HomeMy WebLinkAbout20120499 Ver 1_More Info Received_20120531X�,
M
5/31/12
E
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1
Diffuse Flow Plan
1 a
Does the project include or is it adjacent to protected riparian buffers identified
[] Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b
If yes then is a diffuse flow plan included? If no explain why
❑ Yes No
Comments
2
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
33%
2b
Does this project require a Stormwater Management Plan?
® Yes ❑ No
2c
If this project DOES NOT require a Stormwater Management Plan explain why I
2d
If this project DOES require a Stormwater Management Plan then provide a brief narrative
description of the plan
Replacement of pipe within Jurisdictional stream The shoulders will be stabilized and lined with grassed swales to
provide treatment All work will be conducted in accordance utilizing NCDOT BMP Manual
❑ Certified Local Government
2e
Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
® DWQ 401 Unit
3
Certified Local Government Stormwater Review
3a
In which local government s jurisdiction is this project?
Columbus County
❑ Phase II
3b
Which of the following locally implemented stormwater management programs
❑ NSW
❑ USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other
3c Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ® No
attached?
4
DWQ Stormwater Program Review
❑ Coastal counties
❑ HQW
4a
Which of the following state implemented stormwater management programs apply
❑ ORW
(check all that apply)
❑ Session Law 2006 246
❑ Other
4b Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
5
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
® Yes ❑ No
5b Have all of the 401 Unit submittal requirements been met?
® Yes ❑ No
Page 9 of 11
PCN Form — Version 1 3 December 10 2008 Version