Loading...
HomeMy WebLinkAbout20120529 Ver 1_Application_20120531O�0F \N Ar�9QG O -< 2®120529 Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 Page 1 of 10 PCN Form — Version 13 December 10 2008 Version Pre-Construction Not>If canon C Form A Apphcant Information 1 Processing 1a Type(s) of approval sought from the Corps Section 404 Permit ❑ Section 10 Permit 1 $ 1 b Specify Nationwide Permit (NWP) number � 1A or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes No Id Type(s) of approval sought from the DWQ (check all that apply) tK401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes No For the record only for Corps Permit ❑ Yes ❑ No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in -lieu fee program [] Yes gNo 1 g Is the project located in any of NC s twenty coastal counties if yes answer 1 h below ❑ Yes No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes No 2 Project Information 2a Name of project 2b County LEO TL9 10 2c Nearest municipality/ town ,� �� 2d Subdivision name �' 2 2e NCDOT only T I P or state project no DENR Wq►gR QU,��7Y weaand3 3 Owner Information 3a Name(s) on Recorded Deed 3b Deed Book and Page No y U of S Q �, a�� -eS �-� 145 yvp DQS.Q Z) 3c Responsible Party (for LLC if applicable) 3d Street address ct 3e City state zip v C. �y 3f Telephone no 3g Fax no 3h Email address 5 Q Cu Ol rncj C Page 1 of 10 PCN Form — Version 13 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 41' Telephone no 4g Fax no 4h Email address 5 AgentlConsultant information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 10 PCN Form — Vernon 13 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) o�W of lb Site coordinates (in decimal degrees) Latitude 2,S S I Longitude g I (DD DDDDDD) (DD DDDDDD) 1 c Property size tQ g3 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to proposed project �c e r e� ti 1�PC V a c ^ti 2b Water Quality Classification of nearest receiving water C 2c River basing V p, 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Q -�60,►tk� 3b List the total estimated acreage of all existing wetlands on the property "4 S crc( Q- 3c List the total `estimated linear feet of all existing streams (intermittent and perennial) on the property 3d Explain the purpose of the proposed project ") b ,4--� 3e Describe the overa I project in detail including the type of equipment to be used 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments ❑YesNo XUnknown ` 4b If the Corps made the jurisdictional determination what type of determination was made 1-1 Preliminary El Final 4c If yes who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the pasty Yes j(Vo Unknown 5b if yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes No 6b If yes explain Page 3 of 10 PCN Form — Version 13 December 10 2008 Version t14k C Proposed Impacts Inventory 1 Impacts Summary 1a Which sections were co pleted below for your project (check all that apply) ❑ Wetlands Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non -404 other) (acres) Temporary W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 []POT ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P [:IT ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non -404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 EPEIT C���l �'C C10C1Q C] I NT U DWQ , O� S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ IT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuanes tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected npanan buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required B1 ❑P [IT El Yes ❑ No B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h Total buffer impacts 61 Comments Page 5 of 10 PCN Form — Version 13 December 10 2008 Version D Impact Justification and Mibgabon 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project S C .OP 1 ­Z11 1b Sp cifically describe measures taken to avoid or minimize the proposed impacts through construction techniques U Se 01 ti, CLAD :1 6 - 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters off the`State 2a Does the protect require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes 2b If yes mrtigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c if yes which mitigation option will be used for this project? ❑ Mitigation bank ❑Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quanfity 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete rf Using a Perinittee Responsible Mtigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 13 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigabon Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 7 of 10 PCN Form — Version 13 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the protect include or is it adjacent to protected riparian buffers identified ❑ Yes Io within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this protect? % 2b Does this protect require a Stormwater Management Plan? ❑ Yes ❑ No 2c If this protect DOES NOT require a Stormwater Management Plan explain why 2d If this protect DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this protect? ❑ Phase it 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply [] ORW (check all that apply) ❑ Session Law 200 6-246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Storm inter Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 513 Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 13 December 10 2008 Version F Supplementary Information 7 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal/state /local) funds or the ❑ Yes o use of public (federal /state) land? 1 b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (if so attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the -fact permit application? ❑ Yes ❑ No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes V0 additional development which could impact nearby downstream water quality? // `` 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Page 9 of 10 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? ❑ Yeslo ' K 5b Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes NO 5c If yes indicate the USFWS Field Office you have contacted ❑ Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ YesNo / \\ 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑ No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodpiain determination? Applicant/Agents Printed Name C-1A Date Applicant/Agent s Signature (Agents signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 PCN Form — Version 13 December 10 2008 Version N\ CS9¢ \ a, 1 a Ctcr z;��S I--I I C� 5` o c)Qp `` . cam - C9pp� 421 landers chapel rpad, lincolnton, nc - Google Maps Valcese South Mountains State Park Address 421 Landers Chapel Rd Lincointon, NC 28092 Shelby 18.1 R -09 Gaffney � Get Google Maps on yow phone /1-1—Q? Tea the vwd "GMAPS"to46645 3 IZZY St Steptieris Hickory Conover Mountain Yew Newtor L Lake Maiden of C Denver Urtcolnton Iron Station Grouse low Cheryville Stanley Dallas Bessemer Mt HOy City Gastonia Lowell Kings Mountain Belmont South, Gastonia S�- z;--. P-,fk Kings Mawlain State Park Clover Lake Wyie Tega tray 02012 43,00900 - Page I of I http://Maps.google.comlmaps?f--q&source=s,_q&hl=-en&geocode=&q=421+landers+chape... 5/28/2012 Gaston County, NC Office of the Director of Revenue, GIS Division DisclairrierThe information provided is not to be considered as a Legal Document or Description. The Map and Parcel Data is believed to be accurate, but Gaston County does not guarantee its accuracy, Print Date: 5/2812012 Page I of I Photo Not Availabic http://egovl.co.gaston.nc.uslservleticom.esri.esrimap.Esrimap?ServiceName=MSOVERVI... 5/28/2012 Print Scale 1:4967 or I" = 414' is ap - GatonCovaty.NC ,. PARCEL INFORMATION undefined: undefined undefined- undefined undefined undefined undefined undefined undefined undefined undefined, undefined undefined: undefined undefined: undefined undefined undefined undefined: undefined undefined 0 undefined* undefined ndefined: undefined undefined undefined undefined: undefined undefined: undefined undefined undefined undefined: undefined undefined undefined undefined: undefined undefined undefined undefined- undefined undefined: undefined undefined undefined undefined: undefined undefined undefined undefined: undefined undefined: undefined undefined: undefined undefined: undefined undefined: undefined undefined: undefined undefined: undefined undefined: iundefined undefined: undefined undefined undefined undefined undefined http://egovl.co.gaston.nc.uslservleticom.esri.esrimap.Esrimap?ServiceName=MSOVERVI... 5/28/2012