Loading...
HomeMy WebLinkAbout20120495 Ver 1_Site Plan_20120518r City MNorth May 16 2012 of Greensboro Carolina Karen Higgins Division of Water Quality 401/Wetlands Unit 1650 Mad Service Center Raleigh NC 27699 -1650 Re Hunter Hill Park Stream Bank Repairs, Greensboro, NC Dear Ms Higgins 20120495 L dqk QU�py The City of Greensboro would like to notify your office of the proposed stream bank repair at Hunter Hill Park — Gentry Street by Memtt Drive Greensboro NC The projects objective is to stabilize the eroded channel by installing a J Hook at the stream bank and install two cross vanes at the adjacent tributary to stabilize the eroded areas Presently this existing channel is eroding toward a public park could endanger usage and create safety hazard & environmental concerns The length of work area at the eroded South Buffalo Creek is about 140 feet and about 100 feet at the unnamed tributary 216 tons of boulders will be used to install the J Hook and two cross vanes per the attached plan Attached is the general information (vicinity map plan view topography layout drawings and inventory map) regarding the subject site for your review Site 3900 Block of Gentry Street/Merntt Drive Cad Hunter Hill Park, Greensboro, NC Site Condition Eroded Stream Bank If you have any further questions please call me at (336) 373 2619 Sincerely Ade Idowu Operations Management Supervisor City of Greensboro Stormwater Management Attachment PCN Application Form Application Fee ($570 00) & Pictures Aerial View Stormwater Topography Layout Construction Drawings PO Box 3136 Greensboro NC 27402 3136 www greensboro nc gov (336) 373 CITY (2489) TTY # 333 6930 `ot W A4�19 O� pG O -c 20120486 Office Use Only Corps action ID no DWQ project no Form Version 14 January 2009 Page 1 of 10 PCN Form — Version 14 January 2009 Pre - Construction Notification (PCN) Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps Q Section 404 Permit ❑ Section 10 Permit 1 b Specify Nationwide Permit (NWP) number or General Permit (GP) number 27 1c Has the NWP or GP number been verified by the Corps? X❑ Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ❑X 401 Water Quality Certification — Regular ❑X Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ❑X No For the record only for Corps Permit ❑ Yes E9 No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ❑X No 1 g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ❑X No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2 Project Information 2a Name of project Hunter Hill Park Stream Bank Repair 2b County Guilford D 2c Nearest municipality / town Greensboro 2d Subdivision name Hunter Hill 2e NCDOT only TIP or state probed no 3 Owner Information N —� 3a Name(s) on Recorded Deed City of Greensboro 3b Deed Book and Page No 3c Responsible Party (for LLC if applicable) 3d Street address 3903 Gentry Street 3e City state zip Greensboro NC 27402 3f Telephone no 3g Fax no 3h Email address greensboro nc gov Page 1 of 10 PCN Form — Version 14 January 2009 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify Employee 4b Name Ade Idowu 4c Business name (if applicable) City of Greensboro 4d Street address 2602 S Elm Eugene Street 4e City state zip Greensboro NC 27406 4f Telephone no (336) 373 2619 4g Fax no (336) 373 3119 4h Email address ade idowu @greensboro nc gov 5 Agent/Consultant Information (if applicable) 5a Name N/A 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 10 B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) 000003320000100003 lb Site coordinates (in decimal degrees) Latitude Longitude 1c Property size 398 acres 2 Surface Waters 2a Name of nearest body of water to proposed project N/A 2b Water Quality Classification of nearest receiving water South Buffalo Creek 2c River basin Haw River Basin 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Park area with eroded stream and the community is residential with institutional insert 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 2 300 3d Explain the purpose of the proposed project Stream Bank Repair and Stabilization 3e Describe the overall project in detail including the type of equipment to be used This work will be done with the use of backhoe bobcat and some small equipment Stabilize bank erosion by installing J hook in the main channel and 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the astl ❑ Yes ❑X No ❑ Unknown Comments 4b If the Corps made the jurisdictional determination what type of determination was made? ❑ Preliminary ❑ Final 4c If yes who delineated the jurisdictional areas> Name (if known) Agency /Consultant Company Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes Q No 6b If yes explain Page 3 of 10 PCN Form — Version 1 4 January 2009 C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404 10) or DWQ (401 other) 2f Area of impact (acres) W1 Choose one Choose one Yes/No W2 Choose one Choose one Yes/No W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes/No W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes /No 2g Total Wetland Impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a Stream Impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or Intermittent (I NT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 T Stabilization South Buffalo Creek PER Corps 60 70 S2 P Stabilization South Buffalo Creek PER Corps 60 70 S3 P Stabilization Unnamed Tributary PER Corps 30 100 S4 Choose one S5 Choose one S6 Choose one 3h Total stream and tributary impacts 240 31 Comments The temporary area Is the stream bank to be laid back and restored with vegetation Please see attached drawings Page 4 of 10 PCN Form — Version 14 January 2009 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then indiv ually list all open water impacts below 4a Open water impact number Permanent (P) or Temporary 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitica3ation then vou MUST fill out Section D of this form 6a Project is in which protected basin? ❑ Neuse ❑ Tar Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer Impact number — Permanent (P) or Temporary 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet 131 Yes/No B2 Yes/No B3 Yes /No B4 Yes /No B5 Yes/No B6 Yes/No 6h Total Buffer Impacts 61 Comments Page 5 of 10 D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project By restoring tis segment of the main channel it will slow down erosion of the upstream bank and stabilized it self with the installation of a J hook lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Many years ago trees were planted to stabilize bank area but was insufficient 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ❑X No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project? ❑ Mitigation bank Payment to m lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested T acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form —Version 14 January 2009 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 7 of 10 E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ❑X No 1 b If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑ No 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0 2b Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan 2e Who will be responsible for the review of the Stormwater Management Plan? 3 Certified Local Government Stormwater Review 3a In which local governments jurisdiction is this project'? 3b Which of the following locally implemented stormwater management programs apply (check all that apply) ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 4 DWQ Stormwater Program Review 4a Which of the following state implemented stormwater management programs apply (check all that apply) ❑Coastal counties ❑HQW ❑ORW ❑Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached [] Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 14 January 2009 F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federaUstate /local) funds or the ❑ Yes ❑X No use of public (federal/state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval ❑ Yes 0 No letter) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes Q No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ❑X No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in El Yes ❑X No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Page 9 of 10 PCN Form — Version 14 January 2009 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? ❑ Yes Q No 5b Have you checked with the USFWS concerning Endangered Species Act impacts ❑ Yes ❑X No 5c If yes indicate the USFWS Field Office you have contacted 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes Q No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Histonc or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑X No 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 -year floodplain? ❑X Yes ❑ No 8b If yes explain how probed meets FEMA requirements Work area is for bank stabilization only 8c What source(s) did you use to make the floodplain determination? FEMA map Abe 4 Applicant/Agent s Printed Name Date Applicant/Agen s Signature (Agents signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 Hunter Hill Park Stream Bank Repair Exist Condition Pictures Application Submitted By City of Greensboro Water Resources — Stormwater Management Stream Bank Repairs — Hunter Hill Park, Greensboro, NC �+l o �• ate+, ^°' �� -� A, u�, 3 IL�i., "'�'" •`. mss, e > aT x South Buffalo Creek — Upstream view @ Repair Location Unnamed Tributary — Downstream view Hunter Hill Park Stream Bank Repair Aerial View Application Submitted By: City of Greensboro, Water Resources — Stormwater Management IL I T--T 6 ;--I- Hunter Hill Park Stream Bank Repair Topographic View Application Submitted By: City of Greensboro, Water Resources — Stormwater Management d c O C d Z� N oJJ N O)£ W a a; s c� Q c m is d Ra c } >_ F- W m 1Q = R L Rm> 3 41 - T Q O R O �UUa aaarcnca Ua.cna V, I I Q ® ®� � c � m c z rn 2 M• ; O 019 12 pp r 8 2 �^ ` M• f r O �• � ram l ! ��� ' s�L � J p / a a o M • i CL• ` J` tiZ o F w 1° M' O r M• OGo O O � � � M r M •'r ! '� •t r LO - - - - -- • %' Co co emo ro / �g2 tl8 Z 0 • • a C4 CID M C Q ` a l C \ /O m a) CL CPI ■ — L s M J _ r cn J � C O ' O N o CL W ._ v 30 4 -O N' m 0 N 1 0 CA N_ m 0 � 0 r b rn 2 M• ; O 019 12 pp r 8 2 �^ ` M• f r O �• � ram l ! ��� ' s�L � J p / a a o M • i CL• ` J` tiZ o F w 1° M' O r M• OGo O O � � � M r M •'r ! '� •t r LO - - - - -- • %' Co co emo ro / �g2 tl8 Z 0 • • a C4 CID M C Q ` a l C \ /O m a) CL CPI ■ — L s M J _ r cn J � C O ' O N o CL W ._ v 30 4 -O N' m 0 N 1 Hunter Hill Park Stream Bank Repair 90% Construction Drawings Application Submitted By City of Greensboro Water Resources — Stormwater Management OWN T T ,,UNTER nILL PARK -9mr-111p* KhAM-ir=lw& m 10, -.AN REPAIR G RE m In NC JL-aN�i-B U-mo Iii 2x 9 .r i'SuX t ' j+ ri L A ma a� Ci 1 W .3 0 y r■ �,D 00o M p� .z CD N CAD N CL 0 �o vo oa U 9 V v � y v J'3 Q j N Q = N WMAMMysixMI ; Existing Fence _ - - - - - - - - - - - - - - - - - - 1 Poll relod I { Right of Way Marker __________ _____ Exist. Right of Way Line w/ Marker - _ Prop. Right of Way Line (by others) Prop. Right of Way Line (by contract) Exist. Easement Line - - - - - - - - - - - - - - - Prop. Temp. Construction Easement Line Limits of Disturbance _______________ -® Buildings _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ISSUED DATE DESCRIPTION 0 UTILITIES Exist. Pole ______________- Exist. Power Pole - _ _ _ _ _ _ _ _ _ _ Exist. Telephone Pole _ _ _ _ _ _ _ _ - xist. Joint Use Pole _________ Telephone Pedestal _ _ _ _ _ _ _ _ _ _ _ Cable TV Pedestal _____ - - - - -- Hydrant - ________________ Exist. Water Valve ®___________ Sewer Clean Out - - - - - - - - - - - - - Power Manhole ______________ L E G E N 0 Q 4 0 Water Manhole ______________ CONCRETE Light Pole - _ _ _ _ _ _ _ _ _ _ _ _ _ _ EXISTING H-Frame Pole -_-_---_--__-- INVERT Power Line Tower_ _ _ _ _ _ _ _ _ _ _ - Polewith ase______________ SAN SEWER MANHOLE Gas Valve _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - a s Meter _ - - - - - - - - - - - - - - - Telephone Manhole - - - - - - - - - - - ,. Power Transformer - - - - - - - - - - - Sanitary Sewer Manhole - - - - - - - - - Corm Sewer Manhole __________ s Tank; Water, Gas, Oil - - - - - - __ - ecorded Wate,r Line Sanitary Sewer _ _ _ _ _ _ _ _ _ _ _ _ _ _� Recorded Sanitary Sewer Force Main® --fss-Fw _ Recorded Gas Storm Sewer- Recorded PowerLine- _________ P P Recorded Telephone Cable- _ _ _ _ _ --T —T Recorded U/G Telephone Conduit- _ ® TC Tc- Unknown Utility ____________--- ?un---?un Recorded Television Cable _ _ _ _ _ _ -lv T,_ Fier Optics Cable ____________ ®FO Fo- xist. Water Meter - - - - - xit. Overheads Power Line Exist. Undergro)und Utilities Approx. STREAM IMPROVEMENTS . Proposed - woulder Cross Vane (See Detail) Approx. Location of Proposed Boulder Vane (See Detail) Existing Thalweg.___________ Existing Edge of Water_ Existing Top of Bank - - - - - - - - - .._ Proposed Thalweg _ _ _ _ _ _ _ _ _ _ _ Proposed Bankfull____________ Slope Stake Line _ _ _ _ _ _ _ _ _ _ _ C(cut)F( fill) Limits of Disturbance_ _ _ _ _ _ _ _ _ __ - - -_ The Water Division of ARCADIS ARCADIS G &M of North Carolina, Inc. One Centerview Drive, Suite 208 Greensboro, NC 27407 Tel: 336 - 292 -2271 Fax: 336 - 855 -5648 License No. C -1869 www.arcadis— us.com HUNTER 0 ILL PARK STREAM BANK REPAIR GREENSBORO, NORTH CAROLINA PROJECT MANAGER L. PM SHEET TITLE r 1 DEPARTMENT MANAGER L. PASS, AD DESIGN PROF. B. LEPSIC I M.11 MA 911 0 l 11 _ a100]1IQ11111111IL LIZ .019 11� '1i : . 1 E CONCRETE EXST EXISTING INV INVERT SBC SOUTH R BUFFALO SSMH SAN SEWER MANHOLE TRIB TRIBUTARY TYP TYPICAL DEPARTMENT MANAGER L. PASS, AD DESIGN PROF. B. LEPSIC I M.11 MA 911 0 l 11 _ a100]1IQ11111111IL LIZ .019 11� '1i : . 1 E rn Ki LLJ rn cn E E- a-c) M C) C-4 04 0 UJ m 0 C.D 4) E E oa 9 r 7 V) � co 0 E2 E 04 CD Q 0 C14 UQ 1 30 60' 90, SCALE IN FEEr ISSUED DATE DESCRIPTION w;Wwcawl;--us.c,om a� v J mom. m a> oii ag - c4, �o UJ rn 3 -v to W S N N a1 C .3 v 0 v S .N c S E- M O o ., m .* 4 1 O Z N � N CCD -4.0 a m 0 E ms a a o a s U H c; En z J u � v V: o v Q E C*l Z v L C v u> n V Kj VAN i v m � o a> o,Q dFo c� `o VJ mm • t] m vmjl w" • �r _ so 11 772 • • [L6-M to� 1 w 776 ME 772 Jai Ef 9 U 0 ISSUED DATE DESCRIPTION 0 0 J m3� �(D O� d fC -a+ � T UJ 3 W S N c a O n WIN I C 7 S v E- � N p) M �: 1 O Z N � U Cl � a� � W � O LL m U N E d L a a va s v N J � O v .. m I.. o_ Q> E v a a> a� t. e t t Y q: i 1. PROPOSED CONSTRUCTED R, i, ' FEATURES 1 D STRUCTURES SHOWN ON THESE PLANS AR SHOWN ' �' ♦. � � � Y, " O 1 �, 1, '.,.. r: SHALL BE i • D LOCATED AND DIMENSIONED EL DIMENSION. CONTRACTOR 3. BOULDERS WILL BE STAGED IN CONSTRUCTION STAGING AREAS UPON DELIVERl 5. r DIRECTED PROJECT SPECIFICATIONS AND IN ACCORDANCE WITH ALL FEDERAL, STATE, AND REGULATIONS. LOCAL U 'JAMEMKO]a IN100 i. Fall, winter, and spring temporary seed mix (August 15 — May 01) Cereal Rye 1- lbs/acre Orchard Grass lbs/acre 2. Summer temporary seed mix (May 01 — August 5) • i • • 35-45 lbs acre Browntop Millet 30-40 lbs/acrl 3. Permanent Seed Mixture: a. Within Stream Bank: A seed mix containin an equal mixture of at least three (3) grasses and four ( 4 herbs will be used on r• banks at • rate of acre. Permanent Seedin 9. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRS TO ANY DAMAGE TO Common Name EXISTING FACILITIES, INCLUDING BUT NOT LIMITED TO CURB AND GUTTER, Deertongue PAVEMENT, SIDEWALKS, STORM DRAINAGE SYSTEMS, SANITARY SEWER SYSTEMS, Bottle -brush Gress LANDSCAPE PLANTS, LAWNS OR FENCING. ANY REQUIRED REPAIRS TO B W MADE IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL STANDARDS. River 0 ats Carex grayi gray Herb = .3 10. CONTRACTOR SHALL KEEP ALL TOPSOIL STOCKPILED ON SITE SEPARATELY FROM Soft Rusin OTHER SOIL MATERIALS. Herb Leathery Rush Eupator um fistulosum H erb ,doe -P e Feed Lobelia card n -al s Herb Cardinal Flower Monarch d d�na Herb _ 'emon a noveboracensis Herb Lo Impatiens capensis H erb om N 4 O I Z U a g � O 3 s c:� r E v %/ a a o a U 'JAMEMKO]a IN100 i. Fall, winter, and spring temporary seed mix (August 15 — May 01) Cereal Rye 1- lbs/acre Orchard Grass lbs/acre 2. Summer temporary seed mix (May 01 — August 5) • i • • 35-45 lbs acre Browntop Millet 30-40 lbs/acrl 3. Permanent Seed Mixture: a. Within Stream Bank: A seed mix containin an equal mixture of at least three (3) grasses and four ( 4 herbs will be used on r• banks at • rate of acre. Permanent Seedin Species Name Stratu m Common Name PanicLm olandest;inum Gress Deertongue Hystrix patula Grass Bottle -brush Gress Panicurn vir atum Gass Swtch Grass Chasmant+ im om lat folium Grass River 0 ats Carex grayi gray Herb Grays Sedge Jun us effusus Herb Soft Rusin JunGUS ooriaceus Herb Leathery Rush Eupator um fistulosum H erb ,doe -P e Feed Lobelia card n -al s Herb Cardinal Flower Monarch d d�na Herb Bee Balm 'emon a noveboracensis Herb Iron Weed Impatiens capensis H erb Jewel 'Need 1. •,. • Material: ly followiing seeding, apply oat or wheat t . rr. to r stream thickness of 1/8 inches and anchor per project specifications lawn areas outside 2. Coir Matting: To be installed on stream banks per project specifications. 3. Fertilizer: percent, phosphoric acid 0 percent, • • - potash i percent. Apply evenly at a rate of 1000 lbs / acre. 4. Lime: Apply evenly at a rate of 4000 lbs/acre or per the sdil test recommendations. { T[ie Watch Division of ARCADIS ARCADIS G &M of North Carolina, Inc. One Centerview Drive, Suite 208 Greensboro, NC 27407 Tel: 336- 292 -2271 Fax: 336- 855 -5648 License No. C -1869 www.arcadis— us.com sx HUNTER HILL PARK STREAM BANK REPAIR GREENSBORO, NORTH CAROLINA (J O O O o Ck 'D 0 O � O O O O C O 0 0 0 0 0 0 0 0 0 0 0 ® 0 0 GALLON r NOTE: MIXTURE 1. PLANT AN EVEN 5 GALLON CONTAINERS ON A 15—FOOT • ': NO SINGLE SPECIES SHALL MAKE UP MORE THAN 15 PERCENT OF THE TOTAL PLANTS. Am PROJECT MANAGER La PASS SHEET TITLE DEPARTMENT MANAGER L PASS ;D PROF. B. U31SIC ter, ■ CHECKED L PASS GEOTEXTILE mim FABRIC a fts .1%, 0 v 31 ni 2 10 4,4. CD CD 0) E as oa a r 73 DID to .0 -W--t--t'1/3 WDTH T" PLAN VIEW PROPOSED STREA)TiBED ELETTJ kktt- TOP OF BANK [:nj WM Afliz • 111111211; •q FOOTER ISET FOOTER BOULDERS BOULDEA 30-40% • STREAM DEPTH BELOW STREAMBED, EX[STING GROUND KFY VANE INTITO BA( KI 5 MINIMUM -- -,u---TOP OF BANK 9,TREAMBED--\ (J?� mi*4 Iff.j.-mgm 1�21 o ISSUED DATE DESCRIPTION FOOTER- GEOTEXTILE BOULDERS FABRIC w VANE ARM • INSIDE OF BEND IS SHORTER AND STEEPER m" FOOTER BOULDERS PLACED IN EXCAVATE31 TRENCH ..... ... .. oil PLAN VIEW WL.W 5-f A FABRIC • - -•-• I 6"30111m,2111 FOOTER BOULDER SET FOOTER BOULDERS BELOW STREAMBED STRUCTURES" ARCADIS .. . .... .... . . I-, U HILL PARK 11 . . The Water Divisli of ARCADIS . ARCADIS G&M of North Carolina, Inc. STREAM BANK REPAIR One Centerview Drive, Suite 208 Greensboro, NC 27407 GREENSBORO, NORTH CAROLINA Tel: 336-292-2271 Fax: 336-855-5648 t. license No. C-1869 www.arcadis—us.com KEY VARE INTO BANK WITH BOULDER CUTOFF SILL 5' MIN. VANE BOULDER OPOSED STREAMBED LEVATI • FOOTER BOULDERS !z *a fell - RE • U no PROJECT MANAGER I DEPARTMENT MANAGER I LEAD DESIGN PROF. 111111110�11 LOCATION BOULDER BOULDER\;'ANE DIIlON (FEET, ELEVATION STREA Il 1`44, [.1 E STRUCTURE T)FE UNIT I I Li L2 L3 L4 El I (STA,, TONNAGE I S BUFFALO CREED. ,"S BC; , BOULDER':' 1+58 EA 80 — — — 70 772.0 UNI'4411 ED TRIB BOULDER CROSS 'l #1 0+32 EA 64 21 7 7 777.1 U NI44. Illi ED TRI 8 BOULDER CROSS VANE 92 0+64 EA 64 21 7 7 N5 ll' U MIA. I'v] ED TRI B BOULDER SILL 1 0+96 9 EA 8 _j 77.4.0 —1, .0 ALL"V'ALUES INT'?1-.BLE ARE ESTIfl3. ACTUALVA WEB 111JI111 13E DETER10 INED IN THE FIELD DURING CONSTRUCTION. ARCADIS .. . .... .... . . I-, U HILL PARK 11 . . The Water Divisli of ARCADIS . ARCADIS G&M of North Carolina, Inc. STREAM BANK REPAIR One Centerview Drive, Suite 208 Greensboro, NC 27407 GREENSBORO, NORTH CAROLINA Tel: 336-292-2271 Fax: 336-855-5648 t. license No. C-1869 www.arcadis—us.com KEY VARE INTO BANK WITH BOULDER CUTOFF SILL 5' MIN. VANE BOULDER OPOSED STREAMBED LEVATI • FOOTER BOULDERS !z *a fell - RE • U no PROJECT MANAGER I DEPARTMENT MANAGER I LEAD DESIGN PROF. 111111110�11 A J m� N � �L y O " ..D d N � C � U J rn 3 -v vi a� rn v 0 P C S a0 si- O O O Z N � G7 v U a CD O � �L H a) s= v a�i s a a o a A t G 0 .. tD o � > L z Q � Jd V) Q° U Q N • <i PLAN VIEW ■ 1-1 Z Ed gel '• M Notes: 4. DIKE HEIGHT SHALL BE MINIMUM REQUIRED PROVIDE FOR SUCTION MIN. HEIGHT • P ABOVE BASE FLOW ►. • hl ■ lo MIN. HEIGHT REQ1;1RED ABOVE BASE - VOTE 4 SEE EROSION CONTROL PLAN FOR PUMP LIMIT WORK AREA The Water Divisivr7 of ARCADIS ARCADIS G &M of North Carolina, Inc. One Centerview Drive, Suite 208 Greensboro, NC 27407 Tel: 336 - 292 -2271 Fax: 336- 855 -5648 License No. C -1869 www.orcadis— us.com EXIST. STREAM BED Lei Z' • lk 114 glymne • 1 � • •� i •� •.... �.- • 1 _ •: ll m HUNTER ILL PARK STREAM BANK REPAIR t� kf`ut y� GREENSBORO, NORTH CAROLINA PROJECT MANAGER L. PASS SHEET TITLE DEPARTMENT MANAGER L PASS i ■ ,r DESIGN PROF. B. LEPSIC PROJECT NUMBER _ r ■ ��� I �0'1 , � CLASS 2 RIP RAP OR SAND BAGS •- r A (D) MINIMUM DISTANCE TO BE OF • • - �&1:1'901 w.mw J COFFERDAM DETAIL m>1— o. UJ o+ 3 ui 'v a� 0 rn c 3 v 0 c S ao 00 �o N Q� r 0 N CC'D- a W f � d aD i= v N L va oa U H V WASHED - ORANGE AGGREGATE 6" THICK 6 , MIN. nmma•ld • i kj 1- ! 019 NOTES: 8' MAX WITH WIRE ' MAX WITHOUT WIRE F MANUAL 3. FOLLOW SECTION 6.62 OF "EROSION AN SEDIMENT CONTROL PLANNING AND DESIGN m ON 12 AMU • • - 030 WIRE INTO TRENCH FABRIC AS ' i c , BY TENAX OR APPROVED EQUAL ARCADIS Elm= p 1'r y 1091 Tire Water Division of AP,CAQtS 0 �, HUNTER ILL PARK ARCADIS G &M of North Carolina, Inc. STREAM BANK REPAIR One Centerview Drive, Suite 208 Greensboro, NC 27407 � GREENSBORO, NORTH LI Tel: 336 - 292 -2271 Fax: 336- 855 -5648 z License No. C- 1869.;:, www.arcadis— us.com NOTE: • � � & • S; • -. • • i; �� • T J m�N N O� � O = U J A N �a+ N N C D i r, �-o MO m M d:. I o N �CD N� v �w �ir CL kg Eo a> s a a oa U f� N 4-2 06 g T I •• O N >z Q� DORMANT POST 0 0 0 0 0 —ij PLANTINGS V /--TOE OF SLOPE J!"TIM1111^11 ^. • ELDERBERRY (S.CANADE! TOP OF 'A U U N NOTES: LATERAL BUD —®° STAKES SHALL vm: 2. STAKES THAT HAVE BEEN SPLIT SHALL BE REJECTED AND NOT USED - CONSTRUCTION. 3. STAKES SHALL INSTALLED BE WITH THE BUDS POINT Z w SIDE BRANCH STAKES a —' REMOVED AT STAKES z —' SLIGHT ANGLE 3 FEET LONG. f. STAKES OW o STAKE REMAINING ABOVE -• r MIX Ujw 80% OF THE STAKE SHALL BE BELOW GROUND. I 30-45" z � -C'4 TAPERED BUTT END f»= 1LI'mQQIf =�I'N 1. STAKES SHALL BE AND INSTALLED ON THE SAME DA 2. STAKES THAT HAVE BEEN SPLIT SHALL BE REJECTED AND NOT USED - CONSTRUCTION. 3. STAKES SHALL INSTALLED BE WITH THE BUDS POINT UPWARD. ;; STAKES SHALL BE INSTALLED PERPENDICULAR TO THE BANK. .., STAKES 1. BE TO DIAMETER AND ..; TO O 0 3 FEET LONG. f. STAKES i 0• OF STAKE REMAINING ABOVE -• r 7. 80% OF THE STAKE SHALL BE BELOW GROUND. ULCH: PINE BARK OR WOOD CHIPS 80mm (3") MIN. OIL SAUCER: USE PREPARED SOIL, 4t' MIN. HT. ACKFILL WITH SOIL MIX AS; SPECIFIED 'REPARED SUBSOIL TO FORM PEDESTAL TOP EVENT ;ETTLING .L D I A. MIN. OI REV. ISSUED DATE DESCRIPTION it R • f�rl�CeZe�7�TT i ! , II 11104:1111 ilk Eel THE CH IN 6" BACFILL TOP OF BANK AND COMPACT I a PLACE MATTING IN 6 TRENCH, BACKFILL AND • 1L t ' • . M 15/ 1. BANKS SHALL BE SEEDED PRIOR • PLACEMENT OF • r ., - Jill Z • x '•,. U 114 LOOSEN • r .. GROWING, r GIRDLING ROOTS ACCORDANCE WITH GOOD NURSERY 14 ARCADIS a r vs '10 The Water Division of ARCAQiS ,f v HUNTER HILL PARK lyr ARCADIS G &M of North Carolina, Inc. STREAM BANK REPAIR One Centerview Drive, Suite 208 ���� �`�' � �;����Y��� t bj�� CAROLINA Greensboro, NC 27407 L cl: 33 No.9C— 2271 Fax: 336- 855 -5648 h www.arcadis— us.com PROJECT MANAGER L PASS SHEET TITLE DEPARTMENT MANAGER L PASS LEAD DESIGN PROF. B. I TASK /PHASE NUMBER r ® ® ® 0 ® O 0 a PLACE MATTING IN 6 TRENCH, BACKFILL AND • 1L t ' • . M 15/ 1. BANKS SHALL BE SEEDED PRIOR • PLACEMENT OF • r ., - Jill Z • x '•,. U 114 LOOSEN • r .. GROWING, r GIRDLING ROOTS ACCORDANCE WITH GOOD NURSERY 14 ARCADIS a r vs '10 The Water Division of ARCAQiS ,f v HUNTER HILL PARK lyr ARCADIS G &M of North Carolina, Inc. STREAM BANK REPAIR One Centerview Drive, Suite 208 ���� �`�' � �;����Y��� t bj�� CAROLINA Greensboro, NC 27407 L cl: 33 No.9C— 2271 Fax: 336- 855 -5648 h www.arcadis— us.com PROJECT MANAGER L PASS SHEET TITLE DEPARTMENT MANAGER L PASS LEAD DESIGN PROF. B. I TASK /PHASE NUMBER r