Loading...
HomeMy WebLinkAbout20210341 Ver 1_PreFiling Acknowledgement Email_20210216Strickland, Bev From: laserfiche@ncdenr.gov Sent: Tuesday, February 16, 2021 7:51 AM To: Becky Ward Cc: Trone, Rick V Subject: Pre -Filing Meeting Request Acknowledgement - Proctor Farm Equestrian Park - 20210341 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Proctor Farm Equestrian Park that you submitted on 2/15/2021. The ID number for that project is 20210341, Version 1. Reviewer Contact Information: Reviewer: Rick Trone Email: rick.trone@ncdenr.gov Reviewing Office: Central Office - (919) 707-9000 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20210341 Version* 1 Regional Office* Central Office - (919) 707-9000 Reviewer List* Rick Trone Pre -Filing Meeting Request submitted 2/15/2021 Contact Name * Becky Ward Contact Email Address* becky.ward@timmons.com Project Name* Proctor Farm Equestrian Park Project Owner* Wake County C/O Eric Staehle, Facilities Design and Construction Project County* Wake Owner Address: Street Address Wake County Office Building, 11th Floor Address Line 2 PO Box 550 aty State / Frovince / Region Raleigh NC Rbstal/Zip Code Country 27602 usa Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit F- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * Proctor Farm is a new equestrian park being constructed through Wake County Facilities and Management. The streams and wetlands on the project are currently a part of a mitigation bank. One existing stream crossing is proposed to be replaced on a tributary and one bridge crossing of the FEMA regulated stream. The crossings are being designed for the horse trails in the park. The crossings in the park are being designed to not impact any of the mitigation bank stream and wetland components. The tributary crossing is planned to be submitted for as the first phase of the project. As design continues for the crossing of the FEMA stream a phase II PCN application will be submitted. Attached are preliminary construction plans for the crossings. We have been coordinating with the City of Raleigh please find the attached memorandum regarding the site visit. They did not have any objectives to the project. Please give a couple of dates you are available for a meeting. 3/2/2021 3/3/2021 3/9/2021 3/10/2021 Please attach the documentation you would like to have the meeting about. Proctor Farm Crossings.pdf 3.41 MB OS_109_Procter_Mitigation_Easement_Ma p. p... 1.23MB Memorandum -Site Visit 8-15-19.pdf 2.91 MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/15/2021