Loading...
HomeMy WebLinkAbout19960975 Ver 3_More Info Received_20120523Mcrrillan, Ian From Beasley Troy [TBeasley @withersravenel com] Sent Wednesday May 23 2012 8 09 AM To Mcmillan Ian Subject FW Columbus County Airport Expansion (DWQ Prod # 1996 0975v3) Attachments Response to Corp,, of EngmPerq 4 23 12 pdf Wetland Exhibits pdf Ian I dust wanted to follow up on the revision to the 401 WQC Please let me know if you have any questions Troy Beasley WITHERS &RAVENEL 1410 Commonwealth Drive Unit 101 1 Wilmington NC 28403 Phone 910 256 9277 1 Fax 910 256 2584 Direct 910 509 6512 1 Mobile 910 622 0122 tbeasley @withersravenel com www wlthersravenel com Jo a From Beasley Troy Sent Wednesday May 02 2012 9 39 AM To Mcmillan Ian Subject Columbus County Airport Expansion (DWQ Proj # 1996 0975v3) Ian This email is in follow up to our phone conversation regarding the 401 WQC that was issued for the Columbus County Municipal Airport Project (DWQ Prod #1996 0975v3) The 401 WQC authorizes 16 57 acres of permanent wetland impacts and 30 If of permanent stream impacts and required mitigation at a 2 1 ratio As discussed in our phone coversation the wetland impacts total has changed as a result of coordination with the Corps of Engineers The Corps of Engineers also approved a 1 1 mitigation ratio for wetland impacts Below is a synopsis of the coordination with the Corps On February 23 2012 the Corps of Engineers issued a letter requesting more information for the proposed project see attached As a result of the Corps request for additional information a site visit was held with Dave Bailey with the Corps of Engineers in order to conduct an NCWAM assessment of the proposed impact areas The result of the NCWAM determined the wetlands to be riparian but also determined that the functional value of the wetland areas proposed for impact to be low Talbert & Bright submitted a response to the Corps of Engineers on April 2 2012 An electronic copy of this response was provied to you via email on April 16 2012 As a result of the low functional value of the wetland impact areas the Talbert & Bright proposed a mitigation ration of 1 1 In a letter from the Corps dated April 3 2012 (see attached) the Corps of Engineers agreed with Talbert & Bright s request for a 1 1 mitigation ratio for wetland impacts due to the low functional value of these areas as determined by NCWAM The letter from the Corps addressed several wetland areas being severed from the larger contiguous wetlands as a result of the proposed parallel taxiway The Corps requested that Talbert & Bright demonstrate how the hydrologic link will remain between these areas and the larger contiguous wetlands and if a hydrologic link could not be maintained to consider these areas as impacted and include them in the total wetland impacts Talbert & Bright uetermined that a hydrologic connection could not be maintained to two of the severed wetiano areas and that thebe wetland areas were included in the total wetland impacts Attached to this email is the response to the Corps letter dated April 3 2012 Please note that you will receive a hard copy of the response to the Corps but I also wanted to provide you an electronic copy Per ou phone con jersat on the 401 WQC sho-ld be evised to a4thonze 16 8A acres of permanent A efiand rrpact 30 If of perrridnent stream impact and a mrtigauon ratio or 1 1 for weadrid mitigation Please feel free to contact me if you have any questions Thanks for your help with this project Troy Beasle 0 __ 1410 Commonwealth Drive Unit 1011 Wilmington NC 28403 Phone 910 256 9277 1 Fax 910 256 2584 Direct 910 b09 6511 1 Mobile 910 621 0112 tbeasley @withersravenel com www withersravenel com NOTICE ()F t 01\11- I)FN I TALI I Y ANC NUNUISf L USURE I s of t o i message ch ncit d ✓ t h- f 9 J tl docume c r i o I ere n contain i orm t i from VVlthe s & Rave iel Inc that n ay be p op Pay i � co i de at The -If(, —a d f h i s nn � I not th addres r n nn q c s p I f i re s n y and nes a11 1 at -i rr n t i reto i f a I o nt re arred t therein are pro ided Tor the I rf r a r I and r ht a ferr b o o I b t i t n n I s on of this ele tr i c g WI pf f h h h 2