Loading...
HomeMy WebLinkAboutNC0000272_BMP 2013 Annual Report_20140331 evergreen ,0 Canton Office 175 Main Street• Canton, NC 287i6 packaging March 31, 2014 NMM#23-14 CERTIFIED MAIL Return Receipt Requested 7099 3220 0007 0371 4460 North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Section ATTENTION: Central Files 1617 Mail Service Center Raleigh,NC 27699-1617 Re: NPDES NO.NC0000272 Best Management Practices 2013 Annual Report Blue Ridge Paper Products Inc. d/b/a Evergreen Packaging Canton,NC This letter report(two copies) is the 2013 summary of Best Management Practices (BMP) daily monitoring for the Canton Mill. The report is required on or before March 31 st of each year by Special Condition A.(6.)Best Management Practices, Section EA and Section F.1, of the mill's NPDES Permit No.NC0000272. The BMP action levels established in accordance with permit requirements and in effect for 2013 are as follows: Effective Dates: 1 Jan 2013- 31 Dec 2013 Total Influent (TI) Color - Action Level daily monitoring result Action Required 1-Day Upper Action > 72,500 Ibs/day for one day Immediate investigation and documented Level (UAL) corrective action 2-day Upper Action > 59,400 Ibs/day for two Investigation and documented corrective Level (UAL) consecutive days action 2-day Lower Action > 55,400 Ibs/day for two Investigation and documentation Level (LAL) consecutive days Daily records of total influent color are maintained at the mill. These daily color data are compared to BMP action levels every morning. Total influent color exceeded BMP action levels Blue Ridge Paper Products Inc. dba Evergreen Packaging -Canton Mill / 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 \\everpack\CTN\Shared\EOHS\Share\Water Files\Nick's Water Files\DWRWnnual Reports\2013 Annual BMP Letter.doc 31 Mar 2014,Page 2 on the dates outlined in the following table. A brief summary of information for these dates are included as required by permit Condition A.(6.), Section E.4. The permit-required BMP investigation reports are maintained at the mill. None of the BMP action level days resulted in disruption to the wastewater treatment plant. The Canton Mill met all NPDES annual average effluent limits during 2013. Total Influent Date(s) (TI) Color Action Level and Summary 28 - 30 Jan 65,110 Ibs/day 2-day UAL— Investigation and documented corrective 2013 62,150lbs/day action 65,569 Ibs/day Cause and Corrective Action(s)— Non-BMP event. Influent color was elevated from activities associated with a scheduled outage for the lower end of the mill. No corrective action(s)taken. 13 & 14 Apr 84,979 Ibs/day 1-day UAL/2-day UAL—Investigation and documented 2013 58,011 Ibs/day corrective action Cause and Corrective Actions)— Non-BMP event. The lower end of the mill was preparing for a month long extended outage so that the #10 Recovery Furnace could be rebuilt. This included taking the hardwood fiberline down for a semi-annual outage. Elevated influent color was associated with cyclone wash material generated during the shutdown of#10. The material was originally thought to be too dilute for processing and was released to the sewer. After a sample at the WWTP, the material was diverted to the#1 spare clarifier. The remaining material from the cyclone wash was captured and processed through the recovery system. The material in the #1 clarifier was batch treated with polyamine and released back into the treatment process at a non-disruptive rate. No corrective action(s)taken. Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 IleverpacklCTNlSharecAEOHSISharel Water ResWick's Water PIIesOWRIAnnual Reports12013 Annual BMP Letter.doc 31 Mar 2014, Page 3 Total Influent Date(s) (TI) Color Action Level and Summary 19 & 20 Apr 57,823 Ibs/day 2-day UAL— Investigation and documented corrective 2013 60,362lbs/day action Cause and Corrective Action(s)— Non-BMP event. During this time, outage activities continue for the#10 Recovery Furnace rebuild. This includes the periodic release of elevated pH material from various tanks in the mill. The increased load in elevated pH material is thought to have caused a sewer generated color effect in the influent. Also, during this time the pine fiberline MRP system has been down for maintenance. It is often observed that influent color is elevated during periods when this system is not operating. No corrective action(s)taken. Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 IleverpacklCTWharedlEOHSISharelWater Reswlck's Water ReslOWRlAnnual Reports12013 Annual BMP Letter.doc 31 Mar 2014,Page 4 Total Influent Date(s) (TI) Color Action Level and Summary 2 - 6 Jul 2013 89,830 Ibs/day 1-day UAL/2-day UAL — Investigation and documented 55,475 Ibs/day corrective action 55,471 Ibs/day 63,390 Ibs/day Cause and Corrective Actionfs)— Non-BMP event. On the 57,184 Ibs/day evening of 7/2, the#11 Recovery Furnace was performing a scheduled cyclone wash. During the maintenance operation, an unmetered amount of elevated color material reached the mill sewer system. This loss of material was in short succession and did not offer an opportunity to capture the material in the spare clarifier at the WWTP. After the May outage, the fiber loss at the WWTP from the acid sewer was elevated. Previous observed periods of elevated fiber loss to the WWTP from the acid sewer can create adverse conditions in the secondary clarifiers. In order to combat these potential conditions, the acid sewer was valved into the main mill sewer. This typically will create elevated influent color numbers because of the phenomena known as sewer generated color. During 7/2 & 7/3, the dregs filter from the green liquor system ran over to the sewer for approximately 48 hours. This loss supports the elevated primary effluent numbers at that time. On the #12 paper machine there was an extended order of Sunkraft Brown paper that required the use of yellow dye after the outage. This dye cannot be treated and has shown to increase influent and effluent color numbers because of the wavelength at which it reflects light. The pulp mill's MRP system was also having issues with runability during this time. Although process trends show more uptime, the process on the whole was up and down. Weather also played a factor in the increased color load to the WWTP. Recent rainfall events around the mill elevated the flow into the treatment plant. When looking at the mass balance equation, the higher flow numbers are what led to the action levels being exceeded. The influent color concentrations were, at times, elevated but by using a more typical flow input BMP action levels were not exceeded for this entire period. No corrective action(s)taken. Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 IleverpacklCTNISharedlEOHSISharel Water FileslNick's Water Files0WRL9nnual Reports120l3 Annual BMP Letter.doc 31 Mar 2014,Page 5 Total Influent Date(s) (TI) Color Action Level and Summary 5- 7 Nov 2013 61,199 Ibs/day 2-day UAL— Investigation and documented corrective 58,492lbs/day action 60,543 Ibs/day Cause and Corrective Action(s)— Non-BMP event. Leading up to the scheduled outage of the#2 fiberline and #11 Recovery Furnace, the Sample Tank at Causticizing overran for a short period of time contributing elevated pH material to the mill sewer system. Also, the MRP system on the#2 fiberline was bypassing due to tears in the fiber strainer resulting in the main flow of filtrate not being able to be screened. Once the outage began on 11/6, the #11 Smelt Dissolving Tank was released to the sewer, contributing elevated pH material. This material was too dilute for processing and had to be purged. The North Mud Washer also overran at this time, contributing additional elevated pH material. This was done in order to clean up the lime mud prior to entering the kilns. On 11/7, after restart, the MRP system bypassed the majority of the day until the fiberline was able to run steady and process instability taken out. In addition, the hardwood Eo filtrate was elevated due to carryover from brownstock washing. No corrective action(s)taken. Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 1leverpacklCTNlSharecAEOHSISharel Water FileslNick's Water FllesIDWR1Annual Reports12013 Annual BMP Letter.doc 31 Mar 2014, Page 6 Total Influent Date(s) (TI) Color Action Level and Summary 28 &29 Nov 58,280 Ibs/day 2-day/ 1-day UAL— Investigation and documented 2013 74,953 Ibs/day corrective action Cause and Corrective Actions— BMP event. On Wednesday 11/27, the pine fiberline secondary screen began flushing frequently. Operators swapped to the swing screen and used it as the secondary in the system to prevent interruption. The secondary screen was found to be plugged. The plug was cleared and a new basket was put into service. The morning of Thursday 11/28, the secondary screen was put back into service but began flushing very frequently again after a short period of time. The quaternary screen then plugged and overnowed the quaternary screen feed tank to the sewer for approximately 20 minutes. That same evening, around midnight, the secondary screen plugged again. Operators attempted to bring the swing screen online but had difficulty. The pine fiberline then went down along with the screen room. This resulted in all screen feed tanks overflowing to the mill sewer. After repairs were made to the secondary screen, the fiberline was brought back up to a steady state. Corrective actions included pulling, cleaning &jetting the pine secondary screen basket,jetting the line to the tertiary screen tank, replacing the rejects control valve and changing the DP cell. All corrective action have been completed. Please contact us if you have questions regarding this information. Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 IleverpacklCTNlSharedlEOHSISharel Water PilesWick's Water ResOWRIAnnual Reports12013 Annual BMP Letter.doc 31 Mar 2014,Page 7 Sincerely, r Nick McCracken EHS Water Supervisor Evergreen Packaging—Canton Mill nick.mccracken@everpack.com cc: Mr. Landon Davidson DWR Regional Supervisor,Asheville Regional Office North Carolina Department of Environment &Natural Resources 2090 U.S. Highway 70 Swannanoa,NC 28778 C. File—Water BMP Notebook Blue Ridge Paper Products Inc. dba Evergreen Packaging—Canton Mill 175 Main Street • PO Box 4000 Canton, North Carolina 28716 • 828-646-2000 IleverpacklCTMSharedlEOHSISharelWater ResUck's Water ResIDWRIAnnual Reports12013 Annual BMP Letter.doc