Project No. 04 - 1013 112) DIVISION OF WATER QUALITY - 401 EXTENDED DETENTION (and POCKET*) WETLAND WORKSHEET 1. PROJECT INFORMATION (please complete the follo ing information): Project Name : 1etin / W /D Contact Person: - Phone Number: For projects with multiple basins, specify which basin this worksheet applies to: ' Permanent Pool Elevation Temporary Pool Elevation 3 4a. 0,0 ft. 4 y I. to o ft. (elevation of the orifice invert out) (elevation of the outlet structure invert in) ' Permanent Pool Surface Area Drainage Area 3 3:7 .6 sq. ft. ac. (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) Impervious Area . LS ac. (on-site and off-site drainage to the basin) Forebay Surface Area sq. ft. (at permanent pool elevation approximately 15%)* ' Marsh 0"-9" Surface Area Marsh 9"-18" Surface Area sq. ft. sq. ft. (at permanent pool elevation approximately 35%)* (at permanent pool elevation approximately 35%)* Micro Pool Surface Area sq. ft. (at permanent pool elevation approximately 15%)* ' Temporary Pool Volume X176 0 L cu. ft. (volume detained on top of the permanent pool) SA/DA used 3.19 (surface area to drainage area ratio)* Diameter of Orifice in. (draw down orifice diameter) 11. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for ' additional information and will substantially delay final review and approval of the project 0 The temporary pool controls runoff from the 1 inch rain. ' The basin side slopes are no steeper than 3:1. A planting plan for the marsh areas with plant species and densities is provided. Vegetation above the permanent pool elevation is specified. An emergency drain is provided to drain the basin. A- J The temporary pool draws down in 2 to 5 days. Sediment storage is provided in the permanent pool. A sediment disposal area is provided. ' Access is provided for maintenance. /vDr? b? CGS A site specific, signed and notarized operation and maintenance agreement is provided. The drainage area (including any offsite area) is delineated on a site plan. Access is provided for maintenance. n details for the wetland are provided. Plan details for the inlet and outlet are provided. A site specific operation and maintenance agreement, signed and notarized b the responsible party is provided (see http://h2o.ehnr.state.nc.us/ncwetiands/0andm.doc). 014 ,C/- e Pocket Wetlands have different design parameters and are only assumed to remove 35% TSS - See pp. 19 and 20 of the NC DENR Stormwater BMP Manual, April 1999. 10% open water, 50% high marsh, 40% low marsh. 1 DURHAM City of Durham , Public Works Department Stormwater Services Divisions 101 City Hall Plaza, Durham, North Carolina, 27701 1 6 6 9 Telephone (919) 560-4326 FAX (919) 560-4316 CITY OF MEDME Constructed Wetland and Pocket Wetland Design Summary Stormwater Management Construction Plan Review: A complete stormwater management construction plan submittal includes a design summary for each stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details. 1 1 1 1 1 1 1 1 1 1 1 1 1 1. PROJECT INFORMATION Project Name: ( LENIN V15W S-rAT)njN Phase PIN: 09!49 -002- 9?4319 Case #: DD4 - 6gL3 Design Contact Person: T . 5 6ozvm Phone #: (M !9) O - 4490 Legal Name of Owner: 6J RS fRfrAJ-rV Owner Contact: °? 5ap t1 !5M; f1 Phone #: IOZLV - l l Owner Address: a 3(,o 1 S Ce)l }&7n?al Ave ?iaen , SC Mao-3 Deed BookOO3381 Page #00445 or Plat Book Page#ooa3'i5 for BMP Property For projects with multiple basins, specify which pond this worksheet applies to: Does the proposed pond also incorporate stormwater detention? 0e No Detention provided for: ? 1-year ?2-year ? 10-year _ other Dam Height: /1.5 (feet) Dam Classification: A_ Elevations Wetland bottom elevation Permanent pool elevation Temporary pool elevation 1-year storm orifice/weir elevation 1-year storm water surface elevation 2-year storm orifice/weir elevation 2-year storm water surface elevation 10-year storm orifice/weir elevation 10-year storm water surface elev. Emergency spillway elevation Top of embankment/dam Maximum water surface elevation Depth from design storm to Lowest orifice elevation Areas Permanent pool area provided Minimum required perm. pool area Design storm surface area Drainage area (10-acres min to Constructed Wetland) 336.00 ft. (floor of the wetland) 31+ 0. Ob ft. (invert elevation of the orifice) 391-60 ft. (elevation of the structure overflow) 391,60- ft. (invert elevation) 3 42_ ? 6 ft. 3 q (, AD ft. (invert elevation) 3 y g.6y- ft. 3 y 1.6 (Z ft. (invert elevation) _ 3 y3. 63 ft. 3 qq. Wo ft. (invert of emergency spillway) 3 y-4. S 0 ft. (elevation) 3 4 5, 14 3 ft. (max. storm pond can safely pass) 3. (o "? ft. 63,311 ft2 (water surface area at orifice invert elevation) L+ q, L 6,3 ft2 (calculated surface area required) 83 ft2 (Sped frequency event: J 0 year) 3 (? q ac. (total drainage to the wetland) Discharges (Sped only applicable frequency events) At BMP ' 1-year 2-year 10-year /00 year Inflow 131.1 cfs J6©.?8 cfs 2145 IL cfs 370.1? cfs ' Routed outflow .1,2.50 cfs qq. Qy- cfs 83.43 cfs Z3 4 . B3 cfs At Analysi s Point(s) that BMP Contributes to ' 1 2 10 -year -year -year -year Pre-development I D . cfs / 9.93 cfs B . 40 cfs cfs Post-development w/o detention 10f. Z.l cfs L61, oy cfs q z •1,6 cfs cfs t With detention q1 cfs 1416.02- cfs 2R9. 70 cfs cfs Volumes Permanent pool volume Water quality pool storage volume Design storm storage volume Total Storage volume provided at design storm Total Storage volume provided at top of dam Forebay volume (Constructed Wetlands only) Environmental Zones Zone Water Depth at Normal Pool Water Depth at Portion of Temporary Temporary Pool (Max Pool Surface Area Depth of 12-inches above Normal Pool 1 Deep Pool t' ?f t 5 6 5/ 3 _ . 0 , Low Marsh ti. High Marsh tt ?,o0 z9 . Woody Upland ?, t ? ft3 (volume of main pond and forebay) O Z491 L4W 3 s 16 38 3Si, ft3 (volume above permanent pool) ft3 (volume above permanent pool) ft3 ft3 ft3 ' Depths are to be calculated using the hydraulic depth calculation for each zone. Hydraulic Depth is the volume of water at an elevation divided by the water surface area at the same elevation. Other Parameters SA/DA2 Diameter of orifice Draw-down time Design TSS removal in. hrs o (from DWQ table) (must provide draw down over 2 to S day period) (minimum 85% removal required) 2 When using the SA/DA tables from the NCDENR BMP Manual, linear interpolation may be used for values between table entries.) Riser/Principal and Emerge; 1-year storm orifice/weir 2-year storm orifice/weir 10-year storm orifice/weir Z- year storm orifice/weir Principal spillway Emergency spillway icy Spillway I4;0 rInation diameter in. diameter in. diameterq / in. diametet?l in. diametei/ 30 in. width_qo__ ft. length ? 0 ft. length ft. length ft. length _?) ft. side slopes 3•i _1 slope % 1 II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Applicant's initials N a. The forebay volume is approximately equal to 20% of the pond volume. b. The temporary pool controls runoff for water quality design storm. c. The temporary pool draws down in 2- to 5-days. d. The drainage area to a Constructed Wetland is at least 10-acres. Smaller drainage areas to Pocket Wetlands will be reviewed on a case-by-case basis. e. Riprap outlet protection, if provided, reduces flow to non-erosive velocities (provide calculations). f. The wetland length to width ratio is greater than or equal to 3:1. g. The wetland side slopes above the permanent pool area are no steeper than 3:1. h. A submerged and vegetated shelf with a slope no greater than 6:1 is provided around the perimeter of the pond (show on plan and profile and provide a vegetation plan). i. Vegetative cover above the permanent pool elevation is specified. No woody vegetation is permitted on the embankment. j. A surface baffle, trash rack or similar device is provided for both the overflow and orifice. Flat top trash racks are not acceptable. Access hatch has been provided. k. A recorded drainage easement is provided for each pond including access to the nearest right-of-way and is graded per Section 8.3, Stormwater Control Facilities (BMPs). 1. If the basin is used for sediment and erosion control during construction, a note requiring clean out and vegetative cover being established prior to use as a wet detention basin shall b provided on the construction plan. in. A mechanism is specified which will drain the pond for maintenance and emergencies. Valves used shall be plug valves. n. Anti-floatation calculations are provided for riser structure. IV "V o. A plan view of the wetland with grading shown is provided. p. A profile through the forebay, wetland and spillway is provided. Water surface elevations are shown on the profile. q. Riser structure details are provided. r. Dam designed to account for a 5.00% settlement factor. s. Compaction specifications for the embankment are shown on the plan. t. The minimum top of dam width has been provided for the wetland embankment top width per Section 8.3, Stormwater Control Facilities (BMPs) e ' Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement, payment of permit fee per facility and payment of surety are required prior to construction drawing approval 1 1 1 1 1 1 1 1 1 1 REVISED WETLAND VOLUME Below normal pool Storage vs. Stage 140000 120000 • 100000 y = 9609.3x"" Rz = 0.9967 V 80000 • d rn $ 60000 N 40000 20000 0 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Stage (feet) KS = 9609.3 b = 1.7848 Wetland Design Sheet Project Name: Glenn View Station Designer: John E. Schrum, P.E. Job Number: 0667 Date: 3/15/2007 John E. Schrum, P.E. 3/15/2007 Contour Stage Contour Area Average Contour Area Incremental Contour Volume Contour Volume Stage w/SS Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 336.0 0.0 14440 338.0 2.0 19082 16761 33522 33522 2.01 339.3 3.3 48215 33649 42061 75583 3.18 340.0 4.0 63379 55797 41848 117430 4.07 1 OF 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 REVISED WETLAND VOLUME Forebays Wetland Design Sheet Project Name: Glenn View Station Designer: John E. Schrum, P.E. Job Number: 0667 Date: 3/15/2007 John E. Schrum, P.E. 3/15/2007 Contour Stage Contour Area Average Contour Area Incremental Contour Volume Contour Volume Stage w/SS Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 336.0 0.0 6576 338.0 2.0 9558 8067 16134 16134 2.00 340.0 4.0 12664 11111 22222 38356 4.00 Storage vs. Stage 45000 40000 35000 2413 y = 6786.6x 30000 R2 = 1 25000 m rn c 20000 h 15000 10000 5000 0 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Stage (feet) Ks = 6786.6 b = 1.2493 I OF I M 1 1 1 1 1 1 1 1 1 1 Revised Ext Det Wetland SA Calc Wetland #1 Stormwater Wetiand Surface Area Requirements Project Name: Glenn View Station Job Number: 0667 Date: 3/15/2007 Pond Drainage Area Description ==> Total DA = 32:69 acres Impervious Area = 27.25 acres DA % impervious = 83.4% SA / DA ratio calculations ==> Designed By: Matt Jones Checked By: John E Schrum, P.E. 3/15/2007 Average depth of wetland = 3.00 feet SA / DA ratios for drainage areas and depth (NCDENR, 1998): 3.00 3.00 4.00 Lower Limit ==> 80.0% 3.36% 2.78% CakV value =_> 83.4% 3.49% 3.49% 2.89% Upper Limit =_> 90.0% 3.74% 3.10% Therefore, SA / DA required for this configuration = 3.49% Pond Surface Area Required ==> Pond SA Required = 49663 SF Pond SA Provided = 63379 SF 1 1 1 1 1 1 1 1 i all REVISED WETLAND VOLUME Glenn View Station Wetland Wetland Desig n Sheet Project Name: GLENN VIEW STATION Designer: John E. Schrum, P.E. Job Number: 0479 Date: 3/15/2007 John E. Schrum, P.E. 3/15/2007 Contour Stage Contour Area Average Contour Area Incremental Contour Volume Contour Volume Stage w/SS Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 340.0 0.0 63379 342.0 2.0 75692 69536 139071 139071 2.01 344.0 4.0 85274 80483 160966 300037 3.94 346.0 6.0 97548 91411 182822 482859 5.98 347.5 7.5 103154 100351 150527 633386 7.58 Storage vs. Stage 700000 600000 y = 62394x1 74" 500000 R2 = 0.9996 V 400000 m a 0 300000 i N 200000 100000 0- 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Stage (feet) KS = 62394 b = 1.1444 Calculation of Runoff Volume required for storage The runoff to the pond for the 1" storm detention requirement is calculated using the SCS curve number method. Impervious areas that directly enter the pond are counted as Directly Connected Impervious Areas (DCIAs). No infiltration calculation will be provided for these areas. Areas not directly connected will be accounted for in a composite curve number. From SCS Soils Survey map, predominant hydrologic soil type = D Using basic SCS runoff methodology, with no adjustments made REVISED WETLAND VOLUME John E. Schrum, P.E. Glenn View Station Wetland 3/15/2007 to initial abstractions (0.2*S and 0.8*S). Impervious Area, directly connected (DCIA) = 27.25 acres @CN= 98 Other areas draining to pond (not DCIA) = 5.44 acres @CN= 80 Total Area = 32.69 Percent Impervious, I = 83.4% Rv = 0.05 + 0.0091 = 0.800 Total Volume Required = 2.180 acre-feet 94959.0 cubic feet Calculation of depth required for runoff storage pool (above normal pool) Normal pool depth (above invert) = 0.00 feet Storage provided at permanent pool depth = 0 cubic feet Total storage required for normal + storage pool = 94959 cubic feet Stage (above invert) associated with this storage = 1.44 feet Therefore, depth required above normal pool for storm storage = 1.44 feet 17.32 inches Therefore set crest of principal spillway at stage = 1.60 feet and EL = 341.60 feet At principal spillway crest, storm pool storage provided = 106841 CF 1 1 1 1 1 1 1 1 Inverted Siphon Design Sheet D siphon = 4 inches No. siphons = 1 Ks= 62394 b = 1.1444 Cd siphon = 0.60 Siphon Invert = 340.00 feet Volume @ Normal Pool = 0 CF Basin Invert = 340.00 feet WSEL (feet) Vol. Stored (cf) Incremental Siphon Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 341.600 106841 0.502 341.461 96317 0.477 0.490 10524 21486 341.323 85936 0.451 0.464 10381 22362 341.184 75712 0.423 0.437 10225 23390 341.046 65659 0.393 0.408 10053 24625 340.907 55797 0.361 0.377 9862 26149 340.768 46152 0.325 0.343 9646 28106 340.630 36755 0.285 0.305 9396 30762 340.491 27655 0.239 0.262 9100 34703 340.353 18923 0.181 0.210 8732 41598 340.214 10684 0.088 0.135 8239 61203 Step Increment = 0.138605623 End Goal = 10684 Drawdown Time = 3.64 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 0.717 feet Orifice composite loss coefficient = 0.600 X-Sectional area of 1 - 4" Inverted siphon = 0.0873 ft2 Q = 0.3557 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 3.48 days Conculsion: Use one - 4 " diameter PVC inverted siphon to draw down the accumulated volume from the 1.0" storm runoff, with a required time of about 3.6 days. S:\Drawings\06\0667\Project Calcs\ 0667 Pre Development Type// 24-hr 1-Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 1 ' HydroCAD® 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/14/2007 Subcatchment 1S. To DP #1 ' Runoff = 106.42 cfs @ 12.24 hrs, Volume= 10.120 af, Depth> 1.18" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 0.790 98 Onsite - Impervious ' 6.750 80 Onsite - >75% Grass cover, Good, HSG D 46.480 77 Onsite - Woods, Good, HSG D ' 6.120 98 Offsite - Impervious 20.580 77 Woods, Good, HSG D 22.050 80 Offsite - > 75% Grass cover, Good, HSG D 0.340 100 Onsite Water Surface 103.110 79 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.6 75 0.0235 0.1 Sheet Flow, n= 0.450 P2= 3.60" 2.5 510 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 762 0.0275 3.9 11.69 Channel Flow, Area= 3.0 sf Perim= 5.0' r= 0.60' n= 0.045 Winding stream, pools & shoals 0.8 194 0.0258 4.0 16.19 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 Winding stream, pools & shoals 5.4 1,048 0.0150 3.2 16.16 Channel Flow, Area= 5.0 sf Perim= 7.0' r= 0.71' n= 0.045 Winding stream, pools & shoals 6 2 589 Total 28 , . ' S:\Drawings\06\0667\Project Calcs\ 0667 Pre Development Type// 24-hr 2-Year Rainfall=3.60" Prepared by Horvath Associates, P.A. Page 2 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/14/2007 Subcatchment IS: To DP #1 ' Runoff = 149.93 cfs @ 12.23 hrs, Volume= 14.009 af, Depth> 1.63" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs ' Type II 24-hr 2-Year Rainfall=3.60" Area (ac) CN Description 0.790 98 Onsite - Impervious ' 6.750 80 Onsite - >75% Grass cover, Good, HSG D 46.480 77 Onsite - Woods, Good, HSG D 6.120 98 Offsite - Impervious ' 20.580 77 Woods, Good, HSG D 22.050 80 Offsite - > 75% Grass cover, Good, HSG D 0.340 100 Onsite Water Surface ' 103.110 79 Weighted Average Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 16.6 75 0.0235 0.1 Sheet Flow, n= 0.450 P2= 3.60" 2.5 510 0.0450 3.4 Shallow Concentrated Flow, ' Unpaved Kv= 16.1 fps 3.3 762 0.0275 3.9 11.69 Channel Flow, Area= 3.0 sf Perim= 5.0' r= 0.60' ' n= 0.045 Winding stream, pools & shoals 0.8 194 0.0258 4.0 16.19 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 Winding stream, pools & shoals ' 5.4 1,048 0.0150 3.2 16.16 Channel Flow, Area= 5.0 sf Perim= 7.0' r= 0.71' n= 0.045 Winding stream, pools & shoals 2 T l 58 t 28.6 , 9 o a ' S:\Drawings\06\0667\Project Calcs\ 0667 Pre Development Type 1124-hr 10-Year Rainfall=5.38" Prepared by Horvath Associates, P.A. Page 3 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/14/2007 ' Subcatchment IS: To DP #1 Runoff = 289.40 cfs @ 12.23 hrs, Volume= 26.710 af, Depth> 3.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs ' Type II 24-hr 10-Year Rainfall=5.38" Area (ac) CN Description 0.790 98 Onsite - Impervious 6.750 80 Onsite - >75% Grass cover, Good, HSG D 46.480 77 Onsite - Woods, Good, HSG D ' 6.120 98 Offsite - Impervious 20.580 77 Woods, Good, HSG D 22.050 80 Offsite - > 75% Grass cov er, Good, HSG D 0.340 100 Onsite Water Surface ' 103.110 79 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) ' 16.6 75 0.0235 0.1 Sheet Flow, n= 0.450 P2= 3.60" 2.5 510 0.0450 3.4 Shallow Concentrated Flow, ' Unpaved Kv= 16.1 fps 3.3 762 0.0275 3.9 11.69 Channel Flow, Area= 3.0 sf Perim= 5.0' r= 0.60' 1 n= 0.045 Winding stream, pools & shoals 0.8 194 0.0258 4.0 16.19 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 Winding stream, pools & shoals 5.4 1,048 0.0150 3.2 16.16 Channel Flow, Area= 5.0 sf Perim= 7.0' r= 0.71' n= 0.045 Winding stream, pools & shoals 28.6 2,589 Total 1 1 1 0667 Berm Consolidation Berm Consolidation Calculation Averag e Dam Hei ght Determ ination Station Contour Elevation Berm Elevation Berm Height ft ft ft ft 0 347.5 347.5 0.0 50 347.3 347.5 0.2 100 343.2 347.5 4.3 150 342.0 347.5 5.5 200 342.6 347.5 4.9 250 343.5 347.5 4.0 300 344.5 347.5 3.0 350 343.3 347.5 4.2 400 341.6 347.5 5.9 450 341.3 347.5 6.2 500 340.3 347.5 7.2 550 341.4 347.5 6.1 600 342.4 347.5 5.1 650 339.5 347.5 8.0 700 340.0 347.5 7.5 750 339.3 344.4 5.1 800 337.0 344.4 7.4 850 336.3 347.5 11.2 900 337.6 347.5 9.9 950 338.7 347.5 8.8 1000 340.3 347.5 7.2 Max Height = 11.2 ft Average Height = 5.8 ft 5% Consolidation, Max = 0.56 5% Consolidation, Average = 0.29 Constructed Top of Berm = 347.50 ft Design Top of Berm* = 346.94 ft 100-Year WSE = 345.43 ft 100-Year Freeboard = 1.51 ft *Based on 5% Consolidation, Max John E. Schrum, P.E. 3/14/2007 2S 1S To DP #1 - o Wetland To DP #1 - etland Bypass 44P Wetland #1 5L DP #1 Subcat Reach on Link Drainage Diagram for 0667 Wetland Design Prepared by Horvath Associates, P.A. 3/15/2007 HydroCAD® 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC AMR- S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type// 24-hr 1-Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 2 HydroCAD®7 10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment IS: To DP #1 - Wetland Bypass Runoff = 78.05 cfs @ 12.23 hrs, Volume= 7.369 af, Depth> 1.24" 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 1.300 80 Onsite - >75% Grass cover, Good, HSG D 21.230 77 Onsite - Woods, Good, HSG D 5.990 98 Offsite - Impervious 20.580 77 Woods, Good, HSG D 21.930 80 Offsite - > 75% Grass cover, Good, HSG D 0.340 100 Onsite Water Surface 71.370 80 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.6 75 0.0235 0.1 Sheet Flow, n= 0.450 P2= 3.60" 2.5 510 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 762 0.0275 3.9 11.69 Channel Flow, Area= 3.0 sf Perim= 5.0' r= 0.60' n= 0.045 Winding stream, pools & shoals 0.8 194 0.0258 4.0 16.19 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 Winding stream, pools & shoals 5.4 1,048 0.0150 3.2 16.16 Channel Flow, Area= 5.0 sf Perim= 7.0' r= 0.71' n= 0.045 Windinq stream, pools & shoals 28.6 2,589 Total 1 1 SADrawings\06\0667\Project Calcs\ 0667 Wetland Design Type// 24-hr 1-Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 3 HydroCAD®7 10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment IS: To DP #1 - Wetland Bypass Hydrograph 1 1 1 1 1 1 1 1 1 1 1 10 11 12 Time (hours) 1s Runoff 14 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type// 24-hr 1-Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 4 ' HydroCAD®7 10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment 2S: To DP #1 - To Wetland Runoff = 131.16 cfs @ 11.96 hrs, Volume= 6.472 af, Depth> 2.45" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs ' Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description ' 27.120 98 Paved parking & roofs 4.370 80 Onsite - >75% Grass cover, Good, HSG D 0.130 98 Offsite - Paved parking & roofs ' 0.120 80 Offstie - > 75% Grass cover, Good, HSG D 31.740 95 Weighted Average Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Minimum Tc ' Subcatchment 2S: To DP #1 - To Wetland Hydrograph 140--- 130-: - 120-- ' 110-- 1001- 90-- 80-- 70-: - LL so - 50 - 40 30 - 20-- 10-- 0 10 t 1 11 i cfs -- - - -_ -- - _ ? -Runoff TypeA 4_-hr lAear _ -Rainfall=3:00" - - Runoff Area=31:740 ac - I Runoff Volume=6.472 of Runoff-Qepth>245'-' - 1---------1__Tc=5.0min CN=95 I I 12 Time (hours) 13 14 1 I S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type// 24-hr 1-Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 5 HydroCADO 7 10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Pond 4P: Wetland #1 Inflow Area = 31.740 ac, Inflow Depth > 2.45" for 1-Year event Inflow = 131.16 cfs @ 11.96 hrs, Volume= 6.472 of Outflow = 22.50 cfs @ 12.12 hrs, Volume= 3.868 af, Atten= 83%, Lag= 9.8 min Primary = 22.50 cfs @ 12.12 hrs, Volume= 3.868 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak Elev= 342.26'@ 12.12 hrs Surf.Area= 76,923 sf Storage= 158,683 cf Plug-Flow detention time= 221.2 min calculated for 3.866 of (60% of inflow) Center-of-Mass det. time= 116.8 min ( 894.9 - 778.1 ) 1 1 1 1 1 1 1 1 1 1 1 1 1 Volume Invert Avail.Storage Storage Description #1 340.00' 633,386 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 340.00 63,379 0 0 342.00 75,692 139,071 139,071 344.00 85,274 160,966 300,037 346.00 97,548 182,822 482,859 347.50 103,154 150,527 633,386 Device Routing Invert Outlet Devices #1 Primary 334.30' 30.0" x 60.0' long Culvert RCP, rounded edge headwall, Ke= 0.100 Outlet Invert= 333.70' S=0.0100'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 341.60' 48.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Device 1 340.00' 4.0" Vert. Orifice/Grate C= 0.600 #4 Primary 344.40' 90.0' long (Profile 6) Broad-Crested Rectangular Weir Head (feet) 0.49 0.98 1.48 Coef. (English) 3.12 3.41 3.59 Primary OutFlow Max=22.49 cfs @ 12.12 hrs HW=342.26' (Free Discharge) 1=Culvert (Passes 22.49 cfs of 75.35 cfs potential flow) L2=Orifice/Grate (Weir Controls 21.88 cfs @ 2.7 fps) 3=Orifice/Grate (Orifice Controls 0.61 cfs @ 7.0 fps) 4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) S:\Drawings\06\0667\Project Calcs\ " ' 0667 Wetland Design Type// 24-hr 1-Year Rainfall=3.00 Prepared by Horvath Associates, P.A. Page 6 HydroCAD®7 10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Pond 4P: Wetland #1 HYdro9raph ' 140 - - - - - - -- - - - - - - _,- - 131.16cfs i _Inflow Primary 130 ' 120 - ----- -- ----- --------- I - ---- -._. ?...... Inflow-Arezi,41-140-ac- 112 - Peak- - lev=342:261_ ' 100- - _ _ Storage.=158,683 cf 90 w 80- v - ---- --- -.I .._ _ ... ..... _ _.. LL 50 i - - - - - - - - - .- - 30 20 - - - - - - - - - 22.50 cfs 10 --------- ?-- 1 0 0 11 12 13 1 4 Time (hours) 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 i 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetiand Design Type 1124-hr 1-Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 7 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Stage-Discharge for Pond 4P: Wetland #1 Elevation Primary (feet) (cfs) 340.00 0.00 340.04 0.00 340.08 0.02 340.12 0.03 340.16 0.06 340.20 0.08 340.24 0.11 340.28 0.14 340.32 0.17 340.36 0.18 340.40 0.20 340.44 0.22 340.48 0.24 340.52 0.25 340.56 0.26 340.60 0.28 340.64 0.29 340.68 0.30 340.72 0.31 340.76 0.32 340.80 0.33 340.84 0.34 340.88 0.35 340.92 0.36 340.96 0.37 341.00 0.38 341.04 0.39 341.08 0.40 341.12 0.41 341.16 0.42 341.20 0.43 341.24 0.44 341.28 0.44 341.32 0.45 341.36 0.46 341.40 0.47 341.44 0.47 341.48 0.48 341.52 0.49 341.56 0.50 341.60 0.50 341.64 0.84 341.68 1.45 341.72 2.23 341.76 3.16 341.80 4.21 341.84 5.37 341.88 6.64 341.92 7.99 341.96 9.44 342.00 10.96 Elevation Primary (feet) (cfs) 342.04 12.57 342.08 14.25 342.12 16.00 342.16 17.81 342.20 19.70 342.24 21.64 342.28 23.65 342.32 25.72 342.36 27.85 342.40 30.03 342.44 32.27 342.48 34.56 342.52 36.91 342.56 39.30 342.60 41.75 342.64 44.24 342.68 46.79 342.72 49.38 342.76 52.02 342.80 54.70 342.84 57.43 342.88 60.20 342.92 63.02 342.96 65.88 343.00 68.78 343.04 71.72 343.08 74.33 343.12 75.32 343.16 76.30 343.20 77.27 343.24 78.22 343.28 79.17 343.32 80.10 343.36 81.02 343.40 81.93 343.44 82.38 343.48 82.61 343.52 82.84 343.56 83.06 343.60 83.29 343.64 83.51 343.68 83.74 343.72 83.96 343.76 84.18 343.80 84.41 343.84 84.63 343.88 84.85 343.92 85.07 343.96 85.29 344.00 85.51 344.04 85.73 Elevation Primary (feet) (cfs) 344.08 85.95 344.12 86.16 344.16 86.38 344.20 86.60 344.24 86.81 344.28 87.03 344.32 87.25 344.36 87.46 344.40 87.67 344.44 90.13 344.48 94.45 344.52 99.99 344.56 106.50 344.60 113.85 344.64 121.96 344.68 130.76 344.72 140.20 344.76 150.23 344.80 160.82 344.84 171.95 344.88 183.58 344.92 196.30 344.96 209.85 345.00 224.05 345.04 238.89 345.08 254.37 345.12 270.48 345.16 287.22 345.20 304.59 345.24 322.59 345.28 341.21 345.32 360.46 345.36 380.33 345.40 400.41 345.44 420.63 345.48 441.36 345.52 462.61 345.56 484.38 345.60 506.67 345.64 529.47 345.68 552.78 345.72 576.61 345.76 600.94 345.80 625.79 345.84 651.14 345.88 677.00 345.92 700.94 345.96 725.19 346.00 749.75 346.04 774.62 346.08 799.80 Elevation Primary (feet) (cfs) 346.12 825.27 346.16 851.03 346.20 877.09 346.24 903.44 346.28 930.07 346.32 956.98 346.36 984.18 346.40 1,011.65 346.44 1,039.39 346.48 1,067.41 346.52 1,095.69 346.56 1,124.24 346.60 1,153.05 346.64 1,182.13 346.68 1,211.46 346.72 1,241.05 346.76 1,270.89 346.80 1,300.99 346.84 1,331.33 346.88 1,361.93 346.92 1,392.77 346.96 1,423.85 347.00 1,455.17 347.04 1,486.74 347.08 1,518.54 347.12 1,550.58 347.16 1,582.86 347.20 1,615.36 347.24 1,648.10 347.28 1,681.07 347.32 1,714.27 347.36 1,747.69 347.40 1,781.34 347.44 1,815.21 347.48 1,849.31 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type// 24-hr 1-Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 8 HydroCAD® 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Stage-Area-Storage for Pond 4P: Wetland #1 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 340.00 63,379 0 340.10 63,995 6,369 340.20 64,610 12,799 340.30 65,226 19,291 340.40 65,842 25,844 340.50 66,457 32,459 340.60 67,073 39,136 340.70 67,689 45,874 340.80 68,304 52,673 340.90 68,920 59,534 341.00 69,536 66,457 341.10 70,151 73,442 341.20 70,767 80,487 341.30 71,382 87,595 341.40 71,998 94,764 341.50 72,614 101,995 341.60 73,229 109,287 341.70 73,845 116,640 341.80 74,461 124,056 341.90 75,076 131,533 342.00 75,692 139,071 342.10 76,171 146,664 342.20 76,650 154,305 342.30 77,129 161,994 342.40 77,608 169,731 342.50 78,088 177,516 342.60 78,567 185,349 342.70 79,046 193,229 342.80 79,525 201,158 342.90 80,004 209,134 343.00 80,483 217,159 343.10 80,962 225,231 343.20 81,441 233,351 343.30 81,920 241,519 343.40 82,399 249,735 343.50 82,879 257,999 343.60 83,358 266,311 343.70 83,837 274,670 343.80 84,316 283,078 343.90 84,795 291,534 344.00 85,274 300,037 344.10 85,888 308,595 344.20 86,501 317,215 344.30 87,115 325,895 344.40 87,729 334,638 344.50 88,343 343,441 344.60 88,956 352,306 344.70 89,570 361,232 344.80 90,184 370,220 344.90 90,797 379,269 345.00 91,411 388,380 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 345.10 92,025 397,551 345.20 92,638 406,784 345.30 93,252 416,079 345.40 93,866 425,435 345.50 94,480 434,852 345.60 95,093 444,331 345.70 95,707 453,871 345.80 96,321 463,472 345.90 96,934 473,135 346.00 97,548 482,859 346.10 97,922 492,632 346.20 98,295 502,443 346.30 98,669 512,292 346.40 99,043 522,177 346.50 99,417 532,100 346.60 99,790 542,061 346.70 100,164 552,058 346.80 100,538 562,093 346.90 100,912 572,166 347.00 101,285 582,276 347.10 101,659 592,423 347.20 102,033 602,607 347.30 102,407 612,829 347.40 102,780 623,089 347.50 103,154 633,386 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type// 24-hr 1-Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 9 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Link 5L: DP #1 Inflow Area = 103.110 ac, Inflow Depth > 1.31" for 1-Year event Inflow = 99.41 cfs @ 12.23 hrs, Volume= 11.237 of Primary = 99.41 cfs @ 12.23 hrs, Volume= 11.237 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs 1 1 U, I 6 .V,. 6 5 0 5 U. 4 4 a 0 e 1 t 1 Link 5L: DP #1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 2-Year Rainfall=3.60" Prepared by Horvath Associates, P.A. Page 10 HydroCAD® 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment IS: To DP #1 - Wetland Bypass Runoff = 108.76 cfs @ 12.23 hrs, Volume= 10.123 af, Depth> 1.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.60" Area (ac) CN Description 1.300 80 Onsite - >75% Grass cover, Good, HSG D 21.230 77 Onsite - Woods, Good, HSG D 5.990 98 Offsite - Impervious 20.580 77 Woods, Good, HSG D 21.930 80 Offsite - > 75% Grass cover, Good, HSG D 0.340 100 Onsite Water Surface 71.370 80 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.6 75 0.0235 0.1 Sheet Flow, n= 0.450 P2= 3.60" 2.5 510 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 762 0.0275 3.9 11.69 Channel Flow, Area= 3.0 sf Perim= 5.0' r= 0.60' n= 0.045 Winding stream, pools & shoals 0.8 194 0.0258 4.0 16.19 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 Winding stream, pools & shoals 5.4 1,048 0.0150 3.2 16.16 Channel Flow, Area= 5.0 sf Perim= 7.0' r= 0.71' n= 0.045 Windina stream, pools & shoals 28.6 2,589 Total 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 SADrawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 2-Year Rainfall=3.60" Prepared by Horvath Associates, P.A. Page 11 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment IS: To DP #1 - Wetland Bypass Hydrograph 1 1 1 1 N V O LL 10 11 12 Time (hours) 13 14 - Runoff ' S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 2-Year Rainfall=3.60" Prepared by Horvath Associates, P.A. Page 12 ' HydroCADO 7.10 s/n 003736 0 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment 2S: To DP #1 - To Wetland Runoff = 160.28 cfs @ 11.96 hrs, Volume= 8.026 af, Depth> 3.03" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs ' Type II 24-hr 2-Year Rainfall=3.60" Area (ac) CN Description ' 27.120 98 Paved parking & roofs 4.370 80 Onsite - >75% Grass cover, Good, HSG D 0.130 98 Offsite - Paved parking & roofs ' 0.120 80 Offstie - > 75% Grass cover, Good, HSG D 31.740 95 Weighted Average Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Minimum Tc Subcatchment 2S: To DP #1 - To Wetland 1 10 11 12 Time (hours) 13 14 7 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type // 24-hr 2-Year Rainfall=3.60" Prepared by Horvath Associates, P.A. Page 13 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Pond 4P: Wetland #1 Inflow Area = 31.740 ac, Inflow Depth > 3.03" for 2-Year event Inflow = 160.28 cfs @ 11.96 hrs, Volume= 8.026 of Outflow = 44.07 cfs @ 12.08 hrs, Volume= 5.401 af, Atten= 73%, Lag= 7.2 min Primary = 44.07 cfs @ 12.08 hrs, Volume= 5.401 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs ' Peak Elev= 342.64'@ 12.08 hrs Surf.Area= 78,744 sf Storage= 188,262 cf Plug-Flow detention time= 197.1 min calculated for 5.401 of (67% of inflow) Center-of-Mass det. time= 99.5 min ( 871.9 - 772.4 ) 1 1 1 1 1 1 1 1 1 1 1 1 Volume Invert Avail.Storage Storage Description #1 340.00' 633,386 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 340.00 63,379 0 0 342.00 75,692 139,071 139,071 344.00 85,274 160,966 300,037 346.00 97,548 182,822 482,859 347.50 103,154 150,527 633,386 Device Routing Invert Outlet Devices #1 Primary 334.30' 30.0" x 60.0' long Culvert RCP, rounded edge headwall, Ke= 0.100 Outlet Invert= 333.70' S= 0.0100'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 341.60' 48.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Device 1 340.00' 4.0" Vert. Orifice/Grate C= 0.600 #4 Primary 344.40' 90.0' long (Profile 6) Broad-Crested Rectangular Weir Head (feet) 0.49 0.98 1.48 Coef. (English) 3.12 3.41 3.59 Primary OutFlow Max=44.04 cfs @ 12.08 hrs HW=342.64' (Free Discharge) 1=Culvert (Passes 44.04 cfs of 77.68 cfs potential flow) L2=Orifice/Grate (Weir Controls 43.38 cfs @ 3.3 fps) 3=Orifice/Grate (Orifice Controls 0.66 cfs @ 7.6 fps) 4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 2-Year Rainfall=3.60" Prepared by Horvath Associates, P.A. Page 14 HvdroCAD® 7.10 s/n 003736 © 2005 HvdroCAD Software Solutions LLC 3115/2007 Pond 4P: Wetland #1 Hydrograph I 170 ----- --------- - - 160.28 cfs t - Inflow -4 -Primary 160 - - - - - - - - -I - - - - -- - - - 150 -- - - - - - - - -I- - - - - -Inflow-Areal=31140-ac- 140 -- - -- - - -I---- ......-- -P--eak Elev=34264'- - - - I 130 - I I 120 Stora e=188 262 d- 110: -- - - g , - I F 100 ------ -- .. 90 c ----- --- -I 80 LL - 70 - - - - - - - - - - i 50 - - 44.07 cfs I 40 -- - I -- - - - - 20 - - - 0 1 0 11 12 13 14 Time (hours) 1 1 1 1 1 1 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 2-Year Rainfall=3.60" Prepared by Horvath Associates, P.A. Page 15 HydroCAD® 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Stage-Discharge for Pond 4P: Wetland #1 Elevation Primary (feet) (cfs) 340.00 0.00 340.04 0.00 340.08 0.02 340.12 0.03 340.16 0.06 340.20 0.08 340.24 0.11 340.28 0.14 340.32 0.17 340.36 0.18 340.40 0.20 340.44 0.22 340.48 0.24 340.52 0.25 340.56 0.26 340.60 0.28 340.64 0.29 340.68 0.30 340.72 0.31 340.76 0.32 340.80 0.33 340.84 0.34 340.88 0.35 340.92 0.36 340.96 0.37 341.00 0.38 341.04 0.39 341.08 0.40 341.12 0.41 341.16 0.42 341.20 0.43 341.24 0.44 341.28 0.44 341.32 0.45 341.36 0.46 341.40 0.47 341.44 0.47 341.48 0.48 341.52 0.49 341.56 0.50 341.60 0.50 341.64 0.84 341.68 1.45 341.72 2.23 341.76 3.16 341.80 4.21 341.84 5.37 341.88 6.64 341.92 7.99 341.96 9.44 342.00 10.96 Elevation Primary (feet) (cfs) 342.04 12.57 342.08 14.25 342.12 16.00 342.16 17.81 342.20 19.70 342.24 21.64 342.28 23.65 342.32 25.72 342.36 27.85 342.40 30.03 342.44 32.27 342.48 34.56 342.52 36.91 342.56 39.30 342.60 41.75 342.64 44.24 342.68 46.79 342.72 49.38 342.76 52.02 342.80 54.70 342.84 57.43 342.88 60.20 342.92 63.02 342.96 65.88 343.00 68.78 343.04 71.72 343.08 74.33 343.12 75.32 343.16 76.30 343.20 77.27 343.24 78.22 343.28 79.17 343.32 80.10 343.36 81.02 343.40 81.93 343.44 82.38 343.48 82.61 343.52 82.84 343.56 83.06 343.60 83.29 343.64 83.51 343.68 83.74 343.72 83.96 343.76 84.18 343.80 84.41 343.84 84.63 343.88 84.85 343.92 85.07 343.96 85.29 344.00 85.51 344.04 85.73 Elevation Primary (feet) (cfs) 344.08 85.95 344.12 86.16 344.16 86.38 344.20 86.60 344.24 86.81 344.28 87.03 344.32 87.25 344.36 87.46 344.40 87.67 344.44 90.13 344.48 94.45 344.52 99.99 344.56 106.50 344.60 113.85 344.64 121.96 344.68 130.76 344.72 140.20 344.76 150.23 344.80 160.82 344.84 171.95 344.88 183.58 344.92 196.30 344.96 209.85 345.00 224.05 345.04 238.89 345.08 254.37 345.12 270.48 345.16 287.22 345.20 304.59 345.24 322.59 345.28 341.21 345.32 360.46 345.36 380.33 345.40 400.41 345.44 420.63 345.48 441.36 345.52 462.61 345.56 484.38 345.60 506.67 345.64 529.47 345.68 552.78 345.72 576.61 345.76 600.94 345.80 625.79 345.84 651.14 345.88 677.00 345.92 700.94 345.96 725.19 346.00 749.75 346.04 774.62 346.08 799.80 Elevation Primary (feet) (cfs) 346.12 825.27 346.16 851.03 346.20 877.09 346.24 903.44 346.28 930.07 346.32 956.98 346.36 984.18 346.40 1,011.65 346.44 1,039.39 346.48 1,067.41 346.52 1,095.69 346.56 1,124.24 346.60 1,153.05 346.64 1,182.13 346.68 1,211.46 346.72 1,241.05 346.76 1,270.89 346.80 1,300.99 346.84 1,331.33 346.88 1,361.93 346.92 1,392.77 346.96 1,423.85 347.00 1,455.17 347.04 1,486.74 347.08 1,518.54 347.12 1,550.58 347.16 1,582.86 347.20 1,615.36 347.24 1,648.10 347.28 1,681.07 347.32 1,714.27 347.36 1,747.69 347.40 1,781.34 347.44 1,815.21 347.48 1,849.31 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 2-Year Rainfall=3.60" Prepared by Horvath Associates, P.A. Page 16 HydroCAD® 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Stage-Area-Storage for Pond 4P: Wetland #1 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 340.00 63,379 0 340.10 63,995 6,369 340.20 64,610 12,799 340.30 65,226 19,291 340.40 65,842 25,844 340.50 66,457 32,459 340.60 67,073 39,136 340.70 67,689 45,874 340.80 68,304 52,673 340.90 68,920 59,534 341.00 69,536 66,457 341.10 70,151 73,442 341.20 70,767 80,487 341.30 71,382 87,595 341.40 71,998 94,764 341.50 72,614 101,995 341.60 73,229 109,287 341.70 73,845 116,640 341.80 74,461 124,056 341.90 75,076 131,533 342.00 75,692 139,071 342.10 76,171 146,664 342.20 76,650 154,305 342.30 77,129 161,994 342.40 77,608 169,731 342.50 78,088 177,516 342.60 78,567 185,349 342.70 79,046 193,229 342.80 79,525 201,158 342.90 80,004 209,134 343.00 80,483 217,159 343.10 80,962 225,231 343.20 81,441 233,351 343.30 81,920 241,519 343.40 82,399 249,735 343.50 82,879 257,999 343.60 83,358 266,311 343.70 83,837 274,670 343.80 84,316 283,078 343.90 84,795 291,534 344.00 85,274 300,037 344.10 85,888 308,595 344.20 86,501 317,215 344.30 87,115 325,895 344.40 87,729 334,638 344.50 88,343 343,441 344.60 88,956 352,306 344.70 89,570 361,232 344.80 90,184 370,220 344.90 90,797 379,269 345.00 91,411 388,380 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 345.10 92,025 397,551 345.20 92,638 406,784 345.30 93,252 416,079 345.40 93,866 425,435 345.50 94,480 434,852 345.60 95,093 444,331 345.70 95,707 453,871 345.80 96,321 463,472 345.90 96,934 473,135 346.00 97,548 482,859 346.10 97,922 492,632 346.20 98,295 502,443 346.30 98,669 512,292 346.40 99,043 522,177 346.50 99,417 532,100 346.60 99,790 542,061 346.70 100,164 552,058 346.80 100,538 562,093 346.90 100,912 572,166 347.00 101,285 582,276 347.10 101,659 592,423 347.20 102,033 602,607 347.30 102,407 612,829 347.40 102,780 623,089 347.50 103,154 633,386 1 1 1 1 1 1 1 1 1 1 S:\Drawings106\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 2-Year Rainfall=3.60" Prepared by Horvath Associates, P.A. Page 17 HydroCADO 7.10 s/n 003736 0 2005 HydroCAD Software Solutions LLC 3/15/2007 Link 5L: DP #1 Inflow Area = 103.110 ac, Inflow Depth > 1.81" for 2-Year event Inflow = 146.02 cfs @ 12.21 hrs, Volume= 15.524 of Primary = 146.02 cfs @ 12.21 hrs, Volume= 15.524 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link 5L: DP #1 Hydrograph i _ 160 ! I 150 146.02 cfs - Inflow Primary 140 - Inflow area=103.110-a- 130 - -. 120_- - - - ._ _ l - I I 110- - -._ I I - - -- - 100 90 - - - .....I - - - 60 - - - .._.. - _ ...... ..... - -- - .... ...... C LL 70-:- - - - 60 - - - - - - 50-- - - - - - -{ .._. - ..- 40 - - - - - - - -. _ ._ _..- _.-.I _.. - - - _.I I I I 20-- - - 10 - - - - - -.._ _. _.. ._.. _... ...._ _ _._ -.... _.... ... - _.. ...... { 0 10 11 112 13 14 Time (hours) 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 10-Year Rainfall=5.38" Prepared by Horvath Associates, P.A. Page 18 HydroCAD® 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment IS: To DP #1 - Wetland Bypass Runoff = 206.40 cfs @ 12.23 hrs, Volume= 19.054 af, Depth> 3.20" 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.38" Area (ac) CN Description 1.300 80 Onsite - >75% Grass cover, Good, HSG D 21.230 77 Onsite - Woods, Good, HSG D 5.990 98 Offsite - Impervious 20.580 77 Woods, Good, HSG D 21.930 80 Offsite - > 75% Grass cover, Good, HSG D 0.340 100 Onsite Water Surface 71.370 80 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft ) (ft/sec) (cfs) 16.6 75 0.0235 0.1 Sheet Flow, n= 0.450 P2= 3.60" 2.5 510 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 762 0.0275 3.9 11.69 Channel Flow, Area= 3.0 sf Perim= 5.0' r= 0.60' n= 0.045 Winding stream, pools & shoals 0.8 194 0.0258 4.0 16.19 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 Winding stream, pools & shoals 5.4 1,048 0.0150 3.2 16.16 Channel Flow, Area= 5.0 sf Perim= 7.0' r= 0.71' n= 0.045 Windina stream, pools & shoals 28.6 2,589 Total 17- I? S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type// 24-hr 10-Year Rainfall=5.38" Prepared by Horvath Associates, P.A. Page 19 HydroCAD® 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 10 Subcatchment 1S: To DP #1 - Wetland Bypass 11 Hydrograph 12 Time (hours) 13 1a ' S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type// 24-hr 10-Year Rainfall=5.38" Prepared by Horvath Associates, P.A. Page 20 ' HydroCADO 7.10 s/n 003736 C 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment 2S: To DP #1 - To Wetland Runoff = 245.76 cfs @ 11.96 hrs, Volume= 12.675 af, Depth> 4.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs ' Type II 24-hr 10-Year Rainfall=5.38" Area (ac) CN Description 27.120 98 Paved parking & roofs ' 4.370 80 Onsite - >75% Grass cover, Good, HSG D 0.130 98 Offsite - Paved parking & roofs 0.120 80 Offstie - > 75% Grass cover, Good, HSG D ' 31.740 95 Weighted Average Tc Length S lope Velocity Capacity Description ' (min) (feet) ( ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Minimum Tc ' Subcatchment 2S: To DP #1 - To Wetland Hydrograph 260 240 220 ' 200 160 - w u - 140 - 3 o LL 120- 100- - 80 ' 60-- 40-- 20 0 10 11 6cfs -------- -i.... --- --- -Runoff Type II 24-hr 10-Year Rainfall=5.38" _ -..Runoff Area=81._.740 _ac _ 12 Time (hours) 13 14 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type// 24-hr 10-Year Rainfall=5.38" Prepared by Horvath Associates, P.A. Page 21 HydroCAD® 7.10 s/n 003736 0 2005 HydroCAD Software Solutions LLC 3/15/2007 Pond 4P: Wetland #1 Inflow Area = 31.740 ac, Inflow Depth > 4.79" for 10-Year event Inflow = 245.76 cfs @ 11.96 hrs, Volume= 12.675 of Outflow = 83.43 cfs @ 12.06 hrs, Volume= 9.987 af, Atten= 66%, Lag= 6.4 min Primary = 83.43 cfs @ 12.06 hrs, Volume= 9.987 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs ' Peak Elev= 343.63'@ 12.06 hrs Surf.Area= 83,481 sf Storage= 268,454 cf Plug-Flow detention time= 163.0 min calculated for 9.987 of (79% of inflow) Center-of-Mass det. time= 81.1 min ( 842.2 - 761.1 ) Volume Invert Avail.Storage Storaqe Description #1 340.00' 633,386 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 340.00 63,379 0 0 342.00 75,692 139,071 139,071 344.00 85,274 160,966 300,037 346.00 97,548 182,822 482,859 347.50 103,154 150,527 633,386 Device Routing Invert Outlet Devices #1 Primary 334.30' 30.0" x 60.0' long Culvert RCP, rounded edge headwall, Ke= 0.100 Outlet Invert= 333.70' S= 0.0100'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 341.60' 48.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Device 1 340.00' 4.0" Vert. Orifice/Grate C= 0.600 #4 Primary 344.40' 90.0' long (Profile 6) Broad-Crested Rectangular Weir Head (feet) 0.49 0.98 1.48 Coef. (English) 3.12 3.41 3.59 Primary OutFlow Max=83.43 cfs @ 12.06 hrs HW=343.62' (Free Discharge) Culvert (Barrel Controls 83.43 cfs @ 17.0 fps) 2=Orifice/Grate (Passes < 86.10 cfs potential flow) 3 Orifice/Grate (Passes < 0.78 cfs potential flow) 4=Broad-Crested Rectangular Weir (Controls 0.00 cfs) S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 10-Year Rainfall=5.38" Prepared by Horvath Associates, P.A. Page 22 HydroCAD®7 10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Pond 413: Wetland #1 Hydrograph -Inflow 260 - - - - - - - -- 245.76 CfS - - Primary 240 ---------I_... - Inflow Area 220 - - - - - - - -;._....... =3.1.740 ac-- 200 P-eak-Elev=343.63' I 180 - - - - - -- Storage=268,454 cf 160 - - - -' 3 140 - - - - o -I- - - - ..._ .. - ...... ..... EL- 120--------- i I I 100 _._------_ 83.43 cfs 80 - ? I I 60 - - - - - - - - 40 ---------I.._ I I I 20 - - 0- 10 11 12 13 14 Time (hours) 1 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetiand Design Type 11 24-hr 10-Year Rainfall=5.38" Prepared by Horvath Associates, P.A. Page 23 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Stage-Discharge for Pond 4P: Wetland #1 Elevation Primary (feet) (cfs) 340.00 0.00 340.04 0.00 340.08 0.02 340.12 0.03 340.16 0.06 340.20 0.08 340.24 0.11 340.28 0.14 340.32 0.17 340.36 0.18 340.40 0.20 340.44 0.22 340.48 0.24 340.52 0.25 340.56 0.26 340.60 0.28 340.64 0.29 340.68 0.30 340.72 0.31 340.76 0.32 340.80 0.33 340.84 0.34 340.88 0.35 340.92 0.36 340.96 0.37 341.00 0.38 341.04 0.39 341.08 0.40 341.12 0.41 341.16 0.42 341.20 0.43 341.24 0.44 341.28 0.44 341.32 0.45 341.36 0.46 341.40 0.47 341.44 0.47 341.48 0.48 341.52 0.49 341.56 0.50 341.60 0.50 341.64 0.84 341.68 1.45 341.72 2.23 341.76 3.16 341.80 4.21 341.84 5.37 341.88 6.64 341.92 7.99 341.96 9.44 342.00 10.96 Elevation Primary (feet) (cfs) 342.04 12.57 342.08 14.25 342.12 16.00 342.16 17.81 342.20 19.70 342.24 21.64 342.28 23.65 342.32 25.72 342.36 27.85 342.40 30.03 342.44 32.27 342.48 34.56 342.52 36.91 342.56 39.30 342.60 41.75 342.64 44.24 342.68 46.79 342.72 49.38 342.76 52.02 342.80 54.70 342.84 57.43 342.88 60.20 342.92 63.02 342.96 65.88 343.00 68.78 343.04 71.72 343.08 74.33 343.12 75.32 343.16 76.30 343.20 77.27 343.24 78.22 343.28 79.17 343.32 80.10 343.36 81.02 343.40 81.93 343.44 82.38 343.48 82.61 343.52 82.84 343.56 83.06 343.60 83.29 343.64 83.51 343.68 83.74 343.72 83.96 343.76 84.18 343.80 84.41 343.84 84.63 343.88 84.85 343.92 85.07 343.96 85.29 344.00 85.51 344.04 85.73 Elevation Primary (feet) (cfs) 344.08 85.95 344.12 86.16 344.16 86.38 344.20 86.60 344.24 86.81 344.28 87.03 344.32 87.25 344.36 87.46 344.40 87.67 344.44 90.13 344.48 94.45 344.52 99.99 344.56 106.50 344.60 113.85 344.64 121.96 344.68 130.76 344.72 140.20 344.76 150.23 344.80 160.82 344.84 171.95 344.88 183.58 344.92 196.30 344.96 209.85 345.00 224.05 345.04 238.89 345.08 254.37 345.12 270.48 345.16 287.22 345.20 304.59 345.24 322.59 345.28 341.21 345.32 360.46 345.36 380.33 345.40 400.41 345.44 420.63 345.48 441.36 345.52 462.61 345.56 484.38 345.60 506.67 345.64 529.47 345.68 552.78 345.72 576.61 345.76 600.94 345.80 625.79 345.84 651.14 345.88 677.00 345.92 700.94 345.96 725.19 346.00 749.75 346.04 774.62 346.08 799.80 Elevation Primary (feet) (cfs) 346.12 825.27 346.16 851.03 346.20 877.09 346.24 903.44 346.28 930.07 346.32 956.98 346.36 984.18 346.40 1,011.65 346.44 1,039.39 346.48 1,067.41 346.52 1,095.69 346.56 1,124.24 346.60 1,153.05 346.64 1,182.13 346.68 1,211.46 346.72 1,241.05 346.76 1,270.89 346.80 1,300.99 346.84 1,331.33 346.88 1,361.93 346.92 1,392.77 346.96 1,423.85 347.00 1,455.17 347.04 1,486.74 347.08 1,518.54 347.12 1,550.58 347.16 1,582.86 347.20 1,615.36 347.24 1,648.10 347.28 1,681.07 347.32 1,714.27 347.36 1,747.69 347.40 1,781.34 347.44 1,815.21 347.48 1,849.31 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 10-Year Rainfall=5.38" Prepared by Horvath Associates, P.A. Page 24 HydroCAD® 7.10 s/n 003736 0 2005 HydroCAD Software Solutions LLC 3/15/2007 Stage-Area-Storage for Pond 4P: Wetland #1 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 340.00 63,379 0 340.10 63,995 6,369 340.20 64,610 12,799 340.30 65,226 19,291 340.40 65,842 25,844 340.50 66,457 32,459 340.60 67,073 39,136 340.70 67,689 45,874 340.80 68,304 52,673 340.90 68,920 59,534 341.00 69,536 66,457 341.10 70,151 73,442 341.20 70,767 80,487 341.30 71,382 87,595 341.40 71,998 94,764 341.50 72,614 101,995 341.60 73,229 109,287 341.70 73,845 116,640 341.80 74,461 124,056 341.90 75,076 131,533 342.00 75,692 139,071 342.10 76,171 146,664 342.20 76,650 154,305 342.30 77,129 161,994 342.40 77,608 169,731 342.50 78,088 177,516 342.60 78,567 185,349 342.70 79,046 193,229 342.80 79,525 201,158 342.90 80,004 209,134 343.00 80,483 217,159 343.10 80,962 225,231 343.20 81,441 233,351 343.30 81,920 241,519 343.40 82,399 249,735 343.50 82,879 257,999 343.60 83,358 266,311 343.70 83,837 274,670 343.80 84,316 283,078 343.90 84,795 291,534 344.00 85,274 300,037 344.10 85,888 308,595 344.20 86,501 317,215 344.30 87,115 325,895 344.40 87,729 334,638 344.50 88,343 343,441 344.60 88,956 352,306 344.70 89,570 361,232 344.80 90,184 370,220 344.90 90,797 379,269 345.00 91,411 388,380 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 345.10 92,025 397,551 345.20 92,638 406,784 345.30 93,252 416,079 345.40 93,866 425,435 345.50 94,480 434,852 345.60 95,093 444,331 345.70 95,707 453,871 345.80 96,321 463,472 345.90 96,934 473,135 346.00 97,548 482,859 346.10 97,922 492,632 346.20 98,295 502,443 346.30 98,669 512,292 346.40 99,043 522,177 346.50 99,417 532,100 346.60 99,790 542,061 346.70 100,164 552,058 346.80 100,538 562,093 346.90 100,912 572,166 347.00 101,285 582,276 347.10 101,659 592,423 347.20 102,033 602,607 347.30 102,407 612,829 347.40 102,780 623,089 347.50 103,154 633,386 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 10-Year Rainfall=5.38" Prepared by Horvath Associates, P.A. Page 25 HydroCAD®7 10 s/n 003736 0 2005 HydroCAD Software Solutions LLC 3/15/2007 Link 5L: DP #1 Inflow Area = 103.110 ac, Inflow Depth > 3.38" for 10-Year event Inflow = 286.70 cfs @ 12.21 hrs, Volume= 29.042 of Primary = 286.70 cfs @ 12.21 hrs, Volume= 29.042 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link 5L: DP #1 Hydrograph w 3 0 U. - Inflow Primary 10 11 12 13 14 Time (hours) 0 1 1 1 F 1 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 25-Year Rainfall=6.41 " Prepared by Horvath Associates, P.A. Page 26 HydroCADO 7.10 s/n 003736 0 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment IS: To DP #1 - Wetland Bypass Runoff = 264.97 cfs @ 12.23 hrs, Volume= 24.532 af, Depth> 4.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.41" Area (ac) CN Description 1.300 80 Onsite - >75% Grass cover, Good, HSG D 21.230 77 Onsite - Woods, Good, HSG D 5.990 98 Offsite - Impervious 20.580 77 Woods, Good, HSG D 21.930 80 Offsite - > 75% Grass cover, Good, HSG D 0.340 100 Onsite Water Surface 71.370 80 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft ) (ft/sec) (cfs) 16.6 75 0.0235 0.1 Sheet Flow, n= 0.450 P2= 3.60" 2.5 510 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 762 0.0275 3.9 11.69 Channel Flow, Area= 3.0 sf Perim= 5.0' r= 0.60' n= 0.045 Winding stream, pools & shoals 0.8 194 0.0258 4.0 16.19 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 Winding stream, pools & shoals 5.4 1,048 0.0150 3.2 16.16 Channel Flow, Area= 5.0 sf Perim= 7.0' r= 0.71' n= 0.045 Windinq stream, pools & shoals _ 28.6 2,589 Total ' S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 1124-hr 25-Year Rainfall=6.41 " Prepared by Horvath Associates, P.A. Page 27 ' HydroCAD87 10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment 1 S: To DP #1 - Wetland Bypass HYdro9raPh ' I 280-- ___ _... .._. _._ __ ._._ ..._. __ I_... _..._ - - 264.97 cfs 260'- 240 .. - - --- - ' Type 11.24-hr125 Year - - - - 220-- Rainfall=6,41" _ ' 200. Runoff-Area-771.370 ac-- 180_ Runoff-Volume 24.532-af v 160 - _ ..- ' Runoff Depth>4.12" - 0 140 - - - - - - - - -I 120 EIoW_LengthL2,5W- _ . LL c-- -. min I 10o - - 80CN-80 I I 40 - 20 - 0 10 11 12 13 14 Time (hours) 1 1 1 1 ' S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 1124-hr 25-Year Rainfall=6.41 " Prepared by Horvath Associates, P.A. Page 28 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Subcatchment 2S: To DP #1 - To Wetland ' Runoff = 294.83 cfs @ 11.96 hrs, Volume= 15.378 af, Depth> 5.81" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs ' Type II 24-hr 25-Year Rainfall=6.41" Area (ac) CN Description ' 27.120 98 Paved parking & roofs 4.370 80 Onsite - >75% Grass cover, Good, HSG D 0.130 98 Offsite - Paved parking & roofs 0.120 80 Offstie - > 75% Grass cover Good HSG D 31.740 95 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Minimum Tc ' Subcatchment 2S: To DP #1 - To Wetland Hydrograph 10 11 12 Time (hours) 13 14 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 25-Year Rainfall=6.41 " Prepared by Horvath Associates, P.A. Page 29 HydroCAD®7 10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2.007 Pond 4P: Wetland #1 Inflow Area = 31.740 ac, Inflow Depth > 5.81" for 25-Year event Inflow = 294.83 cfs @ 11.96 hrs, Volume= 15.378 of Outflow = 86.46 cfs @ 12.07 hrs, Volume= 12.658 af, Atten= 71%, Lag= 7.0 min Primary = 86.46 cfs @ 12.07 hrs, Volume= 12.658 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs ' Peak Elev= 344.17'@ 12.07 hrs Surf.Area= 86,348 sf Storage= 315,047 cf Plug-Flow detention time= 153.1 min calculated for 12.658 of (82% of inflow) Center-of-Mass det. time= 78.5 min ( 835.2 - 756.7 ) i i i Volume Invert Avail Storage Storage Description #1 340.00' 633,386 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 340.00 63,379 0 0 342.00 75,692 139,071 139,071 344.00 85,274 160,966 300,037 346.00 97,548 182,822 482,859 347.50 103,154 150,527 633,386 Device Routing Invert Outlet Devices #1 Primary 334.30' 30.0" x 60.0' long Culvert RCP, rounded edge headwall, Ke= 0.100 Outlet Invert= 333.70' S= 0.0100T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections #2 Device 1 341.60' 48.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Device 1 340.00' 4.0" Vert. Orifice/Grate C= 0.600 #4 Primary 344.40' 90.0' long (Profile 6) Broad-Crested Rectangular Weir Head (feet) 0.49 0.98 1.48 Coef. (English) 3.12 3.41 3.59 Primary OutFlow Max=86.46 cfs @ 12.07 hrs HW=344.17' (Free Discharge) 1=Culvert (Barrel Controls 86.46 cfs @ 17.6 fps) N=Orifice/Grate (Passes < 97.08 cfs potential flow) 3=Orifice/Grate (Passes < 0.84 cfs potential flow) 4=Broad-Crested Rectangular Weir (Controls 0.00 cfs) r S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 25-Year Rainfall= 6.41 " Prepared by Horvath Associates, P.A. Page 30 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 ' Pond 4P: Wetland #1 HY 9. ph 320 - - - - - - - - - - - - 300 - - - - - - - - - I ._ .... - - - 8 3 -- - - -- - - - - - - - - - - - - - 29 4 cfs - - - - - - -? - - - - - - - - F--1 n-fl o-w - Primary ' 260 - - - - - - - - I Inflow Area=3-1:7`40_-arc 260 - -- - - - - - --I _ _. Peak Elev=344.17'- ' 240------- 220 - - - - - - - '- I 047 cf' Storage=315 200'-- ----- - - , _ - - -r -- ,80 -- - ---- - - I- 180 160 - c u- 140,-:- _. .._ _ .. ..... ...... . _ ._. -i. ' 120 - - - - 100-- 86.46 cfs 80 - - - - - - - - - I I I 60-- 40 I 20 - -- 1 0 10 11 12 13 14 Time (hours) 1 1 1 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 11 24-hr 25-Year Rainfall= 6.41 " Prepared by Horvath Associates, P.A. Page 31 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Stage-Discharge for Pond 4P: Wetland #1 Elevation Primary (feet) (cfs) 340.00 0.00 340.04 0.00 340.08 0.02 340.12 0.03 340.16 0.06 340.20 0.08 340.24 0.11 340.28 0.14 340.32 0.17 340.36 0.18 340.40 0.20 340.44 0.22 340.48 0.24 340.52 0.25 340.56 0.26 340.60 0.28 340.64 0.29 340.68 0.30 340.72 0.31 340.76 0.32 340.80 0.33 340.84 0.34 340.88 0.35 340.92 0.36 340.96 0.37 341.00 0.38 341.04 0.39 341.08 0.40 341.12 0.41 341.16 0.42 341.20 0.43 341.24 0.44 341.28 0.44 341.32 0.45 341.36 0.46 341.40 0.47 341.44 0.47 341.48 0.48 341.52 0.49 341.56 0.50 341.60 0.50 341.64 0.84 341.68 1.45 341.72 2.23 341.76 3.16 341.80 4.21 341.84 5.37 341.88 6.64 341.92 7.99 341.96 9.44 342.00 10.96 Elevation Primary (feet) (cfs) 342.04 12.57 342.08 14.25 342.12 16.00 342.16 17.81 342.20 19.70 342.24 21.64 342.28 23.65 342.32 25.72 342.36 27.85 342.40 30.03 342.44 32.27 342.48 34.56 342.52 36.91 342.56 39.30 342.60 41.75 342.64 44.24 342.68 46.79 342.72 49.38 342.76 52.02 342.80 54.70 342.84 57.43 342.88 60.20 342.92 63.02 342.96 65.88 343.00 68.78 343.04 71.72 343.08 74.33 343.12 75.32 343.16 76.30 343.20 77.27 343.24 78.22 343.28 79.17 343.32 80.10 343.36 81.02 343.40 81.93 343.44 82.38 343.48 82.61 343.52 82.84 343.56 83.06 343.60 83.29 343.64 83.51 343.68 83.74 343.72 83.96 343.76 84.18 343.80 84.41 343.84 84.63 343.88 84.85 343.92 85.07 343.96 85.29 344.00 85.51 344.04 85.73 Elevation Primary (feet) (cfs) 344.08 85.95 344.12 86.16 344.16 86.38 344.20 86.60 344.24 86.81 344.28 87.03 344.32 87.25 344.36 87.46 344.40 87.67 344.44 90.13 344.48 94.45 344.52 99.99 344.56 106.50 344.60 113.85 344.64 121.96 344.68 130.76 344.72 140.20 344.76 150.23 344.80 160.82 344.84 171.95 344.88 183.58 344.92 196.30 344.96 209.85 345.00 224.05 345.04 238.89 345.08 254.37 345.12 270.48 345.16 287.22 345.20 304.59 345.24 322.59 345.28 341.21 345.32 360.46 345.36 380.33 345.40 400.41 345.44 420.63 345.48 441.36 345.52 462.61 345.56 484.38 345.60 506.67 345.64 529.47 345.68 552.78 345.72 576.61 345.76 600.94 345.80 625.79 345.84 651.14 345.88 677.00 345.92 700.94 345.96 725.19 346.00 749.75 346.04 774.62 346.08 799.80 Elevation Primary (feet) (cfs) 346.12 825.27 346.16 851.03 346.20 877.09 346.24 903.44 346.28 930.07 346.32 956.98 346.36 984.18 346.40 1,011.65 346.44 1,039.39 346.48 1,067.41 346.52 1,095.69 346.56 1,124.24 346.60 1,153.05 346.64 1,182.13 346.68 1,211.46 346.72 1,241.05 346.76 1,270.89 346.80 1,300.99 346.84 1,331.33 346.88 1,361.93 346.92 1,392.77 346.96 1,423.85 347.00 1,455.17 347.04 1,486.74 347.08 1,518.54 347.12 1,550.58 347.16 1,582.86 347.20 1,615.36 347.24 1,648.10 347.28 1,681.07 347.32 1,714.27 347.36 1,747.69 347.40 1,781.34 347.44 1,815.21 347.48 1,849.31 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design Type 1124-hr 25-Year Rainfall=6.41" Prepared by Horvath Associates, P.A. Page 32 HydroCAD®7 10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Stage-Area-Storage for Pond 4P: Wetland #1 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 340.00 63,379 0 340.10 63,995 6,369 340.20 64,610 12,799 340.30 65,226 19,291 340.40 65,842 25,844 340.50 66,457 32,459 340.60 67,073 39,136 340.70 67,689 45,874 340.80 68,304 52,673 340.90 68,920 59,534 341.00 69,536 66,457 341.10 70,151 73,442 341.20 70,767 80,487 341.30 71,382 87,595 341.40 71,998 94,764 341.50 72,614 101,995 341.60 73,229 109,287 341.70 73,845 116,640 341.80 74,461 124,056 341.90 75,076 131,533 342.00 75,692 139,071 342.10 76,171 146,664 342.20 76,650 154,305 342.30 77,129 161,994 342.40 77,608 169,731 342.50 78,088 177,516 342.60 78,567 185,349 342.70 79,046 193,229 342.80 79,525 201,158 342.90 80,004 209,134 343.00 80,483 217,159 343.10 80,962 225,231 343.20 81,441 233,351 343.30 81,920 241,519 343.40 82,399 249,735 343.50 82,879 257,999 343.60 83,358 266,311 343.70 83,837 274,670 343.80 84,316 283,078 343.90 84,795 291,534 344.00 85,274 300,037 344.10 85,888 308,595 344.20 86,501 317,215 344.30 87,115 325,895 344.40 87,729 334,638 344.50 88,343 343,441 344.60 88,956 352,306 344.70 89,570 361,232 344.80 90,184 370,220 344.90 90,797 379,269 345.00 91,411 388,380 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 345.10 92,025 397,551 345.20 92,638 406,784 345.30 93,252 416,079 345.40 93,866 425,435 345.50 94,480 434,852 345.60 95,093 444,331 345.70 95,707 453,871 345.80 96,321 463,472 345.90 96,934 473,135 346.00 97,548 482,859 346.10 97,922 492,632 346.20 98,295 502,443 346.30 98,669 512,292 346.40 99,043 522,177 346.50 99,417 532,100 346.60 99,790 542,061 346.70 100,164 552,058 346.80 100,538 562,093 346.90 100,912 572,166 347.00 101,285 582,276 347.10 101,659 592,423 347.20 102,033 602,607 347.30 102,407 612,829 347.40 102,780 623,089 347.50 103,154 633,386 1 1 1 1 S:\Drawings\06\0667\Project Calcs\ " 0667 Wetland Design Type 11 24-hr 25-Year Rainfall= 6.41 Prepared by Horvath Associates, P.A. Page 33 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/15/2007 Link 5L: DP #1 Inflow Area = 103.110 ac, Inflow Depth > 4.33" for 25-Year event Inflow = 350.05 cfs @ 12.23 hrs, Volume= 37.190 of Primary = 350.05 cfs @ 12.23 hrs, Volume= 37.190 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs '7 1 S:\Drawings\06\0667\Project Calcs\ 0667 Wetland Design -100 YR STORM Type// 24-hr 100-Year Rainfa//=8.00" Prepared by Horvath Associates, P.A. Page 2 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 3/14/2007 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Minimum Tc Pond 4P: Wetland #1 Inflow Area = 31.740 ac, Inflow Depth > 7.39" for 100-Year event Inflow = 370.27 cfs @ 11.96 hrs, Volume= 19.560 of Outflow = 324.83 cfs @ 11.99 hrs, Volume= 14.304 af, Atten= 12%, Lag= 2.2 min Primary = 324.83 cfs @ 11.99 hrs, Volume= 14.304 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak Elev= 345.43'@ 11.99 hrs Surf.Area= 94,078 sf Storage= 319,120 cf Plug-Flow detention time= 169.7 min calculated for 14.304 of (73% of inflow) Center-of-Mass det. time= 78.1 min ( 829.7 - 751.7 ) Volume Invert Avail.Storage Storag e Description #1 341.60' 523,819 cf Custom Stage Data (Pri smatic) Listed below (Recalc) ?`rR?Tt?G Io© - Y2 (aS? Elevation Surf.Area Inc.Store Cum.Store ? ?? (feet) 341 60 (sq-ft) 831 71 (cubic-feet) 0 (cubic-feet) 0 }?• 3 ed pf . , 'E??' cif r2? iZexl?,? ? 342.00 75,692 29,505 29,505 tS 344.00 85,274 160,966 190,471 ?puhcn 346.00 97,548 182,822 373,293 ? 347.50 103,154 150,527 523,819 Device Routing Invert Outlet Devices ' #1 Primary 344.40' 90.0' long (Profile 6) Broad-Crested Rectangular Weir Head (feet) 0.49 0.98 1.48 Coef. (English) 3.12 3.41 3.59 '-11=Broad-Crested OutFlow Max=324.43 cfs @ 11.99 hrs HW=345.43' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 324.43 cfs @ 3.5 fps) ' Link 5L: DP #1 Inflow Area 103.110 ac, Inflow Depth > 5.53" for 100-Year event Inflow 511.92 cfs @ 12.02 hrs, Volume= 47.542 of Primary - 511.92 cfs @ 12.02 hrs, Volume 47.542 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 OUTLET STRUCTURE DESIGN F n Velocity Dissipator Design.xls Designer: Ben Thayer Detention Basin 1 Checker: John Schrum, PE 1/11/2007 Velocity Dissipator Calculations w/ PIPES.EXE NRCD Land Quality Section - Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. 10-Year Outflow, Q (cfs) = 83.87 Flow Depth (ft.) 2.50 Slope, S (%) = 0.010 Velocity, V (ft/s) 17.09 ' Pipe Dia., D (in.) = 30 Manning's n Value = 0.013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe Dia., Do (ft.) = 2.50 Outlet Velocity, Vo (fps) = 17.09 Apron Length, LA (ft.) = 25.0 I Average Dia. Stone Thickness (inches) Class (inches) ' 4 A 12 8 B 18 >> 10 14 1 24 2 36 << Width,W = LA + Do Thickness = 1.5 * DMAX Width, W = 27.5 ft. SAY: 28.0 ft. FINAL DIMENSIONS: Length, L (ft.) = 25.0 Width, W (ft.) = 28.0 Depth, D (in.) _ 36 (NCDENR E&SC Manual §8.06.6) Stone Class - 2 (NCDOT Std. §1042) *Cells in red denote required inputs from PIPES.exe outputs Anti-Floatation Calcs for NC Products Extended Base Riser.xls John Schrum, P.E. 4' DIAMETER RISER 1/11/2007 Extended Base- NC Products Manhole Riser/Barrel Anti-Flotation Calculation Sheet I Input Data =_> 1 1 1 1 Inside diameter of manhole = 4.0 feet Wall thickness of manhole = 5.0 inches Outside diameter of manhole riser sections = 4.83 feet Total Required Height for Manhole Riser = 7.3 feet (Riser Crest to Invert) Height of Extended Base = 60.0 inches Concrete unit weight = 142.0 PCF Note: NC Products lists unit wt. of OD of barrel exiting manhole = 38.5 inches manhole concrete at 142 PCF. Size of drain pipe (if present) = 8.0 inches Trash Rack water displacement = 26.0 CF Concrete Present =_> Total amount of concrete above ground: Base of Manhole = F-2-1.-68-8--l CF Height of Riser Walls = 7.30 ft Manhole Walls = 42.204 CF Adjust for openings: Opening for drain pipe =1 0.145 1CF Total Concrete less base, adjusted for openings = 38.690 CF Bouyant Weight of Concrete in Riser = 3080 Ibs Amount of water displaced =_> Displacement by open air in riser = 95.248 CF Displacement by trash rack = 25.980 CF Note: Consult NC Products Manual for lb/ft weight of riser walls Total water displaced by riser/barrel structure = 121.228 CF ' Weight of water displaced = 7565 Ibs Net Water Displaced = 4485 lb (Weight of Water - Bouyant Weight of Concrete) t Opening for barrel = 3.369 CF for drain pipe = 0.145 CF 1 1 1 1 Anti-Floatation Calcs for NC Products Extended Base Riser.xls John Schrum, P.E. 4' DIAMETER RISER 1/11/2007 Calculate amount of concrete to be added to riser =_> Safety factor to use = 1.25 (minimum) Must add = 5606 Ibs concrete for buoyancy Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Diameter of Base = 7 feet Thickiness of Base = 12 inches Volume of Base =F--4-9 0-0 CF Weight of Base =F--6-9-5-8-] Ibs OK Actual Factor of Safety = 1.55 Results of design =_> Diameter of Base = 7.00 feet Thickness of Base = 12.00 inches CY of concrete added for Fill Block = 1.43 CY 1 1 1 1 1 1 1 1 1 1 1 1 1 LEVEL SPREADER DESIGN DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET (1/2007) 1. PROJECT INFORMATION (please complete the following information): ' Project Name : Glenn View Station Road Widening Contact Person: John Schrum Phone Number: (919 ) 490-4990 Level Spreader ID: LS 25B 1 1 1 1 1 1 1 1 1 Level Spreader Length 74 ft. Drainage Area 0.80 ac. Impervious Area 0.80 ac. Forebay Area 166 cu ft. Maximum Filter Strip/Buffer Slope 7.4%/2% % Max. Discharge from 1 "/Hr Storm 0.86 cfs Max. Discharge to Level Spreader 0.86 cfs Filter Strip/ Zone 1 Buffer Vegetation Grass Filter Strip/ Zone 1 Buffer Width -20 ft. Filter Strip/ Zone 2 Buffer Vegetation Forested Filter Strip/ Zone 2 Buffer Width -50 ft. Bypass Method Used Bypass Structure (perpendicular to flow) (on-site and off-site drainage to the level spreader) (on-site and off-site drainage to the level spreader) (0.2% of the contributing impervious surface area) (6% for forested/leaf litter cover, 8% for grass/thick cover) (Discharge rate from extended detention wetland or pond) (Grass/Thick ground cover or Forested) Please include a worksheet for this. II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, please explain why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. A lic I ' ials Project Site was visited prior to designing level spreader system. Date of the Site visit. Please attach time-dated digital photos of existing buffer conditions. Level spreader length is at least: 13 ft. per cfs for thick ground cover / grass; OR 65 ft per cfs for 50- foot canopied forest with leaf litter; 50 ft per cfs for 100-foot forested buffer; 40 ft. per cfs for 150-foot forested buffer; OR a weighted average of the two vegetation types within the buffer/filter strip). All ground cover types and their widths have been labeled on the construction plans. All contours have been depicted on the construction plans. No structures are located in protected buffers (must meet no practical alternatives criteria). No draws are located in the buffer or filter strip in the vicinity of the proposed level spreader. Construction details for the level spreader have been provided. The operation and maintenance agreement signed and notarized by the responsible party is provided. No practical alternatives explanation + Variance request. (Level Spreaders in Series only). Bypass method used: ari A?T U V Bypass conveyance method is specified and construction details and calculations are provided. Alternative design option is specified and plan details and calculations are provided. Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. Construction details for the bypass and outlets are provided. y1 i 4 �x � s r { x� a* as `,s 0 OD x W7. .. ` 4+• 4' i # i '3',' -gig e/"'<^ # �e 3 QLV x �. r� ,1 a. € INV :.ria ��" •-r�� � y as Ty en - i c ,r Fa Oji`' .r « r y _T Y k' -710 r.."now L . s. S s sob wwo op �qo m t Ott" low r Y r ` f t r � _ k - a " 1 Via'* , 'yfAAb p . v 4 MRS, # w r-, . O CL O N 00 D L U cn W O N N D O O N Q J c ? _o 0 O ? N O N O >N N n ? -o _N o C? N 4- U O I I N O CQ. C O U L N O O 4- D O Q. LO D + O Q Q L i_ Q N U E L 4- O N ? N N C L C O N N O L N U U O N ? .? 10 C) 10 co co C) 't (e) II II II II II II II p N a) N Q a) CU -0 o C O ? p 0 O •y O CL CL i .vU oo Q)? ? ,? ? U U L L H N V) Q. Q. V) N -' N N N O 0 O O ?N N N v m ? O LO LO co C) II II O O O O N N W W J •L D 2 Q. L CL C- U C= N U ICoI N V) N Q. CL J 1 1 1 1 L O 2 L d Q. V i O m C d V N N U 4 d m U N O r C ? O N 20 IL ? O N O C C1 C > > W Q N .2- CL (0 O O M O N D U) m I,- (0 0 F.. U C 3 tf m m N C N U c .0 _ 0 N 0 0 r m m 2 U C E N N T a N I n I Mm O N CL N N Mm N N ? ? O CL 0 0 ? N N r N O M W 0 O 8 N F- vi O N ET r C O O 0 N ? O a) 29 a .N ?o c (0 m ? c > W p Q °U N 'o IL O cn 0 N?Q LL O 0 c O Q U N a) a) m " o (0D m (0D CR (0O O Cl) Cl) 7 N N 10 > E O O O O O O o q O O o 0 O J O N U) V 0) U) 'I Cl) O n a N ' U m U U U N U L U. V m N ` C ` C L) C ` C ` ` U O L U) U LO U.) Lr) LO LO U U U U U I ) ao U U w C 00m(D00?rn00(0(0 0 O a .U - "k V 00 V W N V (M V 0 O U L U O (D O (D O O O (D O (D O N a v 66 yU O N 00 M 0 N 0 0 m 0 M v t` O v O (O N N O O N V' (D m w r r O M M O w w N N m in (5 LO LO LO U) (O LO 0 LO LO LO V = C v M M M M M M M M M M M M a3 O 000000000000 O O O O O O N r N O O O C3 m m m m O N o z N C .? 0 0 0 0 0 0 0 M M co M M M M M m m M (h Z) O i6 C0 (p (D 00 00 O CO 00 N M O 7 Q mU O O O O O O N UE? U N N CL 00 Q Q m« in Q N O O Z Z O O O y c U ? CL Q Q m m y O N tO M O Z Z O O O O N C Q U a ? 73 E m mm? m N N co 1 m Z N C N N N N N (4 N 1 0 ' 0 M J U m co m m W L i U U U a) 0 n co rn C) v a v v ? ? ? ? J a d a d o. n v ti *4• V q V Y (0 (0 N Cl) 0 N N 0) (0 (0 O U c 0 c a) U c O ._ 0 U N O L m V N m co 2 U C N N C a) co N O a) m N CL N _ N N ? O O Lea U CO ?€a 0 o Lo N N r a) .0 O M ((0oo 0 00 ai H N O ' L O L Q 0 c O a? O d V Cl) J ?lt 00'Z9£ :1n0 AUl 00'99£ :w2i 00+0 : e1S call 00'6b£ :ul nul 00'Z9£ :wld M+G :e1S 99z Sly 4 0 0 c O. o o N r ? O N O N O a ? O N N C p? > W Q ?0 'o E ? o N Ln N co O N + N O N O H U C 3 r N c d U 0 .j 0 U w a 0 r a? a a? m S U C E T CO T d C N m O N N a a N N N ? L d c C l? 0 O N N r ? 1] O M (0 of N O CO N i U) p Oi o ai l ed Report for Inlet: 1-165 t %? ; k6 y0t fot-r Scenario Summary 1 Scenario 1-Inch per Hour Physical Properties Alternat Base-Physical Properties Catchments Alternative Base-Catchments System Flows Alternative Base-System Flows Structure Headlosses Alterr Base-Structure Headlosses Boundary Conditions Altern Base-Boundary Con ditions Design Constraints Alternat Base-Design Constraints Capital Cost Alternative Base-Capital Cost User Data Alternative Base-User Data ' Geometric Summary x 2,046,383.71 ft Calculated Station 1+10 ft Y 828,684.22 ft El ti eva ons Ground Elevation 356.00 ft Hydraulic Grade Line In 352.47 ft Rim Elevation 356.00 ft Hydraulic Grade Line Out 352.44 ft Sump Elevation 352.00 ft Headlosses ' Gravity Element Headloss 0.03 ft Depth Out 0.44 ft Headloss Method AASHTO Velocity Out 3.53 ft/s ' AASHTO Shaping Method Full Velocity Head Out 0.19 ft System Flow Summary Total System Flow 0.86 cfs System Rational Flow 0.00 cfs ' System Flow Time 5.00 min System Additional Flow 0.00 cfs System Intensity 0.00 in/hr System Known Flow 0.86 cfs System CA 0.00 acres Total Diverted Flow In 0.00 cfs d F Incoming Diverte low Local Diverted Flow In 0.00 cfs Global Diverted Flow In 0.00 cfs ' Total Diverted Flow In 0.00 cfs Inlet Flow Summary Area 0.00 acres Composite Rational C 0.00 Inlet CA 0.00 acres Carryover CA 0.00 acres Total Inlet CA 0.00 acres Total Inlet Intensity 0.00 in/hr Total Inlet Rational Flow 0.00 cfs Total Inlet Time of Concenti 5.00 min ' Total Inlet Additional Flow 0.00 cfs Total Inlet Known Flow 0.00 cfs Total Flow To Inlet 0.00 cfs Inlet Characteristics Inlet Type Generic Inlet Inlet Location On Grade Inlet Generic Default 100% Inlet Section Properties Gutter Section Road Cross Slope 0.020 ft/ft Depressed Gutter? true Gutter Cross Slope 0.100 ft/ft Gutter Width 2.00 ft Bypass Target <Automatic> Longitudinal Slope 0.020000 ft/ft Mannings n 0.012 Title: Ravenstone Phase III Project Engineer: Matt Jones s:\...\0667b stormcad-offsite level spreader.stm StormCAD v5.6 [05.06.012.00] ' 05/18/07 01:55:0- 1$ ntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 1 1 1 1 1 1 1 1 1 Detailed Report for Inlet: 1-165 External Pipe Flow External CA 0.00 acres External Time of Concentra 0.00 min Intercepted Flow Summary Intercepted Rational Flow Intercepted Additional Flow Intercepted Known Flow Total Intercepted Flow 0.00 cfs 0.00 cfs 0.00 cfs 0.00 cfs Intercepted CA Intercepted Intensity Intercepted Tc Capture Efficiency 0.00 acres 0.00 in/hr 5.00 min 100.0 % Upstream Piped Flow Summary Upstream Rational Flow Upstream Additional Flow Upstream Known Flow Total Upstream Flow 0.00 cfs 0.00 cfs 0.00 cfs 0.00 cfs Upstream CA Upstream Intensity Upstream Time Of Concent 0.00 acres 0.00 in/hr 0.00 min Design Constraints Summary Pipe Matching Matchline Offset Design Structure Elevation, Crowns 0.10 ft true Allow Drop Structure? Local Pipe Matching Constr Desired Sump Depth false false 0.00 ft User Data Date Installed Message List Time (hr) Message No bypass target specified. Bypass is assumec Title: Ravenstone Phase III Project Engineer: Matt Jones s:\...\0667b stormcad-offsite level spreader.stm StormCAD v5.6 [05.06.012.00] 05/18/07 01:55:0rWUntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 F 1 s 11 J Scenario: 1-Inch per Hour DOT Report Label -Node- Upstream Downstream pstrea Inlet Area (acres) pstrea Inlet CA (acres) pstream Calculate System CA (acres) d -Ground- Upstream ownstrea (ft) -HGL- Upstream ownstrea (ft) Section Discharge Capacity (cfs) -Section Shape Size Length (ft) Average Velocity (ft/s) Description P-46 CB25 0.50 0.48 0.48 361.00 358.02 0.48 Circular 50.00 3.08 JB26A 361.00 357.48 6.46 15 inch P-47 JB26A N/A N/A 0.86 361.00 357.03 0.86 Circular 42.00 3.66 JB26B 360.00 356.56 6.46 15 inch P-48 JB26B N/A N/A 0.86 360.00 353.22 0.86 Circular 35.00 4.68 FES25B 352.00 353.25 9.14 15 inch P-49 CB27 0.30 0.28 0.28 362.20 359.16 0.29 Circular 104.00 2.65 CB26 361.70 358.09 6.46 15 inch P-50 CB26 0.10 0.10 0.38 361.70 358.05 0.38 Circular 79.00 2.89 JB26A 361.00 357.23 6.46 15 inch P-44 1-165 0.00 0.00 0.00 356.00 352.44 0.86 Circular 110.00 5.50 LS 25B 352.00 349.67 2.00 18 inch Title: Ravenstone Phase III Project Engineer: Matt Jones ' s:1 ...\0667b stormcad-offsite level spreader.stm StormCAD v5.6 [05.06.012.00] 05/18/07 01:55:539?1$@ntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 M__ LEVEL SPREADER SYSTEM OPERATION AND MAINTENANCE AGREEMENT (1/2007) A level spreader system includes: a forebay, diverter box, level spreader, riparian buffer/vegetated filter strip, and flow bypass channel. Name of Project: Glenn View Station NC DWQ Project # 06-1013 Address: Geer Street and Glenn School Road, Durham, North Carolina Maintenance activities shall be performed as follows: MAINTENANCE ACTIVITY FREQUENCY Post-construction monitoring-inspect for vegetation, Check after every heavy rainfall for first 6 months settling, erosion, or concentrated flow. following construction. Inspect Diverter Box and clean and/or make repairs. Once a month and after heavy rainfalls/storms. Look for: • Clogged inlet or outlet pipes. • Trash/debris in the box. Inspect Forebay + Level Spreader. Clean and/or Once a month and after heavy rainfalls/storms. make repairs. Look for: • Sediment in forebay and along level spreader lip; • Trash and/or leaf buildup. • Scour, undercutting of level spreader. • Settlement of level spreader structure (no longer level; you see silt downhill below level spreader). • Fallen trees on level spreader. • #57 stone washing downhill. Inspect the Riparian Buffer and the Bypass Swale Once a month and after heavy rainfalls/storms. and make repairs as needed'. Look for: • Damaged turf reinforcement or riprap rolling downhill. • Erosion within the buffer or swale. • Concentrated flows downhill of level spreader-look for gullies or sediment flows. Mow grass to a 6" height. As needed during growing season. Remove any weeds/shrubs growing on level spreader Once a year. or in swale. 1 NOTE: Contact NC Division of Water Quality, 401/Wetlands Unit at 919-733-1786 BEFORE any work in Protected Riparian Buffers. Page I of 2 LEVEL SPREADER NO. LOCATION ON SITE (DESCRIBE) HOW WILL IT BE ACCESSED? 1 (LS 2513) West of Geer Street Entrance Sanitary Sewer Easement 2 3 4 5 6 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Page 2 of 2 T. ' . ~ ~ , ~ i ~ c ~ ~ ` '1 ~ ! y. ~ f i ~ ~ 1 I 1 1 V ~ ~ 1 r / ! \ \ t i ~ . 1 t t \ ~ ~ l I t r J r'• O ~ \ ' r 1 ~ F / , t ` ' ~ t ~ / J/l / ~ ~ i ~ ~ l 1 ~ f t i V ¦ i 11.r+ 1/ ~ \ r L ~ . 1 l 1 r ~ / F ~ ~ \ ` ~ r ~ i ~ ~ ~ / \ \ ~1 i ~ t f t 1~ 1 \ 1 1 ~ ~ r1 t 1 1 ~ ~ 1 i j I i ~ Jam- r ~1 ;t ~ 1 ~ F ~ y ~ r ~r \ ~r t i ~ , ~ ~ ` ~ t 1,:: 1 r .i l I J ~ ~ i ~ / ~ ~ r r t t r f f ~ f l ~ ~ ~ ( ~ + f 1 r J n r f ~ ~ / , ~ 1 r .ti. r ~ ~ - \ 1 ~ ~ ~ ~ < 1 ~ 1 ~ . ~ ~ / ~ . ~ 1 v ~ U ~ r ~ ~ \ s i ~ / s f 1 ~ \ / f ~ . 1 l ~ t f i i \ r / l' ; ~ ; ~ \ s \ ~ ~ J l > ~ ~ t ' ~ ; / / r' r i r- ~ ~ ! 1 ~ ~ r ~ ~ ~ , . , t ~ r 1 ~ ~1 ! t f r• ~ . ~V / Q t ! / 4 f ~ / ~ ~ ~ ¦ \ ~ I ! / ~ ~ / ~ ~ ~ ~ 1 ~ r ! \ \ ~ t r-- i ~ f ¦ ~ i \ f 1 t ~ ~ 'r." 1 , 1 ! ~ , \ ~ \ { ti J ~ ~ ~ r . ,J, If ~ t \ ` ? ! ~ ~ 1 \ ~ ( i t l am/ ~ ~ 1 ~ i ` 1 \ ' ! i~ /r' ~ / t / / i l ~ ~ r ~ 1 t i , t t ) ~ / ~ , HORVATH 1 .rte ~t~ ti~ .rte ~ ` 1 1 i 1 ~ ` r 1 ~ / 'r 1 • ~ ~ 1 ~ t tom-- ~ 1 ~ 1 ~ v t~¦ ASSOCIATES \ ~ ~ t ter. t ~ r / J ` 1 ~ 1/ 1 / ~ 1 ~ \ \ t 1"'r ~ , i t . ¦ \ ~ • t ~ ! ~ t t T 1 I 16 CONSULTANT PLACE. SUITE 201 + ! ¦ DURHAM. NORTH C.MOUNA 27707 P 919.190.4990 P 919.490.8953 J ~ l ~ ~ r / i , + 1' ~ \ . ~ i ~ r ~ 1 1 ~ ` ~ j r r \ / i r~ i 1 f ! ! ; r ¦ 537 MARKET STREET. SUITE 1.120 r : ~ r i \ y` ~ T ~ i / .n•.~ CHATTANOOGA. TENNESSEE 37102 I l t ¦ P 423166.4990 F423.266.5700 ~ ~ \ ~ ~ ~ t / ~ / ~ J ~ , l ~ ~1 ~ ~ ~ r.~ 1 ~ r, i t l 1 ~ ~ 1~ ~ 1~ r ' i l ` ~ \ r / . r / . I 1 r--~ ? , \ ~ ~ r ~r ~l , t F f t ~ ~ ~ 1 1 LMw' 1 1 / r i . ~ s i , ~ ~ Q, ~ t ~ \ t r \ f ~ / ~ ~ f , 1I MM 2 1 ZOO" ~ ~ ~ ~ / 1 / M . • ~ ~ - 1 1 r .r r- ~ ~ . ~ ~ ~ ~ ~ f. \ ~ 1 \ \ ~ ~ ~ ~ ~ . ~ \ r , ~ f ~ ` r ~ ~ ~ \ \ r / TEAR - WATER QOALI I ' ~ ~ ~ \ l v 1 ~ ~ r ~ l ~ . O r ~ \ ` ~ f ~ ~ ~ ~ ~ ~ ~ f J ~ ~ , 1 ~ ~ ~ r ~ ~ ~ i \ ~ ~ ~ ~ ~ ~ v 1 r ? ~ 1 \ `1 \ 1 ' ~ : ~ -3 ~ ~ ~ . ~ ~ ~ ~ Z 1 \ 1 ~ { ~ ~ \ ~ ~ 1 ~ 5 ~ 1 ~ II ~ ~ / \ ~ \ \ 0 L ~ ~ , / ~ / ~ t r ~ / ~ / i ~ / ; ~ \ / ~ \ ~ ~ \ ~ , J \ ~ 1 1 ti ~ti t ! F 1 / ! / 1 ~ 1 \ ~ - ~ \ ~ ~ \ ~ Q cn tu E, ~ ~ ~ / . ti ~ i \ ~ ~ ~ / \ ~ ~ ~ ~ ~1 \ , 1 \ ~ ~ W V i / ( t v ! r ~ , i ~ ~ J ~ ~ ~f ~ ~ 5 \ \ ~ ~ i{ • r 1 L + \ rte' ~ f 1 ~ ~ ~ ~ \ r f t + , \ 1 i ~ / _ t t, ~ ~ ~ F V1 I l \ i \ ~ t 1 ~ ~ ~ ~ ~ 1 1 i ~ ~ C?~ ~ ~ ~ ~ ~ \ ~1 ~ _ oe s ~ ~1 + t ' ' ~ ~ f ~ 1: ~ ~ ~ ~ ~ / \ ~ : J ~1~ 1 r oe. 0 Lu t / ~ ~ ~ S ~ ~ s } , i 1 t ~ ~ ~ ~ \ / ~ 1 t ~ i t ~ \ 1, r ~ , > s, ~ ~ • ~ ~ ~ ~ 1 W Z r ~ J + ; t 1 t 1 ~ ~ 1 \ r{ ~ t ti i t \ 1 . ' l L. 1 1 t y , rr • . 1 a Z Q ~ 1 1 \ 1 1 t 1 r ~ ` ~ V : 1 ~ t 7 + + ~ ~ ~ i J r 1 ~ fF f J f~ 1 ~ ~ / j l s r ~ ~ ----7 ~ 1 ; ti • , rJ ~ i - r ~ 1 I a t .r t ~ , ~ J / i r ~ / ~ ' ~ ~ 1 , ~ ~ / ¦ L.LI ~ / ~ + ~ i ~ + ~ i ' t ~ ~ l 1 ~ ~ 1 r / ~ t ~ i ~o ~ i ~ ti ~ ~ ~ ~ r 1 ` / r ~ J d i. 1 ~ i 1 ~ _ _ . . ~ ~ / ! ci ~ ~ / ~ ~ ~ / / t 1 / i - ` ~ ~ ~ 1 i 1• t~ ~ ~ \ 1 - ~ , - • ~ t ~ r• r ~ l / f 1 ` l / t, 1 / ~ ~ ` 1 t ` / r I ; ~ ~ ' ~ ~ \ ~ '''i ~ 11 I 4 • , t I r' i ~ , ~ t! ~ ~ ¦ ~ ~ 1 1 ~ ~ % i 1 ~..r / i ~ • \ t _ ~ . ` ter- ~ ~ ~ ~ ~ ~ < + f ~t ~ • r \ ~ \ 1 1 ~ r ~ r , \ . ~ 1 v t • ~ ~ ~ / r f / ~ ,t 1 ~ / f i ~ . POST_ ` ; ` ~ ~ 'Z ¦ i I ~ ~ 1 r- DEVELOPMENT • _ ~ / ~ 1 ~ 1 ~ i r \ • DRAINAGE + ~ ~ ~ ` t t~ ~ ~ r t-t , 1-. / ~ / ~ ¦ MAP 1 ~ ~ ~ ~ ~ / / ~ \ \ i ~ r ~ ~ i \ ~ 1 1 t / 1 t t 7 ~ r/ / i / . . t ~ ~ 1 ! t !F f ~ t 1 ~ ~ ~ ~ r ~ : ~ , , ~ ~ ; f t / ~ ` r f 'ti r ~ . i ~ ~ ~ ~ , ~ ~ , j. ~ ~ r / , J J 1. / ~ ~ } ` ? I ~ ~ / \ S; t t fir.. \ / ~ ! 'ti ~ f l / ~ + r + / 1 .l. \ ~ 1 ~ / ~ , r• ~ ~ ~ I 1 ~ 1 Jr ~ ~ I r , ~ r ~ i 'a ~ ~ i ` ~ r ~ ~ ~ ~ 1, r / \ r l .i ~ r I I i ~ t \ , ~ ~ ' l r / \ ~ I ~ ~ ` I~ ~ ~ ~ , ~ ~ / ~ , ~ , . r ~ r 1 / ~ I t ~ . e/ ~ ~ \ ~ \ L 1 r ~ ~ / ~ 11 r \ ~ 1? 1. f , , ~ ! t' t ~ t \ ~ ~ / \ r \ 11 1 I • / J r r, . t ~ ii i ~ . 1 ~ ~ ~ ~ +L ~ . 4 ~o ~ r . ~ . \ ~ S \ f : ~ r t f j r r ~ J \ ! ~ r \ ~ ~ ~ .r ~ ~ ~ , f / , ~1 ~ ~ \ ~ E t ~ r ~ \ f 1 1 - ~ ! / ~ to , ~ \ f' \ ~ ~ 1ot~ \ \ ! ! 1 j ; / ~ L~ r 1 1 i 1 I / ~ ~ ~ ~ ~ i ~ l ~ ~ O 1 I . r1 ~ r~ , ` ~ i ~ i t t . 1, ~ ~ I ~ ` ~ y t t ~ t ~ 1, j t! ~ i l~ ~ r r ~ 1 ~ / J \ ~ I ~ ~ Ali r i .f ~ ~ ~ ~ ~ l ~ ~ t ~ ~ I ~ I f r . iL / ~ ~ ~ i ~ ~ - ~ ~ t i L i ~ \ \ ~ fly 1 ~ ~ ~ ~ ~ L ~ ~ ~ ~ 1 ` ~ r 1 , ~ ! ~ ~ r ( I 4 , I ~ \ ~ r . ~ . ~ 1 ~ ~ ~ ~ ~ f ~ i ~ ~ / \ ~ : ~ ~ ~ ~ ~ ~ ~ ~ ~ , r ~ } s I ~ ~ ~ ~ , t , ~ • j ? i ! ~ 1 L r t ~ c ~ ~ ~ / ~ , / / / r ~ 1 .i' ~ I \ ~ ~ r a,1 r ~ , t \ ` ~ ~ i ~ 1 t l ~ ~ ~ ~ 1 ~ r/ i ~ ) ~ 1 l j \ ~ J ~ ~ ? ~ ~ ~ r / ~ ~ \ , \ \ ~ • ..vii ~ `J ~ ~ ~ t ~ / r ~ ~ ~ r ~ ~ c 1 t ~ l r "'OC'R ~ \ ...f 1, , ~ ~.J i ~ ~ 1 ~ ~ ti I \ \ 1 ¦ ~ ~ ti ~ ~ \ > 1 ~ ~ / ~ ~ , ,r ~ ~ ` .1 ~ ~ ~ ? ~ ~ t ~ ? ~ 1 \ ~ ~ ~ 1 \ \ / ! 1 ~ . \ \ ~ i ~ ~ r \ j l I ~ ~ ~ \ , r l l ~ • ~ ~ \ \ ~ r ~ / ' ~ ~ t l ~ ~ ~ f ~ 1 / ~ f 1 1 1 / ~ ~ ~~J \ ! ~ r f ~ \ \ r C 1' ~ v \ ~ f ' r ~ • ~ ~ ~ ~ \ r r~ ~ r ~ \ ~ ~ r { r / / ~ f r . ( i ~ • \ t ' ~ / r ~ ...V _ i, I I ~ ~ 1 ~ t ~ ~ ~ ~ ~ / ~ v ~ ~ ~ , ~ ~ ~ ~ ~ I ~ ~ ~ 1 1 t ~ ` ~ I ~ 1` \ ~ r \ 1 ~ i ¦ I I \ L~ ~ ~ ~ , j ~ \ ~ ` 1r ~ ~ 1. / ~ ~ . r / ! f ~ L \ \ ~ ¦ DRAWN BY. CMM W. ~ r ~ , f / ~ ~ ~ ~ . ~ r , ~ ~ t~ ~ j ~ ~ , ~ ~ l ~ i f t F ~ / ~ ~ ' / ` V ~ ~ ~ ( ~ ~ ~ ~ , i •r t ~ 1 ` ~ t ~ • DATE 9-28-2006 / ~ 1 l ~ , f i i ~ / ~ ~ ~ : / . ! , ~ / i ~ ! i , `I ~ ~ ~ ~ ! ~ a ~ ~ \ ! . ~ ~ 1 \ ~ ~ / ~ ; ! 1 \ ~ 1 I 7 ~ ~ ~ 1 / i 1 ~ ¦ SCALE 111=2W ~ ~ ~ r r 1 ? ~ ~ ~ ~ \ ~ ~ ~ ~ \ ~ 111-200 ¦ i ~ 1 , ~ ~ i J ~ \ t` \ r ! , 1, ~ i ! • ti ~ ~ / ~ / PROJECT NO. 0667 \ \ ? . \ ~ L ~ ~ / ~ / / / ~ ~ / ~ ~ / / ~ ~ / 1, ~ d / ~ , SHEET NO. . ~ / ~ . ~ ~ I / i / ~ ~ 2~ 00 0 / / 1 ~ ~ ~ 400 ¦ \ \ ~ \ t \ ~ O ~ \ / ~ i ~ ~ , i t ~ i L / I . ~ / ~ ~ 1- i ~ ~ ~ 1 SW2 • ~ t ~ \ \ ti , 1 , • ~ t ~ / t ~ ` ` ~ ~ / A~,~..3 20Q / / l / ~ SC --380- . \ 1. ~ / ~ ¦ \ r / • ~ ~ \ 1 ~ f ~ / / / / r - f ~