Loading...
HomeMy WebLinkAboutNCC211017_Site Plan or Location Map_202102191333 O£ = HONI L '31VOS OZOZ'OZ d3UN3AON WOO'66S£'S3O1n2�3SONV7'MMM No No 669f —S7d — NOSVl73 'O S37b'VHO 9Lfi8-000 (616) :90!OA N O21 VNIIOdVO H1dON - A1Nnoo MHIVHO-sdIHSNMOl A310VH VN/702iV,� HILION .(1/,� L137/S v� s'" O e£9101 e6-900Z 3OIlS1Vld OLL 39Vd Seel N008 0330 30N32i333a 3nN3nV WVHl b'H.7 Hlb'ON L L L' re'' S3WOH Noisno SoW ON/ddVW "ON/NNV7d ONV7 "ON/.13n2InS ONV7 O ao3 a3avd3ad ^" S3 Ma3S ONV7 — iV111Wons SdV NO3 NVld 311S /.H 03b'Vd3b'd NOI-LVC]HO33H HO 30N` )\AANOO A-IVS HOA ION )\HVNIWl-13Hd 8C9 10-1 - ]1901�:l -lAdVH0 - NV-ld A11S U 2 4 ~ � = W 2 > w Fj iz,? �o� Oz �z2J _= W W W = O= J 6Qo ]WOE wz O V�ww z8 a z= w °o wxxrcz jz\� L °UU m ti w o WO ww ' LU aw�O2° °ww ��i a�oppW a �aO°o8 5ww a w a33vW °gi�gh e zW�m VI UI uu� i? k- WUWiOi� I. I U x# U m m m � 2 ° Qi ■o��M+ ° Oi�n®®OO®OO O® (3 ®fyF 000 da i cs-a= tans Ind a� S) as f a da ci y, ao�S ap'( 0 \ 7 5 � /� YET•\ Q� o S JJi may 7J m� � OJ m O O C7 �O i � O £O OQ a o � (O0 Z)�Q ti00 WQLu W O � � 0 U � ao Q3 a O Z S m mp F c v- ti� d a sad �, 21 J .J O U , v m Q V It1 O b N h LO O 7 a V e `v V v c M o 0 0 0 0 0 t J J J J J J � 020 W�� mM p$d ti�?}tiW ZWO� W�C)Q ti =00�0 j2 �vOi�� OQ}xg� �nwWx o �o��m dQ Q JWpw OZ¢aWp�ti W°°�O�QOZ~O w °o,� 02k��NO2(zO w¢W �ne�mWOe Op vl v„pp OmW zQwe°W C, x=o¢�Oz ZZ, J:v�aw°m ~�~OQ�mmtipmooz=oowe OpJ I. W�vWi��wW Uti� WWJW aw mmm��° �xn~O°m�z WO ��Ox 1 WW �Ev1tiO Q Q Z�tipOm �WC�7�VU�1 O Z O d U U SEEDING AND MULCHING TO BE INSTALLED IF SITE WORK IS DISCONTINUED. A. APPLYING LIMESTONE AND FERTILIZER. After the seedbed has been approved by the Engineer, the contractor shall apply at o unifarm ate dolomitic limestone (4,000 lbs. per cre) and fertilizer (1,000 Ibs. per a of 10-10-10) within 24 hours after the seedbed hasrbeen prepared, Is method of applying the limestone and fertilizer to the soil shall be approved by the Engineer. B. TYPE I SEEDING (LAWNS). Immediately after the limestone and fertilizer have been applied to the sail, the contractor shall uniformly apply the seed in accordance with the fallowing schedule: DATE SEED TYPE APPLICATION RATE Aug. 15 - Oct. 31 Kentucky 31 TaII Fescue 225 Ibs/ac. Nov. 1 - Jan. 31 Kentucky 31 Tall Fescue 225 lbslac. Rye Grain 40 Ibslac. Feb. I - Aug. 14 Kentucky 31 Tall Fescue 225 Ibslac. C. TYPE II SEEDING (GENERAL). Immediately after the limestone and fertilizer have been aee l ied to the soil, the c tractor shall uniformly apply the seed in accordance with the following schedule: DATE SEED TYPE APPUCATION RATE Aug. 15 - Oct. 31 Kentucky 31 Tall Fescue 120 Ibelac. Nov. 1 -Jan. 31 Kentucky 31 Tall Fescue 120 Ibs t Rye Grain 40 Ibs ac Feb. 1 - April 30 Kentucky 31 Tall Fescue 120 Ibs/ac. May 1 - June 30 Tall Fescue 120 Ibs/ac. German Millet 40 Ibs/ c. July 1 - Aug. 14 Tall Fescue 120 Ibsl/ac Sudangrass 20 Ibslac. GENERAL DETAILS: Temporary Sol] erosion and sedimentation on trol (S&E) n m shall be provided in ordonce with theS&E plan approved by Orange County. A letter of plan approves/ will be i ved to permit the contractor to grade only se ough as to instal/ the S&E m . Once the S&E measures nstal/ede and es found to be acceptablewith the approved S&E plan, the contractor co continue land disturbing activities onthe applicable phase of the site. The S&E plan shall be in ordo, ce with the NCOENR Erosion and Sediment Contra/ Planning and Design nuo/ (latest revisions) and Orange County. TheCONTRACTOR/DEVELOPER Should also be fomi/ior with the Oronge County S&E Ordinance. The app—ved S&E Plan shall be kept on site by the CONTRACTOR at a/l times while work is being performed. All S&E m shall be installed prior to clearing operations, and in ca shall on where work is completed, a denuded for m e than 21 calendo days. Grou nd cove, shall be established in graded slopes and fil/s within 15 working days or 14 calendar days, whichever is shorter. S&E me shall be coordinated with oil other on, an project to nsu a economical, effective, and ontinuo us S&Er throughout the construction and post construction period and to siltotian of streams, lakes, and other water impoundments, ground "rsurfaces, roadways, or other properties. /t is the owners responsibilty that the Orange County erosion control plan be implemented and followed. SEEDBED PREPARA110N 1. Chisel compacted a and spread topsoil 3 inches deep ativene soil conditions, with stockpiled topsoil. Contractor sufficient topsob far seedbed p,eParat'an.e 2. 1;p the entire area to 6 inch depth. J. Remove all loose rock, roots, and other obstructions leaving sueace reasonably smooth and uniform. Apply agncultuml I, fertilize,, a super -phosphate un-61 and m,r with sob (see below'). 5. Continue tillage until a well -pulverized, firm, as rc ocb, unilorm seedbed is prepared 4 to 6 inches deep. 6. Seed an a freshly prepared s r seed lightly with seed;nq equipment or cwtipack bafte�nseed;ng 7. Mulch immediate" after seeding and anchor, mulch. S. lepect all seeded areas an make eces repairs or e dings within the planting s , if possible. If stand is less than 60$ established, the ent�e a shall be r eeded cording to opeci/ications using the orig naI lime, fertilizer and seeding r es. g. consult a Conservation Inspector a ntenonce —a— and fertilization after Permanent cave, ,s established. •Appy: Agricutural Limestone - 2 tons/acre (3 tons/acre in Fe,til iers� 1.000 lb/acr - 10-10-10 Super -phosphate - 500 lb/acre - 20S analysis 2or Anchor,-Aspha/t—,.;an ®-angals/acre o o 0 0 o T°ro. o a This plan is applicable to the project as s1¢c ax�armrs�sr named in the title black only. w AWee rtxrz ax Wes: tsx¢ srm tsx¢ axr D. MULCHING. Immediately after the limestone, fertilizer and seed has been applied to the soil, the seedbed shall be harrowed, dragged, raked or otherwise worked so as to cover the seed with a layer of Mulch shall consist of grain straw or other equally satisfactory material approved by the Engineer. Mulch shall be spread un Ifarm ly over the area by hand or mechanical spreader. The mulch will be applied at a rate that will allow some sunlight to penetrate and air to circulate but also partially shade the ground, reduce erosion and conserve moisture (approximately 65 bales per acre). Mulch shall be held in place by crimping the grain straw or by sprayying emulsified asphalt to the mulch at a rate of 3.5 gallons per 1,000 square feet. Adequate precations shall be taken to prevent spraying asphalt emulsion on cars, fire hydrants, driveways, sidewalks, or other structures. The contractor shall clean any cars, fire hydrants, driveways, sidewalks or other structures which have been sprayed. PLAN VIEW ygg. s xw°.E. stl1ra"re tic no dN l II SIOE VIEW U u STANDARD SILT FENCE OUTLET DocuSigned by: unx s IMPERVIOUS SURFACE AREA1 Crushed aggregate 3 inches TOTAL 6,065 SF LOT AREA = 20,01B SF3 PERCENTAGE OF IMPERVIOUS AREA = 30% Original "�m`e ercliam�i`rmm me PROPOSED DISTURBED AREA 11,7B5 SF3 grade 6 inches Min, unless otherwise CONSTRUCT/ON ENTRANCES: e�x� Gravel construction entrance pods shall be constructed at each point of construction SECTION B—B access to the site, including residentiol lots. S NTThe gravel pods shall be maintained in such o manner as to prevent the deposition of mud and debris onto existing public roadways or ' k� ^^tla^ �z' ^ NOTE: i"z- ... din: properties adjacent to the site. Surge Stone or = tie,d, u=^ Railroad Bollast (nominal size of 2 —3 inches), Construct sediment barrier ^wm.tw mr.r r.n shall be laced to o nominal depth of 12 and channelize runoff to DO NOT USE BURLAP. p p 01 sediment trapping device inches for the first 15 feet and 6 inches for > B the remaining 35 feet. Gravel pods for o y, in single—family lots shall be 25 feet ti \ long and 12 feet minimum width. Washed stone sha// be 6 inches thick. Special Note: It shall a , be the develaper,s responsibility to see that the construction entrance pads are properly N maintained so that mud is not tracked onto adjacent streets. In the event that the grovel z +� construction entrances ore not properly VI m ax=,,..mtwm maintained, or ore otherwise ineffective, \iempeorary pipe culvert r, B^ _a"aanwxlac nc�slm ras Chatham County may issue a Notice of Te eded xar cxi r Violation, Stop Work Order, and/or assess a as penalty which shall remain in effect until such srnrx 3' MAx. time as the pods One rest ored and replenished 50' MINIMUM ,'sac 2, MIN and until ony resulting mud and debris hos BarTON al W. -cE been removed from the adjacent Match ix ms sxckvkrss a� streets by the CONTRACTOR. Existing ox,^d. ( 16" MIN Gr d PLAN ne. e.r ^ . �— NTS .t STANDARD SILT FENCE SITE PLAN CHAPEL RIDGE --- LOT 638 PRELIMINARY NOT FOR SALE CONVEYANCE OR RECORDATION S2 IS2 OOZ (6Lf) j3a�OA SEIVAOH NO n 3f) airvsry 70&VO HI&ON HI&0&3716 IS 0 SOW N3AV "VHIVHO N Z11 'ONINW76 ONV7 '0N1A3A&n6 ONV7 —ing-9-0AN— - NV As dd 9,02 Cc— --, NO1IVGaO:D3a aO 3ONVA3ANO:D 3-1VS aOA ION AaVNIM-13ad eC9 10-1 - �1901a -UdVH:D - NV-1d �11S 2. 22 m II A� ns C, 7- FE, Q; .1 1 -.' I A " � aL k 5-5�2ap u 1 Q 0 o x, wl. 8 10 .1 o