Loading...
HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20120522_1 A 0; A NCDENR North Carolina Department of Environment and Natural Beverly Eaves Perdue Governor Mr J B Setzer P E Division 14 Engineer N C Department of Transportation 253 Webster Road Sylva North Carolina 28779 Dear Mr Setzer Division of Water Quality Charles Wakild P E Director May 21 2012 c� rces�y22 POs 0 DeeFreeman ?Y Secretary Subject Inspection NCSR 1783 Upward Road DWQ Project 08 1327 TIP No R 4430 Henderson County On May 3 2012 I inspected the construction work on Upward Road between US Highway 176 and Howard Gap Road in Henderson County Construction work is continuing all along Upward Road between Howard Gap Road and US Highway 176 with the main focus on grading paving and completing the new 126 Bridge Please ensure that all sediment and erosion control structures are being maintained as required and that seedmg and mulching are being performed as needed to protect State surface waters Please refer to the attached copy of the inspection report for additional comments regarding the inspection If you have questions please call me at 828 296 4500 Attachment cc Aaron Powell Mark Davis Division 14 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office Upward Road R 4430 Inspection Letter May 2012 SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296-45001 FAX 828 299 7043 Internet www ncwaterouality org An Equal Opportunity I Affirmative Action Employer Sincerely Michael R Parker Environmental Senior Specialist NorthCarollnd Natural& Wetland Inspection Report Project Num 20081327 Version 1 Status Issued Project Name NCDOT SR 1783 (R 4430) Project Type Road /Highway Widening County Henderson Region Asheville Location NCDOT SR 1783 (R 4430) Latitude +35 1751 Longitude 82 2425 SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 05/03/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person Title Phone On Site Representative(s) Primary Inspector Michael R Parker Secondary Inspector(s) Facility compliance Status E Compliant n Not Compliant Program Area 401 (includes isolated /non 404) Question Areas 0 Permit (401 WQC) Inspection Summary Repair inlet area at 48 inch pipe Repair silt fence throughout project Continue to maintain sediment and erosion control structures throughout project Phone 828 296 4500 Page 1 Project Num 20081327 Owner NC DOT PDEA Inspection Date 05/03/2012 Inspection Type Site Inspection (DOT) Reason for Visit Routine Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit'? Are the culverts and /or filled areas installed properly'? Is the site compliant with additional conditions of the 401 WQC or non 404 permit'? Comment Some sediment Is getting Into stream at Inlet to 48 pipe culvet The sediment should be removed from the stream and the drainage to this area should be repaired to prevent sediment from entering the stream ■nnn ■nnn n ■nn Page 2