Loading...
HomeMy WebLinkAbout20120202 Ver 1_Primilary Plans_20120525H 1 V1 0 BEGIN PROJECT NEW BERN AVENUE/ US 64 BUSINESS CRABTREE (/S 61 ANDERSON POINT END PROJECT PARK POOLE ROAD VICINITY MAP EQUATION: - Y2REV3- POT Sta 56 +31.53 BK = -Y2- POT Sta 56 +20.00 AH = CITY OF RALEIGH NORTH CAROLINA CRABTREE CREEK GREENWAY TRAIL LOCATION: FROM END OF EXISTING GREENWAY ON MILBURNIE ROAD TO ANDERSON POINT PARK TYPE OF WORK: GRADING, PAVING, STRUCTURE, DRAINAGE, EROSION CONTROL, LANDSCAPING EQUATION: -Y2- PC Sta 96 +24.81 BK = -Y2- PC Sta 96 +25.62 AH INDEX OF SHEETS 1 1A 1B THRU 1C 2 TH RU 2D 3 4 TH RU 19 X -1 TH RU X -72 -Y2- POT Sta.130 +20.00 BK = - Y2REV1- POT Sta.130 +20.71 AH TITLE SYMBOLOGY SHEET NOTES TYPICAL SECTIONS & DETAILS DRAINAGE SCHEDULE, SIGN SCHEDULE PLAN & PROFILE SHEETS CROSS SECTIONS (o 0 5 cp � 5 r w a C rn f 0 64 (n :g _ - W P v rn rn rn _ un U) EQUATION: -Y2- PC Sta 42 +26.95 BK = - Y2REV3- PC Sta 42 +26.95 AH = BEGIN PROJECT BEGIN CONSTRUCTION -Y2- STA. 10 +60.00 END PROJECT � 1$ - Y2REV1- POT Sta.198 +78.20 BK = - Y2REV2- POT Sta.198 +78.20 AH END CONSTRUCTION - Y2REV2- STA. 209 +66.28 19 m w oc a a w oC a z g a �e J Lu W U ~ w Q Lu � z m w Lu U CD E w/ o a _ m d�Z�om LLMPG;6 ...� W aui��LL 3 **u) w z z g a Z w w O z w U) Y U O aw z J O U > II PRELIMINARY PLANS I I ®® NOT USE FOR CONSTRUCTION DAI t: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE IPROJECT NO.: H9001.00 1 (D ~ W � W W zM' J Q Q W H kO � w N U 00 �„L iU 0 O z INn O �Qw�co LU a m u m a U m w oc a a w oC a z g a �e J Lu W U ~ w Q Lu � z m w Lu U CD E w/ o a _ m d�Z�om LLMPG;6 ...� W aui��LL 3 **u) w z z g a Z w w O z w U) Y U O aw z J O U > II PRELIMINARY PLANS I I ®® NOT USE FOR CONSTRUCTION DAI t: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE IPROJECT NO.: H9001.00 1 BOUNDARIES AND PROPERTY State Line - - - -- County Line -- Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Parcel /Sequence Number Existing Fence Line O D 123 CONVENTIONAL Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary - - - -WLB- - - - Proposed Wetland Boundary WLB Existing Endangered Animal Boundary EAB Existing Endangered Plant Boundary EPB BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap o DRAWN BY: MET S Sign NO. W Well Small Mine T T T T Foundation 0 Area Outline Telephone Booth Cemetery fi Building ❑D W School U) Church U/G Telephone Cable Hand Hole "H J Dam T HYDROLOGY: Stream or Body of Water Hydro, Pool or Reservoir Jurisdictional Stream Buffer Zone 1 Buffer Zone 2 100 Year Flood Plain 500 Year Flood Plain Floodway Flow Arrow Disappearing Stream Crrirn vrw....7a Wetland Proposed Lateral, Tail, Head Ditch False Sump PLAN RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled RIGHT OF WAY.- Baseline Control Point Existing Right of Way Marker 0 Existing Right of Way Line Proposed Right of Way Line n Proposed Right of Way Line with R Iron Pin and Cap Marker Proposed Right of Way Line with R Concrete or Granite Marker Existing Control of Access Proposed Control of Access Existing Easement Line E Existing Greenway Easement Line -- -- -- Proposed Temporary Construction Easement - Proposed Permanent Greenway Easement Proposed Permanent Drainage Easement Proposed Permanent Drainage /Utility Easement Proposed Permanent Utility Easement Proposed Temporary Utility Easement Proposed Permanent Easement with Iron Pin and Cap Marker ROADS AND RELATED FEATURES: Existing Edge of Pavement Existing Curb — Limits of Disturbance - Proposed Slope Stakes Cut - - - C - - - Proposed Slope Stakes Fill - - - F - - - Temporary Silt Fence Temporary Tree Protection Fence F__ Temporary Combination Tree -x Protectiorv'Silt Fence -E- PGE PDE DUE PUE TUE O is BZ 1 BZ 2 100 - 500 FW - < -- - -- <- FLGW Proposed Wheel Chair Ramp Existing Metal Guardrail Proposed Guardrail Existing Cable Guiderail Proposed Cable Guiderail Equality Symbol Pavement Removal Culvert Inlet Protection Silt Fence Outlet -X -X- SHEET SYMBOLS PEGETATION.- Single Tree Single Shrub Hedge Woods Line Orchard Vineyard EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall - MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES: POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H -Frame Pole Recorded UVG Power Line Designated U/G Power Line (S.U.E. *) 0 � M J Vineyard CONC ) CONC WW CONC HW CB O s i b HH H P - - - -P- - - - WATER: Water Manhole Water Meter CD Water Valve Water Hydrant Recorded UAG Water Line W Designated U/G Water Line (S.U.E.* ) - - - -W____ Above Ground Water Line A/G Water TV: TV Satellite Dish C TV Pedestal ILI TV Tower U/G TV Cable Hand Hole Iq Recorded LPG TV Cable TV Designated U/G TV Cable (S.U.E. *) - - - -TV- - - - Recorded LPG Fiber Optic Cable TV FO Designated U/G Fiber Optic Cable (S.U.E. *)-- - - - -TV FO- - - GAS: Gas Valve Gas Meter Recorded LPG Gas Line Designated U/G Gas Line (S.U.E. *) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E. *) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line U/G Tank Water, Gas, Oil AEG Tank Water, Gas, Oil U/G Test Hole (S.U.E. *) Abandoned According to Utility Records End of Information 0 -G- - -G- - - - A/G Gas O O SS- A/G Sanitary Sewer FSS - - - -FSS- - - - • D 0 D = TELEPHONE: DRAWN BY: MET wcR Existing Telephone Pole NO. T T T Proposed Telephone Pole ~ w T T T T Telephone Manhole O n n n Telephone Booth 0 n n n n Telephone Pedestal ❑D W Telephone Cell Tower U) U/G Telephone Cable Hand Hole "H J Recorded U/G Telephone Cable T boo Designated LYG Telephone Cable (S.U.E. *) - - - -T- - - - Recorded U/G Telephone Conduit TG Designated LYG Telephone Conduit (S.U.E. *)- - - - -TC- - - - Recorded U/G Fiber Optics Cable T FO Designated LYG Fiber Optics Cable (S.U.E.*)- - - - -T FO- - - - WATER: Water Manhole Water Meter CD Water Valve Water Hydrant Recorded UAG Water Line W Designated U/G Water Line (S.U.E.* ) - - - -W____ Above Ground Water Line A/G Water TV: TV Satellite Dish C TV Pedestal ILI TV Tower U/G TV Cable Hand Hole Iq Recorded LPG TV Cable TV Designated U/G TV Cable (S.U.E. *) - - - -TV- - - - Recorded LPG Fiber Optic Cable TV FO Designated U/G Fiber Optic Cable (S.U.E. *)-- - - - -TV FO- - - GAS: Gas Valve Gas Meter Recorded LPG Gas Line Designated U/G Gas Line (S.U.E. *) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E. *) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line U/G Tank Water, Gas, Oil AEG Tank Water, Gas, Oil U/G Test Hole (S.U.E. *) Abandoned According to Utility Records End of Information 0 -G- - -G- - - - A/G Gas O O SS- A/G Sanitary Sewer FSS - - - -FSS- - - - • D 0 D = DATE: FEBRUARY 22, 2012 DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. (D ~ w I--I w W z ° U) J J Q w � kO � w N U 0000 LL iU a 0 Z Ln 0 6 Q w LU d M (n M H U m W oc a W a z g "I q1111 �e J LU W U ~ w Q LU � z m w LU U CD f E w/ o a _ m d C) LE ...�1p W a (n IF LL 3 U, Cn a w z z g a Z w w a C� O z w U) Y U O Ln U co LU Z J U U> IPRELIMINARY PLANS I ®® NOT USE FOR CONSTRUCTII ®N z AATU R E.0.1. DATE: FEBRUARY 22, 2012 DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS GENERAL NOTES THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF THE JULY 2006 NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. ALL DEMOLITION SHALL BE APPROVED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT. ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND APPLICABLE STATE, COUNTY, AND LOCAL CODES. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, PERMITS, EQUIPMENT, ETC. THAT MAY BE REQUIRED. WHERE ASPHALT SECTION IS REMOVED, CONTRACTOR SHALL USE A SAW CUT AT THE LIMITS OF DEMOLITION TO OBTAIN A CLEAN EDGE. ALL TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO LAND DISTURBANCE OPERATIONS INCLUDING TREE REMOVAL, IN SUCH A MANNER AS TO CLEARLY AND ADEQUATELY SEPARATE ALL TREES TO BE REMOVED FROM REMAINING VEGETATION. CONTACT CITY OF RALEIGH PARKS AND RECREATION DEPARTMENT TO SET UP A PRE - CONSTRUCTION MEETING PRIOR TO LAND DISTURBANCE. TREE PROTECTION FENCING CAN AND SHOULD BE INSTALLED PRIOR TO PRE - CONSTRUCTION. NOTES THE ENGINEER AND OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH PROJECT AS SET FORTH IN THESE PLANS. IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER IN WRITING FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF THE OWNER. TO PREVENT THE INTRODUCTION OF INVASIVE SPECIES, CONTRACTOR SHALL WASH ALL CONSTRUCTION EQUIPMENT PRIOR TO ACCESSING PARCEL 42. EQUIPMENT MAY BE WASHED OFF SITE, BUT ALL DEBRIS AND VEGETATION MUST BE REMOVED. SEE SPECIFICATION 01535 FOR MORE INFORMATION. SEQUENCE OF CONSTRUCTION ACTIVITIES 1. A PRECONSTRUCTION CONFERENCE MUST BE HELD PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES. A MANDATORY PRE - CONSTRUCTION MEETING WILL ALSO BE REQUIRED WITH THE LAND QUALITY SECTION OF NCDENR BEFORE LAND DISTURBING ACTIVITIES BEGIN. CALL 919 - 791 -4200 TO SCHEDULE A MEETING. 2. INSTALL CONSTRUCTION ENTRANCES AS NEEDED AT LOCATIONS SHOWN ON SHEET 1 D. OTHER STAGING AREAS WILL NEED TO BE DISCUSSED WITH CITY OF RALEIGH PRIOR TO THE START OF CONSTRUCTION. CONTACT THE CITY OF RALEIGH AT (919)516 -2837. 3. DETERMINE AND MARK LIMITS OF DISTURBANCE. C7 J LL O 1­4 U w w z I O U) Q J kO W N cj� N iLu w U o^o ��ozr,4 QU w"00 C)e M 1­4 _j p1 a m u a m Il, CONTRACTOR SHALL LOCATE ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO CONSTRUCTION. ALL UTILITIES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR. CONTRACTOR SHALL RESTORE ALL LAY DOWN AND STAGING AREAS TO ORIGINAL CONDITIONS AND TO THE SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA. CONSTRUCTION /SAFETY FENCING REMOVED TO FACILITATE ACCESS BY THE CONTRACTOR FOR CONSTRUCTION MUST BE REPLACED AT THE END OF EACH WORK PERIOD TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM HAZARDOUS AREAS. DEMOLITION, AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED IN SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND PIPING ARE IMMEDIATELY PUT INTO SERVICE. CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE DOES NOT REMAIN OUT OF SERVICE FOR LONGER THAN 12 HOURS AT A TIME. PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATER DRAINAGE DURING CONSTRUCTION. CONTRACTOR SHALL STAKE CENTERLINE OF TRAIL ACCORDING TO PLANS AND OBTAIN APPROVAL FROM OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE RESOLVED PRIOR TO CONSTRUCTION. STATIONING IS APPROXIMATE. CONTRACTOR SHALL VERIFY ALL STATIONING FOR APPLICABILITY TO EXISTING CONDITIONS PRIOR TO CONSTRUCTION. DEVIATION FROM ALIGNMENT DUE TO LARGE TREES OR OTHER OBSTACLES ETC SHALL BE APPROVED BY CITY OF RALEIGH. CONTRACTOR SHALL MAINTAIN ALL ABOVE AND BELOW GROUND STORM WATER DRAINAGE AND PATTERNS AND PIPING AS THEY CURRENTLY EXIST UNLESS NOTED OTHERWISE. ANY DISTURBANCE OF THE PATTERNS OR STRUCTURES BY THE CONTRACTOR SHALL BE CORRECTED BY THE CONTRACTOR TO CONDITION PRIOR TO DISTURBANCE. CLEAN OUT STORM WATER PIPE ONLY IF NOTED ON PLAN AND ACCORDING TO DETAIL. CONTRACTOR ACCESS FOR TRAIL CONSTRUCTION SHALL BE CONFIRMED BY CONTRACTOR WITH OWNER'S REPRESENTATIVE AND PROPERTY OWNER PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REVIEW TREE REMOVAL WITH OWNER'S REPRESENTATIVE AND OBTAIN APPROVAL PRIOR TO TREE REMOVAL. CONTRACTOR SHALL REMOVE ALL VEGETATION TO 3' BEYOND ASPHALT EDGE OF TRAIL OR WITH IN REQUIRED DRAINAGE DITCHES. TRIM UP BRANCHES OF TREES TO PROVIDE 8' VERTICAL CLEARANCE. ALL CONSTRUCTION SHALL COMPLY WITH CITY OF RALEIGH STANDARDS. CONTRACTOR SHALL PROVIDE SILT FENCING IN ALL AREAS AND EROSION CONTROL MEASURES AS NEEDED OR DIRECTED BY THE EROSION CONTROL INSPECTOR. IF ADDITIONAL MEASURES ARE REQUIRED IN ADDITION TO THE PLANS, COMPENSATION WILL BE PROVIDED PER THE CONTRACT PROVISIONS. ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER SHALL BE SEEDED BY CONTRACTOR. VEGETATION ON BANKS AND WETLANDS SHOLD BE HAND CUT WITH ROOT MATS UNDISTURBED. 9. THE AMOUNT OF DISTURBED AREA REQUIRED TO BE TEMPORARILY SEEDED IS LIMITED TO 2,000 LF OF TRAIL OR 14 DAYS, WHICHEVER IS SHORTER. THE CONTRACTOR CANNOT EXCEED 2,000 LF OF DISTURBED AREA WITHOUT TEMPORARY SEEDING. THE CONTRACTOR SHALL PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER. 10. INSTALL STORM SEWER SYSTEMS AND CULVERTS AND PROTECT INLETS WITH INLET PROTECTION. INSTALL CULVERTS IN JURISDICTIONAL AREAS ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. CULVERT INSTALLATIONS IN STREAMS WILL REQUIRE DEWATERING BY USE OF COFFER DAMS /IMPERVIOUS DIKES AND PUMPS TO MAINTAIN WATER QUALITY STANDARDS, PER DETAIL ON SHEET 2C. CONTRACTOR TO COORDINATE WITH EROSION CONTROL INSPECTOR. ANY TEMPORARY COFFER DAM SHALL BE CONSTRUCTED OF MATERIALS SUCH AS SHEET PILING, SANDBAGS OR CLEAN CLASS 1 RIP RAP OR LARGER STONE THAT WILL NOT CONTRIBUTE TO TURBIDITY OR SILTATION OF THE WATER BODY. A TEMPORARY SEDIMENTATION BAG SHALL BE USED PER NCDOT STANDARD DRAWING NUMBER 1630.06. SANDBAGS SHALL BE OF THE FILTER FABRIC TYPE, DOUBLE BAGGED AND INDIVIDUALLY TIED TO PREVENT SAND LEAKAGE. THEY SHALL BE PLACED AND REMOVED MANUALLY TO PREVENT SPILLAGE. ONLY CLEAN SAND, FREE OF DEBRIS, SILT, FINE PARTICLES OR OTHER FOREIGN SUBSTANCES, SHALL BE USED TO FILL THE BAGS. THE COFFERDAM SHALL BE ENTIRELY REMOVED IMMEDIATELY UPON COMPLETION OF WORK. DURING PERIODS OF WORK ACTIVITY, FLOW IMMEDIATELY DOWNSTREAM OF THE WORKSITE SHALL EQUAL FLOW IMMEDIATELY UPSTREAM OF THE WORKSITE. ALL OTHER OPTIONS WILL NEED PRIOR APPROVAL. SEE SHEET 2D FOR DETAIL. NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION, MAINTENANCE, AND REMOVAL OF IMPERVIOUS DIKE(S) AS DESCRIBED IN THIS PROVISION. PAYMENT FOR SUCH WORK SHALL BE DISTRIBUTED AMONG THE VARIOUS PAY ITEMS. 12. AS AREAS ARE BROUGHT UP TO FINISH GRADE, SPREAD TOPSOIL OVER ALL AREAS TO RECEIVE TURF OR LANDSCAPING. SEED ALL AREAS WITHIN 14 DAYS OF COMPLETING ACTIVITY. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE, WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN A VIGOROUS STAND OF GRASS. 13. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND SPREAD EVENLY ACROSS THE SITE. THEN REMOVE TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREA AND APPLY APPROPRIATE GRASS. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR FINAL SITE INSPECTION BY ENVIRONMENTAL OFFICER. OBTAIN CERTIFICATE OF COMPLIANCE. 14. CONTRACTOR IS REQUIRED TO MAINTAIN A WEEKLY WRITTEN REPORT OF SEDIMENT AND EROSION CONTROL DEVICES. m w oc a w OC a z g a E w/ o a _ m > N n d�Z�D MPG; ... W **U)-aui��LL 3 w z z g a Z w w c� O z w U) Y U O Ln aco Lu Z J U o> IPRELIMINARY PLANS ®® NOT USE FOR CONSTRUCTION UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: NO. DATE IPROJECT NO.: H9001.00 t 4. INSTALL TREE PROTECTION FENCING, SILT FENCE, COMBINATION FENCE AND, SILT FENCE OUTLETS. j NO GRADING IS TO OCCUR IN THE TREE PROTECTION AREAS OR TREE CRITICAL ROOT ZONES. SILT FENCE OUTLETS SHALL BE INSTALLED PER FIELD LOCATED LOW POINTS AND AS SHOWN ON I w H APPROVED PLANS. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, w ETC. THAT MAY BE REQUIRED. 5. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. CALL FOR ON SITE INSPECTION BY ENVIRONMENTAL INSPECTOR AND OBTAIN CERTIFICATE OF COMPLIANCE. CALL FOR TREE PROTECTION U THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE FENCE INSPECTION BY CHRIS CRUM OF THE CITY OF RALEIGH. 919 - 516 -2561 MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE Lij Q REMOVED FROM THE SITE ON A DAILY BASIS. 6. TOPSOIL AND STONE BASE REMOVAL AND /OR STORAGE AREAS SHALL BE CONTAINED WITHIN THE w PROPOSED LIMITS OF DISTURBANCE. RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY PROVIDER(S). 7. BEGIN GRADING & CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. ROUGH GRADE SITE. Z EXISTING UTILITIES AND STRUCTURES SHOWN BOTH UNDERGROUND AND ABOVE ARE BASED ON THE BEST INSURE THAT SEDIMENT LADEN WATER IS DIRECTED TO SEDIMENT CONTROL DEVICES. m w AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO Q w BEGINNING RELATED CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S 8. INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES EVERY 7 DAYS AND AFTER EACH SIGNIFICANT REPRESENTATIVE IMMEDIATELY. RAINFALL (0.5 INCHES OR GREATER) AND DOCUMENT WITH INSPECTION REPORTS. U (D CONTRACTOR SHALL LOCATE ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO CONSTRUCTION. ALL UTILITIES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR. CONTRACTOR SHALL RESTORE ALL LAY DOWN AND STAGING AREAS TO ORIGINAL CONDITIONS AND TO THE SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA. CONSTRUCTION /SAFETY FENCING REMOVED TO FACILITATE ACCESS BY THE CONTRACTOR FOR CONSTRUCTION MUST BE REPLACED AT THE END OF EACH WORK PERIOD TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM HAZARDOUS AREAS. DEMOLITION, AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED IN SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND PIPING ARE IMMEDIATELY PUT INTO SERVICE. CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE DOES NOT REMAIN OUT OF SERVICE FOR LONGER THAN 12 HOURS AT A TIME. PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATER DRAINAGE DURING CONSTRUCTION. CONTRACTOR SHALL STAKE CENTERLINE OF TRAIL ACCORDING TO PLANS AND OBTAIN APPROVAL FROM OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE RESOLVED PRIOR TO CONSTRUCTION. STATIONING IS APPROXIMATE. CONTRACTOR SHALL VERIFY ALL STATIONING FOR APPLICABILITY TO EXISTING CONDITIONS PRIOR TO CONSTRUCTION. DEVIATION FROM ALIGNMENT DUE TO LARGE TREES OR OTHER OBSTACLES ETC SHALL BE APPROVED BY CITY OF RALEIGH. CONTRACTOR SHALL MAINTAIN ALL ABOVE AND BELOW GROUND STORM WATER DRAINAGE AND PATTERNS AND PIPING AS THEY CURRENTLY EXIST UNLESS NOTED OTHERWISE. ANY DISTURBANCE OF THE PATTERNS OR STRUCTURES BY THE CONTRACTOR SHALL BE CORRECTED BY THE CONTRACTOR TO CONDITION PRIOR TO DISTURBANCE. CLEAN OUT STORM WATER PIPE ONLY IF NOTED ON PLAN AND ACCORDING TO DETAIL. CONTRACTOR ACCESS FOR TRAIL CONSTRUCTION SHALL BE CONFIRMED BY CONTRACTOR WITH OWNER'S REPRESENTATIVE AND PROPERTY OWNER PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REVIEW TREE REMOVAL WITH OWNER'S REPRESENTATIVE AND OBTAIN APPROVAL PRIOR TO TREE REMOVAL. CONTRACTOR SHALL REMOVE ALL VEGETATION TO 3' BEYOND ASPHALT EDGE OF TRAIL OR WITH IN REQUIRED DRAINAGE DITCHES. TRIM UP BRANCHES OF TREES TO PROVIDE 8' VERTICAL CLEARANCE. ALL CONSTRUCTION SHALL COMPLY WITH CITY OF RALEIGH STANDARDS. CONTRACTOR SHALL PROVIDE SILT FENCING IN ALL AREAS AND EROSION CONTROL MEASURES AS NEEDED OR DIRECTED BY THE EROSION CONTROL INSPECTOR. IF ADDITIONAL MEASURES ARE REQUIRED IN ADDITION TO THE PLANS, COMPENSATION WILL BE PROVIDED PER THE CONTRACT PROVISIONS. ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER SHALL BE SEEDED BY CONTRACTOR. VEGETATION ON BANKS AND WETLANDS SHOLD BE HAND CUT WITH ROOT MATS UNDISTURBED. 9. THE AMOUNT OF DISTURBED AREA REQUIRED TO BE TEMPORARILY SEEDED IS LIMITED TO 2,000 LF OF TRAIL OR 14 DAYS, WHICHEVER IS SHORTER. THE CONTRACTOR CANNOT EXCEED 2,000 LF OF DISTURBED AREA WITHOUT TEMPORARY SEEDING. THE CONTRACTOR SHALL PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER. 10. INSTALL STORM SEWER SYSTEMS AND CULVERTS AND PROTECT INLETS WITH INLET PROTECTION. INSTALL CULVERTS IN JURISDICTIONAL AREAS ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. CULVERT INSTALLATIONS IN STREAMS WILL REQUIRE DEWATERING BY USE OF COFFER DAMS /IMPERVIOUS DIKES AND PUMPS TO MAINTAIN WATER QUALITY STANDARDS, PER DETAIL ON SHEET 2C. CONTRACTOR TO COORDINATE WITH EROSION CONTROL INSPECTOR. ANY TEMPORARY COFFER DAM SHALL BE CONSTRUCTED OF MATERIALS SUCH AS SHEET PILING, SANDBAGS OR CLEAN CLASS 1 RIP RAP OR LARGER STONE THAT WILL NOT CONTRIBUTE TO TURBIDITY OR SILTATION OF THE WATER BODY. A TEMPORARY SEDIMENTATION BAG SHALL BE USED PER NCDOT STANDARD DRAWING NUMBER 1630.06. SANDBAGS SHALL BE OF THE FILTER FABRIC TYPE, DOUBLE BAGGED AND INDIVIDUALLY TIED TO PREVENT SAND LEAKAGE. THEY SHALL BE PLACED AND REMOVED MANUALLY TO PREVENT SPILLAGE. ONLY CLEAN SAND, FREE OF DEBRIS, SILT, FINE PARTICLES OR OTHER FOREIGN SUBSTANCES, SHALL BE USED TO FILL THE BAGS. THE COFFERDAM SHALL BE ENTIRELY REMOVED IMMEDIATELY UPON COMPLETION OF WORK. DURING PERIODS OF WORK ACTIVITY, FLOW IMMEDIATELY DOWNSTREAM OF THE WORKSITE SHALL EQUAL FLOW IMMEDIATELY UPSTREAM OF THE WORKSITE. ALL OTHER OPTIONS WILL NEED PRIOR APPROVAL. SEE SHEET 2D FOR DETAIL. NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION, MAINTENANCE, AND REMOVAL OF IMPERVIOUS DIKE(S) AS DESCRIBED IN THIS PROVISION. PAYMENT FOR SUCH WORK SHALL BE DISTRIBUTED AMONG THE VARIOUS PAY ITEMS. 12. AS AREAS ARE BROUGHT UP TO FINISH GRADE, SPREAD TOPSOIL OVER ALL AREAS TO RECEIVE TURF OR LANDSCAPING. SEED ALL AREAS WITHIN 14 DAYS OF COMPLETING ACTIVITY. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE, WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN A VIGOROUS STAND OF GRASS. 13. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND SPREAD EVENLY ACROSS THE SITE. THEN REMOVE TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREA AND APPLY APPROPRIATE GRASS. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR FINAL SITE INSPECTION BY ENVIRONMENTAL OFFICER. OBTAIN CERTIFICATE OF COMPLIANCE. 14. CONTRACTOR IS REQUIRED TO MAINTAIN A WEEKLY WRITTEN REPORT OF SEDIMENT AND EROSION CONTROL DEVICES. m w oc a w OC a z g a E w/ o a _ m > N n d�Z�D MPG; ... W **U)-aui��LL 3 w z z g a Z w w c� O z w U) Y U O Ln aco Lu Z J U o> IPRELIMINARY PLANS ®® NOT USE FOR CONSTRUCTION UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: NO. DATE IPROJECT NO.: H9001.00 t EROSION CONTROL NOTES TOTAL ACREAGE OF DISTURBED AREA IS 22.81 ACRES, TOTAL PROJECT AREA IS 582.75 ACRES. ACREAGE OF PERMANENT AND TEMPORARY SEEDING IS 10 ACRES. SEE CONTRACT DOCUMENTS AND SHEET 2P FOR SEEDING SPECIFICATIONS. ON -SITE BURIAL PITS ARE NOT ACCEPTABLE. ANY GRADING BEYOND THE LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE STATE /COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO FINE. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL IN LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 14 CALENDAR DAYS OF COMPLETION OF GRADING. DURING UNSUITABLE GROWING SEASONS, MULCH WILL BE USED AS A TEMPORARY COVER ON SLOPES THAT ARE 4:1 OR STEEPER, MULCH WILL BE ANCHORED. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A LOCAL REPRESENTATIVE OF THE STATE /COUNTY STORM WATER MANAGEMENT SECTION AND THE LOCAL INSPECTIONS DEPARTMENT. CONSTRUCTION, MAINTENANCE, REMOVAL OF ALL EROSION CONTROL DEVICES, ALL FINES, LEGAL FEES AND RESTORATION COSTS ARE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. A COPY OF THE APPROVED PLANS MUST BE ON FILE AT THE JOB SITE. CONTRACTOR SHALL OBTAIN A COPY OF EACH SUBSURFACE INVESTIGATION REPORT AND FOLLOW THE RECOMMENDATIONS OR AS DIRECTED FOR GRADING, COMPLETION AND PAVEMENT DESIGN, ETC. THE AMOUNT OF DISTURBED AREA REQUIRED TO BE TEMPORARILY SEEDED IS LIMITED TO 2,000 LF OF TRAIL OR 14 DAYS, WHICHEVER IS SHORTER. THE CONTRACTOR CANNOT EXCEED 2,000 LF OF DISTURBED AREA WITHOUT TEMPORARY SEEDING. THE CONTRACTOR SHALL PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER. EROSION PROVISION THE CONTRACTOR SHALL BE REQUIRED TO TAKE EVERY REASONABLE PRECAUTION THROUGHOUT THE CONTRACT TO PREVENT THE EROSION OF SOIL AND THE SEDIMENTATION OF STREAMS, LAKES, RESERVOIRS, OTHER WATER IMPOUNDMENTS, GROUND SURFACES, OR OTHER PROPERTY AS REQUIRED BY THE SEDIMENT POLLUTION CONTROL ACT OF 1973 AND THE 1974 AMENDMENTS TO THE ACT. FAILURE ON THE PART OF THE CONTRACTOR TO COMPLY WITH THE PROVISIONS OF THE EROSION CONTROL PLAN OR TO PERFORM EROSION CONTROL WORK AS DIRECTED WILL RESULT IN THE ENGINEER, INSPECTOR OR NCDENR NOTIFYING THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS. IN THE EVENT THAT THE CONTRACTOR FAILS TO BEGIN SUCH REMEDIAL ACTION OR FAILS TO BEGIN EROSION CONTROL WORK WITHIN 24 HOURS AFTER RECEIPT OF SUCH NOTICE WITH ADEQUATE FORCES AND EQUIPMENT, THE ENGINEER MAY PROCEED TO HAVE THE WORK PERFORMED WITH OTHER FORCES. NO PAYMENT WILL BE MADE TO THE CONTRACTOR FOR WORK PERFORMED BY OTHERS. ANY COSTS INCURRED BY THE CITY DUE TO THE FAILURE OF THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS WILL BE BORNE BY THE CONTRACTOR. SUCH COSTS WILL INCLUDE CIVIL PENALTIES ASSESSED FOR SOIL EROSION AND SEDIMENTATION CONTROL VIOLATIONS. ANY COSTS INCURRED BY THE CITY FOR WORK PERFORMED BY OTHERS AS PROVIDED ABOVE IN THE EXCESS OF THE COSTS THAT WOULD HAVE BEEN INCURRED HAD THE WORK BEEN PERFORMED BY THE CONTRACTOR WILL BE DEDUCTED FROM RETAINAGE OR OTHER MONIES DUE THE CONTRACTOR OR HIS CONTRACT. MISC - WETLANDS. TREES. STORM PIPING CONTRACTOR TO VERIFY ACTUAL WETLAND BOUNDARY IN THE FIELD PRIOR TO CONSTRUCTION OF BOARDWALK. WETLAND LOCATION WILL DETERMINE BOARDWALKS STARTING /STOPPING LOCATION. NO EQUIPMENT IS ALLOWED IN THE WETLANDS. EQUIPMENT MUST BE ON TIMBER MATS. TIMBER MATS SHALL BE CAROLINA MAT INCORPORATED BRIDGE /TIMBER MAT (6" MIN. THICKNESS) OR APPROVED ALTERNATE. TEMPORARY WETLAND CROSSING SHALL REQUIRE TIMBER MATS. ALL DISTURBED AREAS TO BE OVERSEEDED WITH APPROVED MIX. CONTRACTOR SHALL MAINTAIN A WETLAND SEEDING MIX ON SITE TO BE APPLIED TO TEMPORARILY DISTURBED WETLAND AREAS AS DIRECTED BY ENGINEER IN THE FIELD. WETLAND SEED MIX IS PROVIDED IN THE SPECIFICATIONS IN SECTION 02910. WETLAND LOCATION /DELINEATION BY ESI DATED 12/2009 LOCATION OF PIPING FOR DITCHES IS APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY LOCATION AND MATCH PIPING TO DITCH CENTERLINE. SAVE ALL PROMINENT EXISTING TREES PLUS EXISTING TREES AS FLAGGED. IF JUDGMENT IS REQUIRED, CONTACT DESIGNER FOR FIELD ADJUSTMENT. IF EGREGIOUS VIOLATIONS OCCUR AS DETERMINED BY THE OWNER, REPLANTING MAY BE ORDERED AT A COMPENSATORY RATE AT THE CONTRACTORS EXPENSE. NOTES COMPACTION NOTES STRUCTURAL FILL BENEATH THE PAVED AREAS SHOULD BE PLACED IN UNIFORM LIFTS OF 8 INCHES OR LESS (LOOSE MEASURE), AND COMPACTED TO AT LEAST 95 PERCENT OF MAXIMUM DRY DENSITY AND WITHIN 2 PERCENT OF THE OPTIMUM MOISTURE AS DEFINED BY THE STANDARD PROCTOR COMPACTION TEST. HOWEVER, THE UPPER 12 INCHES OF THE FILL PLACED SHOULD BE COMPACTED TO 98 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. TO CONFIRM THAT THE SPECIFIED DEGREE OF COMPACTION IS OBTAINED, FIELD DENSITY TESTING SHOULD BE PERFORMED IN EACH LIFT BY A SOILS TECHNICIAN. 2006 NCDOT ROADWAY ENGLISH STD. DRAWINGS THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" HIGHWAY DESIGN BRANCH - N.C. DEPARTMENT OR TRANSPORTATION - RALEIGH, N.C., DATED JULY 187 2006 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS: STD.NO. DIVISION 2 - EARTHWORK 200.02 DIVISION 3 - PIPE CULVERTS 300D.01 DIVISION 8 - INCIDENTALS 838.01 838.80 846.01 876.01 876.02 876.04 TITLE Method of Clearing - Method II Method of Pipe Installation - Method 'A' Concrete Endwall for Single and Double Pipe Culverts - 15" thru 48" Pipe 90° Skew Precast Concrete Endwall - For Single 12" thru 72" Pipe 90° Skew Concrete Curb, Gutter, and Curb & Gutter Rip Rap in Channels Guide for Rip Rap at Pipe Outlets Drainage Ditches with Class 'B' Rip Rap ADDITIONAL NCDOT STANDARDS NOT ON THE LIST ABOVE MAY BE REQUIRED AS PER PLAN DETAILS AND SPECIFICATIONS. SEEDING A. ACCOMPLISH SEEDING BY MEANS OF AN APPROVED POWER -DRAWN SEED DRILL, COMBINATION CORRUGATED ROLLER - SEEDER, APPROVED HAND OPERATED MECHANICAL SEEDER, OR OTHER APPROVED METHODS TO PROVIDE EVEN DISTRIBUTION OF SEED. B. DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY. AFTER SEEDING, ROLL AREA WITH A ROLLER, NOT LESS THAN 18 INCHES IN DIAMETER AND WEIGHING NOT MORE THAN 210 POUNDS PER FOOT OF WIDTH. UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY. C. IMMEDIATELY FOLLOWING SEEDING APPLY MULCH OR MATTING. DO NOT SEED AREAS IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY. D. APPLY WATER WITH A FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED. SATURATE TO 4 INCHES OF SOIL DEPTH. E. THE AMOUNT OF DISTURBED AREA REQUIRED TO BE TEMPORARILY SEEDED IS LIMITED TO 2,000 LF OF TRAIL OR 14 DAYS, WHICHEVER IS SHORTER. THE CONTRACTOR CANNOT EXCEED 2,000 LF OF DISTURBED AREA WITHOUT TEMPORARY SEEDING. THE CONTRACTOR SHALL PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER. MULCHING AND MATTING A. APPLY MULCH OR MATTING AS REQUIRED TO RETAIN SOIL AND GRASS, BUT NO LESS THEN THE FOLLOWING: 1. SLOPES FROM 5:1 OR FLATTER BY SPREADING A LIGHT COVER OF MULCH OVER SEEDED AREA AT THE RATE OF NOT LESS THAN 92 LBS. PER 1000 SQ.FT. 2. SLOPES GREATER THAN 5:1 MULCH WITH MATTING. PIN MATTING TO THE GROUND WITH WIRE STAPLES AT 5 FOOT INTERVALS, IMMEDIATELY AFTER SEEDING. 3. USE TACK TO PREVENT DISRUPTION OF MULCH. B. FOR TACK USE AN ASPHALT TIE -DOWN OF EMULSIFIED ASPHALT GRADE AE -E OR CUT -BACK ASPHALT GRADE RC -2 OR OTHER APPROVED EQUAL. AN APPROVED JUTE MESH OR NET MAY BE USED IN LIEU OF TACKING STRAW MULCH. C. OTHER TYPES OF MULCH AND ANCHORING METHODS MAY BE USED UPON APPROVAL BY THE ENGINEER. m W oc a W OC a z g a �e J LU W U ~ w Q LU � z m w LU U CD E w/ o a _ m doZ�om LLda��� ... W aui��LL 3 **U) w z z g a Z w w c� O z w U) Y U O Ln U co LU Z J U O > IPRELIMINARY PLANS ®® NOT USE FOR CONSTRUCTION UAIt: Ftt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE ALL STORM PIPING SHALL BE HDPE DBL WALL- SMOOTH INTERIOR EXCEPT WERE OTHERWISE NOTED. SEE D. EXCELSIOR MATTING SHALL MEET NCDOT STANDARD SPECIFICATIONS AND SHALL BE INSTALLED PER PROJECT NO.: DRAINAGE SUMMARY SHEET. APPROVED PLANS. H9001.00 ON ALL STORM PIPING, BURY INVERTS ONLY AS NEEDED. PROTECTION SCALE: NTS CMP PIPING SHALL HAVE ASPHALT COATING INSIDE AND OUT WHEN DESIGNATED (SEE SPECS). A. PROTECT SEEDED AREAS FROM DAMAGE BY BARRICADES, SIGNS, AND OTHER ALL PROPOSED CONCRETE WALKWAYS, ASPHALT TRAILS, ETC. WILL BE CONSTRUCTED TO EXISTING APPROPRIATE MEANS. MAINTAIN AND PROTECT SLOPES FROM WEATHER- DAMAGE. 1 C GRADES UNLESS OTHER WISE NOTED ON THE PROFILE. Uj w w W ZI J Q �O � w N U 00 LL iU 0 OZLn O U) LU m U � OP C)e a M m u QJ p1 m a U m W oc a W OC a z g a �e J LU W U ~ w Q LU � z m w LU U CD E w/ o a _ m doZ�om LLda��� ... W aui��LL 3 **U) w z z g a Z w w c� O z w U) Y U O Ln U co LU Z J U O > IPRELIMINARY PLANS ®® NOT USE FOR CONSTRUCTION UAIt: Ftt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE ALL STORM PIPING SHALL BE HDPE DBL WALL- SMOOTH INTERIOR EXCEPT WERE OTHERWISE NOTED. SEE D. EXCELSIOR MATTING SHALL MEET NCDOT STANDARD SPECIFICATIONS AND SHALL BE INSTALLED PER PROJECT NO.: DRAINAGE SUMMARY SHEET. APPROVED PLANS. H9001.00 ON ALL STORM PIPING, BURY INVERTS ONLY AS NEEDED. PROTECTION SCALE: NTS CMP PIPING SHALL HAVE ASPHALT COATING INSIDE AND OUT WHEN DESIGNATED (SEE SPECS). A. PROTECT SEEDED AREAS FROM DAMAGE BY BARRICADES, SIGNS, AND OTHER ALL PROPOSED CONCRETE WALKWAYS, ASPHALT TRAILS, ETC. WILL BE CONSTRUCTED TO EXISTING APPROPRIATE MEANS. MAINTAIN AND PROTECT SLOPES FROM WEATHER- DAMAGE. 1 C GRADES UNLESS OTHER WISE NOTED ON THE PROFILE. I � I 4 I I SHLD.I I I I I ORIGINAL GROUND 2. I I I I I I I I I I I I I I INSET 1 PAVEMENT SCHEDULE Cl PROPOSED APPROX. 2" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.513, AT AN AVERAGE RATE OF 224 LBS. PER SQ. YD. J1 PROPOSED 6" AGGREGATE BASE COURSE. T EARTH MATERIAL. V1 GEOTEXTILE SEPERATOR FABRIC BOARDWALK PLATFORM BOARDWALK NO. 1 2 4 5 6 7 8 9 10 BOARDWALK TYPICAL SECTION CHAIN Y2 Y2 Y2 Y2 Y2 Y2REV1 Y2REV1 Y2REV1 Y2REV1 1 Y2REV1 2 Y2REV1 BEGIN STATION 17 +00.00 32 +80.50 100 +35.00 113 +04.83 114 +24.83 152 +05.00 182 +80.00 191+31.47 196 +86.59 193 +11.47 196 +69.18 CHAIN 5' 0.02 �) V1 I _ 5' I I GRADE POINT CCl I I i 0.02 6' SHLD. 4'W/ SAFETY RAIL 3' =MAX. GRADE TO THIS LINE ( T ASPHALT TRAIL TYPICAL SECTION BEGIN STATION END STATION SAFETY RAIL* SEE SHEET 2B -Y2- (BEGIN CONSTRUCTION) 10 +60.00 17 +00.00 (BEGIN BOARDWALK 1) -Y2- (END BOARDWALK 1) 20 +60.00 32 +80.50 (BEGIN BOARDWALK 2) -Y2- (END BOARDWALK 2) 33 +20.50 42 +26.95 (STATION EQUATION BK) - Y2REV3- (STATION EQUATION AH) 42 +26.95 56 +31.53 (STATION EQUATION BK) -Y2- (STATION EQUATION AH) 56 +20.00 57 +41.46 (BEGIN BRIDGE S1) -Y2- (END BRIDGE S1) 58 +81.46 96 +24.81 (STATION EQUATION BK) -Y2- (STATION EQUATION AH) 96 +25.62 100 +35.00 (BEGIN BOARDWALK 3) -Y2- (END BOARDWALK 3) 101 +45.00 113 +04.83 (BEGIN BOARDWALK 4) -Y2- (END BRIDGE S2) 117 +62.30 130 +20.00 (STATION EQUATION) - Y2REV1- (STATION EQUATION) 130 +20.71 152 +05.00 (BEGIN BOARDWALK 7) - Y2REV1- (END BOARDWALK 7) 153 +55.00 182 +80.00 (BEGIN BOARDWALK 8) - Y2REV1- (END BOARDWALK 8) 185 +80.00 191 +31.47 (BEGIN BOARDWALK 9) - Y2REV1- (END BOARDWALK 10) 198 +66.59 198 +78.20 (STATION EQUATION BK) - Y2REV2- (STATION EQUATION AH) 198 +78.20 209 +46.15 (END CONSTRUCTION) END STATION 20 +60.00 33 +20.50 101+45.00 113 +84.83 116 +22.30 153 +55.00 185 +80.00 193 +11.47 198 +66.59 193 +29.18 196 +86.59 VARIES 10' -0" TO 12' -0" CLEAR NOTES: -USE 6' SHOULDER IN FILL SECTIONS AND 3' SHOULDER IN CUT SECTIONS. - TRANSITION SUPERELEVATION AS SHOWN ON PLANS. TRANSITION DISTANCE SHALL BE 10. - FOR -DR1 -, DEPTH OF ABC TO BE 8" ORIGINAL GROUND PROVIDE A SAFETY RAIL FOR THE FOLLOWING CIRCUMSTANCES: SLOPE >_ 3:1 AND DROP OF 6' SLOPE >_ 2:1 AND DROP OF 4' SLOPE >_ 1:1 AND DROP OF 1' D D D D D D D D D D D ------------------------------------------------------ STRUCTURAL STEEL TRUSS, NP BRIDGE TYPICAL SECTION BRIDGE NO. (CLEAR WIDTH) CHAIN BEGIN STATION z 0 END STATION m w Q a w oC a z g a �e J Lu W U ~ w Q Lu � z m w Lu U CD E w/ m d O Zp�p� O IL N a � 6 ...� W aui��LL 3 **U) w z z g a z w w c� _O Z w U) Y U O Ln Q w Z J U O > PRELIMINARY PLANS ®O NOT USE FOR CONSTRUCCIION DAI t: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE S 1 S2 S3 S4 Y2 Y2 Y2 Y2REV1 57 +41.46 113 +84.83 116 +22.30 193 +29.18 58 +81.46 114 +24.83 117 +62.30 196 +69.18 (= V H9001.00 ~ w 1­4 w W z0� ° U) J J Q w H ID CR o^o w N 00 LL iU 0 OZ� O U� L) u LU 00 � d M J (1 M (n m U m w Q a w oC a z g a �e J Lu W U ~ w Q Lu � z m w Lu U CD E w/ m d O Zp�p� O IL N a � 6 ...� W aui��LL 3 **U) w z z g a z w w c� _O Z w U) Y U O Ln Q w Z J U O > PRELIMINARY PLANS ®O NOT USE FOR CONSTRUCCIION DAI t: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE S 1 S2 S3 S4 Y2 Y2 Y2 Y2REV1 57 +41.46 113 +84.83 116 +22.30 193 +29.18 58 +81.46 114 +24.83 117 +62.30 196 +69.18 PROJECT NO.: H9001.00 SCALE: NTS z 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER STEEL FENCE POST WIRE FENCE HARDWARE CLOTH MIN. 12 -1/2 GA. NCDOT SEDIMENT CONTROL STONE MIN. 10 GA. SILT FENCE FABRIC INTERMEDIATE LINE WIRES INSTALLED TO SECOND WIRES WIRE FROM TOP GRADE FRONT VIEW NOTES: - END OF SILT FENCE SHOULD BE TURNED UPHILL STEEL POST TOP OF SILT FENCE - SEE N.C. STATE DENR PRACTICE STANDARDS & SPECIFICATIONS WOVEN WIRE FABRIC MUST BEAT LEAST 1' IS ALWAYS REQUIRED ABOVE THE TOP OF SEDIMENT FENCE SET FOR CONDITIONS WHERE PRACTICE APPLIES THE WASHED STONE PLANNING CONSIDERATIONS & DESIGN CRITERIA. (HOWEVER FLOW _ SILT FENCE GEOTEXTILE FABRIC SHALL NOT RUN PARALLEL WITH THE TOE OF THE FENCE). -c�,'� _ z= FILL SLOPE N 0 `" * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE GRADE FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. IN EACH CASE THE SILT FENCE IS TO BE PROPERLY ENTRENCHED & THE o 6" MIN. COVER STONE SHALL BE AT A MINIMUM OF 16" ABOVE GRADE AT THE N OVER SKIRT DIRECTION OF FLOW & BETWEEN 60 - 45 DEGREES. ANCOR SKIRT AS DIRECTED BY ENGINEER. SIDE VIEW ,� STANDARD TEMPORARY SILT FENCE C.O.R. STD # 40.01 TYPE A TYPE B PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL PIPE OUTLET TO WELL- DEFINED CHANNEL x p CHANNEL BOTTOM ch . PLAN VIEW 4 x DIAMETER FILTER FABRIC SEE PLANS FOR QUANTITIES SECTION A -A 40" 4 x DIAMETER FILTER FABRIC J SEE PLANS FOR QUANTITIES SECTION B -B PIPE OUTLET PROTECTION NCDOT STD. 876.02 c� TREE PROTECTION AREA 18" c� DO NOT ENTER WARNING SIGN DETAIL NOTES: 3' FILTER FABRIC ON GROUND BURY WIRE FENCE AND HARDWARE CLOTH BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH SECTION VIEW Al RAIA1 nn r'KICE STEEL FENCE POST SET MAX 2' APART - I�- MIN. 18" INTO SOLID GROUND FRONT VIEW SILT FENCE OUTLET L l NOTES: FOOTING SIZE PIPE SIZE WIDTH DEPTH 15"-24" 8" 12" >24" - 36" w 24" >3611- 54" 18" 36" DOUBLE -Y2- 114 +00 ll�_ w - Y2Rev1- 152 +80 48" TRIPLE w w A o B B x p CHANNEL BOTTOM ch . PLAN VIEW 4 x DIAMETER FILTER FABRIC SEE PLANS FOR QUANTITIES SECTION A -A 40" 4 x DIAMETER FILTER FABRIC J SEE PLANS FOR QUANTITIES SECTION B -B PIPE OUTLET PROTECTION NCDOT STD. 876.02 c� TREE PROTECTION AREA 18" c� DO NOT ENTER WARNING SIGN DETAIL NOTES: 3' FILTER FABRIC ON GROUND BURY WIRE FENCE AND HARDWARE CLOTH BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH SECTION VIEW Al RAIA1 nn r'KICE STEEL FENCE POST SET MAX 2' APART - I�- MIN. 18" INTO SOLID GROUND FRONT VIEW SILT FENCE OUTLET L l NOTES: FOOTING SIZE PIPE SIZE WIDTH DEPTH 15"-24" 8" 12" >24" - 36" 12" 24" >3611- 54" 18" 36" till T FILTER FABRIC H = RIP RAP TO TOP OF PIPE (MAX. H = D +T) T = 15" CLASS 'I' RIPRAP T = 12" CLASS 'B' RIP RAP 1/2 DIAMETER OF PIPE OR 12" WHICHEVER IS GREATER FILTER FABRIC CAPACITY OF PIPE CULVERTS - TOGETHER = BANK FULL FLOW TEMPORARY STREAM CROSSING SUMMARY CHAIN STATION DIAMETER NOTES -Y2- 33 +00 48" SINGLE -Y2- 100 +80 48" DOUBLE -Y2- 114 +00 48" DOUBLE - Y2Rev1- 152 +80 48" TRIPLE 1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 3. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. 4. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 5. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 7. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. 8. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. 9. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 10. FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATIONS ( HOWEVER FLOW SHALL NOT RUN PARALLEL WITH THE FENCE) AND DESIGN CRITERIA. 11. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 12. SEE N.C. STATE DENR PRACTICE & SPECIFICATION SEDIMENTS FENCE SECTION. FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATIONS. 13. SEE N.C. STATE DENR PRACTICE & SPECIFICATION SEDIMENTS FENCE SECTION. (HOWEVER FLOW SHALL NOT RUN PARALLEL WITH THE FENCE) STEEL POST -WOVEN WIRE FABRIC — WARNING SIGN SILT FENCE GEOTEXTILE FABRIC MIN. 10 GA. LINE WIRES o CID FILL SLOPE co z M GRADE -VIII 6" MIN. COVER o 1111111 lily l� I OVER SKIRT N IIII�I EXTEND WIRE 6" MIN. INTO TRENCH AND ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. 8' MAX. VARIARI F AR nIRFCTFn RY THE FNrINFFR TM WARNING SIGN TM TREE PROTECTION AREA DO NOT ENTER TREE PROTECTION AREA DO NOT ENTER SILT FENCE FABRIC INSTALLED TO SECOND LEW�IREFRTMO III III it IIIIIIIIII IIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII FRONT VIEW VIII VIII VIII VIII VIII VIII III VIII III III III MIN. 12 -1/2 GA. INTERMEDIATE WIRES GRADE I 1 6 COMBINATION SILT/ TREE PROTECTION FENCE C.O.R. STD # 40.03 MIN. 10 GA. LINE WIRES DESIGN CRITERIA NOTES THE DRAINAGE AREA IS LIMITED TO ONE HALF ACRE. 1. PLACE STONE TO THE LINE AND DIMENSION SHOWN IN THE PLAN CD w w KEEP A MAXIMUM HEIGHT OF 2 FEET AT THE CENTER OF ON A FILTER FABRIC FOUNDATION. III � Z THE DAM. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW W ZO U z KEEP THE CENTER OF THE CHECK DAM AT LEAST 9 INCHES NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL J w o 0- LOWER THAN THE OUTER EDGES AT NATURAL GROUND BANKS. w J N a ELEVATION. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO > KEEP THE SIDE SLOPES OF THE DAM AT 2:1 OR FLATTER KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK w w U 00 ENSURE THAT THE MAXIMUM SPACING BETWEEN DAMS DAM. LL O z Ln w PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION O o-6 L>u c°� o Lu ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE Y w w ao STABILIZE OUTFLOW AREAS ALONG THE CHANNEL TO ELEVATION OF THE UPPER DAM. w o� RESIST EROSION. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM a M � m USE NCDOT CLASS B RIP RAP AND LINE THE UPSTREAM HEAVY FLOW THAT COULD CAUSE EROSION. H w SIDE OF THE DAM WITH NCDOT SEDIMENT CONTROL STONE. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST U U) KEY THE STONE INTO THE DITCH BANKS AND EXTEND IT UPSTREAM IS STABLE. Y BEYOND THE ABUTMENTS A MINIMUM OF 1.5 FEET TO 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT U AVOID WASHOUT FROM OVERFLOW AROUND THE DAM. ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO ® ®�� d�o� v O DAMAGE OR BLOCKAGE FROM DISPLACED STONES. I °� w 99 9 12" OF NCDOT SEDIMENT ® II O U 9 MIN. 1.5' MIN CONTROL STONE 1.5 `�'� U > CLASS B RIP -RAP 2' MAX AT CENTER FILTER CLOTH FILTER CLOTH 4' TO 6' PLAN VIEW - CROSS - SECTION VIEW PURPOSE: TO REDUCE EROSION IN A CHANNEL BY REDUCING THE FENCE, VELOCITY OF FLOW. L = THE DISTANCE SUCH THAT POINTS 3RIC, A AND B ARE OF EQUAL ELEVATION .WARE DO NOT USE CHECK DAM IN INTERMITTENT OR PERENNIAL STREAMS. CLOTH IN TRENCH A g SEE DENR STANDARDS & SPECS. FOR COMPLETE DESIGN CRITERIA & L - MAINTENANCE CHECK DAM SIDE VIEW 6" DEEP COARSE AGGREGATE ELEVATION v FOR USE IN PROPOSED DITCHES EARTH FILL COVERED BY LARGE ANGULAR ROCK FLOW EARTH FILL COVERED BY LARGE ANGULAR ROCK COARSE AGGREGATE TOP OF BANK -I I I f` TOP OF BANK PLAN STANDARD TEMPORARY STREAM CROSSING 5 40" M TREE PROTECTION AREA 18" ih DO NOT ENTER WARNING SIGN DETAIL 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER NOTES: WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. TM WARNING SIGN TM TREE PROTECTION AREA DO NOT ENTER lxx III III lil IIIIIIIIII VIII VIII (IIII (IIII VIII VIII VIII (IIII —VIII VIII — (IIII —VIII (IIII — (IIII ORANGE, UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) — (IIII — (IIII —VIII VIII VIII IIII FRONT VIEW 7 MIN. 12 -1/2 GA. INTERMEDIATE WIRES GRADE VIII III - c N TREE PROTECTION FENCE C.O.R. STD # 40.04 °T�EL POST 1VEN WIRE FABRIC ARNING SIGN )RANGE, UV RESISTANT iIGH - TENSILE STRENGTH 3OLY BARRICADE FABRIC (TYPICAL) SIDE VIEW NOTE: FOR TREE PROTECTION ONLY m 13 w oC Q a w oC a ul z g � J uj W U ~ w Q � z ui m w ui U CD 2 I $ E w/ 2 05 o a 0 m cq n � OO m 10 2 p0a O LLda��� ...� W a 0 11 11 3 (**U) DAI t: Ftt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS 2A EXISTING ROADWAY = U < c Z o c� cnC CL III vc � Ocn �- m 1 Y2" X 51/2" RAIL U) D,.,� z J J z1_ m� v� Q w 14%21 3011 m% r r w N U 0000 PLAN iU 0 25' OR FULL WIDTH OF PROPOSED STREET OR ENTRANCE, WHICHEVER IS GREATER. Mnl 11 nCO /T /n x NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD °- IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE i STONE, THEN THE TIRES OF THE VEHICLE MUST BE 7 WASHED BEFORE ENTERING THE PUBLIC ROAD. CD n 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS ON i z TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL CLEAN THE AREA AND INVOICE THE FINANCIALLY n RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL n RESPONSIBILITY FORM. NEW CONSTRUCTION EXISTING ROADWAY 75' MIN. 25' MIN. o 2" MIN. 6" MIN. o00 00 1 FABRIC UNDER STONE CONSTRUCTION ENTRANCE STOP SIGN GREENWAY TRAIL HINGED BOLLARD BOULDER (TYP. SEE DETAIL BOULDERS TO ICE SUPPLIED BY CITY OF RALEIGH TRANSPORT AND PLACEMENT BY CONTRACTOR C) 2" YELLOW PAVEMENT MARKING 1/2" EXPANSION JOINT (SEE DETAIL 3, THIS SHEET) WHEN TIEING TO TIE TO EXISTING CONCRETE SURFACE N CONCRETE /ASHPALT 5FT RADIUS UNLESS OTHERWISE NOTED ---- - - - - -- r------- - - - - -- ----------------------------------------------------------1--------- PLAN VIEW 2' -6" SQUARE FOOTING HINGED BOLLARD & BOULDERS NOTE: BOULDERS PROVIDED BY THE CITY OF RALEIGH A r B 6' -6" C GENERALNOTES 1. ALL CONCRETE TO BE 3600 PSI COMPRESSIVE STRENGTH 2. TYPE OF PIPE TO BE USED IS 1 -5/8" MAX. O.D. BLACK IRON, LOW CARBON PIPE 3. ALL JOINTS TO HAVE Al2" FILLET WELD. 4. ALL METAL SHALL BE GALVANIZED PER SPECIFICATIONS. 42" OR 48" SAFETY RAI L 5 'X' DIMENSION 42" SAFTEY RAIL: X = 1' -2" 48" SAFETY RAIL: X = 1' -4" 2 GREENWAY ENTRANCE 6 "x 6" POST, S.Y.P. PRESSURE TREATED FOR GROUND CONTACT (SEE SPECS) TOP OF CONCRETE FOOTING TO DRAIN AWAY FROM BOLLARD L "' CONCRETE FOOTING 1" BEVEL @ 45° (TYP) STEEL PLATE HOLE FOR LOCK 1/2 " DIA. 4" GRAVEL BASE COMPACTED SUBGRADE PERMANENT BARRIER WOOD BOLLARD BOLLARDS mmin. 4 11 PROPOSED SAFETY RAIL 6" LG. PVC SLEEVES TYP. (4) #4 RE -BAR CONT. (2) #4 RE -BAR @ 1' -6" CTS. 0 611 I — 18" MINIMUM O_ 3" CLR. TYP. -I M/ l 1 A 1-f m/ P UCTION 10 FT. - SOLID YELLOW LINE 2" TRAIL OBSTRUCTION WITHIN PAVEMENT MARKING 3 NOTE: SEE 2009 MUTCD HOLE FOR LOCK 1/2 " DIA. FINISH GRADE 611 311 1/4" 6 11X3" X %" STEEL BOLLARD 00 3 "X13 "XY2' 7Y4" STEELPLAI TACK WELD TYP. /g' 1 "X10 "Sl LOCK P c'') /$, 1" X 10" STE HINGE PIP BOLLARD B STEEL PLATE << HINGE PIN N A CONCRETE FOOTI A NG 0) 2- 6 "X2 -6 "X2' < I. �. G B LOCK PIN PLAN I , SECTION A -A HINGED BOLLLARD POST( 5" SQ PO: POST CAP OPTIONS = U < J m Z o Q CL III � R' -n,, (TR T() r.TR \TYI Y4 3 "X6 Y4 "X STEEL PLA- 11 /4 TyI 2 "X1 1/2"X SECTION B -B T -7" FACE TO FACE ,AP 211 ( V ;T ~ w 10%2" III � 1 Y2" X 51/2" RAIL U) J J NOTES: 1. FENCE TO BE MASTER HALCO THREE -RAIL RANCH STYLE Q w 14%21 3011 FENCE WITH NOMINAL 8' SECTION LENGTH FOOTING WIDTH TO BE (2X) POST WIDTH. MINIMUM DEPTH 30 ". = ( V ~ w III � z ° U) J J Q w > kO N w N U 0000 LL iU 0 � O U) Lu Lu � D! d M J � 0-i M (n ON U m w oC a w OC a z g a � J Lu W U ~ w Q Lu � z m w Lu U CD E w/ .. a " o m > N 'q n v co ,o a1 m oZOp m LLda�6i ..-1p W I(aaKFLL r **u) a w z z g a z w w a c� O z w U) Y U O Ln Q w Z 1 U O > I PRELIMINARY PLANS I 5411 ®® NOT USE FOR CONSTRUCTION DAI t: Ftt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS n) SAFETY RAIL EMBEDDED IN CONCRETE TRAIL ��� DETAIL FOR WHITE VINYL FENCE I 2B V � / I I I I I I/ PERVIOUS DIKE - EXISTING TERRAIN a TEMPORARY SEDIMENTATION BAG 15 X 10 TEMPORARY SEDIMENTATION BAG `. L PUMP TO SEDIMENTATION BAG SLOPE DRAIN INLET G-1­171177A \A InAAII/ [0!•W,t ]Ml MAN 191 ­1\0 mMlwj w 0 m&xw. 011►11wwj w 1�`Wl M`. im .l NOTE: PROVIDE STABILIZED OUTLET TO STREAMBANK J/'11 � v urw.A )RAIN DRAW DETAIL FOR CULVERT CONSTRUCTION AT WET STREAMS AND DITCHES � J uj TEMPORARY SEDIMENTATION BAG(S): W THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING PLACING AND 0 REMOVING A TEMPORARY SEDIMENTATION BAG(S) AS DIRECTED BY THE ENGINEER. U THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE USED TO FILTER PUMPED WATER W DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR W Q PIPE CONSTRUCTION. THE FILTER FABRIC SHALL MEET THE REQUIREMENTS OF SECTION 1056 FOR TYPE 2 � Z FABRIC. m W SEDIMENT CONTROL STONE SHALL MEET THE REQUIREMENTS OF SECTION 1005 AND Q W SHALL BE CLEAN OF DIRT AND DEBRIS. INSTALL STONE ACCORDING TO THE DETAIL SHOWN ON THE PLANS. u THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A WATER PERMEABLE FABRIC BAG THAT TRAPS SAND, SILT, AND FINES AS SEDIMENT LADEN WATER IS PUMPED INTO IT. THIS DEVICE SHALL BE CONSTRUCTED SUCH THAT IT IS PORTABLE AND CAN BE USED ADJACENT TO THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR PIPE CONSTRUCTION. THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A BAG CONSTRUCTED TO A MINIMUM SIZE OF 10'X 15' MADE FROM A NONWOVEN FABRIC. IT SHALL HAVE A SEWN -IN 8 � IN. (MAXIMUM) SPOUT FOR RECEIVING PUMP DISCHARGE. THE BAG SEAMS SHALL BE o SEWN WITH A DOUBLE NEEDLE MACHINE USING A HIGH STRENGTH THREAD. THE SEAMS A a w yozoo 3 SHALL HAVE A MINIMUM WIDE WIDTH STRENGTH AS FOLLOWS: a LLa a��� -� Ww ,...29P 0. TEST METHOD MINIMUM SPECIFICATIONS ay�LL 3 � ASTM D -4884 60 LB/IN g a (**U) THE FABRIC USED TO CONSTRUCT THE BAG SHALL BE STABILIZED TO PROVIDE RESISTANCE TO ULTRA- VIOLET DEGRADATION AND MEET THE FOLLOWING SPECIFICATIONS FOR FLOW RATES, STRENGTH, AND PERMEABILITY: PROPERTY TEST METHOD UNITS MIN. SPECIFICATIONS SPECIFICATIONS WEIGHT ASTM D -3776 OZ/YD 8.0 GRAB TENSILE ASTM D -4632 LB 200.0 IMPERVIOUS DIKE: FLOW RATE ASTM D -4491 GAL /MIN /SF 80.0 w PERMITTIVITY ASTM D -4991 1 /SEC 1.2 Lu . THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING, INSTALLING, w J z ° � w P `J PRELIMINARY STRUCTI w z g MAINTAINING, AND REMOVING AN IMPERVIOUS DIKE FOR THE PURPOSE OF DIVERTING � w o N a / -- - NORMAL STREAM FLOW AROUND THE CONSTRUCTION SITE. THE CONTRACTOR SHALL DATE: FEBRUARY 22, 2012 v w u oo CHECKED BY: BRC REVISIONS' CONSTRUCT AN IMPERVIOUS DIKE IN SUCH A MANNER APPROVED BY THE ENGINEER. IL ENGINEER MUST BE RECEIVED BEFORE REMOVAL AND REPLACEMENT. o z T w THE IMPERVIOUS DIKE SHALL NOT PERMIT SEEPAGE OF WATER INTO THE CONSTRUCTION O 0 � _� M w � -' SITE OR CONTRIBUTE TO SILTATION OF THE STREAM. THE IMPERVIOUS DIKE SHALL PROJECT NO.: Y Q w M w oo J o BE CONSTRUCTED OF AN ACCEPTABLE MATERIAL IN THE LOCATIONS NOTED ON THE THIS PAYMENT WILL BE FULL COMPENSATION FOR ALL WORK COVERED BY THIS a "' `� °' z PLANS OR AS DIRECTED BY THE ENGINEER. (> Lu IOUS.UIKE ,, ACCEPTABLE MATERIALS SHALL INCLUDE BUT NOT BE LIMITED TO SHEET PILES, ®N Y U m SANDBAGS, AND /OR THE PLACEMENT OF AN ACCEPTABLE SIZE STONE LINED WITH � Lu z SAND SAGS / ; \` \ m POLYPROPYLENE OR OTHER IMPERVIOUS FABRIC. 0 EARTH MATERIAL SHALL NOT BE USED TO CONSTRUCT AN IMPERVIOUS DIKE WHEN IT IS STREAM IN DIRECT CONTA CT WITH THE STREAM. THE 1 NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION MAINTENANCE AND REMOVAL OF IMPERVIOUS DIKE(S) AND RELATED WORK AS DESCRIBED IN THIS PROVISION. PAYMENT FOR SUCH WORK SHALL BEDISTRIBUTED AMONG THE VARIOUS PAY ITEMS. 15 X 10 TEMPORARY SEDIMENTATION BAG `. L PUMP TO SEDIMENTATION BAG SLOPE DRAIN INLET G-1­171177A \A InAAII/ [0!•W,t ]Ml MAN 191 ­1\0 mMlwj w 0 m&xw. 011►11wwj w 1�`Wl M`. im .l NOTE: PROVIDE STABILIZED OUTLET TO STREAMBANK J/'11 � v urw.A )RAIN DRAW DETAIL FOR CULVERT CONSTRUCTION AT WET STREAMS AND DITCHES � J uj TEMPORARY SEDIMENTATION BAG(S): W THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING PLACING AND 0 REMOVING A TEMPORARY SEDIMENTATION BAG(S) AS DIRECTED BY THE ENGINEER. U THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE USED TO FILTER PUMPED WATER W DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR W Q PIPE CONSTRUCTION. THE FILTER FABRIC SHALL MEET THE REQUIREMENTS OF SECTION 1056 FOR TYPE 2 � Z FABRIC. m W SEDIMENT CONTROL STONE SHALL MEET THE REQUIREMENTS OF SECTION 1005 AND Q W SHALL BE CLEAN OF DIRT AND DEBRIS. INSTALL STONE ACCORDING TO THE DETAIL SHOWN ON THE PLANS. u THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A WATER PERMEABLE FABRIC BAG THAT TRAPS SAND, SILT, AND FINES AS SEDIMENT LADEN WATER IS PUMPED INTO IT. THIS DEVICE SHALL BE CONSTRUCTED SUCH THAT IT IS PORTABLE AND CAN BE USED ADJACENT TO THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR PIPE CONSTRUCTION. THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A BAG CONSTRUCTED TO A MINIMUM SIZE OF 10'X 15' MADE FROM A NONWOVEN FABRIC. IT SHALL HAVE A SEWN -IN 8 � IN. (MAXIMUM) SPOUT FOR RECEIVING PUMP DISCHARGE. THE BAG SEAMS SHALL BE o SEWN WITH A DOUBLE NEEDLE MACHINE USING A HIGH STRENGTH THREAD. THE SEAMS A a w yozoo 3 SHALL HAVE A MINIMUM WIDE WIDTH STRENGTH AS FOLLOWS: a LLa a��� -� Ww ,...29P 0. TEST METHOD MINIMUM SPECIFICATIONS ay�LL 3 � ASTM D -4884 60 LB/IN g a (**U) THE FABRIC USED TO CONSTRUCT THE BAG SHALL BE STABILIZED TO PROVIDE RESISTANCE TO ULTRA- VIOLET DEGRADATION AND MEET THE FOLLOWING SPECIFICATIONS FOR FLOW RATES, STRENGTH, AND PERMEABILITY: PROPERTY TEST METHOD UNITS MIN. SPECIFICATIONS SPECIFICATIONS WEIGHT ASTM D -3776 OZ/YD 8.0 GRAB TENSILE ASTM D -4632 LB 200.0 PUNCTURE ASTM D -4833 LB 130.0 FLOW RATE ASTM D -4491 GAL /MIN /SF 80.0 PERMITTIVITY ASTM D -4991 1 /SEC 1.2 UV RESISTANCE ASTM D -4355 % 70.0 THE CONTRACTOR SHALL INSTALL THE TEMPORARY SEDIMENTATION BAG IN ACCORDANCE PRELIMINARY STRUCTI WITH THE DETAILS IN THE PLANS AND AT LOCATIONS AS DIRECTED BY THE ENGINEER. THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE PLACED SO THE INCOMING WATER FLOWS INTO AND THROUGH THE BAG WITHOUT CAUSING EROSION. THE NECK OR SPOUT OF THE BAG SHALL BE TIED OFF TIGHTLY TO STOP THE WATER FROM FLOWING OUT OF THE BAG WITHOUT GOING THROUGH THE WALLS. DATE: FEBRUARY 22, 2012 THE TEMPORARY SEDIMENTATION BAGS SHALL BE REPLACED AND DISPOSED OF WHEN BAG(S) IT IS 3/4 FULL OF SEDIMENT OR WHEN IT IS IMPRACTICAL FOR THE BAG TO FILTER THE SEDIMENT OUT AT A REASONABLE FLOW RATE. PRIOR APPROVAL FROM THE DRAWN BY: MET CHECKED BY: BRC REVISIONS' NO. DATE ENGINEER MUST BE RECEIVED BEFORE REMOVAL AND REPLACEMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A SUFFICIENT QUANTITY OF BAGS TO CONTAIN SILT FROM PUMPED EFFLUENT DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR PIPE PROJECT NO.: CONSTRUCTION. H9001.00 TEMPORARY SEDIMENTATION BAG (S) WILL BE MEASURED AND PAID FOR PER EACH. SCALE: NTS THIS PAYMENT WILL BE FULL COMPENSATION FOR ALL WORK COVERED BY THIS PROVISION, INCLUDING BUT NOT LIMITED TO, FURNISHING ALL MATERIALS, PLACING AND MAINTAINING THE TEMPORARY SEDIMENTATION BAG(S), AND REMOVAL AND DISPOSAL OF SILT ACCUMULATIONS AND BAG. OEM, Seeding mixture Species Rate (Iblacre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. Seeding dates Mountains—Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont—Jan. 1 - May 1 Coastal Plain—Dec. I -Apr. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Seeding mixture Species' Rate (Iblacre) Tall fescue 80 Sericea lespedeza 20 Kobelespedeza 10 Seeding notes 1. After Aug. 15, use unscarified sericea seed. 2. Where periodic mowing is planned or a neat appearance is desired, omit sericea and increase Kobe lespedeza to 40 lb/acre. 3. To extend spring seeding dates into June, add 15 lb/acre hulled Bermudagrass. However, after mid-Apr. it is preferable to seed temporary cover. Nurse plants Between May 1 and Aug. 15, add 10 lb/acre German millet or 15 lb/ acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 Iblacre rye (grain). Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Late Winter: Feb. 15 - Mar. 21 Feb. 1 -Apr. 15 Fall is best for tall fescue and late winter for lespedezas. Overseeding of Kobe lespedeza over fall-seeded tall fescue is very effective. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre ground agricultural limestone and 1,000 Iblacre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre grain straw or equivalent cover of another suitable mulch. Anchor straw by tacking with asphalt, netting, or roving or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. 'Refer to Appendix 8.02 for botanical names. Practice Standards and SpeCifiMdOnN Seeding mixture Species Rate (Iblacre) German millet 40 In the Piedmont and Mountains, a small-stemmed Sudangrass may be substituted at a rate of 50 lb/acre. Seeding dates Mountains—May 15 -Aug. 15 Piedmont —May's -Aug. 15 Coastal Plain—Apr. 15 -Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Iblacre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre straw. Anchor straw bytacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. F M11 Practice Standards and SpecificationN Seeding mixture Species, Rate (lb/acre) Blend of two turf-type tall fescues (90%) and two or more improved Kentucky bluegrass varieties (10%) 200-250 Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Winter: — Feb. I - Mar. 31 For quality turf, avoid spring seeding. Where grading is completed during late winter or spring, an alternative is to seed 30 lb/acre Kobe lespedeza, keep mowed, prepare seedbed, and seed a permanent mixture in early fall. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre small grain straw or equivalent cover of another suitable mulch. Anchor straw by tacking with asphalt, netting, roving, or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Fertilize according to soil tests or apply 40 lb/acre nitrogen in Jan. or Feb., 40 lb in Sept., and 40 lb in Nov., from a 12-4-8, 16-4-8, or similar turf fertilizer. Avoid fertilizer applications during warm weather, as this increases stand losses to disease. Mow to a height of 2.5-3.5 inches as needed. Reseed, fertilize, and mulch damaged areas immediately. 'Refer to Appendix 8.02 for botanical names. 151st 0 6.11.22 Seedin g mixture Species Rate (lb/acre) Rye (grain) 120 Seeding dates Mountains—Aug. 15 - Dec. 15 Coastal Plain and Piedmont—Aug. 15 - Dec. 30 Soil amendments Follow soil tests or apply 2,000 lb/acre ground agricultural limestone and 1,000 Ib/acr8 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchorstraw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. I Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Winter: — Feb. I - Mar. 31 For quality turf, avoid spring seeding. Where grading is completed during late winter or spring, an alternative is to seed 30 lb/acre Kobe lespedeza, keep mowed, prepare seedbed, and seed permanent mixture between Aug. 25 and Sept. 15. Soil amendments Apply lime and fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre grain straw or equivalent cover of another suitable mulch. Anchor straw by tacking with asphalt, roving, netting, or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Fertilize according to soil tests or apply 40 lb/acre nitrogen in Jan. or Feb., 40 lb in Sept., and 40 lb in Nov., from a 12-4-8, 16-4-8, or similar turf fertilizer. Avoid fertilizer applications during warm weather, as this increases stand losses to disease. Reseed, fertilize, and mulch damaged areas immediately. Mow to a height of 2.5-3.5 inches as needed. 'Refer to Appendix 8.02 for botanical names. . im, I Q 117M'1114 it TEMPORARY AND PERMANENT SEEDING CHARTS CHARTS FROM NCDENR PRACTICE STANDARDS AND SPECIFICATIONS (REV 6/06) Seeding mixture Species' Rate (lb/acre) Tall fescue 100 Sericea lespedeza 30 Kobelespedeza 10 Seeding notes 1. In Eastern Piedmont, add 25 lb/acre Pensacola Bahiagrass or 10 lb/ acre common Bermudagrass. Use common Bermudagrass only where it is unlikely to become a pest. 2. After Aug. 15, use unscarified sericea seed. 3. Where a neat appearance is desired, omit sericea and substitute 40 lb/acre Bahiagrass or 15 lb/acre Bermudagrass. 4. To extend spring seeding dates into June, add 15 lb/acre hulled Bermudagrass. However, it is preferable to seed temporary cover and seed fescue in Sept. Nurse plants Between May I and Aug. 15, add 10 lb/acre German millet or 15 lb/ acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 lb/acre rye (grain). Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Late Winter: Feb. 15 - Mar. 21 Feb. 1 -Apr. 15 Fall is best for tall fescue, and lespedezas in late winter. Overseeding of Kobe lespedeza over fall-seeded tall fescue is very effective. Use unhulled Bermudagrass seed in fall. Soil amendments Apply lime and fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000-5,000 Iblacre grain straw or equivalent cover of another suitable mulching material. Anchor mulch by tacking with asphalt, roving, or netting. Netting is the preferred anchoring method on steep slopes. Maintenance Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. 'Refer to Appendix 8.02 for botanical names. Seeding mixture Species' Rate (Iblacre) Tall fescue 200 (4-5 lb/1,000 ft2) Nurse plants Between May 1 and Aug. 15, add 15 lb/acre Sudangrass or 15 lb/acre German millet. Prior to May 1 or after Aug. 15, add 40 lb/acre rye (grain). Seeding dates Best: Aug. 25 - Oct. Possible: Feb. -Apr. 15 Avoid seeding from Nov. to Jan. If seeding must be done at this time, add 40 lb/acre rye grain and use a channel lining that offers maximum protection. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre ground agricultural limestone and 1,000 Iblacre 10-10-10 fertilizer. Operate tillage equipment across the waterway. Mulch Use a rolled erosion control product to cover the bottom of channels and ditches, and staple securely. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb/acre grain straw, and anchor straw by stapling netting over the top. Mulch and anchoring materials must not be allowed to wash down slopes where they can clog drainage devices. Maintenance Inspect and repair mulch frequently. Refertilize in late winter of the following year; use soil tests or apply 150 Iblacre 10-10-10. Mow regularly to a height of 2-4 inches. 'Refer to Appendix 8.02 for botanical names. _r (D 11-4 J LL 0 U fl LU ce LU ce Z I tu Lou� Z U) Q I.- 0 U C, < _J 0 W _j � 0� 5: N U 00 U Lu LU 0� 1714 0 Z in 06 LU 0 M U, Q LU , op LU M _j 0'j < M a- in in ON Uj Uj U Uj Uj Z Uj < Uj U C� E s 0 ito .0 IL IM . LU 3 FA LL Vi a Lu Z Z Z Lu Lu C, 13� 1­4 0 Z LU U) Y U 0 U-) Q CO Lu Z U 0 . U > PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DA It:: Vt:L5KIUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE (PROJECT NO.: H9001.00 2D LIST OF PIPES ENDWALLS ETC. (FOR PIPES 48" & UNDER) `� � z Z Z J O � g '� ENDWALLS _ Q w m ABBREVIATIONS ~ -i kD w J w amJ J U w U o^o z HDPE STD. 838.01, STD. 838.11 w Q O Q F- Z D w z X C.B. CATCH BASIN W o z w w o =^ w STATION w CLASS III R.C. PIPE BITUMINOUS COATED C.S. PIPE TYPE B DOUBLE WALL OR � � Cn c� U ii FRAME, GRATES 0 0 } M C7 0 U (UNLESS NOTED OTHERWISE) (UNLESS NOTED OTHERWISE) SMOOTH INTERIOR STD. 838.80 z Q 0 J D �- AND HOOD N.D.I. NARROW DROP INLET cn w �, o (� O z O O J PIPE J J J Q (UNLESS J + H Q d0 zQ N o STANDARD 840.03 Lo r co D.I. DROP INLET � Q M D Q ,i O U O i= Q i= Q Q U Q~ 2} w NOTED OTHERWISE) (n F- O Q o ° o co o co G.D.I. GRATED DROP INLET acncnarn z w Q > > w > w w- p m Q O o o o G.D.I. (N.S.) GRATED DROP INLET U � w w w w U w w w = V U' � cn 3 (NARROW SLOT) Y U .-. LIN. FT. SIZE z O n- w w w 12" 15" 18" 24" 30" 36" 42" 48" 12" 15" 18" 24" 30" 36" 42" 48" 12" 15" 18" 24" 30" 36" 42" 48" cn > Q Q CU. YDS. b ui OO of w m J.B. JUNCTION BOX ®�� d�o� U On U O o z_ z_ U) w w H A w ° o) O o O 06 w w M.H. T.B.D.I. MANHOLE TRAFFIC BEARING DROP INLET ® �� Q w � I J ® Z U II O > THICKNESS OR GAUGE J a w b ° O Q ° qt w w T.B.J.B. TRAFFIC BEARING JUNCTION BOX ��� ®a �® o 0 0 ° ° �j a U 0 p TYPE OF GRATE D LL 0O o o 0 w 2 w Q = Ix z cn w O w V REMARKS a- ° L6 o U E F G -Y2- 30 +00 CL 1 176.20 176.00 32 -Y2- 35 +80 CL 2 178.20 178.00 48 -Y2- 67 +35 CL 3 174.90 174.70 64 3.8 DUAL 36" HDPE W/ UPSTREAM ENDWALL -Y2- 79 +20 CL 4 177.20 177.00 88 DUAL 24" HDPE J -Y2- 89 +30 CL 5 172.80 171.80 44 3.8 DOWNSTREAM ENDWALL w ~� ui -Y2- 96 +90 CL 6 180.70 178.00 40 0 -Y2- 102 +90 CL 7 173.00 172.50 44 -Y2- 125 +00 CL 8 175.50 172.90 36 - Y2REV1- 136 +50 CL 9 170.00 167.90 28 5.6 UPSTREAM & DOWNSTREAM ENDWALL u ui - Y2REV1- 137 +65 CL 10 172.00 170.00 36 - Y2REV1- 147 +40 CL 11 170.80 169.50 36 0 - Y2REV1- 157 +75 CL 16 176.34 172.56 48 co ui - Y2REV1- 162 +65 CL 12 172.30 171.90 44 < w - Y2REV1- 169 +95 CL 13 172.50 172.00 44 0 - Y2REV1- 181 +15 CL 14 168.80 166.70 56 U v - Y2REV1- 202 +20 CL 15 166.50 166.40 60 3.2 TRIPLE 18" HDPE W/ ENDWALLS SEE SP DETAIL Y2REV2- 203+58.74 RT 17 170.17 167.67 167.40 24 1 1 TOTALS 216 248 116 148 44 16.4 1 1 E w N cq 'rd' V ao aD '0 z o a Q w m O > O LL a mate+ �i "' W a a('n��LL 3 cn **U) PRELIMINARY PLANS ®® NOT USE FOR CONSTRUCTION DATE: FEBRUARY 22, 2012 DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS 3 BEGIN PROJECT BEGIN CONSTRUCTION -Y2- STA 10+60.00 N N co -Y2- P/ STA. 14 +44.1 / P/ STA. 17 +60.87 PI STA. 21+23.09 0 = 8° 14' 37.9" (RT) 0 = 33° 09' 07.1" (LT) 0 = l8.50' 45.4" (LT) D = 5° 43' 46.5" D = 8° 40' 52.2" D = 7° 09' 43.1" L = 143.88' L = 381.88' L = 263.14' T = 72.07' T = 196.45' T = 132.77' R = 19000.00' R = 660.00' R = 800.00' N N co �s x ca -Y2- POT Sta.10 +02.85 N t v 1 ti zr 10 +00 F1 LD 11+00 F FF FLD F 12+00 -SILT FENCE y -Y2 - PC Sta.13 +72.04 13 +00 F 14 +00 L 7111 ' LD BI ? F F LL F F 82 2 NATION FENCE (TYP) BUFFER IMPACT B2 SEE PCN APP. -Y2 - PT StaJ9 +46.30 \ -Y2 -17 + 00.00 -Y2 - PC Sto.19 +90.32 END 10' APP SLAB BEGIN BOARDWALK 1 -Y2- 20 +60.00 END BOARDWALK 1 BEGIN 10' APP SLAB w� BEGIN BOARDWALK 1 END 'l 14+50.00 -Y2 -17 + 00.00 -i EL = 192.10 _ ' .L 191.63 CC INT MH (MH 25A) -Y2- STA. 17 +73.94 CC INT MH (MH 25) CC INT MH (MH 24) 84.07 'C = /00' OFFSET 31181 +RT OFFSET P OX.2RIMO ELT191.91 OFFSET 44.09 RT4 -Y2- TA 10+56.57 -)4.0( RIM EL. 192.11 APPROX INVERT EL. 170.6 RIM EL. 192.11 OFFSET 40.38 RT (- )3.000% INVERT IN EL. 163.46 INVERT IN EL. 163.43 RIM EL. 189.48 INVERT OUT EL. 163.46 INVERT OUT .1 3.43 INVERT IN EL. 163.02 (- )2,000% INVERT OUT EL. 163.02 (- )1.a0a� (+)0.4350;1. (- )0.8000% - - - - - - - - -}. (- )0.8000% Y2- STA. 16 +86.58 APPROX ROCK I OFFSET 76.4 LT - - -- LOCATION APPROX. RIM EL. 188.73 III II -Y2- STA. 19 +51.84 II APPROX INVERT EL. 170.53 II II I� OFFSET P APPROX. 68 ELT 189.98 II P1 = 20 +00.( 189.70' )l/ = 16 +50.00 �III1 II III APPROX INVERT EL. 170.54 II � EL = Pl - - 2- 0 +-10- .0 1 EL 192.50' i t II EL 189.60' VC 60' I I Iy EXSTING 42" PVC SEWER - III EXISTING 42" PVC f - - -� - - - -- - ------- y-- - - - -�- III - - - -- I I III III PROPOSED 72 PVC SEWER III PROPOSED 72 PV( 72" PROPOSED SEWER Pl = 20 +30.G CROSSES UNDER GREENWAY -Y2- 17 +54.85 EL 189.10' AT THIS LOCATION EXISTING 42" SS -Y2- 16 +66.11 APPROX EL. 170.64 INVERT EL = 163.47 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 1 21+00 2 H W � W W w Z N Z J O U) m g r- W o kD a > N Q w �s x ca -Y2- POT Sta.10 +02.85 N t v 1 ti zr 10 +00 F1 LD 11+00 F FF FLD F 12+00 -SILT FENCE y -Y2 - PC Sta.13 +72.04 13 +00 F 14 +00 L 7111 ' LD BI ? F F LL F F 82 2 NATION FENCE (TYP) BUFFER IMPACT B2 SEE PCN APP. -Y2 - PT StaJ9 +46.30 \ -Y2 -17 + 00.00 -Y2 - PC Sto.19 +90.32 END 10' APP SLAB BEGIN BOARDWALK 1 -Y2- 20 +60.00 END BOARDWALK 1 BEGIN 10' APP SLAB w� BEGIN BOARDWALK 1 END 'l 14+50.00 -Y2 -17 + 00.00 -i EL = 192.10 _ ' .L 191.63 CC INT MH (MH 25A) -Y2- STA. 17 +73.94 CC INT MH (MH 25) CC INT MH (MH 24) 84.07 'C = /00' OFFSET 31181 +RT OFFSET P OX.2RIMO ELT191.91 OFFSET 44.09 RT4 -Y2- TA 10+56.57 -)4.0( RIM EL. 192.11 APPROX INVERT EL. 170.6 RIM EL. 192.11 OFFSET 40.38 RT (- )3.000% INVERT IN EL. 163.46 INVERT IN EL. 163.43 RIM EL. 189.48 INVERT OUT EL. 163.46 INVERT OUT .1 3.43 INVERT IN EL. 163.02 (- )2,000% INVERT OUT EL. 163.02 (- )1.a0a� (+)0.4350;1. (- )0.8000% - - - - - - - - -}. (- )0.8000% Y2- STA. 16 +86.58 APPROX ROCK I OFFSET 76.4 LT - - -- LOCATION APPROX. RIM EL. 188.73 III II -Y2- STA. 19 +51.84 II APPROX INVERT EL. 170.53 II II I� OFFSET P APPROX. 68 ELT 189.98 II P1 = 20 +00.( 189.70' )l/ = 16 +50.00 �III1 II III APPROX INVERT EL. 170.54 II � EL = Pl - - 2- 0 +-10- .0 1 EL 192.50' i t II EL 189.60' VC 60' I I Iy EXSTING 42" PVC SEWER - III EXISTING 42" PVC f - - -� - - - -- - ------- y-- - - - -�- III - - - -- I I III III PROPOSED 72 PVC SEWER III PROPOSED 72 PV( 72" PROPOSED SEWER Pl = 20 +30.G CROSSES UNDER GREENWAY -Y2- 17 +54.85 EL 189.10' AT THIS LOCATION EXISTING 42" SS -Y2- 16 +66.11 APPROX EL. 170.64 INVERT EL = 163.47 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 1 21+00 2 H W � W W w Z Z J O U) g r- W o kD a > N Q w U N 00 LL iU � o z rL., w o-6 > M = ^ Lu ce O Y w W w oo U < M D a O a m u QJ a m z I--I w U `) Y U O En U w ® I Z u U m w oC Q a w oC a z g a � J uj W U ~ w Q Lu � z m w Lu U CD E w/ � o a _ m ,� Vmao m do ew D IL MPG; ...� W aui��LL 3 U) PRELIMINARY PLANS I I ®® NOT USE FOR CONSTRUCTION UAI t: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: 1 " =50' C! BY 1761 PIN 1724 9340 Up 10' PROPOSED ASPHALT TRAIL 4V a PUF F. 3nj I e 3na < 00, 200 CC INT MH (MH 23) VC = 60' -Y2- STA. 22 +49.03 OFFSET 39.87 RT RIM EL. 180.62 INVERT IN EL. 162.96 INVERT OUT EL. 162.96 190 P1 21 *85.00 EL 181.45' VC /00., O o (+)0 J000x 180 II I II 170 EXISTING 42" PVC SEWER III PROPOSED 72 PVC SEWERIII PROPOSED 72" 160 - - - - - - 0 150 21+00 22+00 23+00 ,.23+1 9.89 R RIW­El INVERT Ll S 20.50 E D' BOA ALK 2 BE lo'\APP SLA -Y2 FR StG.33 +71.98 BZ 2 _r I (D tu a L ou� � w z Z I.- z 0 U) p 'u C, LU _j r,� 0� U 5: w r1i U 00 LL Lu lz 0 z N Ln z Lu 06 LU 0 M Lu 0 U, w Lu w o op U m 1.2 _J o'j lm� 0 < m a- M Ln ON Lu U ) Y U 0 En U co 99 CD Z 0 u A u > w w oC z uj ui U LU � z Lu ca Lu Lu U (D E e ii p ri cq aq ozoa IL MPG; Lu it (a 111.. LL U) EL. 170.27 200 CC INT MH (MH 22) -Y2- STA. 23 + 74.83 CC INT MH (MH 21) CC I N T MH (MH 20) OFFSET 49.00 RT -Y2- STA. 29+40.51 P1 30+45.00 35+53.46 RIM EL. 178.94 OFFSET 55.17 RT P1 32 +00.00 OFFSET 62.90 RT INVERT IN EL. 162.93 P1 26 *60.00 RIM EL. 181.77 RIM EL. 182.29 INVERT OUT EL. 162.93 P1 28 +00.00 INVERT IN EL. 162.84 EL 181.06" -Y2- STA. 30 + 78.49 EL 181.69' INVERT IN EL.162.75 OFFSET 12.63 LT INVERT OUT EL.162.75 FP-RELIMINARY PLANS I EL 178.07" EL /8/./5' INVERT OUT TEL 162.84 P1 29+85.00 VC 40' RIM EL. 189.19 190 DO NOT USE FOR CONSTRUCTION P1 24+20.00 P1 25 +00.00 vc 69 x INVERT IN EL.169.59 VC /00" -NIZ I I VC 70' EL 178.75" INVERT OUT EL. 169.44 Q) EL 178.00*' Q) EL 179.04" VC 80" Q) VC /00" -------- co VC 60" C3 -)/.j000;/ (+).9.4092.- S;j�z(- 11 __7:::� 107-N - � III A 'i 1�41.;_69097. (+)2.1!974;1. Q +)3.85 180 FEBRUARY 22, 2012 BEGIN BOARDWALK 2 (+)1.2938;1. ov IV DATE: F (-)I.JO007 -Y2- 32 + 80.50 DRAWN BY: MET (-)0.6000;l. 32LF-18" HDPE EL 180.33 CHECKED BY: BRC 0 REVISIONS: EXISTING 42" PVC SEWER EXISTING 42" PVC SEWER 17 NO. DATE PROPOSED 72" PVC SEWER 111 PROPOSED 72" PVC SEWER III 160 END BOARDWALK 2 iol 33 +50.00 PROJECT NO.: -Y2- 33+20.50 EL = 179.65 EL 179.15' H9001.00 VC 50' 150 SCALE: 1"=50' 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 5 i E N SEMEG MR�G' pG L /a ,c 200 � � 1 180 (+)0.80007. 170 1 b'L X 3'W - 1811 HDPE md EXISTING WATERSHE -EASEMENT- (Hm 1,971, PG 453 E 1M;- t,. L -Y2 - PC Sto.38 +51.17 1 3N7 20l}7 88 ",BSI' BUFF IMPACT B7 L 79 j; S PCN APPrr' -Y2REV 3 - PRC Sta.44 +50.03 BUFFER IMPACT B6 SEE PCN APP. ST AT ION EQUALIT Y P . + 6.95 -8K _ PC Sta.42 +26.9 Al -F -Y2REV 3 - PRC Sta.42 +96.02 \ CC INT MH (MH 17) -Y2- STA. 43 + 71.21 OFFSET 47.92 RT K _ RIM EL. 189.40 INVERT IN EL. 162.55 200 .95 AH P1 = 42 +45.00 INVERT OUT EL. 162.55 P1 = 44 +60.00 EL = 182.06' EL = 180.69' 1//'% _ zn• 1 it - Qnl EX MH _ V t w a w w z w Z� J ° U) g p w o N Q i w U ^ 00 iU lz o z Ln w M = 0 Y w w w op U M J a < d O M (n ON Z H w U `) Y U En En U w 99 ® I Z o U > m w Q a w oC a Z g a � J uj W U ~ w Q Lu � z m w Lu U CD E w/ o a _ m > N cq n V cq aq R d G Z o O m ILL 0.06 O W ,_ a (all �LL 3 U* V1 ' Pl = 43 +35.00 EX MH OFFSET 7.24 LT -Y2- STA. 43 + 84.94 RIM EL. 186.48 19 0 PRELIMINARY PLANS EL_ OFFSET 6.11 LT INVERT IN EL. . /8/025 RI EL 1 7.75 2 ®® NOT USE FOR CONSTRUCTION 0 INVERT OUT EL.2 C) VC 30' I INVERT OUT EL. 168.60 ASSUMMED) (+)2.2 0-3 °° 1 ( +)1.3298% ( +)1.4000 °° 4 - +) .4� 180 _ III Pl = 45 +90.00 GI - P1 = 43 +90.00 DATE. FEBRUARY 22, 2012 ' Pl = 42 +90.00 III III _ � III EL = 183.08' III III EL = 182.60' EL - 183.55 DRAWN BY: MET _ VC - 50" III CHECKED BY: BRC ---- - - - - -- - - - - VC = 60' - III III VC _ 60' III I REVISIONS: - �---------------------- - - - -�I 170 XISTING 42" PVC SEWER III EXISTING 42" PVC SEWER I NO. DATE PROPOSED 72 PVC S EWER PROPOSED 7 2 P V C SEWER ... PROPOSED 72 P V C SEWER 160 -------- - - - - -- 160 PROJECT NO.. H9001.00 150 34 +00 35 +00 36 +00 37 +00 38 +00 39 +00 40 +00 41 +00 42 +00 150 SCALE: 1 " =50' 43 +00 44 +00 45 +00 46 +00 47 +00 1 6 �X'' t uj W W W I" - - Y2REV 3 - POT StG.56 +3/.53 BK - , •1' 04 \S3, -Y2 - StG.56 +20.00 AH P BUFF "+MPA T 8 END BRID E �' 7 w; w SEF P j AP s / o �'w..... � - - �� B GIN 10' APP SLA �% S '' Y2 PC StG.57 +00.67 - STA 5$ + 81.4 �jrGE S 0� 'v Y2 � ww PRC St - Cl) -Y2REV 3 G.5/ +22.49 �� C m - 6 s N -�� m MP SSA• -Y w 57+ 0. PT S x• W DETAIL 1 -Y2REV 3 - -Y2- O SPECIAL CUT DITCH Pl STA. 59 +5/.62 (Not to Scale) P/ STA. 50+52.07 P/ STA. 52+34.99 P/ STA. 54+96.13 z Front p = 20° 23' 38.9" (LT) A = 560 21' 21.9" (RT) A = 400 0/' 10.7" (RT) A = 71* 40' 16.0" (RT) Ditch g Natural NA\ e < Slope D = 140 l9' 26.2" D = 270 /7' 0/.3" D - - 280 38' 52.4" D = 1140,35129.6" Ground d ° L = 142.38' L = 206.56' L = 139.69' L = 62.54' m Min. D =1 Ft. T = 71,95' T = 112.50' T = 72.83' T = 36.11 ' Type of Liner= PSPM Max d =1 Ft. R = 400.00' R = 210.00' R = 200.00' R = 50.00' FROM STA. 54 +J5 -Y2 REV3- TO STA. 56 +J5 -Y2- � s � m a Bozo °m co LL "aa; W ar'n��LL 3 U) PRELIMINARY PLANS I8 I8 II ®® NOT USE FOR CONSTRUCTION Alt: rtt3KUAKY 11, 1U11 RAWN BY: MET NECKED BY: BRC EVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: 1"=50' 7 LJ -o C m EQUATION: , END......... 10 APP SLAB T H H 1 CC N M M 3 { ) -Y2- STA. 5 + 21.......32 9 XM E H _ _ Y2 ST OFFSET .5 +23.3 9 7 6.58 LT T H 1 CC N M MH 6 { _ - - + Y2REV 3 Pl 54 65.00 STA 56 + 3/.53 BK BEGIN BRIDGE OFFSET 166..1 LT . Y2 TA 4 + 2 -Y2- 0. 5 1 RT OFFSET 9 85 - - / 4 EL 86.0 - - _ Y T A - , 2 S �- P/ / 53 6.00 56 20.00.. AH - Pl 7 4/ 4 5 . 6 RIM EL. 184.33 INVERT I EL 155.84 Nv N ..55.8 INVERT I INVERT Nv EL.1 7.45 b OUT EL. 16 .25 7 200 RI EL. 18 .15 M 9 Pl - 48 40.00 _ - VC 100 = El .........184.37 EL 184.9/ , INVERT OUT EL. 155.84 200 INVERT IN EL 162.4$ EL - l8 /.l5 INVERT TEL 162.48 NV OUT EL _ 18.3.35' ........................ CC I T H H 15 N M M { � CC I T H H 14 N M M { - -Y2- STA. 54 + 2.14 - f vc 00 47.57 IT EX H M - - Y2 STA. 5b + 5 4 99 R/ END BRIDGE r BEGIN to APP SLAB........ VC _ , _ 50 -Y2- STA. 52 +.........12.54 OFFSET 1 RT 7 05 .OFFSET EX H RIM EL. 185. 1 M INVERT......... IN El.. 155.8 - Pl - f 55 80.00 OFFSET 1 1 RT O S 5. 3 RIM EL. 1 4. 8 80 o e P/ / 4 58 8. 6 RI EL. 1 4.2 M 8 9 (.......NVERT IN EL. 162.38 _ _ 9 Y2 STA. 52 +47.28 T EL. 1 OFFSET......... 15.2 LT INVERT OUT 155.89 9 _ EL _ , / 4 /4 8. INVERT I L 1 2 12 F NV R N E. 7 .92 M INVERT IN EL. 172.05 6") _ EL 184.........91 190 RT T E . 1 INVERT OUT L 62 38 RI EL. 18 .32 - VC - , 80 INVERT I EL. 16 .80 42 ,, NV N 7 19 0 INYERT 1N ELlbg.30 INVERT OUT EL. 168.07 INVERT T EL. 1 NV OUT b7 65 O - 2. 9 8 9 O o ) I. 4 5 1 / e JO 87. 7 2/ 0 (-)1.64757. 7 3 7 _ e + )0. 44 8 a .4448 a - (JD.000/ e 0 0 Pl 47..40.00 ................ Q ',, 36 -� /a r ) 87 -� _ o _ 1..80.. ....18.0 I EL 185.55 Pl 49 25.00 I 7 2 � O N 0 e _ ._ .o 0 - /© _ VC ........100......... - - 184.58' EL ...� III........ G2 III ................. m � � 4 O � N O 4 0 o ,, III 4 O � o 12 FM � I II I _ VC 50 111 III II N .I. 0 Cp II - III.....- III II II � lCi I II � - --- - III....... ....17.0 /R EXI TI 42 P .....E ER s NG �c s W III II� ,, - - - -I- - -- EXISTING 42 ....PVC SEWER III - -- - -. - W + Pl 59 20.00 I� II 17 0 --- - - - - -- -- � II tJ�------------ - - - - -- III W 42 RCP - -- III EXISTING REMAINS ON WEST T EL 184.69" .69 PROPOSED 72" , -PVC SEWER III -- -- .� III - -� PVC.. SEWER SIDE OF CRABTREE CK. _ VC - 40 III -------- - - - - -- -� RO `- - -- P - OS D III - - 160.. 160 , 2 - PV C SEWER R �I� Ilfi- - - ;, PROPOSED 72 PVC SEWER PROPOSED 72 PVC SEWER III LE FT DITCH ----------------- C 150 150 0 47 +00 48 +00 49 +00 50 +00 51 +00 52 +00 53 +00 54 +00 55 +00 56 +00 57 +00 58 +00 59 +00 0 � s � m a Bozo °m co LL "aa; W ar'n��LL 3 U) PRELIMINARY PLANS I8 I8 II ®® NOT USE FOR CONSTRUCTION Alt: rtt3KUAKY 11, 1U11 RAWN BY: MET NECKED BY: BRC EVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: 1"=50' 7 LJ $00_ $00 _ 0(A FW ND WG7 LD - ADDITIONAL CLEARING APPROXIMATE 30' WIDE 69 +42.23 45.00 _ +10.00 ;.00 1 200 190 Pi= EL = 'V = 1 170 160 - EL. 1 EX MH -Y2- STA. 69 +43 OFFSET 16.54 RT RIM EL. 181.91 INVERT IN EL. ? INVERT OUT EL. ? -Y2- STA. 69 +43.79 OFFSET 13.50 LT RIM EL. 179.61 INVERT IN EL. 155.61 INVERT OUT EL. 155.61 EX N -Y2- RM. INVE INVE Md---, 200 m w Q a w oC a z g a � J Lu W U ~ w Q Lu � z m w Lu U CD E w/ w � O e Q m d O Zp�p� O IL .N a � 6 ..� W aui��LL 3 U) 19 0 I PRELIMINARY PLANS I ®® NOT USE FOR CONSTRUCTION Annn % -- - )0.35767 �......... I 180 l +)0.l674 % a (- )1.48007. P1 = 66 +25.00 P1 = 68 +15.00 V t w II EL _ 178.67' EL = 178.98' IIMI IN P1 = a P1 = 70 +60.00 P1 = 71+r w VC = 60' EL = 179.27' EL = 177.79' w z w Z� III VC III = 90' VC = 90' VC = /00 — — — — — — — — — — — — — — — — — — — — — — — — — J ° U) — — — — — PROPOSED 72" PVC SEWER III g PROPOSED 72" PVC p w o w U 00 LL iU 0 0 z Ln w m c, 0 U) Y w w w 8 0o U M J a < d O M (n ON Z H w U `) Y U O En U CO H ® I Z O U > m w Q a w oC a z g a � J Lu W U ~ w Q Lu � z m w Lu U CD E w/ w � O e Q m d O Zp�p� O IL .N a � 6 ..� W aui��LL 3 U) 19 0 I PRELIMINARY PLANS I ®® NOT USE FOR CONSTRUCTION Annn % -- - )0.35767 �......... I 180 l +)0.l674 % a (- )1.48007. P1 = 66 +25.00 P1 = 68 +15.00 II EL _ 178.67' EL = 178.98' IIMI IN P1 = 69 +60.00 P1 = 70 +60.00 P1 = 71+r II VC = 80' VC = 60' EL = 179.27' EL = 177.79' EL = 180 DUAL 32LF -36" III HDPE III VC III = 90' VC = 90' VC = /00 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — III PROPOSED 72" PVC SEWER III PROPOSED 72" PVC SEWER 150 1 60 +00 61 +00 62 +00 63 +00 64 +00 65 +00 66 +00 67 +00 68 +00 69 +00 70 +00 71 +00 72 +00 III DAI t: rtt3KUAKY 11, 1U11 III DRAWN BY: MET CHECKED BY: BRC III REVISIONS: 170 III NO. DATE 160 PROJECT NO.: -- H9001.00 150 SCALE: 1 " =50' 73 +00 8 1 200 E CL az N W uj ui elf CL 4& > Q QZ LU CL INVERT OUT EL. 155.54 OFFSET 190 P1= 75 +05.00 /RNVERTL-1 180 0004 (+)1.1749;1. 7---7 (—)0..3576:1- —Y2 — (D F/ ST A. 74+10.33 A = 8* 44" 40.6" (RT) D = 7* 091 43.1" L = 122.101 T = 61.171 R = 800.00/ F1 ST A. 75 -f 60.94 A = 61* 44" 43.1" (LT) D = 38* //" 49.9" L = 161.651 T = 89.681 R = 150.00/ F/ ST A. 76+82.04 A = 27* 361 13.0" (RT) D = 28* 381 52.4" L = 96.351 T = 49.131 R = 200000 ---- -1312 F1 ST A. 78 +89,73 F1 STA. 79 +74020 F1 ST A. 84 +87.90 w 0� A = 55* 221 23.2" (RT) A = 43 53" 43.8" (LT) A = 68* 161 37.9" (LT) 76+70.00 P1= 77+85.00 DUAL 44LF-24- HDPE 170 D = 57* 171 44.8" D = 57* 171 44.8" D = 9* 321 57.5" Iii EL 179.18" P1 75 +95.00 L = 96.641 T 52.471 R /00.00/ L T R = 76.611 40.301 /00.00/ L T R = 715.001 406.82' 600.001 NIF EIGH c,Ty OF F�PG 37 )E3 5443�G 147?- IM N 1�?j4t505547 III VC = 50" III C, 160 III 1 200 E CL az N W uj ui elf CL 4& > Q QZ LU CL INVERT OUT EL. 155.54 OFFSET 190 P1= 75 +05.00 /RNVERTL-1 180 0004 (+)1.1749;1. 7---7 (—)0..3576:1- 0 (D V A ok 1, -1312 1" —)0.75007. u% w 0� III P1 = 76+70.00 P1= 77+85.00 DUAL 44LF-24- HDPE 170 III P1= 74 +05.00 III III EL = 179.73' EL = 181.08" Iii EL 179.18" P1 75 +95.00 VC = 80' VIC = 100" III VC = 40' EL = 182.08" III III VC = 50" III C, 160 III _III Lu N III PROPOSED 72" PVC SEWER u III ruj oro- LL 150 1 73+00 74+00 75+00 76+00 77+00 78+00 79+00 Fololliffell] 44021L. ;:� -- /80./5/ l3wellel P1 = 82+10.00 EL 179.38' VC /00" A (+)1.2972;1. sz7 v (—)1.6400;l. P1 = 83 +00.00 EL 180.55" VC = 801 FoloNallel 10*1mollel 200 Lu Lu U Lu � z Lu ca Lu Lu U (D w - i C D LLY w W f 'A U) Lr) '/ = 83 +90.00 190 PRELIMINARY PLANS I= 179.07' DO NOT USE FOR CONSTRUCTION C = /00" O -x - 7 +)2.2000;l. 180 -1 DATE: FEBRUARY 22, 2012 17 IDRAWN BY: MET CHECKED BY: BRC P1 = 85 +00.00 170 REVISIONS: EL 179.40' NO. DATE VC = 401 160 1 PROJECT NO.: H9001.00 150 SCALE: 1"=50' 84+00 85+00 86+00 9 (D w 0� w z W Z I.- z 0 U) p < 'u C, Lu N u w ruj oro- LL Lu 0� 0 z 1714 z Lu 0 -6 L > u m CD L :ue 0 U) �e w 00 L9 Ile t:; L—u j o < a- M Ln m Lu U ) Y U 0 CMD 99 z 0 u . u > Lu Lu U Lu � z Lu ca Lu Lu U (D w - i C D LLY w W f 'A U) Lr) '/ = 83 +90.00 190 PRELIMINARY PLANS I= 179.07' DO NOT USE FOR CONSTRUCTION C = /00" O -x - 7 +)2.2000;l. 180 -1 DATE: FEBRUARY 22, 2012 17 IDRAWN BY: MET CHECKED BY: BRC P1 = 85 +00.00 170 REVISIONS: EL 179.40' NO. DATE VC = 401 160 1 PROJECT NO.: H9001.00 150 SCALE: 1"=50' 84+00 85+00 86+00 9 0L DETAIL 2 _y2_ NOTE: STANDARD 'V' DITCH ( " ° "° 5ca1e) P/ STA, 91+41.75 P/ STA. 93 +0/058 P/ STA, 94 +05,31 o Natural Natural 0 = 6'311 26,0" (RT) 0 = 4° 52' 19.1" (RT) 0 = 19° 46' 46 °1" (LT) Ground 3., , A Ground D = 14° 19' 26,2" D = 7° 09-43.1" D = 14° 19' 26,2" 001 d L = 45.55' L = 68.03' L = 138,09' o EQUAT IONe DITCH 2 Min. d= ' Ft. T = 22.80' T = 34003' T = 69.74' PC StG 96 +24,81 BK = DISCHARGES INTO EXISTING WETLANDS 00! \ Type of Liner= JUTE NET Max. d= 0.5 Ft. R = 400,00' R = 8OOo0O' R = 400000' IPC StG 96 +25.62 AH FROM STA. 89 + 55 TO STA. 90 + 40 RT RATIONAL COEFFICIENT C = 0.40/ Pl STA. 96 +87.89 Pl STA. 97+90.97 P/ STA. 99 +07.95 RAINFALL INTENSITY I = 7.22 IN /HR �. A = 17° 4/' 45.2" (RT) 0 = 11 ° 56' 01.7" (LT) A = 21° 22' 12.7" (RT) o CATCHMENT AREA A = 0..235 AC 00 D = 14° 19' 26.2" D = 14° 19' 2602" D = 14° 19' 26,2" ° FLOW 0 = 0.68 CFS o L = 123.54' L = 83031' L = 149.19' LENGTH = 85 LF 0, T = 62.27' T = 41°81' T = 75.47' _ MAX SLOPE = .008% MIN SLOPE = I.40% R = 400.00' R = 400.00' R = 400.00' OUTLET VELOCITY = 2.25 FPS -Y2 - PT StG.91 +64050 -Y2 - PC StG.92 +67.55 -Y2 - P .9/ +18,95 Soo oo� -Y2- PT StG.94 +73,66 0) _ -Y2 - PT StGo87 +96.08 CD goo 50q -Y - PRC StG.93 +35.57 OOL w DITCH DEL N�o /,V 300 o FW Fyy 00 0 - LIMN Ofl 4!j ko - P of aRo eENF r 1 200 1 190 1 170 1 160 150 � 86 +00 �:lmmift 160116=1181 1b 81 r� o 1'I1IIiI11 0...ilm V a m do (^ J 1\ 1'iI11 Z Z8 - = L Zs - Jf �TDP OF BRIDGE t ' % iI11 O 0XIM1I11 -Y2- PRC StGo97 +49.16 -Y2- PRC StG.98 +32.47 BOUND 1 -440 OUTER US -64 RAMP TO I -440 OUTER 7 = 94 +50.00 L = 181.82' C - 200 f CLEARANCE 200 m w Q a w oC a z g a � J Uj W U ~ w Q LU � z m w LU U CD E w/ m dOZ°�p D O IL N m� 6 . ..� W aui��LL 3 U) 19 0 I PRELIMINARY PLANS I ®° NOT USE FOR CONSTRUCTION ( +)0.5019% ( +)0 019% ° -)2.o6r4i - - - - -- - - - - -- _ 180 -- �i ♦ e 18" HDPE EL = 182.87' EaVATIONo StG 96 +2408/ BK = vc = 60' DAI L: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC 170 REVISIONS: NO. DATE 160 PROJECT NO.: H9001.00 150 SCALE: 1 " =50' 94 +00 95 +00 96 +00 97 +00 98 +00 99 +00 1 10 (n v LU w � w w z w z� J ° U) g w o � Q I..L i w N U ^ oo LL IU ��oz� w U) w LU 0 M � J p1 � d O M (n m z I--I w U `) Y U O Ln U w ® I z U > m w Q a w oC a z g a � J Uj W U ~ w Q LU � z m w LU U CD E w/ m dOZ°�p D O IL N m� 6 . ..� W aui��LL 3 U) 19 0 I PRELIMINARY PLANS I ®° NOT USE FOR CONSTRUCTION ( +)0.5019% ( +)0 019% ° -)2.o6r4i - - - - -- - - - - -- _ 180 -- �i ♦ e 18" HDPE EL = 182.87' EaVATIONo StG 96 +2408/ BK = vc = 60' DAI L: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC 170 REVISIONS: NO. DATE 160 PROJECT NO.: H9001.00 150 SCALE: 1 " =50' 94 +00 95 +00 96 +00 97 +00 98 +00 99 +00 1 10 0 0 0 0 0 00, FW FW FW P306 N/F —Y2 — PRC StG.111 +94,47 —Y2— PRC StG.111 +03.28 ' —Y2 — PRC StG.105 +34.85 ti STREAM IMPACTS V -Y2- a Pl STA, 99 +07.95 P1 STA. /00 +32.77 Pl STA. 104 +51.66 BUFFER IMPACT B14 STREAM S G 5 D — 21* 22' 12,7" (RT) A = 14° 33' 42.5" (LT) A = //* 57' 30,6' (RT ) LD PERMANENT IMPACTS = 0 LF D = 14 °19'26.2" D = 14 °19'26,2" D = 7 °09'43J" TEMPORARY IMPACTS = 40 LF L = 149,19' L = 101.66' L = 166.97' o �� - _ - DISTURBANCE T = 75.47' T = 5 /./// T = 83,79' N R = 400,00' R = 400.00' R = 800.00' \ P1 STA. 107+23.59 Pl STA. 109 +98.11 P1 STA. 111+49.68 iU 0 � 0 = 50° 31' 2/.4" (LT) 0 = 30° 53' 57.8" (RT) 0 = 26° 07' 32.5" (LT) D = 14° 19' 26.2" D = 14° 19' 26.2" D = 28° 38' 52.4" L Oo� L = 352.71' L = 215.72' L = 91.20 ' 3 T = 188.75' T = 110.55' T = 46.40' R = 400,00' R = 400.00' R = 200.00' � I O M WETLAND WG5 ON z i--i w U — — —was_ FW FW `) FW Y W ipw _ —Y2— PT StG.100 +83.33 O W 10 ' PROPOSED ° Ln _ HALT TRAIL r S REAM SG5 'Z + w 0 0 0 0 0 00, FW FW FW P306 N/F —Y2 — PRC StG.111 +94,47 —Y2— PRC StG.111 +03.28 + FIND 10' APP SALB - CITY OF RALEIGH ui _ DB 2050 PG 155 —Y2 — PRC StG.l08 +87.56 — — BEGIN BO ALK < , (� BY 2007 PG 72 Lu -Y2- STA. 100 +35.00 END BOAR WALK PIN 17248/6908 (� BEGI 10' PP SLAB -Y2 STA 1 1 + 45 00 —Y2— PC StG 103 +67 87 — — W Q D ' —Y2 — PRC StG.105 +34.85 ti V w Lu a BUFFER IMPACT B14 F``. F w z w0z Q � x x • �•• LD UP) g _ LIMITS OF p w F o �� - _ - DISTURBANCE Lu > N Q w U ^ 00 LL iU 0 � z N w - M = ^ L Oo� Y w w w op 3 < M J a d O M (n ON z i--i w U `) Y U ° Ln U w ® I z U + FIND 10' APP SALB - CITY OF RALEIGH ui _ DB 2050 PG 155 —Y2 — PRC StG.l08 +87.56 — — BEGIN BO ALK < , (� BY 2007 PG 72 Lu -Y2- STA. 100 +35.00 END BOAR WALK PIN 17248/6908 (� BEGI 10' PP SLAB -Y2 STA 1 1 + 45 00 —Y2— PC StG 103 +67 87 — — W Q D ' —Y2 — PRC StG.105 +34.85 ti BUFFER IMPACT B14 F``. F 534 SEE," SEE' PCN APP. Q � x x • �•• LD x x _ LIMITS OF F — �� - _ - DISTURBANCE - 31U rcrvtc 533 v 1 200 190 BEG —Y2 EL. _ 170 P/ _ EL = VC = 1 160 150 � 99 +00 III I�IIiI m re�il swoI►�il� ixIIll BZ - - - - - -, 005 (+)0.46j9;1,-=— r -. P1 = 107 +50.00 EL = 176.70' '/ = 109+( 'L = 175.. C = /00' 1 (+)0.4000;1. =-4—)0.6445 ri = /iu rtlqV c, EL = 175.85' Q III � 1=1 1111 ---w mylymrill l -- --� �I]—1 �IIIII� lIX m w a w OC a z g a 200 � J uj W U ~ w Q Lu � z m w < Lu U CD a � o e m LL d m c; ...�1p W I (n LL 3 U) 19 0 I PRELIMINARY PLANS I ®® NOT USE FOR CONSTRUCTION DAI L: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC REVISIONS: 170 NO. DATE 160 PROJECT NO.: H9001.00 150 SCALE: 1 " =50' 112 +00 STREAM IMPACTS STREAM SG4 PERMANENT IMPACTS = 0 LF TEMPORARY IMPACTS = 36 LF -Y2 - PT StG.112 +90.09 BUFFER IMPACT B15 SEE PCN APP. N 11 N 1 200 1 190 170 I P/ _ 112 +4 EL /74. � 160 VC = /00' 150 � ii2 +oo O -Y2 - PRC StG.115 +25.86 7�\: N m LD X X -Y2 - PT StG.116 +18.45 F ,011 F►y O Z F`N r n ~ ce Fw V w Lu W z W Z U z o U) g t H W O a W - U W W N U o0 N Z PC 0tG.Il7 94.19 _ _ Y2 PT StG.l23 +42.73 Y2 PC StG.l24 +66.27 z FW t)FFER fMPACT B17 O -SEE- -PCN APP. 10' PRO POSED -! X - - ASPHALT TRAIL X , • • BUFFER IMPACT 1319 -. v. • .SILT FENCE ,;� °,� t., - ,b, ; • • . • ,. • OUTLET (TYP) r Bz 1 Z 104 T 100 -' B u 0 ' PR POSED sl ENCE • W > �. SPHALT L ', .' - �G/ SYST�MS.� 113 +00 114 +00 _r 115 +00 s_ ��� P307 W BM 2004 P _ PIN 72.95 \ \ ` Ip N/F / fl 0 S �, p AI PE DE LOPM�NT PTN fl 1 DB /30 PG ,1725 , i ! M 200 G /421, �O N 172 6832 %RI r 200 m w Q a w oC a z g a � J Lu W U ~ w Q Lu � z m w < Lu U CD E w/ m > N cq n V cq aq R d O z o a O ILL MPG; ...� W a(°n111..LL 3 U) P1 116 +92.30 19 0 PRELIMINARY PLANS !, ®® NOT USE FOR CONSTRUCTION EL 180.86' P1= 123 +45.00 � - Pr = 118 +60.00 Pl = 121+65.00 o o VC = 140 EL = 177.76 °o, °o, EL = 176.17' EL = 176.57' VC = 40' Ln VC = /00' VC = 80' �- ( +)27923X - )27923% co 180 0 — 6200 °° (— I DATE: FEBRUARY 22, 2012 23/ ( +10.9700/ 10.3/88/ (]0.3/88/ ( +)2• 10.2608/ �. DRAWN BY: MET ((-)0.9000;/. -J .2608 � � CHECKED BY: BRC / P1 = 119 +65.94 Pr = 122 +45.00 REVISIONS: EL 178.66' P1 = 124 +65.00 170 NO. DATE EL = 177.20' VC = 80 EL = ..177.45' VC - l00' VC - /00' 160 PROJECT NO.: H9001.00 150 SCALE: 1 " =50' 116 +00 117 +00 118 +00 119 +00 120 +00 121 +00 122 +00 123 +00 124 +00 125 +00 12 O Z W W 1-4 0 U < M D J �c w Ln 0 2 so- �' - - �' "' - U N duo —Y2 — PT StG.118 +66.51 CRABT REE CREEK I �� w PC 0tG.Il7 94.19 _ _ Y2 PT StG.l23 +42.73 Y2 PC StG.l24 +66.27 z FW t)FFER fMPACT B17 O -SEE- -PCN APP. 10' PRO POSED -! X - - ASPHALT TRAIL X , • • BUFFER IMPACT 1319 -. v. • .SILT FENCE ,;� °,� t., - ,b, ; • • . • ,. • OUTLET (TYP) r Bz 1 Z 104 T 100 -' B u 0 ' PR POSED sl ENCE • W > �. SPHALT L ', .' - �G/ SYST�MS.� 113 +00 114 +00 _r 115 +00 s_ ��� P307 W BM 2004 P _ PIN 72.95 \ \ ` Ip N/F / fl 0 S �, p AI PE DE LOPM�NT PTN fl 1 DB /30 PG ,1725 , i ! M 200 G /421, �O N 172 6832 %RI r 200 m w Q a w oC a z g a � J Lu W U ~ w Q Lu � z m w < Lu U CD E w/ m > N cq n V cq aq R d O z o a O ILL MPG; ...� W a(°n111..LL 3 U) P1 116 +92.30 19 0 PRELIMINARY PLANS !, ®® NOT USE FOR CONSTRUCTION EL 180.86' P1= 123 +45.00 � - Pr = 118 +60.00 Pl = 121+65.00 o o VC = 140 EL = 177.76 °o, °o, EL = 176.17' EL = 176.57' VC = 40' Ln VC = /00' VC = 80' �- ( +)27923X - )27923% co 180 0 — 6200 °° (— I DATE: FEBRUARY 22, 2012 23/ ( +10.9700/ 10.3/88/ (]0.3/88/ ( +)2• 10.2608/ �. DRAWN BY: MET ((-)0.9000;/. -J .2608 � � CHECKED BY: BRC / P1 = 119 +65.94 Pr = 122 +45.00 REVISIONS: EL 178.66' P1 = 124 +65.00 170 NO. DATE EL = 177.20' VC = 80 EL = ..177.45' VC - l00' VC - /00' 160 PROJECT NO.: H9001.00 150 SCALE: 1 " =50' 116 +00 117 +00 118 +00 119 +00 120 +00 121 +00 122 +00 123 +00 124 +00 125 +00 12 1 200 190 170 160 36LF -1 150 � 125 +00 Fl 126 +00 127 +00 128 +00 129 +00 130 +00 d� �o W, mil— aw =- COMBINATION FENCE (TYP) TEMP. S1 -Y2REV l - -Y2 - 0 = 9° 24' 07.9" (RT) 0 = Pl STA. 125 +12.74 Pl STA. 127 +37.93 Pl STA. 128 +96.12 P1 STA. 129 +90.69 0 = l3° l5' 05.9" (LT) 0 = 61* 41' 08.1" (RT) 0 = 16° 19' 44.3" (LT) 0 = 14° 33' 02.8" (RT ) D = l4° 19' 26.2" D = 19° 05' 54.9" D = 57° 17' 44.8" D = 28° 38' 52.4" L = 92.51' L = 322.98' L = 28.50' L = 50.79' T = 46.46' T = 179.14' T = 14.35' T = 25.53' R = 400.00' R = 300.00' R = 100.00' R = 200.00' W, mil— aw =- COMBINATION FENCE (TYP) TEMP. S1 STREAM IMPACTS STREAM SG2 PERMANENT IMPACTS (USACE) = 12 LF PERMANENT IMPACTS (NCDENR) = 20 LF TEMPORARY IMPACTS = 0 LF ,STREAM SG2 EST 5 TONS CLASS B RIP RAP 'EST 14 SY FILTER FABRIC JTATION BAG $'L X 4'W _ SEE SHEET ;2D 1 131 +00 132 +00 005 WG PERMANENT.' WETLAND MPAtsT = .02(71 AC F � O \ o F / Xl�-9 I\O � p pp� ci F. F F' F EST 5 TONS EST 14 SY F 8'L 100 100 \ 00S 1O O 1 0 0 Ln 200 -Y2REV l - Pl STA. l3/ +20.35 Pl STA. 132 +12.38 0 = 9° 24' 07.9" (RT) 0 = 16° 5/' 43.9" (LT ) D = 14° 19' 26.2" D = 14° 19' 26.2" L = 65.64' L = 117.72' T = 32.89' T = 59.29' R = 400.00' R = 400.00' STREAM IMPACTS STREAM SG2 PERMANENT IMPACTS (USACE) = 12 LF PERMANENT IMPACTS (NCDENR) = 20 LF TEMPORARY IMPACTS = 0 LF ,STREAM SG2 EST 5 TONS CLASS B RIP RAP 'EST 14 SY FILTER FABRIC JTATION BAG $'L X 4'W _ SEE SHEET ;2D 1 131 +00 132 +00 005 WG PERMANENT.' WETLAND MPAtsT = .02(71 AC F � O \ o F / Xl�-9 I\O � p pp� ci F. F F' F EST 5 TONS EST 14 SY F 8'L 100 100 \ 00S 1O O 1 0 0 Ln 200 m W oC a w OC a z g a �e J Lu W U ~ w Q Lu � z m w < Lu U CD � s � � o e m ,� Vmao m doZOpm MPG; ... W aui��LL 3 U) Pl = 132 +70.00 190 P R E]LIMINARY PLANS ®® NOT USE FOR CONSTRUCTION EL = 174.95` VC = 50' ( +)1.36001 -) .6337 A V . v = 133 +45.00 175.97' and - )0.63377- n (+)0.1700,Y. P1 = 1,35+35.00 1 EL 174.77' ifr, = inns E�c�iI� fe-noll( wifflIX DAI t: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC 170 REVISIONS: NO. DATE 160 PROJECT NO.: H9001.00 150 SCALE: 1 " =50' 138 +00 1 13 V Lu W a W W z W z� g -'J ID o LLJ i N Q W U ^ 00 LL iU � o z rL., w C-6 L c:l M = O Y W W w op U < M D J a d O M (n ON Z H W U `n Y U ° I U w99 ® I Z O U > m W oC a w OC a z g a �e J Lu W U ~ w Q Lu � z m w < Lu U CD � s � � o e m ,� Vmao m doZOpm MPG; ... W aui��LL 3 U) Pl = 132 +70.00 190 P R E]LIMINARY PLANS ®® NOT USE FOR CONSTRUCTION EL = 174.95` VC = 50' ( +)1.36001 -) .6337 A V . v = 133 +45.00 175.97' and - )0.63377- n (+)0.1700,Y. P1 = 1,35+35.00 1 EL 174.77' ifr, = inns E�c�iI� fe-noll( wifflIX DAI t: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC 170 REVISIONS: NO. DATE 160 PROJECT NO.: H9001.00 150 SCALE: 1 " =50' 138 +00 1 13 M w� w. V) c W W a U� W U Z � J = i UW Q�fN m 1 190 .l FW � J FW W FW FW —Y2REV l P1 STA. 1,39 +35.94 Pl STA. 143 +35.42 P1 STA. 147 +34.03 P1 STA. 149 +75.04 FW 0 = 4° 12' 45.0" (LT) 0 = 8° 39' 39.0" (LT) A = 38° 25' 01.4" (RT) A = 48° l3' 53.8" (LT) n = f)° c� it L� � D = 9° .3 ,9' 57_.5" D = 47° 44' 47.3" D = 57° 17' 44.8" 00�' ,cam ooL FW \ FW (+)0.1700;l. 170 (— )0.45007. 1 160 1 150 140 1 138 +00 139 +00 140 +00 +10.5 /00 /�( P1 = 146 EL = /7� VC = /0 141 +00 142 +00 143 +00 144 +00 145 +00 146 +00 147 +00 / = 148 +20.00 190 L = 174.56' = Inns m w Q a w oC a z g a U CD E w/ m d O Zp�p� O IL N a � 6 . ..� W aui��LL 3 U) 180 I PRELIMINARY PLANS ®® NOT USE FOR CONSTRUCTION (- )U.5SVUz - - --- I%% —_ -- 170 36LF -30" HDPE DATE: FEBRUARY 22, 2012 DRAWN BY: MET CHECKED BY: BRC 160 REVISIONS: NO. DATE 150 PROJECT NO.: H9001.00 140 SCALE: 1 " =50' 148 +00 149 +00 150 +00 151 +00 1 14 � J Lu W V Lu w ~ U a w w Q Lu w z WOZ � z m w y � w s UP g w 0 kD > N Q w U ^ 0 LL iU 0� 0 z w C- M = O Y w w o0 00 < M D J a d O M (n m Z H w U `) Y U ° U w99 ® I O z > / = 148 +20.00 190 L = 174.56' = Inns m w Q a w oC a z g a U CD E w/ m d O Zp�p� O IL N a � 6 . ..� W aui��LL 3 U) 180 I PRELIMINARY PLANS ®® NOT USE FOR CONSTRUCTION (- )U.5SVUz - - --- I%% —_ -- 170 36LF -30" HDPE DATE: FEBRUARY 22, 2012 DRAWN BY: MET CHECKED BY: BRC 160 REVISIONS: NO. DATE 150 PROJECT NO.: H9001.00 140 SCALE: 1 " =50' 148 +00 149 +00 150 +00 151 +00 1 14 � J Lu W ~ U w Q Lu � z m w y � w s / = 148 +20.00 190 L = 174.56' = Inns m w Q a w oC a z g a U CD E w/ m d O Zp�p� O IL N a � 6 . ..� W aui��LL 3 U) 180 I PRELIMINARY PLANS ®® NOT USE FOR CONSTRUCTION (- )U.5SVUz - - --- I%% —_ -- 170 36LF -30" HDPE DATE: FEBRUARY 22, 2012 DRAWN BY: MET CHECKED BY: BRC 160 REVISIONS: NO. DATE 150 PROJECT NO.: H9001.00 140 SCALE: 1 " =50' 148 +00 149 +00 150 +00 151 +00 1 14 —Y2REV l — 00 S 200 200 m w Q a w oC a z g a � J Lu W U ~ w Q Lu � z m w Lu U CD E w/ m d O Zp�p� O IL N a � 6 ...� W aui��LL 3 U) w Z Z g a Z w w a C� _O Z w U) Y U O Ln Q w Z J U O > ',. I L. I I V ✓V I',. !l .,V I I I IL! \ ',. ',. I I I I I I I ',. P/ / 62 80.00 PRELIMINARY PLANS END l 0 r A PP SL A B BEGIN l0 , APP SLAB ®O NOT USE FOR CONSTRUCTION BEGIN 0 AR A K Y Vl . ! + • E t 178.75" — + + Pl l6/ 80.00 Y2REV l ST A. 152 05.00 EL. 176.65......... — VC = 50 174 2 / EL. .2 0 EL = 174.85 + . .5500 VC 150 + .500 — 0/ 105 4 00 / .4 180 +)2. � 0 180 ( r- O o .. 0 0 0 , 8 1 � 1 t 5 �, / / 0 �+)6 0� DATE. FEBRUARY 22 2012 6-3857. 3. o 0 Pl 1 �. I DRAWN BY: MET 0 55 95.00 2222 + + 2.0 �- Pl 158 90.00 ) ( — P 60 20.00 �. 1 _ 4 CHECKED BY. BRC r o 2222., kI 2222. _ / D O 2222 181.25" l0 F -� EL M L !82.87 � �. E , REVISIONS. — LOCATION EL 18/.89 4 + L A N Pl 154 /5.00 ................. r = 170 t � (+)1.63E5-1. - _ k��44LF-30" 170 0.3500/ VC 100 ................. APPROXIMATE / NO. DATE ,� VC oo , HDPE r - - VC - !00 /7 E� 7.65 — 4 F- 0 HD PE + 8L 3 H E Pl l5/ 55.00 r - EL 73.39 VC 60 VC = lOo 160 160 PROJECT NO.. H9001.00 150 150 SCALE: 1"=50' 151 +00 152 +00 153 +00 154 +00 155 +00 156 +00 157 +00 158 +00 159 +00 160 +00 161 +00 162 +00 163 +00 164 +00 1 15 C7 ~ w i--i w W OZ J Q w > kO Q� w N U 00 LL iU 0 Z z Qw Lu oco:) d M -J 01 M (n 01 H U m w Q a w oC a z g a � J Lu W U ~ w Q Lu � z m w Lu U CD E w/ m d O Zp�p� O IL N a � 6 ...� W aui��LL 3 U) w Z Z g a Z w w a C� _O Z w U) Y U O Ln Q w Z J U O > ',. I L. I I V ✓V I',. !l .,V I I I IL! \ ',. ',. I I I I I I I ',. P/ / 62 80.00 PRELIMINARY PLANS END l 0 r A PP SL A B BEGIN l0 , APP SLAB ®O NOT USE FOR CONSTRUCTION BEGIN 0 AR A K Y Vl . ! + • E t 178.75" — + + Pl l6/ 80.00 Y2REV l ST A. 152 05.00 EL. 176.65......... — VC = 50 174 2 / EL. .2 0 EL = 174.85 + . .5500 VC 150 + .500 — 0/ 105 4 00 / .4 180 +)2. � 0 180 ( r- O o .. 0 0 0 , 8 1 � 1 t 5 �, / / 0 �+)6 0� DATE. FEBRUARY 22 2012 6-3857. 3. o 0 Pl 1 �. I DRAWN BY: MET 0 55 95.00 2222 + + 2.0 �- Pl 158 90.00 ) ( — P 60 20.00 �. 1 _ 4 CHECKED BY. BRC r o 2222., kI 2222. _ / D O 2222 181.25" l0 F -� EL M L !82.87 � �. E , REVISIONS. — LOCATION EL 18/.89 4 + L A N Pl 154 /5.00 ................. r = 170 t � (+)1.63E5-1. - _ k��44LF-30" 170 0.3500/ VC 100 ................. APPROXIMATE / NO. DATE ,� VC oo , HDPE r - - VC - !00 /7 E� 7.65 — 4 F- 0 HD PE + 8L 3 H E Pl l5/ 55.00 r - EL 73.39 VC 60 VC = lOo 160 160 PROJECT NO.. H9001.00 150 150 SCALE: 1"=50' 151 +00 152 +00 153 +00 154 +00 155 +00 156 +00 157 +00 158 +00 159 +00 160 +00 161 +00 162 +00 163 +00 164 +00 1 15 PIN 1733371744 all O D q ` ". .. Q0S rIon 1 200 1 190 1 170 1 160 150 1 164 +00 165 +00 IT:�:�i 0iI�� "ZiIIlIll r-1 = r i z -rj o.uu . EL = 174.10' \ �f ©off vc loo' P1 = 171 +25.00 (+)0.4000;1. EL = 181.91' +)0.4000% EL = 17 171 +00 172 +00 173 +00 174 +00 175 +00 176 +00 (nn H 00� ,,, Z W z� z J ° U) p w o g LU i N ^ Q w w U 00 o LL 0 Ln w 0 w o N w 06 Y LL w W 00 < M J a d M (n ON z Z H w U `) Y 0o U U Ln lop w I ° U � z o 0 0 o�r m w Q a w oC a z g a 200 � J Lu W U ~ w Q Lu � z m w Lu U CD E w/ m d O Zp�p� O IL N a � 6 . ..� W aui��LL 3 U) 19 0 I PRELIMINARY PLANS I ®® NOT USE FOR CONSTRUCTION 1 180 DAI t: rtt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC 170 REVISIONS: NO. DATE 160 PROJECT NO.: H9001.00 150 SCALE: 1 " =50' 177 +00 16 o �\ d J � _U J FW FW I J . c cfz PROPOSLD l0' CONC. APPROACH SLAB" — Y2REVI - PT Stae186 +17,9,4' %e I e� �m Zu END BOARD K — Y2REVl— PC Stael84 +5/e34 BEGIN 10' P SLAB Y2R 185 +80.00 —Y2REV l — PT Stael co t f' to / / 0 a- BZ Q'1 1 - , - J Lu Y , C n , i d., F v , �+ ��p',� YY }eYiY YYUYUYi LLJ MBiNATI(I „ r 100 PRO r E P p nr •1 i f ` ALT TRAIL jo W � � 0 C ON f i EX. l5 C w L- ti CE P S T e � � a SPREADER. (N �OTJ f- 1a r :,a. a J X LIMITS F' � ;, ,. .. a G DISTURBAN �., v p,. Lli C� o F Aid P d DPE 56 LF 36 H — Y2REVl PC O \ 10 PROPOSED F ASPHALT TRAIL \ c c v0 &" 1 190 '.000% — )4.000% i _ is nnn o 180 190 Pl = e1 14�f° 1-1. (_n v = 169.56' w t VC 8 00.00 � 1 0 Y PLANS PRELIMINARY I8 I8 w ®O NOT USE FOR CONSTRUCTION w z - - -- W z� EL 170.24" O J °U) +)5• 8 g ( — ° (+)0.5500/ 11.330 VC r ° i llO i 49 o i o LU _� N Q w Pl = ........ +90.00 -- ..� _ r Pl — 183 +40.00 Pl — 183 +80.00 Pr — 184+30. LL Pl - 176 +85.00 .178 f EL = 173.03 o � EL 182.51 EL 183.91 EL 83. 00 _ EL 17/.90......... VC 40 56LF -36,, HDPE......... f _ Pl .........183 + 50.OD Pr r + 83 ...90.00 Pl _ 184+40, 60 _ - VC 100 8 END l0 APP SLAB BEGIN ..BOARDWALK EL _ f 183.0/ " EL 184,0/ EL f 182.8/ � J p1 — Y2REVl— STA. 182 +80.00 Pl = 183 +60.00 P1 = 184 +10.00 O EL = 179.34' EL = 183.41' EL = 184.01' Ln 150 z Pl _ 183 +70.00 Pl = 184 +20.00 140 1 177+00 ins +oo wimlill it:IiaiIll il� :IC�iI� :�il� p 16 -7" MIN O CLEARANC ° O ° Pr 186+2( EL 168.41' VC = 90' END BOAR2 BEGIN l0' � — Y2REVl — EL = 171.61' Etf'�iItj .- 7: S. EL = 168.63' 17 -11" MIN f CLEARANCE VC = 40 � Et:lgaiItj ( +)0.1200% Pl 188 +45 EL 169.67' VC 20' Et:I:lmiI( 00S' m w Q a w oC a z g a �e J Lu W U ~ w Q Lu � z m w Lu U CD s E w/ w I m > N cq n V cq aq R d O z o a O ILL MPG; ...� W a(°n11�LL 3 U) 190 Pl = 188 +80.00 (_n v = 169.56' w t VC = 50' � 1 0 Y PLANS PRELIMINARY I8 I8 w ®O NOT USE FOR CONSTRUCTION w z - - -- W z� O O J °U) +)5• g p w o LU i N Q w U ^ 00 LL iU � � o z w 00 LU c, 0 U) w Lu 8 L9 M � J p1 d O M Ln ON z U `n Y U in in �� U w 99 H ® I z o > m w Q a w oC a z g a �e J Lu W U ~ w Q Lu � z m w Lu U CD s E w/ w I m > N cq n V cq aq R d O z o a O ILL MPG; ...� W a(°n11�LL 3 U) DAI L: I- tbKUAKY ZZ, ZU11 DRAWN BY: MET Pl — 189 +35.00 CHECKED BY. BRC EL = 172.42 REVISIONS: 160 vn _ cnf NO. DATE 150 PROJECT NO.: H9001.00 140 SCALE: 1 " =50' 189 +00 190 +00 17 190 Pl = 188 +80.00 EL = 169.56' VC = 50' 1 0 Y PLANS PRELIMINARY I8 I8 ®O NOT USE FOR CONSTRUCTION ° - - -- - - -- O O 000 (— )0.401// +)5• 170 DAI L: I- tbKUAKY ZZ, ZU11 DRAWN BY: MET Pl — 189 +35.00 CHECKED BY. BRC EL = 172.42 REVISIONS: 160 vn _ cnf NO. DATE 150 PROJECT NO.: H9001.00 140 SCALE: 1 " =50' 189 +00 190 +00 17 �BY-PASS Z A)V 1 200 190 170 160 o ,),, t , CH .n QN Bi R. IMPACT 30 E TA SEEP APP. � �� � TY OF RAL H �B I DB 43/5. PG 28 -Y2REV EG STA OF EN �`, A !� (� Oj PIN 1733468660 � Y � \ E ING EM `�` \ �� NvNN ti . � 0' Pyt POSED WETLAND WGl HA IL \ \ D ASP HA TRAIL END RDWALI(­PLATFORM GIN B GE x e \ - EV1- 19 29.18 \ P3 3 , O 9 o END BOARDWALK BEGIN BOARDWALK PLATFORM ' Y2REV2 PAC Sta.2 +8/.42 � O Y2 REV- STA 193+11.47 NSF - t I8 4.Y SUNOCO % \� a RECYCLING. IN — Y2REV) — Pl Sta.193 +19,59 `;_ \ DB 13005. PG 103 W� P,, ,E WETLAND- `�5:. t M 2004 PG 1754 ? F i��� b n E P IN 1733369456 IMPACTS P B32� , � VVGI TEMP BOARDWALK PLATFORM . A 16 FT X 16 FTC IMPACT r, \�� — o °c O / 150 190 +00 191 +00 192 +00 193 +00 194 +00 195 +00 196 +00 000 /. (— )3.000% r— (- )4.000% ttf b.J y /-'/ = I JI -f5Fb.5; .41' EL = 180.21' V+06.59 P1= 197 +66 81.21' EL = 179.41' /' EGIN 10' APP SLAB Y2REV I - ST A.198 +F L = 174.41' rl = lyy�lv.vv EL = 172.24' VC = 40' STATION EQUATION EQUATION — Y2REV!- STA.198 +78.20 BK = 197 +00 198 +00 199 +00 200 +00 EL = 169.03' (-)1,25007. . aimaiIX —Y2REV 2 — Pl STA. 199 +19.14 Pl STA. 200+95.82 Pl STA. 202+90.73 Pl STA. 204 +81.66 0 = 31* 09' 32.2" (RT) A = 53° 14-'13.0" (LT) 0 = 84° 39' 40.3" (LT) 0 = 34° 09' 58J" (RT ) w D = 57° 17' 44.8" D = 28° 38' 52.4" D = 47° 44' 47.3" D = 14° 19' 26.2" L = 54.38' L = 185.83' L = 177,31' L = 238.52' T = 27,88' T = 100.23' T = 109.31' T = 122.93' g R = 100,00' R = 200.00' R = 120,00' R = 400.00' BOARDWALK PLATFORM END BOARDWALK PLATFORM- 16 FT X 16 FT BEGIN BOARDWALK _ - sARRER W� � — Y2REV 1— - Pl Sta.196 +78.43 - - _ Y2REVT= STA 196 + 59-59 =r = c Ilk U ^ 00 LL iU ��ozrL., , A)V 1 200 190 170 160 o ,),, t , CH .n QN Bi R. IMPACT 30 E TA SEEP APP. � �� � TY OF RAL H �B I DB 43/5. PG 28 -Y2REV EG STA OF EN �`, A !� (� Oj PIN 1733468660 � Y � \ E ING EM `�` \ �� NvNN ti . � 0' Pyt POSED WETLAND WGl HA IL \ \ D ASP HA TRAIL END RDWALI(­PLATFORM GIN B GE x e \ - EV1- 19 29.18 \ P3 3 , O 9 o END BOARDWALK BEGIN BOARDWALK PLATFORM ' Y2REV2 PAC Sta.2 +8/.42 � O Y2 REV- STA 193+11.47 NSF - t I8 4.Y SUNOCO % \� a RECYCLING. IN — Y2REV) — Pl Sta.193 +19,59 `;_ \ DB 13005. PG 103 W� P,, ,E WETLAND- `�5:. t M 2004 PG 1754 ? F i��� b n E P IN 1733369456 IMPACTS P B32� , � VVGI TEMP BOARDWALK PLATFORM . A 16 FT X 16 FTC IMPACT r, \�� — o °c O / 150 190 +00 191 +00 192 +00 193 +00 194 +00 195 +00 196 +00 000 /. (— )3.000% r— (- )4.000% ttf b.J y /-'/ = I JI -f5Fb.5; .41' EL = 180.21' V+06.59 P1= 197 +66 81.21' EL = 179.41' /' EGIN 10' APP SLAB Y2REV I - ST A.198 +F L = 174.41' rl = lyy�lv.vv EL = 172.24' VC = 40' STATION EQUATION EQUATION — Y2REV!- STA.198 +78.20 BK = 197 +00 198 +00 199 +00 200 +00 EL = 169.03' (-)1,25007. . aimaiIX m w oC a w �c a z g 200 � J uj W U ~ w Q Lu � z m w Lu U CD s � s � � o e _ m > N - n V a: co m BozoD LLda�� W aui��LL 3 U) V 1 19 0 I PRELIMINARY PLANS I ®® NOT USE FOR CONSTRUCTION EL = 168.28' d 180 DAI L: Ftt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC 170 REVISIONS: NO. DATE 20LF -18" HDPE 160 F/ 202 +4 PROJECT NO.: = EL = 168.52 H9001.00 VC = 40' 150 SCALE: 1 " =50' 202 +00 203 +00 18 CD t w � 1­4 w w z 0z UP) g w o kD > N Q w U ^ 00 LL iU ��ozrL., w M = ^ � O Y w w w 0o U M D 0-i a O < a m u QJ a m z i--i w U `) Y U ° U w z U m w oC a w �c a z g 200 � J uj W U ~ w Q Lu � z m w Lu U CD s � s � � o e _ m > N - n V a: co m BozoD LLda�� W aui��LL 3 U) V 1 19 0 I PRELIMINARY PLANS I ®® NOT USE FOR CONSTRUCTION EL = 168.28' d 180 DAI L: Ftt3KUAKY ZZ, ZU1Z DRAWN BY: MET CHECKED BY: BRC 170 REVISIONS: NO. DATE 20LF -18" HDPE 160 F/ 202 +4 PROJECT NO.: = EL = 168.52 H9001.00 VC = 40' 150 SCALE: 1 " =50' 202 +00 203 +00 18 Lu a h o L99 u > LEIGH' c\j 0 c\j A"IM4p 210 200 190 202- 180 L = 167. C = 50" 170 160 q1XIMSIX Lu ui U Lu � z Lu ca Lu Lu U (D E u ii z 0 ci 'm C* vi 210 1 200 PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION 190 DATE: FEBRUARY 22, 2012 DRAWN BY: MET CHECKED BY: BRC REVISIONS. 180 NO. DATE 170 PROJECT NO.: H9001.00 160 SCALE: 19 1"=50' r. Lu Lu Vu z C) Lu Lu a h o L99 u > LEIGH' c\j 0 c\j A"IM4p 210 200 190 202- 180 L = 167. C = 50" 170 160 q1XIMSIX Lu ui U Lu � z Lu ca Lu Lu U (D E u ii z 0 ci 'm C* vi 210 1 200 PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION 190 DATE: FEBRUARY 22, 2012 DRAWN BY: MET CHECKED BY: BRC REVISIONS. 180 NO. DATE 170 PROJECT NO.: H9001.00 160 SCALE: 19 1"=50'