Loading...
HomeMy WebLinkAbout310871_5 day poa_20210216PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31_ - _871 County: Duplin Facility Name: Earth Right Farms, Inc. — Sow Farm Certified Operator Name: _Stephen M Williamson Operator # 19128 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): 1 Spillway (Yes or No): _No Level (inches): 8 2. Check all applicable items _X_ Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2-17-2021 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Stephen M Williamson Phone: _(910)296-1513 Facility Owner/Manager (print) Sty M Date: 02-16-2021 Facility Owner/Manager (signature) PoA Cover Page 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 31-871 2. Current liquid volume in structural freeboard a. current liquid level according to marker 8 inches b. designed structural freeboard zone 12 inches (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = 4 inches d. top of dike surface area according to design 254021_ ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 alg Ion = 633359_ gallons 12 ft 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 g. volume of waste produced according to structural design _326784 h. actual waste produced = current herd # x line g = _307931 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days = line f _148179 _94769_ 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = gallons WTTi K-1 days ft 3 ft3 ft3 ft3 gallons REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS PoA (5 Day) 2/21/00 1 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: line I = 728128 gallons 2. structure ID: line I = gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n. lines 1 + 2 + 3 + 4 + 5 + 6 = 728128 gallons o. line n = 26.8 acre -inches 27,154 III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD11'2 1 While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan 2 Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 2197 1 GoA Rye(grazed) 19.59 50 .5 .5 2197 2 Ra Rye(grazed) 9.53 50 .4 .5 7997 1 NoA Corn 36.59 116 .5 .5 x. total acres available during 5 day draw down (sum of column t) = 65.71_acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA (5 Day) 2/21/00 2 Y. line o = .41 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g./ Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff , etc.) Fields are well drained but moderately wet from rain and may have some equipment mar but will have no runoff. 2. Date and amount of last rainfall event? w/e 2/15/21 1.0" 3. Dates of last waste application event per field 2197-1 & 2 none 7997-1 01/22/21 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within five days? Yes, we will be using an aerway and draghose with sufficient pump capacity to complete draw down given no additional rainfall. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration Tuesday — aerway and pump setup Wednesday — aerway application to begin (650 gpm @ 9 hours) Thursday — Saturday — aerway application to continue I have also contacted a custom aerway applicator to help with this draw down which will increase the gpm. PoA (5 Day) 2/21/00 3