HomeMy WebLinkAbout20120285_Gaston East-West Corridor Email_20091013FW NCTA October 13 2009 TEAC Meeting Gaston LEDPA Concurrence Page 1 of 1
FW NCTA - October 13, 2009 TEAC Meeting - Gaston - LEDPA Concurrence
Lespinasse, Polly
Sent Tuesday May 08 2012 2 57 PM
To Carrillo Sonia
Attachments 2009 10 13 -TEAC -LEDPA pdf (193 KB)
- - - -- Original Message---- -
From Jennifer Harris [mai.lto system @constructware com]
Sent Wednesday October 07 2009 1 04 PM
To aferlo @perkinscoie com amy simes @ncmail net Gamber Anne D McMillan Art
Johnson Ben3etta L wmalley @perkinscoie com brian wrenn @ncmail net
bslambeth @pbsj com cgibilaro Dagnino Carla S mili.tscher chri.s @epa gov
Shumate Christy clarence coleman @fhwa dot gov Grissom Daniel C
dwbass @pbs] com Chang David S Barbour Deborah M Hutchings Deborah S Sykes
Dewayne L Keener Donna donnie brew @fhwa dot gov edward dancausse @fhwa dot gov
Lusk Elizabeth L george hoops @dot gov hankg @cityofgastonia com Dayton Jeff
Harris Jennifer 3geratz @pbs3 com grmccrain @pbs3 com 3sgurak
]dcooper @pbs3 com jfredette @perkinscoie com Dcadams @pbsj com Wadsworth John C
matthews kathy @epa gov Fischer Kimberly J Barrette Korey Solberg Kristina L
Brooks Lonnie I marella_buncick @fws gov Chambers Marla J Clawson Marshall W
mcgloden @pbsj com Holder Michael L Pair Missy Lespi.nasse Polly Beauregard
Rachelle Simons Reid Gledhill- earley Renee Roach Renee B
rob ayers @fhwa dot gov rwcook @ci charlotte nc us slane @louisberger com
scott c mclendon @usace army mil Franklin Spencer T Gurganus Stephen J (Steve) -
HEU Dewitt Steve steven w lund @saw02 usace army mil bisterfeld ted @epa gov
Hart Teresa A Houser Anthony A Roberts Tracy wbarrett @ncdot gov
Sub3ect NCTA - October 13 2009 TEAC Meeting - Gaston - LEDPA Concurrence
Participating and Cooperating Agencies
As requested at last month s TEAC meeting NCTA will present the case for
identifying DSA 9 as the LEDPA at the upcoming October 13 2009 meeting Please
see attached powerpoint that will be presented at the meeting
Previous meetings were held on August 12 2009 and September 8 2009
As discussed this meeting s presentation will complete the process of us providing
information to you in order for you to concur on the LEDPA Therefore we expect
to sign the LEDPA concurrence form at the meeting (with the exception of EPA
indicating they need to defer until the clean air act issues are resolved)
Please let us know if you need any additional information to come to the meeting
prepared to identify agree and concur on the LEDPA for the project
Thanks in advance for your cooperation
Jennifer Harris P E
Staff Engineer
North Carolina Turnpike Authority
Jennifer harris @ncturnpike org
(919) 571 -3004
https //mall nc gov /owa/ ?ae= Item &t =IPM Note &1d= RgAAAADMSzLcd9W2TJHI4 %2bm 5/17/2012
Turnpik Authority