HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20120522_1 A 0;
A
NCDENR
North Carolina Department of Environment and Natural
Beverly Eaves Perdue
Governor
Mr J B Setzer P E
Division 14 Engineer
N C Department of Transportation
253 Webster Road
Sylva North Carolina 28779
Dear Mr Setzer
Division of Water Quality
Charles Wakild P E
Director
May 21 2012
c�
rces�y22
POs
0
DeeFreeman
?Y Secretary
Subject Inspection
NCSR 1783 Upward Road
DWQ Project 08 1327
TIP No R 4430
Henderson County
On May 3 2012 I inspected the construction work on Upward Road between US Highway 176 and Howard
Gap Road in Henderson County Construction work is continuing all along Upward Road between Howard
Gap Road and US Highway 176 with the main focus on grading paving and completing the new 126 Bridge
Please ensure that all sediment and erosion control structures are being maintained as required and that seedmg
and mulching are being performed as needed to protect State surface waters
Please refer to the attached copy of the inspection report for additional comments regarding the inspection
If you have questions please call me at 828 296 4500
Attachment
cc Aaron Powell
Mark Davis Division 14 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
Upward Road R 4430 Inspection Letter May 2012
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296-45001 FAX 828 299 7043
Internet www ncwaterouality org
An Equal Opportunity I Affirmative Action Employer
Sincerely
Michael R Parker
Environmental Senior Specialist
NorthCarollnd
Natural&
Wetland Inspection Report
Project Num 20081327 Version 1 Status Issued
Project Name NCDOT SR 1783 (R 4430) Project Type Road /Highway Widening
County Henderson Region Asheville
Location NCDOT SR 1783 (R 4430)
Latitude +35 1751 Longitude 82 2425
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 05/03/2012
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person Title Phone
On Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Facility compliance Status E Compliant n Not Compliant
Program Area 401 (includes isolated /non 404)
Question Areas
0 Permit (401 WQC)
Inspection Summary
Repair inlet area at 48 inch pipe
Repair silt fence throughout project
Continue to maintain sediment and erosion control structures throughout project
Phone 828 296 4500
Page 1
Project Num 20081327 Owner NC DOT PDEA
Inspection Date 05/03/2012 Inspection Type Site Inspection (DOT)
Reason for Visit Routine
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit'?
Are the culverts and /or filled areas installed properly'?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit'?
Comment Some sediment Is getting Into stream at Inlet to 48 pipe culvet The
sediment should be removed from the stream and the drainage to this area should be
repaired to prevent sediment from entering the stream
■nnn
■nnn
n ■nn
Page 2