Loading...
HomeMy WebLinkAbout20120285 Ver 1_Meeting Minutes_20070620ht- ..vu eel ' Inc.v�u,��vOt�d .dam `tom- mttthc wewt ck., ode d �� e. drupe ° App Agenda 4-June 20, 2007 3 00 P M to 4 30 P M Purpose Further updates on recently completed /ongoing environmental and technical studies field verification meetings and next steps towards the DEIS Action Items Identify any environmental issues based on the recently completed studies tick �► Toll -only Alternative - uxU 6, L.0 "e -tAd," a fuu- aiaOO, `ter.. ,�, ",1afA *o pct. u uubtc. lb Recently Completed Studies �oa2.o W_ • Human Environment • Historic Architecture — SHPO Eligibility Meeting - • Archaeology — Draft Report • Natural Environment ■ Field Verified Wetlands and Streams • Special Technical Studies ■ Geotechnical Analysis at Fly -Ash Basin tXX `r ,nRCenn*� C56"0 "om x aaao bt (,, t* do ► Ongoing Studies KiD � � w2- �" • Engineering Designs • Interchange Configurations & Mainline Shifts • Basic Number of Lanes 3"af 4ta�,���, • Community Characteristics _ 4&dZL CCUU.+ � ^"Ud • Traffic Forecasts 4ta aat w +, ■ MPO Traffic Model —Toll Forecasts for Detailed Study Alternatives Next Steps Towards DEIS • Indirect and Cumulative Effects • Possible Elimination of Detailed Study Alternatives • Name Change to Garden Parkway o Field Tours ■ Natural Systems ■ Historic Architecture % ) 044� G.9G f abu b�nu, e '�`t ✓� t1Cd�G� � " w a N .Upolt Sch w, Owj 9G6 -1 C Ns�� Y "� •.+.Qme a.rborty Recently Completed Studies BAs IOA Stream D 75 intermittent point verified ■ s. • 'ail .. �) I • .: #,` fr`�,II� �, Wetland 141 t� to 8 i k �6 c 4. A�:.FiA� I �~N � s. • 'ail .. �) I • .: #,` fr`�,II� �, Wetland 141 t� to 8 1� T 9 I t a Wetland w3i3, high sediment load quality rating 62 r n..4awa.M�q Wetland J 11 32 Shift to minimize Impact to streamstwettands v Shift to minimize Impact to potential historic resource 32 Original Modified - Centerline Centerlim 1Jt'r..�- 'mac -.Y� �'•' �'t f.� ` i 13 i l 14 - if -,..., North Carolina Turnpike Authority Gaston East -West Connector Turnpike Environmental Agency Coordination Meeting —June 20, 2007 Table 1 — Summary of Field Verified/Delineated Wetlands, Streams and Ponds Jurisdictional Wetlands and Surface Waters Type Quantity Stream Units - linear feet (miles) Wetland & Pond Units - acres Segment 1— I -85 to US 321 (Approximately 5,800 corridor acres) - VERIFIED Streams Perennial 123 189,284 35.85) Intermittent 36 9,240 1.75 Total Streams 159 198,524 (37.6) Wetlands 130 52.58 Ponds 21 16.11 Total Wetlands /Ponds 151 68.69 Segment 2 —US 321 to NC 279 (Approximately 4,400 corridor acres) - VERIFIED Streams Perennial 102 161,155 (30.5 Intermittent 19 19,550 (3.7 Total Streams 121 180,705 (34.2) Wetlands 156 66.92. Ponds 21 18.51 Total Wetlands /Ponds 177 85.43 Segment 3 —NC 279 to 1 -485 (Approximately 4,200 corridor acres) - DELINEATED Streams Perennial 54 TBD Intermittent 80 TBD Total Streams 134 TBD Wetlands 80 TBD Ponds 16 TBD Total Wetlands/Ponds 96 TBD All Segments I -85 to I -485 (Approximately 14,400 acres) — VERIFIED & DELINEATED Streams Perennial 279 TBD Intermittent 135 TBD Total Streams 414 TBD Wetlands 387 TBD Ponds 58 TBD Total Wetlands/Ponds 445 TBD Note: These totals are for jurisdictional resources within the 1,400 -foot study corridor boundaries. Segment 3 resources have not yet been completely field verified.