Loading...
HomeMy WebLinkAbout710014_30 day poa_20210110 (2)PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 16 inches b. designed 25 yr./24 hr. storm & structural freeboard 20 inches c. line b - line a (inches in red zone) = 4 inches d. top of dike surface area according to design 127650 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 318273 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design _180 days g. volume of waste produced according to structural design 118684 ft3 h. actual waste produced = current herd # x line g = 118684 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 76562 ft3 k. (lines h + i +i) x 7.48 x 30 days = _243406 gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated _1.28 Ib/1000 m. (lines e + k) x line 1 = 718 lb PAN 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE PoA (30 Day) 2/21/00 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 1 line m = 718 lb PAN 2. structure ID: line m = lb PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6 = 718 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 7046 131-4 cc 15.73 50 771 Sept-april 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = 771 lb. PAN PoA (30 Day) 2/21/00 2 IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ _718 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 771 lb. PAN y. Overall PAN balance (w - x) _ -53 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 3 PoA (30 Day) 2/21/00