HomeMy WebLinkAbout20120443 Ver 1_Approval Letter_20120517tJt1� ®�PI�1�
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Waklld P E Dee Freeman
Governor Director Secretary
May 17 2012
DWQ# 12 0443
Guilford County
Jana Stewart
City of Greensboro Water Resources Dept
2602 S Elm Eugene St
Greensboro NC 27406
APPROVAL of 401 Water Quality Certification with Additional Conditions
APPROVAL of Jordan Lake Riparian Buffer Impacts with Additional Conditions
Dear Ms Stewart
You have our approval to conduct stream and wetland restoration and enhancement activities for the South Buffalo
Creek Habitat and Water Quality Improvement Project in accordance with the attached conditions along a total of
approximately 3019 existing linear feet of South Buffalo Creek and its tributaries 0 0048 acres of wetlands and to
temporarily impact 63 278 square feet of Zone One and 46 782 square feet of Zone Two of Jordan Lake Riparian
Buffers located in Greensboro NC in Guilford County as described in your application received by the Division of
Water Quality on May 2 2012 After reviewing your application we have deternuned that this activity is covered by
General Water Quality Certification Number 3885 which can be viewed on our web site at
http / /www ncwatgrqualgy org/wetlands html This Certification allows you to use Nationwide Permit Number 13 or 27
when it is issued by the U S Army Corps of Engineers In addition you should secure any other applicable federal
state or local permits before you proceed with your project including (but not limited to) those required by Sediment
and Erosion Control Non Discharge and Water Supply Watershed regulations Also this approval will expire when
the accompanying 404 permit expires unless otherwise specified in the General Certification
This approval is valid only for the purpose and design that you have described in your application If you change your
project you must notify us in writing and you may be required to send us a new application for a new certification If
the property is sold the new owner must be given a copy of the Certification and approval letter and is thereby
responsible for complying with all conditions For this approval to be valid, you must follow the conditions lasted an
the attached certification, as well as the additional conditions lasted below
The following impacts are hereby approved as long as all other specific and general conditions of this
Certification are met No other impacts including mcidental impacts are approved
Stream Impacts
Location Identifier
Amount Approved
Type of Impact
S Buffalo Creek,
3019 linear feet
Restoration and enhancement see design
Piedmont Creek,
Kersey Tributary
UT1 UT2 and UT3
North Carolina Division of Water Quality Winston -Salem Regional Office
Location 585 Waughtown St Winston Salem North Carolina 27107
Phone 336 7715000 1 FAX 336 771 -46301 Customer Service 1- 877 -623 -6748
Internet www ncwaterquality org
An Equal Opportunity 1 Affirmative Action Employer
NofthCariohna
Natffir 'l`'ff
S Buffalo Creek Habitat and Water Quality Improvements
DWQ# 12 0443
May 17 2012
Page 2 of 4
Buffer Impacts
Identifier
Zone 1 Impact
Zone 2 Impact
Site B 1
40 048 square feet impact
40 4052 square feet impact
Site B2
11 342 square feet impact
547 square feet impact
Site 133
11 888 square feet impact
5 783 s uare feet impact
Total
63,278 square feet temporary impact
46,782 square feet temporary impact
Wetland Impacts
Sites
Type of Impact
Amount Approved
WA
Excavation
0 00002 acres
WD
Enhancement
0 0046 acres
Total
0 0048 acres permanent impact
2 This authorization exempts the Perrmttee from meeting Condition #7 in the attached general certification for the
placement of in stream structure material into the stream The Pernuttee shall take all reasonable measures to
construct in stream structures while keeping heavy equipment out of the stream channel Stream flow will be
diverted around work areas as much as practicable All reasonable steps must be taken to limit the amount of
disturbance in the channel and to therefore reduce downstream turbidity during construction This exemption
does not relieve the Permittee of meeting stream standards as indicated in 15A NCAC 02B
3 Native vegetation shall be used throughout this project All tree and shrub plantings within the proposed buffer
on both sides of the stream shall be protected from mowing or clearing
4 Stream bed habitat material such as cobble and gravel should be harvested from abandoned channels and
relocated to new channels to the maximum extent practical
Visual monitoring of the relocated streams in stream structures reshaped streambanks and restored/replanted
temporary buffer impact areas shall be conducted at a minimum of quarterly for the first year or two bankfull
events (whichever is longer) and then annually until it is determined that all structures and stream banks are
stable (particularly after storm events) and all vegetation is successful Any failures of structures stream banks
or vegetation may require future repairs or replacement to ensure the stability and water quality of the stream and
downstream waters
6 Upon fimshmg the protect, the Apphcant shall fill out and return the enclosed "Certificate of Completion"
to notify NCDWQ when all work included in the §401 Certification has been completed This certificate
should be returned to the Winston Salem Regional Office of the NC Division of Water Quality at the
address listed on the form Along with the Certificate of Completion, please send photographs showmg the
restored stream reach
If you do not accept any of the conditions of this certification you may ask for an adjudicatory hearing You must act
within 60 days of the date that you receive this letter To ask for a hearing send a written petition which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings 6714 Mail Service
Center Raleigh N C 27699 6714 This certification and its conditions are final and binding unless you ask for a
hearing
S Buffalo Creek Habitat and Water Quality Improvements
DWQ# 12 0443
May 17 2012
Page 3 of 4
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act If you
have any questions please telephone Sue Homewood in the DWQ Winston Salem Regional Office at 336 771 4964
Sincerely
Charles Waluld P E Director
' Division of Water Quality
cc Todd St John Kimley Horn (via email)
Thomas Brown USACE Raleigh Regulatory Field Office (via email)
DWQ Winston Salem Regional Office
DWQ Wetlands /401
S Buffalo Creek Habitat and Water Quality Improvements
DWQ# 12 0443
May 17 2012
Page 4 of 4
DWQ Project No
Applicant
Project Name
Date of Issuance of 401 Water Quality Certification
County
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules and any
subsequent modifications the applicant is required to return this certificate to the 401 /Wetlands Unit North Carolina
Division of Water Quality 1650 Mail Service Center Raleigh NC 27699 1650 This form may be returned to DWQ by
the applicant the applicant s authorized agent or the project engineer It is not necessary to send certificates from all of
these
Applicant's Certification
I hereby state that to the best of my abilities due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and
other supporting materials
Signature
Date
Agent's Certification
I hereby state that to the best of my abilities due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and
other supporting materials
Signature
Engineer's Certification
Partial Final
Date
I as a duly registered Professional Engineer in the State of North
Carolina having been authorized to observe (periodically weekly full time) the construction of the project for the
Permittee hereby state that to the best of my abilities due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials
Signature
Date
Registration No