Loading...
HomeMy WebLinkAbout20120518 Ver 1_401 Application_2012051220 1 205 1 8 305 W Wilson Creek Drive Trent Woods NC 28562 7537 May 18 2012 NC DENR — Division of Water Quality Wetland 401 Unit 2321 Crabtree Boulevard Suite 250 Raleigh NC 27604 2260 Re PCN Application for Sediment Removal Dear Staff Attached is my PCN Form with sketch attached for permit approval and issuance I am coordinating with Dominion Shoreline Management to insure that I am compliant with their rules and policies Your prompt attention to my request will be greatly appreciated If you have any questions please call me at 252 676 0088 or email me at iggihusar@verizon net Sincerely Ihor W Husar Attachment PCN Form with Sketch �5 MAY 252012 20120518 Office Use Only o Corps action ID no DWQ protect no Form Version 13 Dec 10 2008 Pre - Construction Notification (PCN) Form A Applicant Information 1 Processing 1 a Type(s) of approval sought from the Corps ❑ Section 404 Permit ® Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 3 or General Permit (GP) number 1 c Has the NWP or GP number been verified by the Corps? LM tees ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ❑ 4ul Water Quality Certitcation — Regular [j Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ® Yes ❑ No If Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program El Yes No 1g Is the protect located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h Is the protect located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Protect Information 2a Name of protect Removal of Accumulated Sediment 2b County Warren 2c Nearest municipality / town Littleton 2d Subdivision name Twin Oak Shores 2e NCDOT only T I P or state protect no 3 Owner Information 3a Name(s) on Recorded Deed Ihor W and Barbara A Husar 3b Deed Book and Page No Deed Book 865 Page 703 Plat Book 18 Page 5 3c Responsible Party (for LLC if applicable) 3d Street address 186 Twin Oaks Lane 3e City state zip Littleton NC 27850 8345 t 252 676 0088 3f Telephone no 3g Fax no 252 633 4131 3h Email address iggihusar @verizon net RENR wotge ®►anrn 1 Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Appucant information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name kif appiicably) - 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 10 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) K2C131 Fib Latitude 36 312132 Longitude Site coordinates (in decimal degrees) 77 572050 (DD DDDDDD) ( DD DDDDDD) 1c Property size 1 5 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to Lake Gaston proposed p oject 2b Water Quality Classification of nearest receiving water 2c River basin Roanoke River Basin 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Water access to boat dock obstructed by sediment 3b List the total estimated acreage of all existing wetlands on the property None 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property None 3d Explain the purpose of the proposed project Accumulated sediment removal in front of boat dock 3e Describe the overall project in detail including the type of equipment to be used Excavate and remove 12 cubic yards of sediment using barge mounted excavator 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / El Yes ®No El Unknown project (including all prior phases) in the past Comments 4b If the Corps made the jurisdictional determination what type ❑ preliminary ❑ Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for ® Yes ❑ No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions GP #200520849 issued 25 May 2005 Expired 31 December 2010 6 Future Project Plans 6a Is this a phased project* ❑ Yes ® No 6b If yes explain Page 3 of 10 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams tributaries ❑ Buffers Z Gpcn 6vaterb ❑ Pond Cunstrucuun 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of Jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ —non 404 other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments Not Applicable 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of Jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non 404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Not Applicable Page 4 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open r a +e I "Jame of v aterbody impact number — kif appucabie) Type oi impdut Aate, body type Area uf mpac' (acres, Permanent (P) or Temporary T 01 ®P ❑ T Lake Gaston Dredging Lake 500 sq ft 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 4g Comments 2100 cubic feet (See attached sketch) 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments Not Applicable 5h Is a dam high hazard permit required ❑ Yes ®No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ❑P ❑T El Yes ❑ No B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T F1 Yes ❑ No 6h Total buffer impacts 61 Comments Not Applicable Page 5 of 10 PCN Form — Version 13 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Minimum amount of sediment will be removed to allow pontoon boat acces to dock from open water on lake Coordination with the Dominion Shoreline Management Authority to follow their rules and Dolicies to mitigate shoreline disturbance 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Specifications from the Dominion Shoreline Management Authority will be applied to the terms and conditions of the sediment removal contractor 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts *c Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments Not Applicable 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments Not Applicable 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 3 December 10 2008 Version E Stormmwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the prnjert iprli frig nr is it adjacent to protected riparian buffers identified I within one of the NC Riparian Buffer Protection Rules? ❑ Yes IJZ No 1 b If yes then is a diffuse flow plan included? If no explain why Comments ❑ Yes ® No 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? % 2b Doe s this protect require a S +o mm a+er Management Plar' ❑ ves ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why Open water sediment removal 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan i ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? Not Applicable ❑ Phase II 3b Which of the following locally implemented stormwater management programs [-] NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties 4a Which (check of the following state implemented stormwater management programs apply all that apply) ❑ HQW ❑ ORW ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 13 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) 10 Does the project involve an expenditure of public (federal/sta +e /Iocnl) funds or +he use ion public (fede, ai / *tote) .and? LJ Yes Z No lb h yolu answered yes tv Lhe above goes the piolect require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If yolu answered yes to the above has the document review been finalized by the State Clearmq House? (If so attach a copy of the NEPA or SEPA final approval letter) ❑ Yes ❑ No Comments Not applicable 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Rlparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in El Yes No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description Not applicabbe 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Not Applicable Page 9 of 10 PCN Form —Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? ❑ Yes ® No 5b Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Raleigh 5c If yes indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources dia you use to determine whether yuur site wouid impact Endangered Species or Des gnated Critical Habitat? Not Applicable 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? Not Applicable 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Not Applicable 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes ® No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Not Applicable No structure will be build in floodplain This is an open water sediment removal project s May 2012. Applicant/Agents Printed Name Date Applicant/Agents Signature (Agents signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 PCN Form — Version 1 3 December 10 2008 Version Z-x,y bt, g ,) - ry A-U r e. 2 IN I � � Exi54in j S "eAu � stied 6 X� N W N Q- stied 6 X� 3 �rL IYYt�rE t �Q/WtI�VA.` '�i�Gl� 0 PC>1I���`�c�c, +prt 9 �►�v- W A Z4%-\t> Ica�sar I �(s iw ih � *s �a-" Lfiio.' vn, N e also-2,4r" N W 3 �rL IYYt�rE t �Q/WtI�VA.` '�i�Gl� 0 PC>1I���`�c�c, +prt 9 �►�v- W A Z4%-\t> Ica�sar I �(s iw ih � *s �a-" Lfiio.' vn, N e also-2,4r"