Loading...
HomeMy WebLinkAboutSW3201001_SIGNED_SuppEZ-2018-Version-2.1.1_02152021_20210217SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 lProiectName Project Area (ac) Coastal Wetland Area (ac) Surface Water Area (ac) Is this project High or Low Density? Does this protect use an off -site SCM? Dollar General - Granite ( 2.17 0 0 No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 1 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 0 25 Ba filter IFilterra 26 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Justin Church, PE / Principal Engineer 28 Organization: BREC, P.A. 29 Street address: 1520 Meadowview Drive 30 City, State, Zip: Wilkesboro, NC 28697 31 Phone numbers : 336.844.4088 32 Email: Iustin(a)brec.biz Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. A �N CA FEssRo oz�2 o� i SEAL = 035736 = �vGs;•�NGINE ''// T,A/ C. C,\A //0 11111\\\\\\ of Designer 02/16/2021 Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 T pe of SCM N/A Sand Filter 5 Total BUA in project (sq ft 53464 sf 53464 sf 6 New BUA on subdivided lots (subject to ermitting) (sq ft N/A N/A 7 New BUA outside of subdivided lots (subject to ermittin s 29211 sf 29211 sf 8 Offsite -total area (sq ft 43875 sf 43875 sf 9 Offsite BUA (sq ft 24253 sf 24253 sf 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft 18026 sf 18026 sf - Sidewalk (sq ft 1976 sf 1976 sf - Roof (sq ft 9209 sf 9209 sf - Roadway s ft sf sf - Future (sq ft sf sf - Other, please specify in the comment box below (sq ft sf sf 11 New infiltrating permeable pavement on subdivided lots (sq ft sf sf 12 New infiltrating permeable pavement outside of subdivided lots (sq ft sf sf 13 Exisitng BUA that will remain (not subject to ermitting) (sq ft sf sf 14 Existing BUA that is already ermitted (sq ft sf sf 15 Existing BUA that will be removed (sq ft sf sf 16 Percent BUA 57% 57 0 17 IDesign storm inches N/A 1 in 18 IDesign volume of SCM cu ft N/A 4404 cf 19 lCalculation method for design volume N/A Simple ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): DRAINAGE AREA INFORMATION Entire Site 1 4 T pe of SCM N/A 5 Total BUA from project (sq ft) 6 1995 rules SL 2006-246 2008 rules 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 2006-246 2008 rules 8 2017 rules 9 Offsite - total area (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 11 IDesign storm (inches) 1995 rules SL 2006-246 2008 rules 2017 rules 12 Breakdown of new BUA: - Parking (sq ft - Sidewalk (sq ft - Roof (sq ft - Roadway s ft - Future (sq ft - Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement outside of subdivided lots (sq ft 15 Exisitng BUA that will remain (not subject to permitting) (sq ft) 16 IlExisting BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19 Design volume of SCM cu ft 20 Calculation method for design volume ADDITIONAL INFORMATION 21 JPlease use this space to provide any additional information about the drainage area(s): SAND FILTER 23 Volume that can be retained in the sediment chamber (cubic feet) 1986 cf 24 Will there be a permanent pool in the sediment chamber? Yes 25 Bottom of the sediment chamber (fmsl) 777.00 26 Area of the sediment chamber (square feet) 1221 sf 27 Physical depth of the sediment chamber (inches) 28.0 in 28 Ponding depth in the sediment chamber, above any permanent pool (inches) i 16.0 in 29 Elevation of top of weir between chambers (fmsl) 779.35 Chamber Volume that can be retained ii Bottom of the sand chamber 34 ronaing aeptn in the sane cnamoer, aoove any permanent pool (inches) 16.0 in 35 Elevation of the bypass device (fmsl) 779.35 36 Type of bypass device weir 37 Mechanism for distributing flow over the sand surface stone dam 38 Sand specification for sand chamber astm c33 39 Depth above underdrain pipe (inches) 18 in 40 Will the media be maintained to drain at least two inches per hour at the sand surface? Yes 41 Is at least one clean -out pipe provided at the low point of each underdrain line? Yes use tins space to proviae any 43 ISand Sand Filter 4 5:01 PM 2/16/2021