Loading...
HomeMy WebLinkAbout20120563 Ver 1_401 Application_201206121 f CONSULTING, PA 7332 Cotesworth Dnve D Wilmington NC 28405 (910) 619 9990 PLANNING ENGINEERING PROJECT MANAGEMENT May 31 2012 NC DWQ 401 /Wetland Unit 1650 Mad Service Center Raleigh NC 27699 -1650 RE 401 Certification Application Coxs Ferry Boating Access Area Boat Ramp Repair Wayne County NC Dear Sirs I am respectfully submitting the above mentioned project for 401 certification On May 22 20121 met with representatives with DWQ (Roberto Scheller) and USACOE (William Wescott) to discuss this project and the related permitting requirements Based on this meeting I am offering the following a Project Narrative - attached b Set of plans for the project- (C 1 C2 & C3) (5 full size sets) c The application fee has been electronically transferred in the state system Documentation of that fee transfer is attached d 5 sets of the PCN for the project e An agent authorization form I trust that the attached information is sufficient for DWQ to review and issue a permit on this project Should you have any questions please do not hesitate to call Sincerely yours < A Bradford Sedgwick PE President f CONSULTING, PA D 7332 Cotesworth Dnve ti Wilmington NC 28405 (910) 619 9990 PLANNING ENGINEERING PROJECT MANAGEMENT May 31 2012 Coxs Ferry Boating Access Area Ramp Repair and ADA Access North Carolina Wildlife Resources Commission owns a 7 05 acre tract of land located at 1048 Coxs Ferry Road In Princeton NC (Wayne County) The property currently supports a single 12 wide boat ramp and a gravel parking area The ramp Is In very poor shape and access to the water /ramp are not ADA compliant At this time the property owner /operator (North Carolina Wildlife Resources Commission) wish to replace the aged concrete boat ramp with a new 14 wide ramp provide a floating dock an ADA compliant approach and provide a parking spot for a handicap vehicle pulling a boat trader The sequence of construction shall be as follows 1 Mobilize to the site 2 Remove existing ramp using front end loader Ramp will be removed In as large of pieces as possible as not to disturbed surrounding areas 3 After ramp Is removed from the water It will be broken Into pieces loaded In dump trucks and transported to a predetermined area of the Holly Shelter Games Lands (Owner held property) 4 After removal of ramp the footprint of the ramp will be excavated deep enough to achieve the proper grade ( +/- 2 125 feet deep from top of existing ramp) 5 After excavation of ramp footprint 18 layer of stone (see sheet C3 - Push Slab Design detail 6 During the excavation process a section of the push slab wIi cc o —ea ana poured on high ground In line with the ramp area Once curea the slab wlli be Nu hind in "n place with a tfack hoe along the top of the gravel This proce.'s wi occu, until the last push slab is in place (See plans for limit between push slab and poured In place portion of the ramp) 7 Once push slabs have been put Into place the remainder of the ramp will be c, rued and poured Into place 8 At +'^e completion of the ramp construction the floating dock abutment the ADA s uewulk and ADA purKing spot ml be iorrnec, uri.., pouiu,.l u , e �, „ „ , 9 After the proper cure time of the abutr -nent the f'oa' ng doc' zec{ o- b o�gh+ onto +he site and anchored into place (Tne docK secs., e'.,e ,"ere ,n +1'e #ciel 10 After the above activity shore ,+ab I za+ or fu +e rna11 " be p oject cleaned up All work on this project will occur in the existing footprint of the site SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION LOT NO PLAN NO PARCEL ID Coxs Ferry Boating Access Area STREET ADDRESS 1046 Ferry Bridge Road Princeton NC 27569 Please print Property Owner North Carolina Wildlife Resources Commission Property Owner The undersigned registered property owners of the above noted property, do hereby authorize Brad Sedgwick PE of JBS Consulting PA (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing Issuance and acceptance of this permit or certification and any and all standard and special conditions attached Property Owner s Address (if different than property above) Telephone (919) 707 -0150 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge 0 4 Authorized Signature Authorized Signature r Date May 24 2012 Date 4 O�0� W A 94 20120563 Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 �c Responsible Far-1V 4iUt i`L-C it Afia,y s,yr, u rE app,,%,ause} l i j 3d St Pe add ecs ! 1 -72EE Mail C' r ira rentp �C C t, -Z ofio y P3 a g !" .. 2''r 9 1'2^ f i v Z i 3f Telepttone no i 919L733-3155 3g Fax no � 919 -707 1720 j 13h Email address mark hamlett0ne ildlife orq Paoe I of ! F-Cim Folini — veismi 1 3 Dectemnbei tU 2008 vCrbion Pre - Construction Notification PC Form A. Appheant Information 1 Processing flo la Type(s) of approval sought from the Corps ❑Section 404 Permit ®Section 10 Permit _PV_ lb Specify Nationwide Permit (NWP) number or General Permit (GP) number- 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification - Regular ❑ Non-404 Junsdicbonal General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization le Is this notification solely for the record For the record only for DWQ 401 i For the record only for Corps Permit `-_ because written approval is not required" C_ -- ® Yes ❑ No ® Yes ❑ No � If Is payment into a mitigation bank or in -lieu fee program proposed for mitigation ❑ Yes ® No of impacts? if so attach the acceptance letter from mitigation bank or in -lieu fee program 1g Is the project located in any of NC s twenty coastal counties if yes answer 1h ❑ Yes ® No below 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Cox Ferry Boating Access Area Ramp Repair and ADA Access { 2b County Wayne 21r Ca CJt mites L Pa y av-- i %.3 Liu u l 2d Subdivision name NIA F 2e NCDOT only T I P or state NIA -- - - - -- -- - - - -- -- -- project no 3 Owner Information �� 3a Name(s) on Recorded Deed State of North Carolina 30 D� 6v�h a� a Page ��u ; Dutd Bv1R i5o Page 435 N ,. ► �c Responsible Far-1V 4iUt i`L-C it Afia,y s,yr, u rE app,,%,ause} l i j 3d St Pe add ecs ! 1 -72EE Mail C' r ira rentp �C C t, -Z ofio y P3 a g !" .. 2''r 9 1'2^ f i v Z i 3f Telepttone no i 919L733-3155 3g Fax no � 919 -707 1720 j 13h Email address mark hamlett0ne ildlife orq Paoe I of ! F-Cim Folini — veismi 1 3 Dectemnbei tU 2008 vCrbion �, ,�'' i �� i 4� �� 4 Applican *'nforration (if d Iferent fro— o.ane ) 4a Applicant is ❑ Agent ❑ Other specify 4b Narne 4c Business name (if applicable) 4d Street address 4e Cily state zip 4f Telephone no j 4g Fax no 4h Email address 5 Agent(Corlsultarit information ff applicablell 5a Name Brad Sedgwick PE 5b Business name (if applicable) j5S Conbulling Pm 5c St eet add ess 71,32 Co+est orth D^ e 5d City state zip WilmingLon NC 28405 5e Telephone no i gi0 -619 9944 ! � a ' r ! i 51 FiAf U i vwA i ! 5g Email address i bradsedg%mck@hotmail com pzno 7 of 11 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History Yes ®ivo ❑ unKnown 7 Property Identification i i 1a Property identification no (tax PIN or parcel ID) 2558752659 lb Site coordinates (in decimal degrees) Latitude 35 356667 Longitude 78136667 (DD DDDDDD) ( DD DDDDDD) 1 c Property size 7 05 acres 2 Surface Waters Agency /Consultant Company 1 2a Name of nearest body of water (stream river etc) to proposed project Neuse River 2b Water Quality Classification of nearest receiving water WS-ry rdSvv 1 2c River basin Neuse River f € .mss � esjcs.s Lve;.'aes gs v- i 3a Descrbe •t'e ex s.^g cond €e€o ^s on the site ano the genera€ land use n the v icinity of the Dro €ect at tree urne o, this € € app ca c- € € Cite c �n ov of nn_ hn?t nn !:ir -ecc o e7 nth on ovnefinn a r+n {a :na+ an�i ncenr ntlmri ri = ni -mrk r..v+ C rr n-r nn S nenera hr wnruted trar-ts f € 1— € ...✓ � o e is 6 cS a ees ac; cagc is a cF.S4i`C c GT iI5 V "'c � isisc'" E MIA v a esu—a cu -ea lee is a cn G.-g str ea - s a-a PC ore, }. v¢.: y f € € f ora c.,ns., „ at,.. n .. _ ..� ♦s,,, .. n .,.,t ., ..a _ f € Rvu aL a ngec nua rap- o oriel orovioe r or ❑c.;i34 adrx nq dna dccess [o me nver OY rnedns or access smewdik and froatino docx € .., esBSii ✓., cis e a Fs 0l0c e... se "Gu.. ^y fle ypsc C eyes p —,e es ase es$ces € a ur`'''n fjEirr 'v %-ate3r A anzer w nes _-F+:t V PL .Fl Inat are PiDift:3 Can nrt115 € 1 ___ .__ �.0 �._ f_ I _ .1��LS _ Z it Pc€ 3.t cv1 –a J f-i Ulu €J—iff Zic J ., ie`c.F v� _ i1T U' Gu –U V Z rw et v a rar=v T un r r�nn n a.r•n n �niv �. r �.•m rr`. reran nn nrae. n nn 6 4-nine nr C vnTA ncnn —r11 �s1G�rA� �r r\r�raf• ... P-n3 7 ^f i PCN Form — Version 1 3 December 10 2008 Version protect (mctudinq au prior vnases) in the past? Yes ®ivo ❑ unKnown Comments Proleet involvez the replacement of an existing i i boat ramp No wetland impacts expected 4b If the Corps made the jurisd ctionai cteterm €nation what type El Preliminary ❑ Final 1 of determination was rnadv' 1 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company 1 Name (if known) Other i 4d i If yes list the dates of the Corps jursdretiona' determ €natio ^s or State deferrr nations a ^d a "ach docurrertation 1 j 5 Project History i 5a I Haire permits or certifications been requested or obtained fo this protect (including all prior phases) n tl�,e past' j ❑ Yes ❑ No ® Unknown 50 if yes expiain in oetai€ according to help rile instructions F I € P-n3 7 ^f i PCN Form — Version 1 3 December 10 2008 Version 6 Future Project Plans 6a is this a phased project? ❑ Yes ® No 6b if yes explain Page 4 of 11 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 question for all stream sites Imoa,• ^'? 1 Impacts Summary ❑ Corps 1 a Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams tributaries ❑ Buffers i �''Qr�i�['1d�4 ❑ Open Waters ❑ Pond Construction �VfS q,- I IMDclCt 2 Wetland Impacts i i PER i or i} r`nmg AU_ 11-1 If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 20 2c 2d 2e 2f vdeudno impact ( ' Type of juribuic,tion nurnbe.l - i yPe Ol illipcitA Type ui wedand Forested r -nr,s 404 10 Area of impair i Permanent (P) of (if mown) S3 ❑ P ❑ T ! I DvvQ — vie �- tit ° Tempo ar T i i , W1 [I P [IT ❑ Yes El Corps ❑ DWQ S4 ❑ P ❑ T ❑ No ❑ DWQ ❑ Corps W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ DWQ S5 ❑ P [IT ❑ No ❑ DWQ ❑ Corps W3 ❑ P [IT ❑ Yes ❑ Corps ❑ DWQ S6 ❑ P ❑ T ❑ No ❑ DWQ ❑ Corps W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ DWQ 31L Total stream and tributary impacts 0 ❑ No ❑ DWQ W5 ❑ P [IT ❑ Yes [I Corps ❑ No ❑ DWQ W6 ❑ P [IT ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 0 2h Comments No wetland impacts from this project Replacing exsibng ramp with a new ramp in same footprint f3 Stream Impacts u � i_� e _ „ c °• ••a!`r acicai!(!lCdilClL'� (9F`LlLLl((`� iC!(ii..'Llttt +y i'l� L �' il'VUU�CU U{" inC �FIC '{le[! S:U['ip{Cle ••7!S 1 question for all stream sites Imoa,• ^'? ❑ PER ❑ Corps art 13e - - -1 3t— - � 3t3 T Pa{ii {Rfi[i.^_g('€ ! kp_g C` F€F'rFaf'F f y F €" `l i'Si' i �''Qr�i�['1d�4 [ Vi3is of (64r[4!'{ i`tjlirF �VfS q,- I IMDclCt i filly i0eF i i i i PER i or i} r`nmg AU_ 11-1 p[ 9 stream- 1 length Dermarent tPl or i I intermittent f) ! DIA ' - nnn -AC-A � width a (i 'year Temporary (T) M S3 ❑ P ❑ T (INT)? �nthPrl (feet) feet) S1 ❑ P [IT ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P [IT ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P [IT ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 31L Total stream and tributary impacts 0 31 Comments No new stream impacts Pa -e 5 OT 1 Pr"Uiv rul -ii i - vCibiuri 1 3 Decor ibei IU 2008 ve wo-, 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a Open water impact number — Permanent (P) or Temporary 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acresl 01 ❑P ❑T 6c 6d 6e 6f 02 []P [IT Buffer impact 03 ❑ PEI T number — Reason 04 ❑P ❑T Zone 1 impact Zone 2 impact Permanent (P) or for 4f Total open water impacts 0 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a Pond ID number E Pi 5b Pr000sed use or ouroose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland E (acres) _ _ _ _ _ r _ Nuese River ® No 548 P2 B2 ❑P ❑T ❑Yes 51' Total ❑ No B3 ❑P ❑T ❑Yes 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit 1D no 51 Expected pond surface area (acres) 0 5) Size of pond watershed (acres) 0 5k Method of construction 0 V B..ffer Impacts (for DWQ) o L em vii impact a protected riparian busier then complete the chart below it yes then individually +Est all buffer impacts helo y if ar% — D--cfs ea e m t not on thap !o.! Jd.U! "I f i 6a ® d%cuba ❑ Tai Pat I111W ❑ voice Project is in which protected basin? ❑ Catawba ❑ Randlerrar i 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required 61 ® P ❑ T Ramp Nuese River ® No 548 72 B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h Total buffer impacts 61 Comments See plans for a total summary of BUA on the site Page 6 of 11 PCN Form — 'veisiuni 3 Ni- ennit:ei EG 2008 version D Impact Justification and Mitigation 1 Avoidance and Mimm¢abon la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Project was sited in the existing footprint of the existing boat ramp and access art-a 1b Specifically describe measures taken io avoid or min m ze the proposed impacts through construction techniques nJA ftiininnzeo To meet: rieeus of puolic useage } f e �,u� tPe1-i°:atOT -Y t I InaTI i1" Lvi ire- 1paCTS t.o a WS Ot -e si v a M. € f fe .a asc 1 I 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? I + El Yes ® No 2b If yes mibgabon is requuW by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this projects ❑ Mifigation bank ❑Payment to in -ilea fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c if using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d 13 il"Fer Mitigation requested tDv%Q only) square feet 4e Riparian wetland mitigation requested acres AF Aron -agan vetland nitigat on regLester' i c7nz 6 .lt 1CT i T 'ii,^.� V.. ?T :i ^!i CTi# i?_ 3tSTi r iii fiCLCR fit` isZ # dh t`nmmenrc l a L 9itplCtC s J$fig d r eltlei: Resp`rsILTL IIIC 9dt3 i P tall i 5a If usi-ig a perm lee respor's ble — t# ation a- pro de a des: p . cl "'--^ cvvL " at plo- g p F r� r :;}. .. yam..,, i. i-age ! of If PCKI Form — \lorsicr 2 oe.:e -ibei r =- versi_r 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b If yes then identrfy the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the 1 1 a- o int o rritigaLion requ red - -- F6r - — - - -- I Rd Zane Reason for impact { Total impact Multiplier I Required mitigation ( I (square feet) I I (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g if Duffer mitgation is regL red d sc ss L.;!!a4 type o, rnitigat o- s proposed =e g payment is p vale rri ga 0- bQ -n pfe t uttee responsible riparian bufFe restorat,o^ payment P c an aD,, v °d , et ¢° r t 1 6h f nmmen*S Dzyy � C PCv,i Futiii — vwtaut 1 3 Dmwiiuvi tv 200o vutaturt E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1 a Does the project include or is it adjacent to protected npanan buffers identified ❑ Yes ❑ No within one of the NC Mpanan Buffer Protection Rules? 1b If yes then is a diffuse flow plan included? If no explain why ❑Yes No ❑ Comments 2 Storrs water Management Plan 2a What is the overall percent imperviousness of this project? 61% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why Entire BUA (exst^g and vr000sed Belo i 247 of ine tact) 2d if Lk s p ;-,' DOES require a Stormwater Management Plan then provide a bnef narrative descnptior• of the plan i i ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? i ❑ DWQ Stormwater Program i ❑ DWQ 401 Unit i 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? i ❑ Phase II 3b Which of the following malty implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4 DWQ Stormwater Prog in Review ❑ Coastal counties 4a Which of the following state - implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropnate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form - Version 13 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ❑ No use of public (federal/state) land? lb If you answered yes to the above does the project require preparation of an en sronmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA'SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (if so amen a copy or me NEPA or SEPA final approval letter) ❑ Yes ® No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the -fact permit application? ❑ Yes ® No 2c If you answered "yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Req. nee —o"I y 3a Mill this project (based on past and reasonably anbc1pated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water oua! t, l p a - -tv t=u yes Lu trie above suomit a quainative or quantitative cumulative Impact analysis to accordance with the s — t Pr.Pnt lib 0 r -t r. � si ;� �,�rFre� -G � vvl � ce ai ry t F lal vat ire fez) s ✓t vii 1 4 Sewage Disaosai tDWQ Requirement) 4a Clearly detail the ultimate treatment methods and disoosition (non- discharge or discharge) of wastewater generated from the oroaosed oroiect or available caaacity of the subiect facilitvv Kfo can a s ?..c —, ties a e nr,., cea n n s r lecT PdgU I V UT ! 1 PLrt Form — Version 1 3 Decemt)er 10 2008 Ve,!.iun & Endangered Species and Designated Critical Habitat (Corps Requirement) 8b If yes explain how project meets FEMA requirements Water access project 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No Applican Agen s Signature (Agents signature is valid only if an authorization letter from the applicant LS provided habitat? 5b Have you checked with the USFWS concerning Endangered Species Act Yes ®No impacts 5c if yes indicate the USFWS Field Office you have contacted ❑ Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat' ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? N/A 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? f 71n t/1 fL...i .i..i.. ......���_ J_J ..___ ..__ a_ J_a_ _.__ . •• _ _ _ _ i ., —2 gel uGIG .AUUlf -=N Ulu VOU USti to uerermine wneIner vour sire wnUia imr%act niStonc or archeological resources? i 1 NSA 8 Flood Zone Designation (Corps Requirements 8a Will this project occur in a FEMA- designated 100 -year floodplain? ® Yes ❑ No ! 8b If yes explain how project meets FEMA requirements Water access project 8c What source(s) did you use to make the floodplain determination? FIRM Map Brad Sedg%vick, APE Applicant/Agent's Pnnted Name Date Applican Agen s Signature (Agents signature is valid only if an authorization letter from the applicant LS provided rage i i of e i PCN Form — Version 13 December 10 2008 Version