Loading...
HomeMy WebLinkAbout20120576 Ver 1_Application_20120608Section 10 Permit Application is hereby made for a USACE Section 10 Permit as required for the above described activities A copy of this permit application and its distribution list will be posted at the NCDOT Website at http / /www ncdot org /doh /preconstruct/pe /neu /permit html If you have any questions or need additional information please contact Tyler Stanton at tstanton @ncdot gov or (919) 707 6156 Sincerely Gregory J Thorpe Ph D Manager Protect Development and Environmental Analysis Unit cc NCDOT Permit Application Standard Distribution List o`'oF�w A�rF9o� O lqi� ^c Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Pre - Construction Notification (PCN) Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps ®Section 404 Permit ER Section 10 Permit lb Specify Nationwide Permit (NWP) number 23 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) N 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification N Yes ❑ No For the record only for Corps Permit ❑ Yes N No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below N Yes ❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? N Yes ❑ No 2 Project Information 2a Name of project Replacement of Bridges No 188 and No 189 on SR 1316 over Cape Fear River 2b County Bladen 2c Nearest municipality / town Tar Heel 2d Subdivision name not applicable 2e NCDOT only T I P or state project no B-4712 3 Owner Information 3a Name(s) on Recorded Deed North Carolina Department of Transportation 3b Deed Book and Page No not applicable 3c Responsible Party (for LLC if applicable) not applicable 3d Street address 1598 Mail Service Center 3e City state zip Raleigh NC 27699 1598 3f Telephone no (919) 707 6156 3g Fax no (919) 250 -4224 3h Email address tstanton @ncdot gov 14 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name not applicable 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name not applicable 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address B Project Information and Prior Project History 1 Property Identification la Property identification no (tax PIN or parcel ID) not applicable 1 b Site coordinates (in decimal degrees) Latitude 34 7447 Longitude 78 7857 (DD DDDDDD) (DD DDDDDD) 1 c Property size 9 4 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to Cape Fear River proposed project 2b Water Quality Classification of nearest receiving water C 2c River basin Cape Fear 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Existing conditions at the site include maintained / disturbed roadside shoulder agriculture and forested areas Land use in the project vicinity is predominantly agriculture with some residential properties 3b List the total estimated acreage of all existing wetlands on the property 2 78 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 577 3d Explain the purpose of the proposed project To replace a structurally deficient bridge (no 188) and a functionally obsolete bridge (no 189) 3e Describe the overall project in detail including the type of equipment to be used The project involves replacing a 1473 foot 24 span bridge (no 188) with a 1570 foot 14 span bridge and a 280 foot 8 span bndge (no 189) with a 300 foot 4 span bridge both on a new alignment while maintaining traffic on the existing structures during construction Standard road budding equipment such as trucks dozers and cranes will be used Overhead powerlme utilities will be relocated away from bridges and telephone lines will be adjusted to provide clearance for the work bridges and equipment required to dismantle the existing bridge 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown Comments USACE conducted an on site jurisdictional determination (Action ID SAW 2009 1877) 4b If the Corps made the jurisdictional determination what type ® preliminary ❑ Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company NCDOT Name (if known) Lance Fontaine & Tyler Stanton Other 4d If yes list the dates of the Corps junsdictional determinations or State determinations and attach documentation 28 April 2011 and a follow up for utilities on 24 Oct 2011 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ® Wetlands ❑ Streams tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ —non 404 other) (acres) Temporary Site 1 ❑ P ® T Fill Rivenne ® Yes ❑ No ® Corps ❑ DWQ 029 Site 1 ❑ P ® T Fill Rivenne ® Yes ❑ No ® Corps ❑ DWQ 003 Site 2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 0 00 Permanent 0 32 Temporary 2h Comments There will be 0 53 acre of hand clearing due to bridge construction and 0 60 acre of hand clearing due to utility relocations 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of Average Impact length number (PER) or jurisdiction stream (linear feet) Permanent (P) or intermittent (Corps 404 10 width Temporary (T) (INT)? DWQ — non -404 (feet) other) Site 1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts X Perm X Temp 31 Comments 4. Open Water Impacts If Mere are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then indivi ually list all open water impacts below 4a 4b 4C 4d 4e Open water Name of impact number — waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Temporary 01 ❑ P ®T Cape Fear River Fill River 006 01 ❑ PMT UT to Cape Fill Stream 002 Fear River 02 ❑P ❑T 03 ❑P ❑T 0 00 Permanent 4f Total open water impacts 0 08 Temporary 4g Comments Impacts due to piers are less than 0 01 acre 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) Flooded Filled Excavat Flooded Filled Excavated Flooded number purpose of pond ed P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number— Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary required? 131 ❑ PEI T El Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑ PEI T El Yes ❑ No 6h Total buffer impacts 61 Comments D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The proposed Bridge No 188 is 97 feet longer than the existing bridge and the proposed Bridge No 189 is 20 feet longer than the existing bridge the proposed bridges will be at approximately the same grade as the existing structures there will be no permanent fill or excavation in jurisdictional areas Deck drains are limited to overbank area under bridge with no direct discharge into the river Removal of existing road fill for longer bridge and increasing bridge opening will improve hydrological conveyance and wildlife passage and reduce bridge opening velocities Stream side areas will be graded such that elevations match natural /undeveloped floodplam in project vicinity Promotion of sheet flow and infiltration over grassed surfaces 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Construction will be both top -down and utilize temporary work pads and barges There will be no permanent fill or excavation in jurisdictional areas An in water work moratorium for the protection of anadroumous fish in the Cape Fear River will be adhered to 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? If no explain 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation bank 2c If es which mitigat ion option will be used for this El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank not applicable 3b Credits Purchased (attach receipt and letter) TType Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible npanan buffer restoration payment into an approved in lieu fee fund) 6h Comments E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? lb If yes then is a diffuse flow plan included? If not explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? N/A 2b Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan See attached permit drawings and stormwater management plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ® DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? not applicable ❑ Phase II ❑ NSW 3b Which of the following locally implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties 4a Which of the following state implemented stormwater management programs apply ❑ HQW (check all that apply) ❑ ORW ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No N/A 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval ® Yes ❑ No letter ) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes additional development which could impact nearby downstream water quality? ® No 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description Due to the minimal transportation impact resulting from this bridge replacement this project will neither influence nearby land uses nor stimulate growth Therefore a detailed indirect or cumulative effects study will not be necessary 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge} of wastewater generated from the proposed project or available capacity of the subject facility not applicable 10 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? El Raleigh 5c If yes ind icate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCNHP USFWS website field surveys 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitats ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ® Yes ❑ No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ® Yes ❑ No 8b If yes explain how project meets FEMA requirements NCDOT Hydraulics Unit coordination with FEMA 8c What source(s) did you use to make the floodplain determination? FEMA Maps Dr Gregory J Thorpe, PhD -OW q z°'y Applicant/AgentsPririted Name Applicant/Agents Signature Date (Agents signature is valid only rf an authonzation letter from the applicant is provided 11 STORMWATER MANAGEMENT PLAN B -4712, State Project 37912 1 1 Date 2/29/12 Bladen County Hydraulics Project Engineer R C Henegar PE ROADWAY DESCRIPTION This project involves replacing Bridge No 188 over Cape Fear River and Overflow Bridge No 189 in Bladen County The overall length of the project is 1 127 miles The existing 23 -foot paved road is a two lane road with 12 foot grassed shoulders Bridge No 188 is a 1472 7 ft twenty four span bridge (2@ 45 3 1Truss Span @ 300 5, 1@ 613, 8@ 60, 11@ 45, 1@ 45 3) with a clear roadway width of 26 feet Bridge No 189 is a 280ft eight span bridge (8@ 35) with a clear roadway width of 26 feet The project will be a two -lane section with 12 foot lanes and 4 foot grassed shoulders The replacement structure for Bridge No 189 will be a 1570 ft bridge with 14 spans (3@ 175' Steel Girders, 11@ 95 54' Prestressed Girder) with a clear roadway width of 32 feet The replacement structure for Bridge No 189 will be a 300 ft bridge with four spans (4@ 75 ) 45" Prestressed Girder with a clear roadway width of 32 feet ENVIRONMENTAL DESCRIPTION This project is located in the Cape Fear River Basin There is one river crossing on this project, which has a Class `C' classification This river is not on the 303(d) list Wetlands will be impacted by the proposed project BEST MANAGEMENT PRACTICES AND MAJOR STRUCTURES There will be no direct discharge into the stream Sheet flow will be utilized as much as practicable and discharged onto grassed surfaces $$$$$$SYSTIME$$$$$ $$$$ $$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$ $$$$USERNAME$$$$I 09/08/99 LC ONT RA CT: C203038 TIP PROJECT: B-4 712 N l71 11 / O O O S 9 �1 J lto-- � m m ? y r \ O O o o to m m Q C z m 1 0 CA bs 0 m C c cm x 0 � b H c c u 00 o m Z <10< o ° 0 n n 11 11 u u u 11 p � ♦b S ° � z It 0O MCAC Ow(AwC" A � O D m y Q O � � (71 2 • I � G� ^� H m mN — CAPE FEAR RIVER �- CAPE FEAR RIVER to ca = O o, m p V y O y0 z C p m 1 Q 1� tu m , ri�Vl v m O ± ° O I m 0 � 0 z p�tp vm!4 y 1 II Q C3 Z x p ca I 1 �4 1 v y� y Q mmm V CIO N N (A Q to a C� m No � 1 y b R ��� M � Q a O m 1 O as m m m �I II 1 Jill a a N4 tj 14 11 a V 4�s IG V, ID v N N N 1 m ooh 1 n 4 3 o� Z I r�la 0 oaf N p [' .� � 1 � w♦iQ a a � 8 gm x y m �F i I X-\ �m m rz nz r 0 1-0 M--4 z m Dm Lo XU) z= mM c)D �3 z r o om D � II K:m -z D O f7 � (/1 ) Z II-I C � � O M;u D D n 70 M -< D m sassassa I O MATCHLINE 33 +00 00 SEE SHEET 4 WE fEM RNER E� o � 0 II �rn T fEAlt MO T 1 1 1 11 1 1 35 � ♦ � X11 1 I _ -aps4E 1 I 1 , I ►1 1 1 40 — 1 I I I I I I I O _ I 1 I 1 1345 I � II a �I IN 1a1 R 11 c� II I O o C 1 11 I I II ' I1 1 � Tv p Z MATCHLINE 45 +50 00 SEE SHEET 6 _`o �r IW € x rM 0 49548948 I o MATCHLINE 33 +00 00 SEE SHEET 4 I I" �� CAPE FEAR �zvEn �l 1 \ � .� \ / / \ � r � -no k-j T— �1 _ FEAR NNE r3 0 - I� 1 i ` z V, Min kz �I \ 1 Ilm mi \ -A \ f I a~ I I I I —� IIQI I ✓'-'----- --- - -- 1 III 1 I \ + w ,� 1 I I ICI \ h \,� -0 cn a3 z MATCHLINE 45 +50 00 SEE SHEET 6 W a� z o o � � . . .. . . . . . . ..... . . . .. ..... ... .. . . . .. ..... . . . . . . . . . . ..... . . . . . ..... ..... . . . . . .. ... .. . . . . . . . . . .... .. . . . ..... ..... . . ... ..... .. .. . . . . . . . .... . . . . . ..... . .. . . . . . .. ..... ..... . . . . . . .. .. . . . . . . .. . . . . . . . . . . . . . . . .. ..... .. . . . . . . .. . . . . . . .... .... . . .. .. .. ... . .. .. .. . .. . . . .. . . . . . . . . . . . . .. . . .... .. ... . .. . . . .. . . . . . . . .. . . . . . . . . . . ... . .... ..... ......... ............................... ..... A..■ ............................... Mason IIE . .. . . . . . . . . . . . . ...... . . . . . . . . .. . . . . . . . . . . . .. . . . . . . . . . . . ..... ..... . .. . . . .... .... . . . . . . . . . . . . . . . . . .... ..... . . . .. . .. . . . . . .. . . . . .. . . . . . . . . . . . . . . .... . ..... ... .. ... .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .. . . . . . . . . . uu■r.u■ ■uuoouoouuuuuuu■ ■oonuo oou.ouuuuu■ u.uuu■ meuuu■ uou .ul��mli uo R... ITH �...i M...I ...I CII..I V roa ��iil ............... ............... .......... ammo...... .......... .......... .......... .......... .......... 11 a n r m REMOM sss MATCHLINE 59 +00 00 SEE SHEET 6 0 I CA --I m .1 � / U 65 y O H I I Jill i No p I 1 � I I INI � � P r-� 70— ��� g I �I° I rC I s' i I n CD � m I 'd b SEE SHEET 8 MATCHLINE 72 + 00 00 v ¢C1 z O O o r P O - 0 o �z ro �o nz n z rp _ , I>rn z� �m �N i- OD �3 Zm Z a Dry V1� C: -0 p C z CD X 'n ►., D ;o >> n;u m� D m .1 � / U 65 y O H I I Jill i No p I 1 � I I INI � � P r-� 70— ��� g I �I° I rC I s' i I n CD � m I 'd b SEE SHEET 8 MATCHLINE 72 + 00 00 v ¢C1 z O O o r P O REMOM SS849948S98SSE MATCHLINE 59 +00 00 SEE SHEET 6 44 l E5 j IIII li it j1111j1 i�I \J� /� I�� n \ N, � 60 m 1 \ 1 I �II I I III III JII Ill it CA Inr 65 � O I 1 I I �I I II II 1J, 1111 X X I -no r-Z �� r -o c�z O z ro --I n o m-+ Z m n --A Dm U) ---1 m MUD V) N z= ' `� m z —� OD r 3 m Z O C 'D o, p D ;7 m n n m� n m I K K I I I 1 I, 2 I� I I — I I i � II\ IIIII I jIIII�IIIIII�I i,. -- ���J� I I �n III 11111 � I MATCHLINE 72+0000 SEE SHEET 8 � m v o W i i I s W z ;3 Z �F o> T K AZ F M 30 i3 0 z Pn .......... :......... .......... .......... .......... :: ,on, a. 1.0 ...........,..■■ ..... .. 1..1 .......................... . . . . . . . . . . . . . . . . . . . . . . . ! . . in .......................... ■.... ....I.......a.......■ ... . . . . . . . ... .. ..... . . . . . . uuo.ra■uuuuu■oo■ ...uo.. �■ uuu...... ■uoou. ■uuuuuu■uou ■../. /...IL........ ■uuu .......................... .u. l.■ l.uua no ■It.111'. ■11..11:1 ■i1rn1.. .IIf!II.. .II.AII_a fllk /11_a .I —.H. .i 1.�11_a ■1111 1.......■ 01112 25y1 ies\ dti$ss \Prof \neu \b4712 rdy neu tsh dgn F— TIP PROJECT.- B-4712 J o a o N N O r � m = Z Q r y O x y b H x N s o� o� A] 0 x 0 y n W Q$ :c j, Ir- y �C C yh 'ro Doo N h wa ~o b 0 b3tj �bo o O � t� �n o� �x tbiyo� x� ao�_b yA �O R-0 On a O x bo ti O N oa �b xN O n z r� z n 0 z z 1 n 1� n k a !n C Z ? CID d�b CD N o, v no O O zz Q z O O O y N 'J Q r y O x y b H x N s o� o� A] 0 x 0 y n W Q$ :c j, Ir- y �C C yh 'ro Doo N h wa ~o b 0 b3tj �bo o O � t� �n o� �x tbiyo� x� ao�_b yA �O R-0 On a O x bo ti O N oa �b xN O n z r� z n 0 z z 1 n 1� n k a !n C Z ? CID d�b CD N o, v Lz O \P ' ,1\ \B4712 Rdy p h4 is it y N O N A � ET n y to N Il u u u u u� H w1��1�0 +�w n�i �til`OD� II II II II II II a �N H r O�� a .n. x �o o� P q y i rl � I Z m m m s < s I I I � 1 I I I 1 1 1 1 / I / I I I I i I I I I n� II l I g I I nl I IQ / oo_ x loA ®Iz I ,55 Imp RI ZI ON r � / �IZI - - - - - -- I � 2 © 1 70 N H 20 � I 1 I o I l C A� vi �O w 0 1 � I wog m m N y n yl wo a ~ Q = m 71' m �I ril Z 1 M—i N ff fZEg 0 c I -0 -010 om y 6 M-0 / .� 1 m A v mic g � D D Bn r 40 cn + anv La 3 Z v n Z ° ca x ar / u ... u y r r, 25 MSZ- m o / / oo_ x loA ®Iz I ,55 Imp RI ZI ON r � / �IZI - - - - - -- I � 2 © 1 70 N H 20 � I 1 I o I l C A� vi �O w 0 1 � I wog m m N y n yl wo a ~ Q = m 71' m �I ril 411` i_ �oS o � o w J I QC3 p \\ \ 2 ,TCHLINE 33 + I \ a II _ J1--4 T ;s s N 1 M—i N ff fZEg 0 c a -0 -010 om y 6 M-0 i + n y o .� Z> t N mZ O° m A v mic g � D D Bn r 40 cn + anv La 3 i oZ D v n Z ° ca x ar + �O 4/ ... u y r, 25 MSZ- 411` i_ �oS o � o w J I QC3 p \\ \ 2 ,TCHLINE 33 + I \ a II _ J1--4 T ;s s 1 a H a n i + n y o .� -ri - e m O a$ D �r r go + anv La 3 _ 1 N W N In �- s r gg ° 1�9 m r f I o o p 30 O n r 0 0 l >�w C� 1938 ?1 E r 78 1t? s o� 2 ca ^" 1 CD X gg ° ar Za ,B4712 Rdy p h5 dgl REYISIOM MATCHLINE 33 +00 00 SEE SHEET 4 I— I I � 4 � — K I CME FEM RNER C fEM RNER � 1 n , 1 � X 0 y '.7 rL OD Q 1 7 �o °Sd X J� O � Ili O CA Fm v� � V v D < II rn II � rn it �Z II x� —�S 8361: 22 OS 125 r4 I JT,-MATCHLINE 45 +50 00 SEE SHEET 6 r5I rs T PUE t pI PUE p. 7c bl � 'IF 9F h C CD L o, v 7 m O m i� -3 N �y w n v T y r\ N s Z o O is i O 1 2011 -712 Rdy p hG N i Y o£ }!j P y y O On O� �w O of Q m�� m � � REMOM MATCHLINE 45 +50 00 SEE SHEET 5 Al", PIN WIN O 7 0 O m m 3 w 0 0 O m i MATCHLINE 59 +00 00 SEE SHEET 7 -55 (f) c= =^ CD 6� III sPC' xP s az O °H w � �a a� ar* CJ =o Cl) o ° D�� pym Ry zN O Nn d z O r-;u mm I m m NN N DCl) ;0O MATCHLINE 59 +00 00 SEE SHEET 7 -55 (f) c= =^ CD 6� III sPC' xP s az O °H w � a� ar* 7 7 o ° Ry zN O Nn d z O e 18 MAY 2012 11 13 1 R \Roodwayy\Prod \84712 rdy tsh dgn 09/08/99 $$$$USERNAME$$$$ CONTRACT: C203038 TIP PROJECT: B-4712 -a a 0 =1 Q �A01 n~'1 n � 2 y V V N I I b 0 0 (A 0 V A w X Z .° O c O N Z N U O N z N 7D X T z O Dr O �n i o N_ T p m p p M S Q O Z o = C O n _ p W Ln O Z 0 Z X CA n a N p ^ O O O O a m IYYY' Z X II 7O cn _ V � C c � � N °o po p v -a a 0 =1 Q �A01 n~'1 n � 2 y V V N I I b Z (A (A b ti x V A w D D Z .° O c O O Z vv -_ m m z C CC z H Dr O �n i o N_ 0 cl M Z S Q O Z o C C O 05 mH C _ p W Ln -a a 0 =1 Q �A01 n~'1 n � 2 y V V N I I b Z w , Y b ti x V A w D D M .° O c V ;a -n vv -_ m m z C CC p zSo C4 m Dr N �n i <<ww g b � a 0 r) r) 11 11 11 11 11 11 x o 0 C O 05 mH C _ p W Ln _ ? @ 0 Z D n a Le p eO O 0 V a m m n IA X II 7O cn _ C c � N v N D r Z � C N T O r r m O0 C1 0 O T S S m Z VI 70 =c m :jcR -a a 0 =1 Q �A01 n~'1 n � 2 y V V N I I b _oo w , Y b ti x V A w W M ®® N N fm/If >° �1 r� Ito M �ro I n o i5 a m m r £ . o C c�u i � cop- LA .(i s h r� Q 00 V 0 r , O b ^� O rN A b N b y � C W a 8 Ln a ti k k � b CO w , Y b ti x W M ®® >° _b < o� W N x g b � a �o 4 _ �{ ? @ �m �0 ti n Le eO A m 0 �"1 M M M m �1 r� Ito M �ro I n o i5 a m m r £ . o C c�u i � cop- LA .(i s h r� Q 00 V 0 r , O b ^� O rN A b N b y � C W a 8 Ln a ti k k � b �a a b ti x n �1 r� Ito M �ro I n o i5 a m m r £ . o C c�u i � cop- LA .(i s h r� Q 00 V 0 r , O b ^� O rN A b N b y � C W a 8 Ln a ti k k w W 0 (7 o A N y N a 7O 77Op Y N N ► v 6 w w - -a j4oj -iii b ®® ®® w W 0 (7 o A N y N a 7O 77Op Y N N ► v 6 w w - -a j4oj -iii R MY R R 2012 \P14 \84712 Rdy cl yP d9 6/2/99 O IE C '"{ 9 L N j X71 N j C 0 N N ° w ~ m ya W m 9 r 2 C T m m r< T m> ws< O T<D >D Z > T O > a T my a T9 i m s a m m mow ON mm icDim sY��PPY ca P PA W m m m r tiw c>iK OPA Q N.i0N -VO t t t t t t ° ti > m D >ati mp o mti aw m 'D OM C� 2 N AAA AAA.° ;,00�o °o °o Z r O Z IY1 N 9 m = ° w w m m > m m m w y amD my .. wOV mr a wm> r H Tv D > < Vf 'mm�'m -Imp r Zx $ ~ -D+ m ° c °° ~ < °~ �w� m� N ti P r r ZZOZOZO vO v m ` v m �^ o wm a w w z m w ZD m Z o �y = m °l �y ` D m i > m H >w x°no °mm �m a y� r OJO �{NI/-��1yN��1 (� + ~ o m m a> m*m °ym 9m mil V 1° Z Apypyp -Ni opYO T �I/A� p Z Q— nN �N�P T S wa m z> z 0 Z C O O � U3 �A n w O N m r' m F VrINNP Scm 0 ^ C z Z m m TT T r x9oa ivmam 0 tizH 0 w mm � °� c e c OOQOmO y C� p o o 0 1- �yz�yz�z m j0 Q - o m> y�N V m W� 1��� - m ° om 00 8ca / (i aaOpa0a0 s sys �m 0 mo =A= r A y mSSZ° m0 CO 0 u 1 1m— C4—�� ' Z m Z O I I n = ~ 00 p2! O— C 0 -0 8 v FE ZZ v� W P W ° � l f HINGE POINT n m FOR FILLS ° M! �A FOR FILLS lio D O A N N v rn ~ rN N r rN ~ N r ' to N Q A H m 'Z W m o Q n 0 N _ 0 c0i v o_p 0 n 9p o; Z1Nm Z Z I �N N m N m O NICII N Z VNm V ~ Z O O C c^ p T A N H P N P l/ � m C P rn ° N P N HINGE POINT HINGE POINT FOR CUTS FOR CUTS 7 N 1- -1- C 1-� N rn rn P rn P DD DD 14 NJ N� LA 14 0 4 00 4 ++ +t+ ++ 0 000, P� n 00 00 F) r 0 0L OOV P700 r mm N ZZO r c- �0 00 N 00 0- L) n 00 y rn o� rn v� 2z Z � n �� m O W M2! NN Z ME! 14 Z 6i0 M C., -A— Z N 10 Lh 00 0 140- I L O O O I rl O OV � CA Dm � p,A ONZ�� '°� re + + /C1 l / +0W IV zi a O $00 C ODOV Nor^ z o 00 rn m m"'� _ mZ Z 0 o Z Z 3 = WW A � x z� v o v �' Z o m mm AY 2012 � 4 w REVISIONS 05/18112 TLS - R/W REV ADDED RIGHT OF WAY AND TEMPORARY CONSTRUCTION EASEMENT TO PARCEL NO I AND INCORPORATED REVISED EXISTING RIGHT OF WAY AND UTILITY EASEMENT LINES 4712 Rdy p h4 dg 8/17/99 i N O ti �.4-oD-0 R Y 9 4 04A O r 0 na -I t) $ G tl ll R 11 Rv1 a 8s A P� ti F g 6 r. II III, m I� N 20 co lip II ° , ym tiN 4 PS silo I . e�N o II Bit r~ I III 0qp NSF ---- - - - - -� I Rai f� o� 1i co r T 0 � a s a �v y + �- m gmm v �A 9 s Up -vD L oA y N N N N � I rs a y - �Q tT T O X I r X W O w T m 0 N M m y m � y 'O 70 m n Z = O %O W z V z< w ? z X111 z z= Ib� z z 0 O m An d z z 0 IAY i 712 Rdy p h5 dg REVISIONS O5/IR //9 T[ S___fi,! RFV_ _ INCORPORATED RFVISFD FY /CT /N - RM.HT-JE j & -WQ f/T/ !/Y I /NFC RFII(1VFn PdRM -MM,L I I MATCHLINE 33 +00 00 SEE SHEET 4 _ .� CAPE FEAR RNER - 5f b0 I£ I ,I I I I I 1 1 / N \ I II II II II lal Ipl� 1 li t,l 1 RR� lam'! J- NIJ mm / -- — — — — — — — — - - - - -/ ,� 2236 2 E m 22 5 � m 12 E q 59 A, s� I N Y RKQ S g I I I � \I I - -jell \ 1 I \ I ` — —I m j o I m I m, I CAPE FEAR ROVER 35 mil T H I T R �N T m m S ag R � y ~ ?I 1 I R 08 I I \ 9 m 7r 1\ c us oz oz MATCHLINE 45 +50 00 SEE SHEET 6 s 'T 0 r I IMP r p rn C) N M m 'O H 70 2 n_ Z 0 CA J W O JO 0 i� A N Z Z m N m 2 O O I 0 Z A Z 0 CRCs co mA Ln I � I I � I o c H m I I a 1 � I I PUE I 1 C PUE i Q ` ry N � G \ AI / 1 / / O �r / m V' a I la 40 I ( m � 5 I RS 755 W I I m -755 W mil T H I T R �N T m m S ag R � y ~ ?I 1 I R 08 I I \ 9 m 7r 1\ c us oz oz MATCHLINE 45 +50 00 SEE SHEET 6 s 'T 0 r I IMP r p rn C) N M m 'O H 70 2 n_ Z 0 CA J W O JO 0 i� A N Z Z m N m 2 O O I 0 Z A Z 0 AY 2012 11.14 REVISIONS 05//8/12 TLS R/W REV INCORPORATED REVISED EXISTING RIGHT OF WAY AND UTILITY EASEMENT LINES REMOVED TCE ON PARCEL NO ] c�anti 0!m0 9 z r �mZ 9 �i a- U 9 P < m r Z syy� K P y G1��y m Z I. z 0 u p1 m Z IA z MATCHUNE 59 +00 00 SEE SHEET 7 50 55 ti �a T 0 I � � 70 I r -v 7v W 70 � � y y m 55 ti �a T 0 70 I r -v 7v W 70 � � m A b P m D m ;ti 9 ¢ o -0 z A in py O m L Z 2 IV Z d O O O J �y S T ^ 0) z M 0 REVISIONS 05118112 TLS - R/W REV INCORPORATED REVISED EXISTING RIGHT Of WAY AND UTILITY EASEMENT LINES 4712 Rdy p h7 dg MATCHLINE 59 +00 00 SEE SHEET 6 � , Ps I I I 1 OZ G nn p I C'" r y 1�0' I I I I a I u n — I 4 ipprz PS � 5Z r rr °rrv► 0 N ~ 4 �o Me O �� e y y 65 -t- � 35� z� —1 m N� inm v I 3 t N J w - -ter — —.•� 3 9 I xg ip \ 3 1 6 4 358 5 I 5 63'09 E 4 E Ll - O owl -4rA 1 N ° ^� o o 4 i s 3i P or ° EL o. BO n MA TCHLINE 72 +00 00 SEE SHEET 8 00 95 I R °s 9 0 C' a Z 0 0 4€ z 0 14 a ..-- . K* REVISIONS 05118112 TLS R/W REV INCORPORATED REVISED EXISTING RIGHT OF WAY AND UTILITY EASEMENT LINES MATCHLINE 72 + 00 00 SEE SHEET 7 cl 29 all I P5 I t �s I I I I,i 5 60CL 611 2 01 5 61'07- 0 5 2 rn :0 -4 C> -_o , I A II" �L t a aaauauf � I I .— j a � o ��* m B CM I , CMP A. Y r I P . N� C N y� r I y �a 75 IN "\ 1 �m s a \ 00 1- JE J3Cy s I s B �Ot OCL 555 JE m OS� I I 2 ] I I I m N o al o � � N I�I I i r JJ2 2 li r I M r°i I I 48 ST CK S 33342 ^' 1 2 2 5 5J 3J N 61 01 OS * 2162 B STOC R 9Sp **4 'T y m T N N >n O a I I I t nj a s o + 02 03 X g ti / 12 PS / A + I X a rock 80 0/ it N +/ s " pp y Ny p f 2 STEEL C Ill \ BST CURB 7n sn / � -- .__ tT - -- CURB Por Vd, elf53Z mll SR 38 RNER RD OW /IE OAK - -_ �^ - -- RNER RD TO FNETTEVILLE t � t I 0 M I r 0 0 C f m $ m` m �N m+" m m � 0 ° —ml o ri+ W 4rZA "G o z z 0 o PROPERTY OWNERS NAMES AND ADDRESSES REFERENCE NO NAMES 03 BARBARA T MERRITT AND HUSBAND DANNY N ADDRESSES Utility Permit Drawing Sheet '3 of 4 NCD®T DIVISION OF HIGHWAYS BLADEN COUNTY PROJECT B-4712 BRIDGE NO 188 AND NO 189 OVER THE CAPE FEAR RIVER ON SR 1316 I i SHEET 1 OF 1 12/13/11 § § 2�& 2 § 2�o ( 2 \\ \ �kk��¥%ens / k ��q /R z � 0 101, j 3 { @ a ° - ( w�c�_ eff�E� § / §���� § o @ § 3 d � � ��kk _ L � r � � � \ � a � � k%�S 2 - � � C cE \oG9 8 0 � e��$��o 0 B� ■ a � 0 0 O p 12f a E� g �b�� Cl) 0 k �CL � � c � m 2 $ w $ CL=f E_n , ®LT\ (D£k cc� E�kCL CD a � @ F- 2� =a :3 ® k k Eq §k \\ §t m \k m E 0 0 �� m-0 � e § Eq §k m \k �� � e PARCEL NO 2 3 PROPERTY OWNERS NAMES AND ADDRESSES NAMES ADDRESSES BENJAMIN G YOUNG 756 McARTHUR ROAD AND WIFE RUBY FAYET17EVILLE, N C 28311 BARBARA T & DANNY 1340 S BLADEN UNION ROAD MERRITT FAYETTEVILLE, N C 28306 Permit Drawing Sheet Ja_of -J.L- L��I1� DIVISION OF HIGHWAYS BLADEN COUNTY PROJECT 3791211 (B -4712) REPLACE BRG'188 AND BRO189 OVER THE CAPE FEAR RIVER ON SR 1316 SHEET OF 2/28/12 c $ 7 § Cq § � ke3 n \m- # ( 2 $ 2 a \�k22� ��Oie k \ § § { @ 2 ® o $ 2 e���§� /���� 2 k O � ��kuS G 2 k �\ �m$�o 0 1"01 $� k G � � k%A� U) � ƒ - � t 2 k 2 ®��� � §f 00 CV) � �� � D S B $ � \ \ ���� E $ k � 2 2k AQ�# \ a Cl) e F- � �fkoq S LU R o 0 0 � co � =f m� ( � �E /G kR j\ wf R� wn �� § � �O �o = c CL $� � �� #E 7 2 I� �� S K i §o k n \k } � \ § / { z En D G k ! q � §f � \ \ ���� \ e � �fkoq S R o 0 0 � � =f m� � �E /G kR j\ wf R� wn �� ee �O �o = c $� � �� #E 7 I� �� S S$ i §o n \k � \ 12/13/11 B -4712 NEU Narrative Utility Owners • Power Four County EMC — (contact Edward Pope 910- 259 -1854) Telecommunications Palmetto - Net — (contact Scott Temple 919 291 0813) General Utility Relocation All utility lines inside the project limits will be adjusted as necessary or relocated away from the construction limits The aerial power transmission pole line and underground telecommunication lines will be relocated or adjusted prior to the date of availability Existing Utilities • Power the existing Four County EMC aerial power transmission pole line is on the west side of SR 1316 (Tarheel Ferry Road) • Telecommunications the existing Telephone Communication lines (fiber optic and copper cables) are underground on the west side of SR 1316 (Tarheel Ferry Road) Proposed Utility Relocation • Power Four County EMC will install a new power transmission pole line further left of Line —L- 50' inside the PUE line on the west side of SR 1316 (Tarheel Ferry Road) from Sta 22 +50 to Sta 56 +78 • Telecommunications Palmetto Net will adjust the fiber optic and copper cables left of Line —L- on the west side of SR 1316 (Tarheel Ferry Road) from Sta 30 +76 to Sta 31 +41