HomeMy WebLinkAbout20181034 Ver 1_PreFiling Acknowledgement Email_20210217Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Wednesday, February 17, 2021 8:34 AM
To: mclemmons@mbakerintl.com
Cc: Davis, Erin B
Subject: Pre -Filing Meeting Request Acknowledgement - Rush Fork Mitigation Project -
20181034 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Rush Fork Mitigation Project
that you submitted on 2/15/2021. The ID number for that project is 20181034, Version 1.
Reviewer Contact Information:
Reviewer: Erin Davis
Email: erin.davis@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20181034
Version* 1
Regional Office* Central Office - (919) 707-9000
Reviewer List* Erin Davis
Pre -Filing Meeting Request submitted 2/15/2021
Contact Name * Micky Clemmons
Contact Email Address* mclemmons@mbakerintl.com
Project Name* Rush Fork Mitigation Project
Project Owner* North Carolina Department of Mitigation Services (NCDMS)
Project County* Haywood
Owner Address: Street Address
1652 Mail Service Center
Address Line 2
aty State / Frovince / Region
Raleigh NC
Rbstal/Zip Code Country
27699 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
20181034
Do you know the name of the staff member you would like to request a meeting with?
Erin Davis
Please give a brief project description below.*
We believe that a pre -filing meeting is unnecessary for this project,
because a post -contract IRT meeting was held on 8/9/18 and the
DWR representative who attended this meeting was Mac Haupt.
The LT to Rush Fork Stream Mitigation Project is located in the
Crabtree Community of Haywood County, NC. The project site is
located in the French Broad River Basin (06010106) and the NC
DIMS Targeted Local Watershed (TLW) 06010106020010. The
project site is bisected by Rush Fork Road approximately 1.8 miles
north of its intersection with Silvers Coves Road.
The existing stream reaches have been significantly impacted by
unrestricted livestock access and removal of riparian buffers. Most of
the project reaches have cleared banks with a mix of small scattered
trees and stands of invasive species located at the top of bank.
Currently, the project reaches are unstable, incised, and exhibit
active bank erosion from both high flows and livestock access.
The project will involve the restoration and enhancement of
approximately 5,300 LF of existing stream. A Best Management
Practice (BMP) will also be implemented at the head of one of the
tributaries to treat nutrient and sediment laden run-off from the
surrounding pasture area. Degraded riparian wetlands will be
restored and/or enhanced with the implementation of Priority Level 1
restoration, livestock exclusion, and native riparian buffer plantings.
At this time, no wetland credit is being sought for the project. A
conservation easement will be implemented along all project reaches
in an excess of 30 feet from the top of bank and will incorporate
existing functional wetlands. The conservation easement will protect
the entire project area in perpetuity. Livestock will be excluded from
the conservation easement with permanent fencing.
Please give a couple of dates you are available for a meeting.
8/9/2018
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 2/15/2021