HomeMy WebLinkAbout20210341 Ver 1_PreFiling Acknowledgement Email_20210216Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Tuesday, February 16, 2021 7:51 AM
To: Becky Ward
Cc: Trone, Rick V
Subject: Pre -Filing Meeting Request Acknowledgement - Proctor Farm Equestrian Park -
20210341 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Proctor Farm Equestrian Park
that you submitted on 2/15/2021. The ID number for that project is 20210341, Version 1.
Reviewer Contact Information:
Reviewer: Rick Trone
Email: rick.trone@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20210341
Version* 1
Regional Office* Central Office - (919) 707-9000
Reviewer List* Rick Trone
Pre -Filing Meeting Request submitted 2/15/2021
Contact Name * Becky Ward
Contact Email Address* becky.ward@timmons.com
Project Name* Proctor Farm Equestrian Park
Project Owner* Wake County C/O Eric Staehle, Facilities Design and Construction
Project County* Wake
Owner Address: Street Address
Wake County Office Building, 11th Floor
Address Line 2
PO Box 550
aty State / Frovince / Region
Raleigh NC
Rbstal/Zip Code Country
27602 usa
Is this a transportation project? * r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit F- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
Proctor Farm is a new equestrian park being constructed through
Wake County Facilities and Management. The streams and wetlands
on the project are currently a part of a mitigation bank. One existing
stream crossing is proposed to be replaced on a tributary and one
bridge crossing of the FEMA regulated stream. The crossings are
being designed for the horse trails in the park. The crossings in the
park are being designed to not impact any of the mitigation bank
stream and wetland components. The tributary crossing is planned to
be submitted for as the first phase of the project. As design continues
for the crossing of the FEMA stream a phase II PCN application will be
submitted. Attached are preliminary construction plans for the
crossings. We have been coordinating with the City of Raleigh please
find the attached memorandum regarding the site visit. They did not
have any objectives to the project.
Please give a couple of dates you are available for a meeting.
3/2/2021
3/3/2021
3/9/2021
3/10/2021
Please attach the documentation you would like to have the meeting about.
Proctor Farm Crossings.pdf 3.41 MB
OS_109_Procter_Mitigation_Easement_Ma p. p... 1.23MB
Memorandum -Site Visit 8-15-19.pdf 2.91 MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 2/15/2021