Loading...
HomeMy WebLinkAbout20072002 Ver 2_More Info Received_2012052401 - aooa a- THE EAST GR UP May 21 2012 Corporate Office NCDENR Division of Water Quality 324 Evans St 401/Wetlands Unit Greenville 1650 Mad Service Center NC 27858 Raleigh NC 27699 www eastgroup corn Reference Kinston Massey Drive Stream Restoration Tel 252 758 3746 PCN Form Modification Fax 252 830 3954 To Whom It May Concern After an initial review of the PCN form by the US Army Corps of Engineers ( USACE) it was determined that Item # 1 b of the form was filled out incorrectly Instead of Nationwide Permit Number 3 we should have put number 13 for Item #1b (bank stabilization) This issue has been corrected as shown on the attached page (page 1 of form) Also after talking with the USACE representative we were informed that the linear footage (780 LF) of the project exceeds the 500 LF limitation for NWP number 13 but that we could ask the USACE to waive the limitation to allow the project to proceed This is reflected on page 3 of the form under item # 3e As part of this letter please find attached five copies of each of the following documents • Revised PCN page 1 • Revised PCN page 3 We ask that these revised pages be inserted into the previously submitted PCN package (Submitted 4/26/2012) Should you have any question please let us know Sincerely C Brad Johnson El Cc Steve Miller City of Kinston File MAY 9 4 1012 I DENR WATER QUALITY Wetlands $ 2.9anwabea Branch Since 1975 servicing clients worldwide ENGINEERING ARCHITECTURE SURVEYING TECHNOLOGY \o�oF war�goG y r o < D 7- 2 o o.1 U a- Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 11 PCN Form — Version 13 December 10 2008 Version Pre - Construction Notification PCN Form A Applicant Information 1 Processing 1a Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 13 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC) ❑ Yes ® No 2 Project Information 2a Name of project City of Kinston Massey Drive Stream Restoration 2b County Lenoir 2c Nearest municipality / town Kinston 2d Subdivision name 2e NCDOT only T I P or state project no 3 Owner Information 3a Name(s) on Recorded Deed See attached list 315 Deed Book and Page No See attached list 3c Responsible Party (for LLC if applicable) City of Kinston P:; Z-2 3d Street address PO Box 339 -91 L 3e City state zip Kiston NC 28502 DENR GYATgR QDgLIn, 3f Telephone no 252 939 -3285 ranch 3g Fax no 252 939 -3279 3h Email address Steve Miller @ci knston nc us Page 1 of 11 PCN Form — Version 13 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) See attached list 1 b Site coordinates (in decimal degrees) Latitude 35 268441 Longitude 77 643797 (DD DDDDDD) ( DD DDDDDD) 1c Property size acres 2 Surface Waters 2a Name of nearest body of water (stream river etc) to Neuse River proposed project 2b Water Quality Classification of nearest receiving water C NSW 2c River basin Neuse 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The site is an existing stream which runs through a residential subdivision The stream drains areas that are commercial industrial recreational and residential in nature The stream is experiencing sever erosion undercutting and bank failure due to the velocity of the runoff and large amount of flow from upstream development 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 800 LF 3d Explain the purpose of the proposed project The proposed project will stabilize the stream banks and stop the loss of grassed lawn by adjacent homeowners 3e Describe the overall project in detail including the type of equipment to be used The existing stream near Massey Dr will be restored which includes but is not limited to re grading of stream banks installation of permanent erosion control matting along the banks installation of two plunge pools within the stream bed to reduce erosive high velocity flows and the construction of a wood retaining wall Typical construction equipment will be used The following equipment will likely be used excavator rubber tire backhoe dump truck service truck and miscellaneous hand tools It was acknowledged that the linear footage (780 LF) exceeds the limit for bank stabilization We request that USACE waive the 500 LF limitation so that construction of the project can proceed 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the pasty ❑Yes No Unknown Comments 4b If the Corps made the jurisdictional determination what type ❑ Preliminary Final ry ❑ of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past ® Yes El No El Unknown 5b If yes explain in detail according to help file instructions Stream Verification — See attached Page 3 of 11 PCN Form — Version 1 3 December 10 2008 Version