Loading...
HomeMy WebLinkAboutSWA000090_20054 SSW Fast Track ATC Form_Revised Sheet 2_20210216 Major Modification, replacing an existing stormwater permit Î provide existing permit number: SW Status of construction? Not Started Partially Completed Completed Major modifications must be submitted by the original permittee and are allowed only if the SW permit is not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you are also requesting that DEQ rescind the previous SW Permit upon issuance of the new Fast Track ATC Permit. Transfer of existing Fast Track ATC Permit Î provide existing ATC permit number: SWA 2.Applicable state stormwater program(s) (check all that apply): Coastal SA-HQW Urbanizing Areas (Phase 2) Coastal SA-ORW Non-Coastal HQW Is any portion of the project within 575 feet of SA-ORW waters? Yes No Non-Coastal ORW Coastal Freshwater ORW USMP Coastal Î Other 3.Other Permits (as applicable; write ÐNAÑ for those permit types that are not applicable): Project Name Permit/Appl Issue Date Other Information No. N/A CAMA Major NA Townhomes at Brookshire Phase 2A Erosion & Disturbed Area Sedimentation Control 15.2 acre NPDES Industrial N/A NA Stormwater Townhomes at Brookshire Proposed 404/401 Permit Impacts 0.085 ac 4.Local jurisdiction for building permits: Wautaga County Point of Contact:Planning and Inspections DeptPhone #: (828 ) 265-8043 D.CONTACT INFORMATION 1.Applicant/Financially Responsible Party (may be an Organization):RCPBD Investments,LLC Signing Official Name & Title:Rick Miller, Registered Agent Street Address:324 NC Hwy 105 Ext. Suite 1 City:BooneState:NC Zip:28607 Mailing Address (if different): City: State: Zip: Phone: (828) 265-6344 Fax: ( ) Email: mpi@bellsouth.net 2.If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of State): Name of Registered Agent:Rick Miller Mailing Address: PO Box 3018 City:Boone State:NC Zip:28607 Phone: (828) 265-6344 Fax: ( ) Email:mpi@bellsouth.net Stormwater Fast Track ATC Application Form Page 2 of 9 Feb. 10, 2018