Loading...
HomeMy WebLinkAbout20120534 Ver 1_More Info Received_2012060120120 -0 34 C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Tem ora T 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404 10) or DWQ (401 other) 2f Area of impact (acres) W1 Choose one Choose one Yes /No W2 Choose one Choose one Yes /No W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g Total Wetland Impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 T Water main crossing UNNAMED TRIBUTARY PER DWQ 20 40 S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h Total stream and tributary impacts 40 31 Comments 40 STREAM EXCAVATION = 40 LF UI)LE v9 LD3ENR N 1 2012 w;,TLER QUAL, & St Page 4 of 10 .a-aw— ea Brant PCN Form — Version 1 4 January 2009��—