Loading...
HomeMy WebLinkAbout20120285_Gaston East-West Corridor Email_20110810FW Gaston E W Connector (U 3321) Agency Meeting for CP 4C August 11 @ IOam Page 1 of 3 FW Gaston E -W Connector (U -3321) - Agency Meeting for CP 4C - August 11 @ 10am Lespinasse, Polly Sent Tuesday May 08 2012 2 53 PM To Carrillo Sonia Attachments U3321_Sheet12_S296_NEW_for -1 pdf (661 KB) U3321_Sheetl0_S296_OLD PDF (136 KB) From Bass, Kiersten R Sent Wednesday, August 10, 20114 32 PM To Holder, Michael L, Marella_Buncick @fws gov, Shumate, Christy Cc Taylor, Bryan D, Moose, Barry S, Wrenn, Brian, Sweitzer, Shannon, Chang, David S, Keener, Donna, George Hoops @dot gov, Jabyrd @hntb com, Harris, Jennifer, Jill Gurak, Chambers, Marla J, Clawson, Marshall W, militscher chris @epa gov, Matthews, Monte K SAW, Lespinasse, Polly, progers @hntb com, Rochelle, Rodger D, Ronald Ferrell (referrell @pbsj com) , Hair, Sarah E SAW, McLendon, Scott C SAW, Dewitt, Steve, Franklin, Spencer T, Houser, Anthony A Subject RE Gaston E W Connector (U 3321) Agency Meeting for CP 4C August 11 @ 10am Marella Our latest design does address your concern regarding Stream S296 and we have improved the culvert skew relative to Stream S296 as discussed at the field review However due to existing topography and natural drainage patterns we were unable to reduce or eliminate the ditches draining down to the culvert inlet Attached are the plan sheets showing the old culvert alignment and the new culvert alignment at S296 Also for your reference the crossing of S296 is referred to in the CP4c meeting packet as Site 51 If you have any outstanding issues regarding this matter please do not hesitate to contact me or Jennifer Harris (as Christy is out on maternity leave enjoying her beautiful baby girl) Thank you Kiersten R Bass Senior Transportation Planner NCTA General Engineering Consultant 1 South Wilmington St Raleigh INC 27601 1578 MS Center Raleigh NC 27699 1578 919 707 2725 From Marella_Buncick @fws gov [mailto Marella_Buncick @fws gov] Sent Wednesday, August 10, 2011 10 40 AM To Shumate, Christy Cc Taylor, Bryan D, Moose, Barry S, Wrenn, Brian, Sweitzer, Shannon, Chang, David S, Keener, Donna, George Hoops @dot gov, jabyrd @hntb com , Harris, Jennifer, Jill Gurak, Bass, Kiersten R, Chambers, Marla J, Clawson, Marshall W, Holder, Michael L, militscher chris @epa gov, Matthews, Monte K SAW, Lespinasse, Polly, progers @hntb com, Rochelle, Rodger D, Ronald Ferrell (referrell @pbsJ com) , Hair, Sarah E SAW, McLendon, Scott C SAW, Dewitt, Steve, Franklin, Spencer T, Houser, Anthony A Subject RE Gaston E W Connector (U 3321) Agency Meeting for CP 4C August 11 @ 10am Hi Christy https //mall nc gov /owa/ ?ae= Item &t =IPM Note &ld= RgAAAADMSzLcd9W2TJH14 %2bm 5/18/2012 FW Gaston E W Connector (U 3321) - Agency Meeting for CP 4C August 11 @ 1Oam Page 2 of 3 I will not be able to attend the meeting tomorrow morning even by phone Given that we have discussed and visited in the field the mayor sites of concern I will defer to what the group decides tomorrow My only comment is that the first site we visited other than the golf course should be redesigned to protect both the structure and the creek Hopefully our conversations in the field have resulted in a better design for the culvert and the ditches Thanks for the opportunity to meet In the field and to provide comments marella Marella Buncick USFWS 160 Zllllcoa St Asheville NC 28801 828 258 3939 ext 237 Hope is the thing with feathers that perches In the soul and sings the tune without the words and never stops at all Dickinson Shumate Christy <croshumate @ncdot gov> 07/27/2011 02 40 PM All To marella_buncick @fws gov <marella_buncick @fws gov> Chambers Marla J <marla chambers(n7ncwildlife or-q> Hair Sarah E SAW < Sarah E Hair @usace army mil> Lespinasse Polly <polly lespinasse ncdenr gov> McLendon Scott C SAW < Scott C McLendon @usace army mil> militscher chris @epa gov <militscher chns(a)epa qov> Wrenn Brian <bnan wrenn(cilncdenr gov> Holder Michael L <mholder(a)ncdot gov> Moose Barry S <bmoose@ncdot gov> Houser Anthony A <thouser(cDncdot gov> Taylor Bryan D <bdtaylor @ncdot gov> Matthews Monte K SAW < Monte K Matthews@usace army mil cc Harris Jennifer ghharris1 @ncdotgov> jabyrd @hntbcom <iabvrd hntb com> Ronald Ferrell (referrell apbsl com) <referrell @pbsj com> George Hoops @dot gov < George Hoops @dot gov> Chang David S <dchang(a )ncdot gov> Clawson Marshall W <mclawson @ncdot gov> Dewitt Steve <sddewitt@ncdot gov> Jill Gurak gill gurak _ atkinsglobal com> Franklin Spencer 'r <stfrankiinCa ncdot gov> Sweitzer Shannon <cssweitzerCcilncdot gov> Keener Donna <dckeenera -ncdot gov> Rochelle Rodger D <rdrochelle(a )ncdot gov> Bass Kiersten R <krbass @ncdot gov> progers @hntb com <progers @hntb com> Subject RE Gaston E W Connector (U 3321) Agency Meeting for CP 4C August 11 @ 10am We had a request to move the start time of the Gaston E W Connector Agency Meeting for 4C to 10 00am The meeting will now be Thursday August 11 at 10 00am in the Structure Design Conference Room at Century Center Thanksl Christy Please note my email and phone number have changed croshumateOncdot gov https / /mail nc gov /owa/9ae= Item &t =IPM Note &id= RgAAAADMSzLcd9W2TJH14 %2bm 5/18/2012 FW Gaston E W Connector (U -3321) - Agency Meeting for CP 4C August 11 @ 10am Page 3 of 3 Phone (919) 707 2729 From Shumate, Christy Sent Monday, July 25, 2011 1 13 PM To marella_buncick @fws gov, Chambers, Marla J, renee gledhill earley @ncdcr gov, Hair, Sarah E SAW, Lespinasse, Polly, McLendon, Scott C SAW, militscher chris @epa gov, Wrenn, Brian, Holder, Michael L, Moose, Barry S, Houser, Anthony A, Taylor, Bryan D, Matthews, Monte K SAW Cc Harris, Jennifer, jabyrd @hntb corn , Ronald Ferrell (referrell@pbsj com) , George Hoops @dot gov, Chang, David S, Clawson, Marshall W, Dewitt, Steve, Jill Gurak, Franklin, Spencer T, Sweitzer, Shannon, Keener, Donna, Rochelle, Rodger D, Bass, Kiersten R, progers @hntb com Subject Gaston E W Connector (U 3321) Agency Meeting for CP 4C August 11 @ 9am Good afternoon The Gaston E W Connector (U 3321) Agency Meeting for CP 4C has been scheduled for Thursday August 11 at 9 00am in the Structure Design Conference Room at the Century Center (see attached agenda) Final minutes from the CP 4B meeting (June 9 2011) as well as a draft summary of the July 15 follow up field visit are attached Draft permit drawings will be distributed in advance of the meeting Please let me or Jennifer know if you have any questions Thanksl Christy Please note my email and phone number have changed croshumate @ncdot gov Phone 919/707 2729 Email correspondence to and from this sender is subject to the N C Public Records Law and may be disclosed to third parties https //mail nc gov /owa/ ?ae= Item &t =IPM Note &ld= RgAAAADMSzLcd9W2TJH14 %2bm 5/18/2012 13314S 3.3S 3N17 14JIM d Y L H I I \ I A\ t 230 � A I I / \ S S-1 I 6065 60Z 1 � 1 1 1 1 / I a � I 1 1I I I I / a I I II W I N I � I II � a0��in I I I h �, idO�ha /I y `\ I I 1 \� a 1 I I 225 I I 1 a I I I I I , 1 1 1 a 1 1 1 , a I a I 1 � 1 SHEET 09 SINE SEE MAT CH f L L o � w� 230 CB GVN 133HS 33S 3N17 14JI N /s �� f 48 I r i I � � N � 11V k 1 t s AT H LINE SEE C SHEET M g � I a gg I� i I S � 8 I�a x �J 111111 Y N jf y 8 S a� j� t k 1 t s AT H LINE SEE C SHEET M g � I a gg I� i I S � 8 I�a 13314S 33S 3N/7 14JIM a zi uj d / w J \ 230 ` IA CS CIYN \ / YGby 62Z S S.. + \ '� i' Tf 8 9 [L / ! w \ 4 s I II G 8 7 225 88 IAN / k a ¢ / _ 2 > v ` Y / 4 TCH LINE SEE SHEET 09 MA �,9 f FW 12/15/06 Turnpike Agency Coordination Meeting Mad's FW 12/15/06 Turnpike Agency Coordination Meeting Matl's Lespinasse, Polly Sent Tuesday May 08 2012 2 57 PM To Carrillo Sonia Attachments Meeting 121506 Gaston Co —1 pdf (80 KB) Agcy Mtg Dec06_FINAL_Gasto -1 pdf (2 MB) From Jeff Dayton [mailto Jeff dayton@ncturnpike org] Sent Wednesday, December 20, 2006 3 54 PM To polly lespinasse @ncmail net Cc Jennifer Harris Subject 12/15/06 Turnpike Agency Coordination Meeting Matl s Polly Page 1 of 1 See attached materials from the afternoon discussion on the Gaston E W Connector Let me know if you have any problems opening the files Jeff Dayton E I Transportation Planner NCTA General Engineering Consultant 5400 Glenwood Avenue Suite 400 Raleigh NC 27612 Tel (919) 571 3000 Dir (919) 788 7148 Fax (919) 571 3015 https / /mail nc gov /owa/ ?ae= Item &t =IPM Note &id= RgAAAADMSzLcd9W2TJH14 %2bm 5/18/2012 Agenda December 15, 2006 Project History Selection of Detailed Study Alternatives (DSA) 0 Public Involvement — Jan /Feb Workshops Recently Completed Studies Mussel Screening Report ■ Biological Conclusion for the Carolina Heelsplitter - No Effect ,L Protected Plant Species Surveys • Gaston County (Schweinitz sunflower) • Mecklenburg County Traffic Forecasts • MPO Traffic Model — Non -Toll Forecasts for DSA • Traffic & Revenue Study Model — Toll Forecast for 3 Construction Scenarios Ongoing Studies Human Environment • Historic Architecture • Archaeology Natural Environment ■ Status, progress and updates Next Steps Towards DEIS Status of Engineering Design and Impact Evaluations Special Technical Studies • Geotechnical Analysis at Fly -Ash Basin • Water Vapor Analysis for Scrubber Stacks Turnpike P N ORTH CAROLINA -Ly yet z In FW NCTA Gaston E W Connector (U 3321) (UNCLASSIFIED) FW NCTA - Gaston E -W Connector (U -3321) (UNCLASSIFIED) Lespinasse, Polly Page 1 of 4 Sent Tuesday May 08 2012 3 00 PM To Carrillo Sonia Attachments EEP Letter-071111 pdf (62 KB) USCG emads_June2011 pdf (43 KB) USCG_emad_Sept2008 pdf (11 KB) USACE_062911- Minutes draft docx (154 KB) ----- Original Message---- - From Matthews Monte K SAW [mailto Monte K Matthews @usace army mil] Sent Thursday August 11 2011 3 26 PM To Wrenn Brian Lespinasse Polly Subject FW NCTA - Gaston E -W Connector (U -3321) (UNCLASSIFIED) Classification UNCLASSIFIED Caveats NONE Brian /Polly - I meant to send this to you much earlier than this but forgot all about it until this morning The Draft minutes simply reflect a meeting I had with Christy to get up to speed on this project After speaking with Chris M on the phone this morning I realized that I forgot and managed to get him a copy before today s meeting None of this is probably new to you but feel free add any thoughts Thnaks Monte Matthews Regulatory Project Manager US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive Suite 105 Wake Forest NC 27587 919 - 554 -4884 x 30 The Wilmington District is commited to providing the highest level of support to the public To help us ensure we continue to do so please complete the Customer Satisifaction Survey located at our websi.te at http / /per2 nwp usace army mil /survey html to complete the survey online - - - -- Original Message---- - From Matthews Monte K SAW Sent Thursday August 11 2011 8 20 AM To Militscher Chris Subject FW NCTA - Gaston E -W Connector (U -3321) (UNCLASSIFIED) Classification UNCLASSIFIED Caveats NONE fyi Monte Matthews Regulatory Project Manager US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive Suite 105 Wake Forest NC 27587 https //mail nc gov /owa/ ?ae= Item &t =IPM Note &1d= RgAAAADMSzLcd9W2TJHI4 %2bm 5/18/2012 FW NCTA Gaston E W Connector (U 3321) (UNCLASSIFIED) Page 2 of 4 919- 554 -4884 x 30 The Wilmington District is commited to providing the highest level of support to the public To help us ensure we continue to do so please complete the Customer Satisifacti.on Survey located at our website at http / /per2 nwp usace army mil /survey html to complete the survey online - - - -- Original Message---- - From Shumate Christy [mailto croshumate Sent Thursday July 14 2011 10 33 AM To Matthews Monte K SAW Cc Harris Jennifer Bass Kiersten R Subject RE NCTA - Gaston E -W Connector Monte ncdot qov] Hair Sarah E SAW McLendon Scott C SAW (U -3321) (UNCLASSIFIED) Attached is a summary of the meeting we had on June 29 Please let me know if my interpretation of your comments is consistent with what you had intended In addition we received this week a letter from EEP indicating that they will be dedicating all stream credits at the Beaverdam Creek site to the Gaston project (13 014 restoration credits and 520 6 restoration equivalent credits) They also note that they will provide additional credits as necessary to offset remaining impacts of the project A copy of their letter is attached With regards to the 4C meeting we would prefer to proceed with having the meeting in August to review the hydraulic plans and permit drawings with agencies since your comments are not specific to the hydraulic design and to determine if there are other agency comments that need to be incorporated into the permit application Please let us know if you are able to get any additional information on the issues of the STIP project numbering phased two -lane construction and the Section 10 compliance I have attached for your reference our previous and recent correspondence with USCG indicating that they do not consider Lake Wylie to be navigable under Section 9 and do not require a bridge permit Finally I wanted to remind Linwood Springs Golf Course of other sites requested by will begin at LOAM tomorrow (2900 Linwood Road) From t 4 culvert crossings on Plan you that there is a field visit tomorrow to review the site that NCDOT recently purchased as well as a couple the agencies at the 4B meeting in June The site visit Friday July 15 at the Linwood Springs Golf Course -iere they will review Sheets 10 11 30 and 41 Thanks for your help Please call or email at any time if you have questions or comments about the project We look forward to continuing to work with you on the permitting Thanks Christy Please note my email and phone number have changed croshumate @ncdot gov Phone (919) 707 -2729 - - - -- Original Message---- - From Shumate Christy https //mail nc gov /owa/ ?ae= Item &t =IPM Note &id= RgAAAADMSzLcd9W2TJHI4 %2bm 5/18/2012 FW NCTA Gaston E W Connector (U 3321) (UNCLASSIFIED) Page 3 of 4 Sent Monday July 11 2011 2 50 PM To Matthews Monte K SAW Cc Harris Jennifer Bass Kiersten R Hair Sarah E SAW McLendon Scott C SAW Subject RE NCTA - Gaston E -W Connector (U -3321) (UNCLASSIFIED) Monte Thanks I 11 get something over to you to look at in the next day or so to make sure we captured your comments We will discuss your concerns about the 4C meeting schedule and get back with you Thanks' Christy Please note my email and phone number have changed croshumate @ncdot gov Phone (919) 707 -2729 - - - -- Original Message---- - From Matthews Monte K SAW [mailto Monte K Matthews @usace army mil] Sent Monday July 11 2011 2 20 PM To Shumate Christy Cc Harris Jennifer Bass Kiersten R Hair Sarah E SAW McLendon Scott C SAW Subject RE NCTA - Gaston E -W Connector (U -3321) (UNCLASSIFIED) Classification UNCLASSIFIED Caveats NONE Christy I did type up a summary but it was intended as an internal summary for Liz and Scott (it contained my ideas/recommendations/thoughts on the project as it moves forward) It would probably be better if you could come up with something brief - I would be happy to confirm your summary Along those lines I know that the TA was anticipating a 4C meeting in August I m concerned that we may not have all the issues satisfied to the point that finalized permit drawings would be prepared What type of flexibility do you have in your timeline if a delay of the 4C is needed? Monte - - - -- Original Message---- - From Shumate Christy [mailto croshumate @ncdot gov] Sent Monday July 11 2011 1 06 PM To Matthews Monte K SAW Cc Harris Jennifer Bass Kiersten R Hair Sarah E SAW Subject NCTA - Gaston E -W Connector (U -3321) Monte Thanks again for meeting with us to discuss the Gaston E -W Connector project I think it was good for everyone You mentioned that you were planning to type up a summary of your comments and the discussion Have you had a chance to do that and could we get a copy? I want to make sure that we are properly addressing the comments and questions you have as we prepare the ROD and permit application Or https / /mail nc gov /owa/ ?ae= Item &t =IPM Note &id= RgAAAADMSzLcd9W2TJHI4 %2bm 5/18/2012 FW NCTA Gaston E W Connector (U 3321) (UNCLASSIFIED) Page 4 of 4 I d be happy to type something else and forward to you for review to confirm that I capture everything we discussed If you have any additional questions about the project please let us know' Thanks Christy Please note my email and phone number have changed croshumate @ncdot gov <mailto croshumate @ncdot gov> Phone (919) 707 -2729 Christy Shumate AICP Senior Transportation Planner NCTA General Engineering Consultant 1578 Mail Service Center Raleigh NC 27699 -1578 Tel (919) 707 -2700 Dir (919) 707 -2729 croshumate @ncdot gov <mai.lto croshumate @ncdot gov> Email correspondence to and from this sender is subject to the N C Public Records Law and may be disclosed to third parties Classification UNCLASSIFIED Caveats NONE Classification UNCLASSIFIED Caveats NONE Classification UNCLASSIFIED Caveats NONE https //mail nc gov /owa/ ?ae= Item &t =IPM Note &id= RgAAAADMSzLcd9W2TJHI4 %2bm 5/18/2012 Mr Steve DeWitt P E Chief Engineer North Carolina Turnpike Authority 1578 Mail Service Center Raleigh North Carolina 27699 1578 Dear Mr DeWitt Y os stem a ewe PROGRAM July 11 2011 Subject EEP Letter of Commitment U 3321, Gaston East West Connector Gaston and Mecklenburg Counties The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide compensatory stream and riparian wetland mitigation for the subject project as needed by the North Carolina Turnpike Authority (NCTA) The total amount of stream and wetland mitigation needed from the EEP has not yet been determined EEP s Beaverdam Creek mitigation project is located adjacent to the project corridor and has been identified as a potential mitigation site for TIP U 3321 EEP commits all stream mitigation assets associated with this mitigation site toward offsetting stream impacts associated with this project The Beaverdam Creek mitigation site is located in Mecklenburg County on the eastern end of the proposed roadway protect in HUC 03050101 170040 of the Catawba River basin Currently the project has an estimated 13 534 60 stream mitigation credits (13 014 restoration credits and 520 60 restoration equivalent credits) and is in the fifth year of monitoring EEP commits to implementing sufficient compensatory stream and wetland mitigation credits to offset the impacts associated with this project in accordance with the N C Department of Environment and Natural Resources Ecosystem Enhancement Program In Lieu Fee Instrument dated July 28 2010 as needed by the NCTA To this effect EEP also has available 17 500 stream restoration equivalent High Quality Preservation credits located in the Southern Piedmont Eco region and over 4 000 000 Riparian buffer restoration credits available in Catawba 03050101 for potential use to offset impacts associated with the roadway protect If you have any questions or need additional information please contact Ms Beth Harmon at 919 715 1929 Sincerely S�VkW 04A- Mich e llison EEP eputy Director cc Ms Liz Hair USACE — Asheville Regulatory Field Office Mr Brian Wrenn Division of Water Quality Wetlands /401 Unit Mr Jerry McCraw PhD CEP PWS Atkins Mr Michael Gloden PWS Atkins Ms Linda Fitzpatrick NCDOT — PDEA File U 3321 R."tor PYdte Our .f�tat& MC LT-WA North Carolina Ecosystem Enhancement Program 1652 Mad Service Center Raleigh NC 27699 1652 1919 715 0476 / www nceep net Shumate, Christy From Bill H Brazier @uscg mil on behalf of Brazier Bill <Bill H Brazier @uscg mil> Sent Friday June 24 2011 9 02 AM To Shumate Christy Subject RE Gaston E W Connector (NCDOT STIP #U 3321) Catawba River crossings Christy Neither of these rivers are listed in our Bridges over Navigable Waterways handbook Bill Brazier Original Message From croshumate @ncdot gov [mailto croshumate @ncdot gov] Sent Friday June 24 20118 43 AM To Brazier Bill Cc Harris Jennifer Jill Gurak Subject RE Gaston E W Connector (NCDOT STIP #U 3321) Catawba River crossings mIl Any luck getting a ruling on the navigability of the Catawba and South Fork Rivers at Lake Wylie North Carolina? We have a meeting with USACE next week on Wednesday and would like to be able to give them an update on the issue Thanks for your help Christy Please note my email and phone number have changed croshumate @ncdot gov <mailto croshumate @ncdot gov> Phone (919) 707 2729 From Shumate Christy Sent Thursday June 02 20119 33 AM To bill h brazier @uscg mil Cc Harris Jennifer Jill Gurak Liz Hair Subject RE Gaston E W Connector (NCDOT STIP #U 3321) Catawba River crossings ZU Have you had a chance to look into the issue of navigability for the Catawba and South Fork Rivers? Please let us know if you need any additional information Thanks Christy Please note my email and phone number have changed croshumate @ncdot gov <mailto croshumate @ncdot gov> Phone (919) 707 2729 From Shumate Christy Sent Tuesday May 17 20114 08 PM To bill h brazier @uscg mil Cc Harris Jennifer Gurak Jill S Liz Hair Subject Gaston E W Connector (NCDOT STIP #U 3321) Catawba River crossings Bill Thanks so much for talking with us this morning about the Gaston E W Connector project The project is located in Gaston & Mecklenburg Counties NC and includes bridge crossings of the Catawba River and South Fork Catawba River above the Lake Wylie Dam You had previously indicated via email that the project was beyond USCG s area of responsibility since the project is upstream of several dams and rapids and would not be considered navigable We appreciate your willingness to get a legal opinion on the navigability that we can include in our records Attached for your use are * a map of the projects preferred alternative alignment * a map showing the Catawba River watershed including dam locations * recent correspondence with the USACE regarding permit requirements 2 * email from September 2008 indicating a USCG bridge permit would not be required Below is some information about the proposed bridges based on our preliminary design We expect that a design build team will reduce the number of bents (and increase the spacing between bents) as part of their value engineering process Catawba River Crossing Bridge Information Westbound Bridge Eastbound Bridge Total Length (ft) 2 466 5 24454 Length over Lake Wylie (ft) 2 153 4 2 063 9 Average Spacing Between Bents* (ft) 914 906 Total # of Bents 26 26 # of Bents with Drilled Shafts in Lake Wylie 23 23 Total Area of Drilled Shafts in Lake Wylie (sq ft) 3 2 656 2 656 Proposed Easement Area over Lake Wylie (ac) 7 80 (permanent) / 4 80 (temporary) Shoreline Mgmt Plan Shoreline Classification Public Infrastructure (west) / Impact Minimization Zone and Future Residential (east) Minimum Vertical Clearance 29 ft * A bent is comprised of a row of columns that support a section of the bridge Each bent in the Catawba River has three columns coming down from the bridge deck Each column connects to a 16 ft by 16 ft square footing positioned above the normal water mark From each footing slab four 3 5 ft diameter drilled shafts extend into the ground South Fork Catawba River Crossing Bridge Information Westbound Bridge Eastbound Bridge Total Length (ft) 1 613 9 1 652 1 Length over Lake Wylie (ft) 8576 8249 Average Spacing Between Bents* (ft) 897 870 Total # of Bents 17 18 # of Bents with Drilled Shafts in Lake Wylie 9 9 Total Area of Drilled Shafts in Lake Wylie (sq ft) 693 5 693 Proposed Easement Area over Lake Wylie (ac) 2 78 (permanent) / 2 01 (temporary) Shoreline Mgmt Plan Shoreline Classification Residential (west and east) Minimum Vertical Clearance 62 ft * Each bent in the South Fork Catawba River has two columns coming down from the bridge deck Each column connects to a 16 ft by 16 ft square footing positioned above the normal water mark From each footing slab four 3 5 ft diameter drilled shafts extend into the ground Also we checked with NCDOT and a USCG bridge permit was NOT required for construction of the NC 49 bridge over the Catawba River in 2003 This bridge is about 7 miles downstream of the proposed crossings If you need any additional information or have any questions about this project please feel free to contact Jennifer Harris or me Thanks Christy Christy Shumate AICP Senior Transportat on Planner NCTA General Engineering Consultant 5400 Glenwood Ave Suite 400 Raleigh NC 27612 1578 Mail Service Center Raleigh NC 27699 1578 Tel (919) 5713000 Dir (919) 788 7149 Fax (919) 5713015 PLEASE NOTE MY EMAIL ADDRESS HAS CHANGED croshumate @ncdot gov Email correspondence to and from this sender is subject to the N C Public Records Law and may be disclosed to third parties 7 Shumate, Christ From Harris Jennifer Sent Wednesday February 23 2011 11 17 AM To jsgurak Shumate Christy Hair Sarah E SAW McLendon Scott C SAW Subject FW Gaston East West Connector (Catawba River) FYI Jennifer Jennifer Harris P E Director of Planning and Environmental Studies NC Turnpike Authority an entity of the NC Department of Transportation Mailing Address Physical Address 1578 Mail Service Center 5400 Glenwood Avenue Suite 400 Raleigh NC 27699 1578 Raleigh NC 27612 PLEASE NOTE MY EMAIL ADDRESS HAS CHANGED jhharrisl @ncdot gov office (919) 571 3000 fax (919) 571 -3015 www ncturnpi.ke org - Original Message - From Gurak Jill S [mailto JSGurak @pbs3 com] Sent Friday September 12 2008 9 41 AM To Dayton Jeff Subject FW Gaston East -West Connector (Catawba River) -- Original Message From Giugno Kiersten R Sent Friday September 12 2008 9 29 AM To Gurak Jill S Subject FW Gaston East West Connector (Catawba River) For your records Kiersten R Giugno I PBS &J I Senior Planner - -- Original Message From Bill H Brazier @uscg mil [mai.lto Bill H Brazier @uscg mil] Sent Friday September 12 2008 9 21 AM To Giugno Kiersten R Cc Gregory Waverly Subject RE Gaston East West Connector (Catawba River) Ms Giugno Following a review of the project area and checking with our legal staff this project is beyond our area of responsibility and will not require a Coast Guard Bridge Permit If you should have further questions please contact me at (757) 398 6422 Bill H Brazier From Giugno Kiersten R Sent Friday September 05 2008 10 04 AM 1 To bill h brazier @uscg mil Cc Gurak Jill S Noonkester Jennifer R Subject Gaston East West Connector (Catawba River) Bill - The North Carolina Turnpike Authority (NCTA) proposes to improve east west travel through Gaston County by constructing a new toll facility between I 85 west of Gastonia and I- 485/NC 160 in western Mecklenburg County PBS &J is currently preparing the Draft Environmental Impact Statement which includes an evaluation of the impacts of 12 Detailed Study Alternatives on the human and natural environment This analysis includes the evaluation of potential impacts to navigable waters under the jurisdiction of the USCG As you can see on the attached map the Catawba River is located in the eastern portion of the project area Although this river is dammed in several locations we have not been able to obtain clarification as to whether or not it is a navigable water Per our conversation could you please identify whether or not the Catawba River qualifies as a Navigable Water and whether or not crossing this river would require a permit from the USCG' Should you need additional information please feel free to contact me Thank you for your assistance with this matter Sincerely Kiersten R Giugno I PBS &J I Senior Planner 1616 E Millbrook Road Ste 310 1 Raleigh NC 27609 1919 431 5290 Email correspondence to and from this sender is subject to the N C Public Records Law and may be disclosed to third parties K /® NORTH CAiROILIINA l t Turnpike Authority MEETING MINUTES (Draft) Date June 29 2011 1 30 pm Location NCTA Offices Project STIP U 3321 Gaston E W Connector — STP 1213(6) Attendees Monte Matthews — USACE Steve DeWitt — NCTA Jennifer Harris — NCTA Christy Shumate — HNTB Purpose Discuss USACE comments on Final Environmental Impact Statement (EIS) and schedule and plan for upcoming permit application submittal Minutes Mr Matthews reviewed his comments and questions on the Final EIS • Purpose and Need — The Final EIS references a 2008 updated statement of purpose and need report The purpose and need was revised after the project became a toll candidate project and to reflect updated traffic forecasts Agencies had previously concurred on the purpose and need in 2002 agencies re concurred with the revised purpose and need in October 2008 Signed concurrence forms can be found in the appendices of the Draft EIS (Concurrence Points 1 2 and 2A) and Final EIS (3 and 4A) Mr Matthews asked about a comment made by the Southern Environmental Law Center on the purpose and need that references improving congestion on 1 85 as part of the purpose for the project Ms Harris explained that improving congestion on 1 85 is listed as a need for the project but is not part of the stated purpose of the project She referred to Section 1 of the Draft EIS which includes the purpose statement for the project to improve east west transportation mobility in the area around the City of Gastonia and the Charlotte metropolitan area and particularly to establish direct access between the rapidly growing area of southeast Gaston County and western Mecklenburg County No changes to the purpose statement were made between the Draft and Final EIS Alternatives — Mr Matthews noted that USEPA did not sign the concurrence form for CPs 3 or 4A but instead provided a memo stating that they were unable to concur until issues regarding regional air quality conformity were resolved Ms Harris confirmed that the air quality issue had been resolved USEPA had also noted concerns regarding compliance with the Clean Water Act related to mitigation and impacts to Section 303(d) listed waters Meeting - 06/29/11 Page 2 of 3 o Mr Matthews commented that service roads and additional y line improvements were only completed for the Preferred Alternative and presented in the Final EIS He asked NCTA to confirm that the addition of these items to the other Detailed Study Alternatives would not have changed the selection of the Preferred Alternative He recommended including a statement in the Record of Decision (ROD) and permit application o Mr Matthews asked that a table of all impacts be included in the permit application The table should include impacts of each of the Detailed Study Alternatives as presented in the Draft EIS with an additional column for the Preferred Alternative The table should include a note that designs for the Preferred Alternative were refined and that impacts would have changed similarly on other DSAs had similar refinements been made Level of Design — Mr Matthews asked about the levels of design used in the Draft and Final EISs and the permit application The Draft EIS used preliminary level design to compare Detailed Study Alternatives Impacts were calculated based on slope stake limits plus a 25 foot buffer on both sides For the Final EIS the overall level of design did not change however the Preferred Alternative was refined based on public comments to avoid and minimize impacts and to add service roads A portion of the Preferred Alternative (NC 279 to 1 485) is being developed to a higher level of design for the permit application This design will incorporate additional changes to the preliminary design resulting from environmental commitments (including reduced number(of mainline lanes and reduced median width) as well as hydraulic design for the permit section Impacts will be calculated on slope stake limits for this portion of the project The remainder of the project will be based on the same design presented in the Final EIS — preliminary design with impacts based on slope stake limits plus a 25 foot buffer on both sides A Concurrence Point 4B meeting to review schematic hydraulic design was held on June 9 2011 and a follow up field visit to review some sites is scheduled for July 15 2011 Permit drawings will be reviewed with agencies at a Concurrence Point 4C meeting in August 2011 STIP Projects — Mr Matthews asked about the STIP project number designations and construction segments for the project and how that compares to the permit section The permit section was selected in fall 2010 based on a review of impacts to jurisdictional resources projected traffic volumes and likely construction phases It was determined that a 6 mile section of the project from NC 279 east to 1 485 would be an appropriate section to include in the initial permit application Later the project was divided into multiple STIP project segments for purposes of design build contracting and construction The permit section is a portion of one of those STIP projects — U 3321C However the U 3321C project also includes an additional 3 +/ miles of the project between Patrick Road and NC 279 Mr Matthews will discuss this inconsistency in project sections for purposes of permitting compared to contracting with USACE attorneys and let NCTA know if it will be an issue during permitting It may be necessary to add an additional project segment that includes only the permit section Typical Section — The proposed typical section for the project in the Draft EIS included a 70 foot median For the Preferred Alternative a commitment was made to reduce the median width to 46 feet during final design The Final EIS notes that this would allow for widening into the median if needed in the future Mr Matthews asked for clarification on this and further explanation of not reducing the median to 23 feet given that it has been determined that the proposed number of lanes would meet the purpose and need of the project through the design year without the need for widening He recommended including an explanation of the decision not to reduce the median width further in the permit application • No Build Alternative — Mr Matthews noted that in addition to a No Build Alternative the permit application should include a discussion of a No Permit Alternative i e a Build Alternative that avoids all jurisdictional impacts by bridging resources and why such an alternative would not be viable • Mitigation — Mr Matthews asked about the status of mitigation for the project NCDOT has recently purchased the Linwood Springs Golf Course property through which Crowders Creek runs This site will be used as on site mitigation for the project for stream impacts The site includes approximately 5 500 If of stream and there are adjacent parcels that will be landlocked by the project that include an additional 5 000 If of stream NCTA anticipates approximately 10 500 If of stream restoration can be accommodated at this site A conceptual plan for the site will be included in the permit application Meeting - 06/29/11 Page 3 of 3 Additional mitigation requirements will be fulfilled through EEP which has sufficient available credits for the projected impacts • Environmental Justice — Mr Matthews asked about potential environmental justice issues associated with the project Ms Shumate noted that there are some EJ communities along the corridor along with many non EJ communities The projects impacts are not disproportionate Mr Matthews requested any additional documentation that may have been prepared related to this topic Permit Modifications — Mr Matthews noted that NCTA is currently proposing phased construction of the section of the project from 1 85 to US 321 as a two lane facility He questioned what design would be submitted in a permit modification for this section — the two lane design or the ultimate four lane design Ms Shumate did not know but stated that the initial permit application would include preliminary design for a four lane facility in this section with impacts based on slope stake limits plus a 25 foot buffer on both sides Mr Matthews will look into the issue further to determine any guidelines USACE may have on such phased construction Navigability of Lake Wylie — Ms Shumate noted that in comments provided by USACE during agency coordination for the FERC license revision required for the crossings of Lake Wylie USACE noted that the Catawba River South Fork Catawba River and Lake Wylie are navigable waters and subject to Sections 9 and 10 of the 1899 Rivers and Harbors Act They also stated that a US Coast Guard bridge permit would be required Ms Shumate noted that NCTA had coordinated with USCG and they are not considering Lake Wylie navigable for Section 9 purposes and no bridge permit would be required Mr Matthews noted that the USACE may still have jurisdiction under Section 10 and said he would look into that and any additional requirements for permitting Action Items • NCTA will provide any additional documentation related to environmental justice issues • Mr Matthews will look into the issues of the STIP project numbering permitting for phased construction of the project from 1 85 to US 321 and Section 10 jurisdiction and requirements Meeting - 06/29/11 FW Gaston East West Connector FW Gaston East -West Connector Lespinasse, Polly Sent Tuesday May 08 2012 2 55 PM To Carrillo Sonia From Harris, Jennifer Sent Tuesday, July 06, 2010 3 04 PM To Mllitscher Chris @epamail epa gov Cc Dayton, Jeff, George Hoops @dot gov, jsgurak„ sarah a hair @usace army mil, Lespinasse Polly marella_buncick @fws gov, Chambers, Marla J, Gledhill earley, Renee, Harris, Jennifer Subject RE Gaston East West Connector Page 1 of 3 Chris Thanks for the clarifications For this project, the only streams that will require mitigation for DWQ are those that were identified as perennial DWQ told us that this project was far enough in the planning process that our new requirement for intermittent stream mitigation does not apply They told us our mitigation ratio will be 1 1 The USACE told us they will require mitigation for all streams and wetlands at the following ratios Intermittent Stream (USACE stream quality rating score 0-49 [unimportant]) 0 5 1 Intermittent Stream (USACE stream quality rating score 50 100 [important]) 1 1 Perennial Stream 21 Wetlands 21 Also we are evaluating the Linwood Springs Golf Course further as a potential mitigation site for the project A conceptual mitigation plan has recently been prepared and will be posted to our website soon This document will also be referenced in the FEIS Thanks again Jennifer Jennifer H Harris P E North Carolina Turnpike Authority 5400 Glenwood Avenue Suite 400 Raleigh North Carolina 27612 Tel (919) 571 3000 Dir (919) 571 3004 Fax (919) 571 3015 From Mllitscher Chris @epamail epa gov [mailto Mllitscher Chris @epamail epa gov] Sent Thursday July 01, 2010 8 19 AM To Harris, Jennifer Cc Dayton, Jeff, Harris, Jennifer, George Hoops @dot gov, jsgurak„ sarah a hair @usace army mil, Lespinasse, Polly, marella_buncick @fws gov, Chambers Marla J, Gledhill earley, Renee Subject Re Gaston East West Connector Jennifer I abstain on CP 3 and 4A I understand that all of the other Merger team members have potentially concurred Air conformity & NCSIP issues have been resolved with EPA s Air Programs in Atlanta However, EPA continues to have substantial environmental concerns regarding the ability to provide adequate compensatory mitigation for Jurisdictional impacts to waters of the U S EPA has not yet received a conceptual mitigation plan as requested As you may be aware, NCDWQ as of October 2009 requires mitigation for all intermittent streams as well https //mail nc gov /owa/ ?ae= Item &t =IPM Note &1d= RgAAAADMSzLcd9W2TJHI4 %2bm 5/18/2012 FW Gaston East -West Connector Page 2 of 3 I appreciate that some avoidance and minimization on the Preferred Alternative has been accomplished which is the primary reason why I conditionally concurred However I continue to have environmental concerns regarding the selection of the LEDPA Please refer to EPA s comment letter on DEIS for further information EPA does not believe that pursuing an elevation to the MMT or Review Board is appropriate at this time I plan to continue to stay an active participant in the Merger process for this proposed project Thank you Christopher A Militscher, REM, CHMM USEPA Raleigh Office Merger Team Representative 919 856 4206 Harris, Jennifer < Jennifer harris@ncturnpike org> wrote To Chris Militscher /R4 /USEPA /US @EPA From Harris, Jennifer < Jennifer harris@ncturnpike org> Date 06/30/2010 09 08AM cc Dayton, Jeff <Jeff dayton@ncturnpike org >, Harris, Jennifer < Jennifer harris@ncturnpike org >, George Hoops @dot gov < George Hoops @dot gov >, Jsgurak, <Jsgurak @pbsj com >, Harris, Jennifer < Jennifer harris@ncturnpike org> Subject Gaston East West Connector Chris We are finalizing the Final EIS for the subject project You provided a letter dated August 31 2009 indicating special circumstances for non concurrence related to CP 3 The reasons were that the Metrolina region conformity determination had not been completed and we had not yet demonstrated avoidance and minimization to Jurisdictional wetlands and streams First question would this be an abstain circumstance? Or were we supposed to elevate this issue since it is a non concurrence ? The letter does not say abstain but we interpreted it that way and want to confirm that is the correct interpretation Second question now that the Metrolina region has demonstrated conformity and we have 4A does that mean that EPA concurs or could concur with CP 39 Third question Your concurrence for 4A also referenced the August memo because the Metrolina conformity determination had not yet been completed at that time Now that it has does that mean the conditional concurrence can be an actual concurrence ? As you can see we want to make sure we are dotting the i s and crossing the t s Thank you in advance for your prompt response Jennifer Jennifer H Harris P E North Carolina Turnpike Authority 5400 Glenwood Avenue Suite 400 Raleigh North Carolina 27612 Tel (919) 5713000 Dir (919) 571 3004 Fax (919) 571 3015 https //mail nc gov /owa/ ?ae= Item &t =IPM Note &id= RgAAAADMSzLcd9W2TJHI4 %2bm 5/18/2012 FW Gaston East West Connector Page 3 of 3 - Message from Militscher Chris @epamail epa gov <Militscher Chris @epamail epa gov> on Thu, 1 Apr 2010 15 25 40 0400 - - To "Dayton Jeff' <jeff dayton @ncturnpike org> "Harris, Jennifer" <jenmfer harris@ncturnpike org> cc "George Hoops @dot gov" < George Hoops @dot gov> Subject Re CP 4a Documentation Jeff Yes The memo being referred to on the CP 4A form is the EPA s 8/28/09 special circumstances for non concurrence brief on the LEDPA We concur that you have clearly demonstrated some Section 404 avoidance and minimization to waters of the U S However, we continue to have reservations concerning the air quality issues and the proposed mitigation for the selected /preferred alternative Thank you Dayton, Jeff <Jeff dayton @ncturnpike org> wrote To Chris Militscher /R4 /USEPA /US @EPA From Dayton, Jeff <Jeff dayton @ncturnpike org> Date 04/01/2010 03 01PM cc Harris, Jennifer < Jennifer hams @ncturnpike org >, George Hoops @dot gov <George Hoops @dot gov> Subject CP 4a Documentation Chris We are beginning the preparations for the Final EIS and did have one question for you Is the briefing memo from USEPA for Concurrence Point 3 (attached as (CP3Signed101309 &GastonSpecC1rc pdt) also being referred to as memo on USEPA s signature line in Concurrence Point 4a (attached as CP 4a signed 021610 pdt)? If not could you provide us the additional documentation /memo for Concurrence Point 4a? Thanks again Jeff Dayton P E Transportation Engineer NCTA General Engineering Consultant 5400 Glenwood Avenue, Suite 400 Raleigh, Tel (919) 571 3000 Dir (919) 788 7148 Fax (919) 571 3015 5 https //mail nc gov /owa/9ae= Item &t =IPM Note &id= RgAAAADMSzLcd9W2TJHI4 %2bm 5/18/2012 Section 404/NEPA Merger Team Meeting Agreement Concurrence Point No 3 — Identification of the Least Environmentally Damaging Practicable Alternative (LEDPA) Protect No /TIP No /Name/Description Federal Project Number STP- 1213(6) State Project Number 8 2812501 TIP Number U 3321 Description Gaston East West Connector in Gaston and Mecklenburg Counties Least Environmentally Damaging Practicable Alternative Following review of the Detailed Study Alternatives (DSAs) presented in the Draft Environmental Impact Statement the Section 404/NEPA Merger Project Team has concluded that DSA 9 is the Least Environmentally Damaging Practicable Alternative contingent upon the Metrolma Region successfully demonstrating air quality conformity in compliance with the Clean Air Act DSA 9 was identified as the LEDPA based on documentation from the Turnpike Environmental Agency Coordination (TEAL) meeting held on October 13 2009 (see attached minutes) Additional discussions were held at TEAC meetings on August 12 2009 and September 8 2009 The Project Team concurred on this date of 10 13 09 that DSA 9 is the Least Environmentally Damaging and Practicable Alternative for the Gaston East West Connector project USACE ... 7tf UfNo 11', Ioq USEPA NCDWQ �At- NCDC GUAM NCTA NCDOT USFWS SECTION 404/NEPA MERGER 01 ISSUE BRIEF Special Circumstances for Non concurrence Date August 31 2009 Submitted by Christopher A Militscher REM CHMM Merger Team Representative \ USEPA Raleigh Office THRU Heinz J Mueller Chief NEPA Program Office USEPA Region 4 Thomas C Welborn Chief Wetlands Coastal Protection Branch USEPA Region 4 CC Kathy Matthews EPA Wetlands Section To Jennifer Harris P E Project Manager NCDOT/North Carolina Turnpike Authority Merger 01 Team Representatives 1 Protect Name and Brief Description Gaston East West Connector From I 85 to I 485 Mecklenburg and Gaston Counties 22 mile new location toll facility (U 3321) 2 Last Concurrence Point CP 2A Bridging and Alignment Review Date of Concurrence 10/7/08 3 Proposal and Position NCTA proposes to select DSA 9 as the LEDPA Generally EPA does not believe that the LEDPA is ripe for concurrence until the Metrolina area air quality ozone issues are resolved first and avoidance and minimization can be demonstrated for Section 303(d) listed impaired waters 4 Reasons for Non - concurrence The Merger 01 Roles and Responsibilities (Revised 5/2/06 — Page 6) describe the decision making philosophy under the NEPA/Section 404 Merger 01 Process Concurrence is not legally defined but could be understood as being potentially pre decisional on the part of EPA employees The requirements of the Administrative Procedures Act of 1946 must also be considered The NEPA/Section 404 Merger 01 Process does not address compliance or requirements under the Clean Air Act Non concurrence is described as I do not concur as the information is not adequate for this stage and /or concurrence could violate the laws and regulations of my program and agency Please refer to EPA s letter dated July 17 2009 on the review of the Draft Environmental Impact Statement and our environmental objections concerning the compliance with the Clean Air Act NAAQS and Clean Water Act Section 404(b)(1) Guidelines It is our understanding that the Federal Highway Administration cannot issue a Record of Decision (ROD) until such time as the SIP and transportation conformity issues are resolved 5 Potentially Violated Laws/Regulations Sections 172 and 182 of the Clean Air Act and Section 404(b)(1) of the Clean Water Act 6 Alternative Course of Action EPA Merger team representatives will continue to work with NCTA FHWA and other Merger team agencies on environmental issues associated with the proposed project However EPA representatives cannot provide written concurrence until such time as the Clean Air Act compliance issues are resolved and Section 404(b)(1) Guidelines on the avoidance and minimization of jurisdictional wetland and stream impacts can be demonstrated Section 404 /NEPA Merger 'Team Meeting Agreement Concurrence Point No 4a — Avoidance and Minimization Project No /TIP No /Name/Description Federal Project Number STP 1213(6), State Protect Number 8 2812501 TIP Number U 3321 Description Gaston East West Connector in Gaston and Mecklenburg Counties Avoidance and Minimization The purpose of Concurrence Point 4a is to identify additional avoidance and minimization efforts not included in the preliminary design during the alternative analysis phase of the project Following a review of the preliminary design changes since the Draft Environmental Impact Statement the Section 404/NEPA Merger Project Team has concluded that project jurisdictional impacts have been avoided and minimized to the maximum extent practicable based on current information and design available at the time Need },o mvie.w StYViCe Zzo s #1 0,,8 0 �ot refinehner.6s Avoidance and Minimization efforts were reviewed and accepted by the NEPA/404 Merger Team based on documentation from the Turnpike Environmental Agency Coordination (1 EAC) meeting held on February 16 2010 The Project Team concurred on this date of Minimization) USACE -2-�1(�10 52,7 I1vC LU 1iE`i N1rMu USEPAQ4& , NCDWQ I W14 aA NCDCR GUA NCT I b 20 Nvith CP 4a (Avoidance and NCDOT v USFWS NCWRC FW Gaston WQ analysis response FW Gaston WQ analysis response Lespinasse, Polly Sent Tuesday May 08 2012 3 26 PM To Carrillo Sonia From Shumate Christy Sent Friday December 16 20118 44 AM To Wrenn Brian Harris Jennifer Cc Lespinasse Polly Subject RE Gaston WQ analysis response Brian Thanks so much Hope you have a happy holidayl Thanks christy From Wrenn Brian Sent Thursday December 15 20114 35 PM To Shumate Christy Harris Jennifer Cc Lespinasse Polly Subject Gaston WQ analysis response Page 1 of 1 Please find attached our final comments on the Gaston WQ analysis A hard copy will follow If you have any questions please let me know thanks Brian PLEASE NOTE THAT MY CONTACT INFORMATION HAS CHANGED Brian Wrenn Transportation Permitting Unit NCDWQ 1650 Mall Service Center Raleigh NC 27699 1650 919 807 6365 (phone) 919 807 6492 (fax) or 585 Waughtown St Winston Salem NC 27107 336 771 4952 (phone) 336 7714631 (fax) brian wrenn @ncdenr l;ov E mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this sender is subject to the N C Public Records Law and may be disclosed to third parties https //mail nc gov /owa/ ?ae= Item &t =IPM Note &1d= RgAAAADMSzLcd9W2TJH14 %2bm 5/18/2012 FKWA VC [S AM A R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Governor Director December 15 2011 Steve DeWitt P E North Carolina Turnpike Authority 1578 Mail Service Center Raleigh NC 27699 1578 Subject Response to NCTA letter dated November 22 2011 regarding Gaston East West Connector Indirect and Cumulative Effects Water Quality Analyses — Draft (Atkins August 2011) Dear Mr DeWitt The NC Division of Water Quality has reviewed your responses to our comments regarding the subject document These comments in conjunction with your explanations provided at our November 22 2011 meeting have adequately answered our questions We find your methodologies to be reasonable and concur with your conclusions regarding water quality impacts due to indirect and cumulative effects from the Gaston East West Connector Furthermore we will no longer require a letter from each Metropolitan Planning Organization (MPO) confirming that the construction of the Gaston East West Connector was omitted from the No Build analysis If you have any further questions regarding this issue please let me know Sincerely i Brian Wrenn Transportation Permitting Unit cc Liz Hair Asheville Regulatory Field Office US Army Corps of Engineers Chris Militscher USEPA Marla Chambers WRC Polly Lespinasse NCDWQ Mooresville Regional Office File Copy Transportation Per ittrtg Unit 1650 Mail Service Center Raleigh North Carolina 27699 1650 Location 2321 Crabtree Blvd Raleigh North Carolina 27604 Phone 919 733 17861 FAX 919 733 6893 Internet http //h2o enr state nc us/ncwetlands/ An Equal Opportunity 1 Affirmative Action Employer Dee Freeman Secretary Noe Carolina N wrall# J