HomeMy WebLinkAbout20100251 Ver 2_Stormwater Approval_20120612MCDENR
North Carolina 1 • and Natural
Beverly Eaves Perdue
Governor
Division of Water Quality
Charles Wakild P E
Director
June 12 2012
Mr Sieve Wara
Harnett County Department of Public Utilities
Post Office Box 1 119
Llllington NC 27546
Subject Property Brightwater Medical Complex
UT to Neills Creek [030607 18 16 (0 7) WSIV]
APPROVAL OF MODIFIED STORMWATER MANAGEMENT PLAN
Dear Mr Ward
Dee Freeman
Secretary
DWQ Project # 10 0251v2
Harnett County
On February 3 2011 the Division of Water Quality (DWQ) issued a 401 Water Quality
Certification to impact 0 35 acre of 404 Wetlands and 219 linear feet of perennial stream in
order to construct the Brightwater Medical Complex in Harnett County Condition 6 of this
certification requires that this project adhere to 401 Stormwater Management
Requirements
On March 26 2012 the DWQ received a stormwater management plan (dated March 23
2012) for the addition of the Brightwater Health Sciences Building on the Brightwater
Medical Complex campus On May 14 2012 the DWQ received additional stormwater
information (dated May 14 2012)
The DWQ approves the SMP as satisfying Condition 6 of the General Water Quality
Certillcalion This approval Is for the purpose and design that you desc abed in your
application If you change your project you must notify us and you may be required to
r,end ! �s a new SMP This sapprovol requires you to follow the conditions listed in the General
Water Quality Certification for the project and the following additional conditions listed
below
1 The SMP approved by the DWQ consists of one wet detention pond and all
associated . -10rYr✓ ✓ate con ✓eyarces inlet and outle+ structures and the grading
and drainage patterns depicted on plan dated March 23 2012 The approved SMP
must be maintained in perpetu►ry No cnanges to ine siruc lural stormwater practices
1617 Mail Service Center Raleigh North Carolina 27699 1617
Location 512 N Salisbury St Raleigh North Carolina 27604
Phone 919 807 6300 1 FAX 919.807 64921 Customer Service 1 877 623 6748
Intemer www nuwa aqua i'Y ova One h v 1
An Equa Orp it li 1 Aff m r 4clio r^pl Nort � Carohna
Amorally
Mi Steve Ward
June 12 2012
Page 2 of 2
shall be made without written authorization from the DWQ The stormwater
management structures shall have maintenance access and at least a 10 foot
dra -age ea,en ent on each s de to ailoNA for +he ab I, +y to ma n +a n the � +ruc +ures
and to pertorm corrective actions The stormwater easements snap be recorded to
provide protection of the structures from potential alterations by future property
owners
2 Operation and Maintenance of BMP Maintenance activities for the proposed sand
filter dry detention basin and level spreader vegetated filter strip shall be performed
in accordance with the notarized O&M agreements signed by Mr Johnston
Tilghman (Harnett Forward Together Committee Inc Chairman) on May 9 2012 The
O & M agreement must transfer with the sale of the land or transfer of
ownership /responsibility for the BMP facility DWQ must be notified promptly of every
£transfer
Thank you for your attention to this matter If you have any questions or wish to discuss these
matters further please do not hesitate to contact me at 919 807 6381
Sincerely
eon
Annette Lucas PE
Wetlands Buffers and Stormwater Compliance
and Permitting (Webscape) Unit
AML /aml
cc Chad Turlington DWQ Fayetteville Regional Office
USACE Wilmington Regulatory Field Office
DLR Fayetteville Regional Office
File Copy
Andrew Moriarty PE Timmons Group 5410 Trinity Road Suite 112 Raleigh NC 27607
Filename 10 025lv2BnghtwaterMedComplex (Hornett)_SW_Mod_Approve docx