Loading...
HomeMy WebLinkAbout20120443 Ver 1_More Info Received_20120517Strickland, Bev From: Homewood, Sue Sent: Thursday, May 17, 2012 1:57 PM To: Strickland, Bev; Dennison, Laurie Subject: FW: South Buffalo Creek Water Quality and Habitat Improvement Project Add'I info for 12 -0443. Sue Homewood NC DENR Winston -Salem Regional Office Division of Water Quality 585 Waughtown Street Winston - Salem, NC 27107 Voice: (336) 771 -4964 FAX: (336) 771 -4630 E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Todd. StJohn(a)kimley- horn.com [mailto:Todd.StJohn(a)kimley- horn.com] Sent: Wednesday, May 16, 2012 5:46 PM To: Homewood, Sue Cc: Jana.Stewart()areensboro- nc.gov Subject: South Buffalo Creek Water Quality and Habitat Improvement Project Sue, South Buffalo Creek has a large urbanized watershed of about 15 square miles at the project area location. Its physical size, base discharge, and flashy nature prevent the ability to ensure that the proposed in- stream structures can be completely constructed in the dry. Please note that the City will require the contractor to use the best practicable means of impacting downstream water quality. Examples are 1) only new or highly maintained equipment (to prevent fuel and oil leaks) can be used in South Buffalo Creek; 2) work that can be accomplished from the bank must be; 3) coffer dams with pump outs into filter bags (and similar) will be used to construct in- stream structures where practicable. All of the work in the sloughs, Piedmont Creek, Kersey Tributary, UT1, UT2, and UT3 will be done in the dry. However, because of the reasons mentioned above, the City is requesting an exception to the requirement to dewater South Buffalo Creek to construct the in- stream structures. Thanks, Todd