Loading...
HomeMy WebLinkAbout20120025 Ver 1_Certification of Completion_20120814Certification of Com letion DWQ Project No.: _ L " -- County: &(,— Y L W L c K Applicant: '13 K ®+F Project Name. �� �c2� ( u e (,,S{- Date of Issuance of Wetland Permit: 3— -_�7 — ) -), Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Waxer Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650_ This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification-and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification 1, /\"1,4L, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. If this project was designed by a Certified Professional 1, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ' etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abifdes, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent' of the 401 W7on&o. ertification and Buffer Rules, the approved plans and specifications, and other supporting materials. � Signature: Regi f� IUI Date AUG 1 4 2012 August 13, 2012 Ian McMillan 401 Oversight / Express Permitting Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 -1650 RE: Sea Wynde Plantation Phase I and III, DWQ Project No. 12 -0025 Dear Mr. McMillan: Poyner Spruill LLP Timothy P Sullivan Partner D: 919.783.2991 F 919.783.1075 tsulllvan @poynersprulll.com On behalf of The Bank of Hampton Roads, I am enclosing a Certification of Completion for the subject project signed by the Bank's consultant Rob Moul, Land Management Group. Please do not hesitate to contact me if you need any additional information. TPS /mxb cc: Mark Bowles (w /enclosure) WWW POYNERSPRUILL.COM 2220526v2 0 Sincerer Timothy P. Sullivan Partner �D Q�ar 1 4 2012 DENR - %(AVyF�,�H YVeN $ 1. QAl17y RALEIGH / CHARLOTTE / ROCKY MOUNT / SOUTHERN PINES 301 Fayetteville Street, Suite 1900, Raleigh, NC 27601 P0. Box 1801, Raleigh, NC 27602 -1801 P' 919.783 6400