Loading...
HomeMy WebLinkAbout20120481 Ver 1_401 Application_20120512MM AND &WM Environmental Engineers & Scientists May 9 2012 20120481 Hazen and Sawyer PC 4011 WestChase Blvd Raleigh NC 27607 919 833 7152 Fax 919 833 1828 NC DWQ 401 WBSCP Unit �� 1650 Mail Service Center I ED Raleigh NC 27699 1650 Re Pre Construction Notification (PCN) Application City of Havelock North Carolina — Church Road Utility Relocation Dear Sir /Madam Please find attached the Pre Construction Notification (PCN) Application for the above referenced project The City of Havelock (City) has an existing gravity sewer pipeline adjacent to Church Road south of US Highway 70 North Carolina Department of Transportation ( NCDOT) has proposed to realign the northern end of Church Road In order to accommodate the road realignment the existing utilities in the area need to be relocated The gravity sewer relocation will involve installation of approximately 475 feet of new pipe south of the proposed NCDOT right of way for Church Road The relocated sewer line will connect to the existing line that runs from south to north along Church Road and to the existing line located along the west side of US Highway 70 Impacts associated with the proposed activities are 40 feet of temporary impact to jurisdictional streams No protected riparian buffers or jurisdictional wetlands will be impacted by the proposed activities The proposed project also requires a Clean Water Act Section 404 Nationwide Permit from US Army Corps of Engineers In accordance with NC Department of Environment and Natural Resources policy and fee schedule a check for the permit application fee of $240 is enclosed If you have any questions or require additional information please contact me at 919 833 7152 Thank you for your assistance Sincerely HAZEN AND SAWYER, P C Keven Arrance Scientist CC James Freeman City of Havelock Attachments New York NY Armonk NY Woodbury NY Detroit MI Raleigh NC Charlotte NC Atlanta GA Fairfax VA Hollywood FL Boca Raton FL Fort Pierce FL Sarasota FL Miami FL Philadelphia PA O�o� W ATE9QG r 20 12 04 8 1 Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 Page 1 of 11 PCN Form - Version 1 3 December 10 2008 Version Pre - Construction Notification (PCN) Form A Applicant Information 1 Processing 1 a Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ® Yes ❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project City of Havelock NC Church Road Utility Relocation 2b County Craven 2c Nearest municipality / town Havelock NC 2d Subdivision name n/a 2e NCDOT only T I P or state project no 3 Owner Information 3a Name(s) on Recorded Deed See Additional Information attached 3b Deed Book and Page No 3c Responsible Party (for LLC if applicable) (� - 3d Street address 3e City state zip 3f Telephone no 1R 3g Fax no J 8 ran 3h Email address Page 1 of 11 PCN Form - Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ® Other specify utility 4b Name James Freeman City Manager 4c Business name (if applicable) City of Havelock 4d Street address 1 Governmental Avenue 4e City state zip Havelock NC 28532 4f Telephone no (252) 444 6401 4g Fax no (252) 444 2616 4h Email address JFreeman @havelocknc us 5 Agent/Consultant Information (if applicable) 5a Name Ms Keven Arrance 5b Business name (if applicable) Hazen and Sawyer P C 5c Street address 4011 WestChase Blvd Suite 500 5d City state zip Raleigh NC 27607 5e Telephone no 919 863 9350 5f Fax no 919 833 1828 5g Email address karrance @hazenandsawyer com Page 2 of 11 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) See Additional Information attached 1 b Site coordinates (in decimal degrees) Latitude 34 88714 Longitude 7692016 (DD DDDDDD) ( DD DDDDDD) 1c Property size See Additional Information attached acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to Southwest Prong Slocum Creek proposed project 2b Water Quality Classification of nearest receiving water C Sw NSW 2c River basin Neuse 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application A portion of the proposed project will traverse a wooded area The remainder of the proposed project corridor will be located in maintained grassy areas including an overhead utility line easement The surrounding area includes residential and commercial development as well as undeveloped wooded areas 3b List the total estimated acreage of all existing wetlands on the property No wetlands are present within the proposed easement 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 40 ft 3d Explain the purpose of the proposed project North Carolina Department of Transportation is realigning the northern end of Church Road (TIP Number B 4488) The existing sewer line along Church Road needs to be relocated in order to accommodate the road realignment 3e Describe the overall project in detail including the type of equipment to be used The project involves the installation of approximately 475 feet of new sewer pipe and abandonment of approximately 600 feet of existing pipeline The portion of the sewer pipeline that is proposed to be relocated will tie into the existing pipeline where the existing line crosses to the east side of Church Road The relocated pipe will extend eastward approximately 190 feet before turning to the northeast The pipe will extend approximately 285 feet to tie into the existing pipeline that is located along a service road southwest of US Highway 70 The northeasterly section of the pipe will cross an unnamed tributary to Southwest Prong Slocum Creek as an aerial crossing Bank stabilization measures including installation of coir matting on the stream banks will be implemented to prevent bank failures following construction Equipment to be used in the installation of the pipeline may include but is not limited to a front end loader a backhoe and dump trucks 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / El Yes ® No El Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination what type ❑ Preliminary ❑ Final of determination was made 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Page 3 of 11 PCN Form — Version 1 3 December 10 2008 Version 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain Page 4 of 11 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ —non 404 other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps E] No E] DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps E] No E] DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non 404 width (linear Temporary (T) (INT)? other) (feet) feet) Installation of UT to Southwest ❑ PER ® Corps S1 ❑ P ®T utility aerial Prong Slocum ®INT E] DWQ 20 30 crossing Creek S2 ❑ P ® T Bank stabilization UT to Southwest Prong Slocum ❑ PER ® INT ® Corps ❑ DWQ 20 10 Creek S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 40 31 Comments Temporary impacts to the stream may occur during construction The pipeline will be subsurface on each side of the stream the aerial portion of the pipe will be over the stream channel only Bank stabilization will consist of placement of coir matting on the disturbed portions of the stream banks in order to protect the banks from erosion prior to the re establishment of vegetation Page 5 of 11 PCN Form — Version 1 3 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Impacts to jurisdictional resources can only be completely avoided by implementation of a no build scenario The no build scenario is not an acceptable option due to the NCDOT roadway realignment The location of the line was dictated by the realignment of the existing utilities and roadways in the area property boundaries and existing land use Impacts to jurisdictional areas have been minimized by avoiding the wetland area north of the proposed construction corridor Engineering and design modifications including using a flanged pipe for the exposed sections of pipe over the stream channel and stabilizing the banks for as short a distance as is needed were made in order to minimize the material placed in the stream channel Impacts to jurisdictional areas were minimized to the extent possible while still meeting minimum engineering and safety requirements Efforts were made to ensure that the stream is crossed within 15 degrees of perpendicular The stream being crossed is not a blueline stream therefore no impacts to protected riparian buffers will occur as a result of the project 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Best management practices and sedimentation and erosion control measures will be used during all construction activities No equipment refueling or maintenance activities will occur adjacent to jurisdictional areas All temporary impacts to jurisdictional areas during construction will be returned to their original configuration and stabilized and /or seeded within 30 days of completion of construction 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation bank 2c If yes which mitigation option will be used for this ❑Payment to in lieu fee program projects ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 7 of 11 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Protected riparian buffers are not present within the proposed construction corridor Page 8 of 11 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why The project will not exceed 24% imperviousness Therefore a Stormwater Management Plan will not be required for the project 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HOW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter ) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 213 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy if you answered no provide a short narrative description The proposed project will not induce growth The proposed project will not serve new customers or increase capacity 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility No wastewater will be generated due to implementation of the proposed project Page 10 of 11 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this protect occur in or near an area with federally protected species or ❑ Yes 0 N habitat? 5b Have you checked with the USFWS concerning Endangered Species Act El Yes ® No impacts? [I Raleigh 5c If yes indicate the USFWS Feld Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish and Wildlife Services website including list of protected species and habitat descriptions for each listed species in Craven County Assessment of the protect corridor and surroundings resulted in a determination that habitat is not available for the species listed as protected under the Endangered Species Act No populations of protected species have been documented in the protect vicinity 6 Essential Fish Habitat (Corps Requirement) 6a Will this protect occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Fisheries Essential Fish Habitat Mapper version 2 0 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this protect occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation El Yes ED No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? State Historic Preservation Office and Office of State Archaeology records were reviewed online 8 Flood Zone Designation (Corps Requirement) 8a Will this protect occur in a FEMA designated 100 year floodplain? FC9 es ❑ No 8b If yes explain how protect meets FEMA requirements The proposed protect will not significantly impede floodwaters decrease the floodplain capacity or modify either the hydrology or hydraulics of the floodplain 8c What source(s) did you use to make the floodplain determination? FEMA FIRM online viewer James Freeman City Manager 41-1 J -11 ApplicanYA4ents Signature Applicant/Agent s Printed Name Date (Agent ignature is valid only if an authorization letter from the applicant is provided V Page 11 of 11 PCN Form —Version 13 December 10 2008 Version Additional Information — PCN Form for City of Havelock project Church Road Utility Relocation Property Owner and Parcel Information (Questions A 3 and B 1 ) Western property Marcus and Sybil Innis 115 Church Road Havelock NC Deed Book and Page — 2262 470 Parcel ID # 6 053 007 3 10 acres (0 22 acres in easement for proposed sewer relocation) Eastern property Realty Vanc LLC 413 W Main Street Havelock NC Deed Book and Page — 2984 184 Parcel ID # 6 053 013 0 90 acre (0 005 acre in easement for proposed sewer relocation) ON `)13010neH 10 AIM dew pedwi :V a.in6i.1 slsilu013S g sJaaui6u3 JeluawuoJInu3 u►1mvs (INV NHZM jaaj OOZ ON 05 S 3 M N loedwl jo eajy _ puellaM weeds augadid JaMaS 6uilsix3 teM- do -l46!8 i000N luawase3 Ajejodwai luawase3 luauewJad pua6a-1 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ® Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ❑P ❑T El Yes ❑ No B2 ❑P ❑T El Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h Total buffer impacts 61 Comments No protected riparian buffers will be encroached upon by the proposed project Page 6 of 11 PCN Form — Version 1 3 December 10 2008 Version ��: � � ��; � � :� }�� :t � ; #\ :� � § � \ #. 4• 15 IN 5 N -5 -10 _1+00 ABANDON EXISTING SANITARY SEWER IN PLACE - LIMIT OF DISTURBANCE SEE PARTk,..,PLAN — DEMOLISH AND REMOVE EXISTING MANHOLE FbR,",' CONSTRUCTION OF NEW MANHOLE A. fi MH 1 (SEE NOTE 2) RIM: 11.43 INV IN: 4.88 (4 VCP)' INV OUT: 4.33 (12 "il-61 P) EX EDGE OF P A VEM EN T .4l ;1 8" WL (BY OTHERS) Z, SILT FENCE, TYP -10' TEMPORARY EASEMENT 6- TEMPORARY IMPACTS TO STREAM 40 LF LIMIT OF DISTURBANCE WETLANDS 20' TEMPORARY EASEMENT 25' PERMANENT EASEMENT—`-, A', :i� ........... �t SILT FENCE )"J/ TREE V ' PROTECTION TYP 177 5` o r: 10227000R g EXISTING 18" STAR! (SEE NOTE MANH" Ef TYP A. PROVIDE COf:R MATTING FOR DISTURBED AREA MH 2 AS REQUIRE01. 4. RIM: 14.00 E LE (NOT TO EXC ED 1.Q. LF OF STREAM L INV IN: 3.92 (12" DIP) I INV OUT: 3.82 (12" D D PLAN 1 It =40' m MH 3 (SEE NOTE 2) RIM: 11.68 INV IN: 0.85 (12" SDR 35) INV IN: 0.80 (10" VCP) INV OUT: 0.70 (10" VCP) 0+00 1+00 2+00 1 3+00 4+00 5+00 20 15 im 5 N –5 –10 6+00 8 G V 8" TEE RODDED TO THRUST COLLAR REMOVE SECTION OF 8" WL AND REPLACE WITH 8' PC 350 DI WL CITY 10 NOTES: ff#1 • HAVELOCK HAVELOCK, NORTH CAROLIN] 1. CONTRACTOR SHALL REMOVE EXISTING STORM DRAIN AS NEEDED TO PROTECT DRAiN PIPING. REPLACE TEMPORARY EXISTING STORM DRAIN WHEN GRAVITY SEWER STREAM CONSTRUCTION CROSSING IS COMPLETE. EASEMENT 2. CONTRACTOR SHALL VERIFY AND MATCH MANHOLE RIM ELEVATIONS TO EXISTING ROAD ELEVATIONS. 8 WL sF/Tp—(BY OTHERS) 3. BOTTOM OF WATER MAIN SHALL BE A MINIMUM OF 18" ABOVE TOP OF GRAVITY SEWER AT CROSSING. WATER MAIN JOINTS AT 90' ELBOW AND AT GATE VALVE SHALL BE EQUIDISTANT FROM THE SEWER PIPE CROSSING. PLUG 8" PIPE 4. FLANGED JOINTS SHALL BE PROVIDED AT BOTH STREAM BANKS AND SHALL BE PLACED AT THE SAME ORIENTATION IN STREAM BANK. 8" PC 350 RJ DI 5. TYPE "A" TRENCH BEDDING SHALL BE USED FOR 0 WATERLINE WATERLINE INSTALLATION. TYPE "B" TRENCH BEDDING SHALL BE USED FOR SANITARY SEWER INSTALLATION. 6. ALL BACKFILL WITHIN THE ROAD RIGHT–OF–WAY SHALL BE SELECT FILL FROM OFF SITE. SF/7P -- 7. THE CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL 8" 90* BEND MEASURES THAT COMPLY WITH NCDOT STANDARDS AND THE LATEST VERSION OF MUTCD. CONTRACTOR SHALL MAINTAIN ACCESS FOR VEHICULAR TRAFFIC TO PERMANENT ONE LANE OF TRAFFIC ALONG CHURCH ROAD DURING EASEMENT PERIODS OF CONSTRUCTION ACTIVITY. 8. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR INGRESS AND EGRESS TO ALL PROPERTY OWNERS ADJACENT TO THE WORK SITE. EX CULVERT 9. DISTURBED AREA SHALL BE LIMITED TO THE TEMPORARY AND PERMANENT EASEMENTS AS WELL AS INDICATED LIMITS OF DISTURBANCE IN THE ROAD . ....... . ..... --------- RIGHT OF WAY. ff#1 • HAVELOCK HAVELOCK, NORTH CAROLIN] W TYPE A IN EARTH 0222100 W TYPE B 0222102 W 'ED BACKFILL IACKFILL (NO MATERIAL rHAN 2 ") IA)z*.ITgTX1141 IACKFILL . (NO MATERIAL THAN 2 ") STONE — 1/8 PIPE DW PIPE (MIN. 6 ") TO PIPE MIDPOINT ORIGINAL GRADE CONCRETE ENCASEMENT (SEE NOTE 1) 0222104 CLASS B CONCRETE 6° MIN ALL AROUND PIPE DESIGNED H & S DRAV N H & S CHE(LKED 0 TYPE C 0222103 nil CONCRETE ARCH (SEE NOTE 1) 022 105 'ED BACKFILL ROCK IACKFILL .OR CRUSHED 18 PIPE O.D. PE (MIN. 6 ") OF 12" OVER NPE. ED BACKFILL =KFILL . (NO MATERIAL THAN 2 ") STONE TO A HEIGHT OF 1/6 ON SIDES OF e 1/8 O.D. BELOW J 6 ") \SANDBA:GS — CONTR OPTION CARO�i �F ESS /0��yy CLASS 3 CONC SELECT BACKFILL MATERIAL (NO MATERIAL LARGER, THAN 2 °) •) w a: w z J I I I I ll i) �I I� L_ki LV'J STEEL POST TOP STRAND STAY WIRES GALV WIRE FABRIC AND FILTER FABRIC. BURY TOE OF FILTER FABRIC A MIN OF 8" BOTTOM STRAND GRADE LINE --\ Z z � 0 N I N 0 z o z I � N 8' -0° MAX I 8" MIN NOTES: ELEVATION — SILT FENCE SECTION — SILT FENCE 1. EXTRA STRENGTH FILTER FABRIC (AS APPROVED BY THE ENGINEER) WITH 6' -0" POST SPACING DOES NOT REQUIRE WIRE FABRIC SUPPORT FENCE. 2. FILTER FABRIC SHALL BE WIRED DIRECTLY TO THE POST. MAINTENANCE REQUIREMENTS: 1. INSPECT WEEKLY AND AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2 INCH OR MORE OF RAIN. REMOVE ANY ACCUMULATED SEDIMENT AND /OR WOODY DEBRIS. 2. FILTER FABRIC THAT HAS COLLAPSED, TORN, OR HAS IN ANY WAY HAS BECOME COMPROMISED SHALL BE REPAIRED OR REPLACED IMMEDIATELY. 3. REMOVE ANY SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND ALSO TO REDUCE PRESSURE ON THE FENCE. AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REPLACE FILTER FABRIC THREE (3) MONTHS AFTER INITIAL INSTALLATION AND EVERY THREE (3) MONTHS THEREAFTER UNTIL CONSTRUCTION HAS BEEN COMPLETED AND CONTRIBUTING DRAINAGE AREA HAS BEEN PERMANENTLY STABILIZED. SILT FENCE 0227000 TRENCH EXCAVATION LIMITS INTERNAL DIAMETER OF PIPE W WIDTH OF TRENCH MAX W =MIN 4 —6 3' -9" 2' -0" 8'-101 S-90 2 —2 12" 3' -9° O.D. +2' 14 " -16" 4' -2" O.D. +2' 180 4' -4" O.D. +2' 20" 21" 4' -8" O.D. +2' 24 4' -11" O.D. +2' 27" 5' -9° O.D. +2' 30" 6' -7° O.D. +2' 36" 7' -4° O.D. +2' 42 8' -2° O.D. +2' 48° 8' -9° O.D. +2' 54" 9' -4" O.D. +2' 60" 9' -101 O.D. +2' 72" 11' -0" O.D. +2' 78" 11' -8" O.D. +2' 84" 12' -0° O.D. +2' 90" 12' -6" O.D. +2' 961 13' -0" O.D. +2' 108" 14' -0" O.D. +2' DEPTH OF CUT S MAXIMUM PAVEMENT REPLACEMENT WIDTH 0 -6' S =W +4' >6 -8' S =W +8' >8 -10' S =W +12' >10 -12' S =W +16' >12 -14' S =W +20' >14 -16' S =W +24' >16 -18' S =W +28' >18, S =W +32' W = TRENCH WIDTH AT BOTTOM OF PIPE. TRENCH SIDE SLOPES SHALL BE IN ACCORDANCE WITH OSHA REQUIREMENTS. 1w 1w &IN HMEN AND SAWYER 38586 g- t�l�� Environmental Engineers 9 Scientists PRO,.;. ENGR. HTT F CO 4011 WestChase Blvd, Raleigh, North Carolina 27607 REGULATORY APPROVAL 5 12 HTT �0�D �P�\G' License Number: C -0381 1 E / NO. ISSUED FOR DATE BY APPROVED 20120511 9:26A 0:\ 30906 \006 \DRAWINGS \Std— Dwgs \D —t.dwg By.PSELISKER Lost Saved By pselisker XREFs= .. \7'sleblock\ 30906- 006TB,L: \SDETAILS \0222100,L: \SDETAILS \0222101,L' \SDETAILS \O222102,L: \SDETAILS \0222103,L: \SDETAILS \0222104,L \SDETAILS \0222105,L \SDETAILS \0222:li10,L: \SDETAILS \0222111,0:\ 30906\ 006 \DRAWINGS \Std— Owgs \Xref \0227000 CITY OF NORTH CAROLIN �. • = IIIwdWID11Wom"� If]0 NOTE: FOR VERTICAL BEND (DOWN) IN EXCESS OF 11 1/4` ANCHORAGE SHALL BE AS RECOMMENDED BY THE ENGINEER. COLLAR. OF MATERIAL UNDISTURBED TYPICAL BEND TRENCH BOTTOM 12" MIN 1� \�/ N\ " �>/ \/ \ \t EXCAVATION FOR COLLAR / TRENCH 12" i \' _ TYPICAL CONCRETE WIDTH MIN > THRUST COLLAR. MIN OF 124 INTO THRUST COLLA?i 1 ri1 r � � 0 THE SCALE BAR SHOWN BELOW MEASURES ONE DATE MAY 2012 H & S JOB NUMBER 30906-015 INCH LONG ON THE ORIGINAL DRAWING. CONTRACT DRAWING NUMBER NUMBER D-1 z m ri1 FLOW CHANNEL MANHOLE STEPS Al PRECAST MANHOLE MANHOLE COVER AND FRAME (SEE SPEC! MANHOLE STEPS AT 18 PLAR I CLASS 'B' CONCRETE FILL COMPACTED CRUSHED STONE CO ` F��� . ��*�--f---- f---� CHANNEL | || . ncuwomtu 4G AS 40 THICK MAX FLOW CHANNEL BENCH FLEXIBLE RUBBER SLEEVE BOOT `SST CLAMP 12^ | Lj | | }| (| /] k|� 6'—»" MAX ELEVATION STEEL POST TOP STRAND GALV WIRE FABRIC AND FILTER FABRIC. BURY TOE OF FILTER FABRIC A MIN OF 8^- FREE PROTECTION ]ARR|ER FENCE WHERE 'A[|ED FOR ON )RAVNNGS--------' BOTTOM STRAND � NOTE: 1^ EXTRA STRENGTH FILTER FABRIC /AS APPROVED BY E@G|mFrP1 WITH 6'-0* POST SPACING DOES NOT REQUIRE MESH SUPPORT FENCE' 2. FILTER FABRIC SHALL BE VNRBJ DIRECTLY TO POST 3. WHERE DOUBLE SILT FENCE IS CALLED FOR ON DRAWINGS ADO SECOND SILT FENCE TO FACE OF FIRST SILT FENCE AND WIRE DIRECTLY TO POST. TEMPORARY SILT FENCE m»TREE PROTECTION BARRIER FENCE 022700OR EXPOSE NO MORE THAN 2|NOFSTAKE[7YPj EROSION CONTROL MAT'T|NC3 —� STAKE ALONG TOE OF SLOPE AT 1 FT SPACINGS TOE C)FSLOPE 4 FT TOP {]FSLOPE STREAMBANK 45" CUT 3 FT 3 FTJ / \ LIVE STAKES U.5|N-1.S|NDIAM. X3FT-4FT � LENGTH SPACED 3.0FTO.C.(TRIANGULAR FLOW SPACING) ANGLES AT45~TO DOWNSTREAM FLOW Mw M --' / `-- 3/4 LENGTH PLAN ��K���� �����v~�U���� nx�x�^x� �o���n ������mx��u� NOTES: 1. ACCEPTABLE GPEC|EG:C(]RNUSAK8DK8UK0 (SILKY DOGVVO{}O).CEPHALANTHUSOCC|OENTAL|G (BUTTONBUSH).G&L|XSER|CEA (SILKY VV|LLOW).GA@BUCU8CANADENG|G(ELOERBERRY). 2. SOAK LIVE STAKES FROM ARRIVAL ONSITE TO IMMEDIATELY BEFORE INSTALLATION AND RECUT no ENDS AT45" ANGLES PRIOR TOINSTALLATION. ~~^ | Z 3. USE REBAR OR OTHER METHOD APPROVED BY ENGINEER FOR PILOT HOLES PRIOR TO DRIVING ' LIVE STAKES INTO GROUND. 4. DRIVE LIVE STAKE 3/4OF ITS LENGTH INTO THE GROUND. 5. RECUT ANY LIVE STAKE TIPS DAMAGED 8YINSTALLATION. � 8. STAKES TC]BE0.5|NTC)1.5|N DIAMETER AND 3'4FTLONG. MIN LIVE STAKE DETAIL, SECTION """= 3|N TOPSOIL (|N|Nj SEED AND STABILIZE (REFER T{�SPECIFICATIONS) \ /_ EXISTING GRADE 12|N \ SECURE EROSION CONTROL MATTING mxrHn/mu9/wYnA/w _~''_^_�,`'`^,,` NOTCHED WOOD DEAD STAKES KEY IN EROSION CONTROL MATTING FOR A DEPTH OF1FT PER MANUFACTURER'S RECOMMENDATIONS NOTES: 1 BEGIN AJ TOP OF SLOPE AND ANCHOR FIBER MATTING |NA12|N DEEP INITIAL ANCHOR TRENCH. BACNF|LL TRENCH AND TAMP EARTH FIRMLY. 2. UNROLL FIBER MATTING DOVVNGLOPE|N THE DIRECTION OF WATER FLOW. 3. OVERLAP EDGES DF ADJACENT PARALLEL ROLLS BYG|N AND ANCHOR AT12|N CENTERS. 4� WHEN FIBER MAT MUST BE SPLICED, PLACE END OVER END (SHINGLE STYLE) WITH 12 IN OVERLAP AND ANCHOR USING TWO STAGGERED ROWS OFSTAKES ATG|NCENTERS. S. LAY FIBER MAT LOOSELY AND ANCHOR SUFFICIENTLY TD MAINTAIN DIRECT CONTACT WITH THE SOIL -DO NOT STRETCH. 6. FOR SLOPES 2:1 AND STEEPER USE A MINIMUM OF3 STAKES PER SQUARE YARD AND FOR SLOPES FLATTER THAN 2:1 USE A MINIMUM OF2 STAKES PER SQUARE YARD. 7. ANCHOR, FILL, AND COMPACT END OF FIBER MATTING |N12|NXG|N TERMINAL ANCHOR TRENCH (MIRROR IMAGE OF TRENCH AT TOP OFGLOPE). O. DO NOT INSTALL MAT UNDERNEATH RIFFLE GRADE CONTROL STONE. ECM DETAIL M7S ENANID SAMER CHECKED Environmental Engineers & Scientists f PROJ. ENGR HTT 4011 WestChase Blvd, Raleigh, North Carolina 27607 0 D License Number: C-0381 1 REGULATORY APPROVAL 5/12 HTT NO. ISSUED FOR DATE BY APPROVED ' p�w�,x�s='\nu��o�o�=-mmny.�\mc�us\�omm\.\x�^0e�o�n..\x=��mumn..\�n�u�mo�u�"./Xm^Smo°m,u�v..*��r�n�ouan.0 o°�\xm�omomx CITY OF HAVELOCK HAVELOCK, NORTH CAROLINI EROSION CONTROL MAT KEY IN PER ECM DETAIL PROPOSED GRADE CHANNEL MATERIAL/ AS INDICATED ON PLANS 4, LIVE S IIAKES ADDITIONAL COIR LOG, IF REQUIRED PER SCHEDULE BELOW BASE STONE (SEE STONE SIZING CHART FOR SIZE AND DEPTH) EROSION CONTROL (CO[R) MAT BIO-D 70 OR APPROVED EQUAL (KEYED IN PER EQM DETAIL DWG 233-GCO-004. ECM TO OVERLAP FILTER CLOTH 12 IN MIN) FOOTER STONES (SEE STONE SIZING CHART FOR SIZE AND DEPTH) FILTER CLOTH STONE TOE,, (ST) DETAIL, NTS / � ~ — — .- ZEAMBANK NOTES: 1 SEE PLANTING SCHEDULE FOR DESIRABLE SPECIES AND SIZE. 0 2. SPACE AT3.OFTOC. (TRIANGULAR SPAC�G). -- 3� ALL TU8EL|N8GSH/\LLCOK8PLYVV|THTHE RE{�OK8K8E��[AJ|[>N8AND FlE{�U|F�EK8ENT8OFANSI �� Z8D1''AK8ER|CAN�TANOA�DFORNQ�8E��GTO���" �� � � =3 4. CUT AND FOLD BACK SLOT IN MAT TO INSTALL TUBELING. SEAL SLOT WITH COMPOST AND STAPLE. ALLOW 8 IN DIAMETER AROUND 7LIBEL|N[9WITH NO ECM. 5 PLANTTHE RO�T BALLSL|{�HTLYOEE��THAN |TVVAG |NTHETUB �� N z 6. FIRMLY PACK SOIL AROUND THE BASE OF TUBELING SO THAT NO AIR POCKETS REMAIN AFTER INSTALLATION. x THE SCALE BAR DATE MAY 2012 cc SHOWN BELOVV MEASURES ONE NUMBER 30906-015 INCH LONG ON THE ORIGINAL DRAWING. Cuw/x*C| uxavwmG NUMBER NUMBER \ �� -�� �� N y U �� 8 z _j r, r 20120511 9:28A 0: \ 30906 \006 \DRAWINGS \Std — Dwgs \D -3.dwg By.PSELISKER Last Saved By pselisker XREFs= .. \I-':cblock\ 30906- 006TB,L: \SDETAILS \0222108,L: \SDETAILS \0222114,L• \SDETAILS \0264000,L: \SDETAILS \UZ221U /