Agenda
4-June 20, 2007
3 00 P M to 4 30 P M
Purpose Further updates on recently completed /ongoing environmental and technical studies
field verification meetings and next steps towards the DEIS
Action Items Identify any environmental issues based on the recently completed studies tick
�► Toll -only Alternative - uxU 6, L.0 "e -tAd," a fuu- aiaOO,
`ter.. ,�, ",1afA *o pct. u uubtc. lb
Recently Completed Studies �oa2.o W_
• Human Environment
• Historic Architecture — SHPO Eligibility Meeting -
• Archaeology — Draft Report
• Natural Environment
■ Field Verified Wetlands and Streams
• Special Technical Studies
■ Geotechnical Analysis at Fly -Ash Basin tXX `r ,nRCenn*�
C56"0 "om x aaao bt (,, t* do
► Ongoing Studies KiD � � w2- �"
• Engineering Designs
• Interchange Configurations & Mainline Shifts
• Basic Number of Lanes 3"af 4ta�,���,
• Community Characteristics _ 4&dZL CCUU.+ � ^"Ud
• Traffic Forecasts 4ta aat w +,
■ MPO Traffic Model —Toll Forecasts for Detailed Study Alternatives
Next Steps Towards DEIS
• Indirect and Cumulative Effects
• Possible Elimination of Detailed Study Alternatives
• Name Change to Garden Parkway
o Field Tours
■ Natural Systems
■ Historic Architecture
% ) 044�
G.9G f abu b�nu, e '�`t ✓� t1Cd�G� � " w
a
N .Upolt Sch w, Owj 9G6 -1
C Ns��
Y
"� •.+.Qme a.rborty
Recently
Completed
Studies
BAs
IOA
Stream D 75 intermittent point verified
■
s. •
'ail .. �) I • .: #,` fr`�,II� �,
Wetland 141 t�
to
8
i k �6
c 4.
A�:.FiA�
I
�~N �
s. •
'ail .. �) I • .: #,` fr`�,II� �,
Wetland 141 t�
to
8
1�
T
9
I
t a
Wetland w3i3, high sediment load
quality rating 62
r
n..4awa.M�q
Wetland
J
11
32
Shift to minimize Impact to
streamstwettands
v Shift to minimize Impact to
potential historic resource
32
Original
Modified - Centerline
Centerlim
1Jt'r..�- 'mac -.Y� �'•' �'t f.� `
i
13
i
l
14
- if -,...,
North Carolina Turnpike Authority Gaston East -West Connector
Turnpike Environmental Agency Coordination Meeting —June 20, 2007
Table 1 — Summary of Field Verified/Delineated Wetlands,
Streams and Ponds
Jurisdictional Wetlands
and Surface Waters
Type
Quantity
Stream Units -
linear feet (miles)
Wetland & Pond
Units - acres
Segment 1— I -85 to US 321 (Approximately 5,800 corridor acres) - VERIFIED
Streams
Perennial
123
189,284 35.85)
Intermittent
36
9,240 1.75
Total Streams
159
198,524 (37.6)
Wetlands
130
52.58
Ponds
21
16.11
Total Wetlands /Ponds
151
68.69
Segment 2 —US 321 to NC 279 (Approximately 4,400 corridor acres) - VERIFIED
Streams
Perennial
102
161,155 (30.5
Intermittent
19
19,550 (3.7
Total Streams
121
180,705 (34.2)
Wetlands
156
66.92.
Ponds
21
18.51
Total Wetlands /Ponds
177
85.43
Segment 3 —NC 279 to 1 -485 (Approximately 4,200 corridor acres) - DELINEATED
Streams
Perennial
54
TBD
Intermittent
80
TBD
Total Streams
134
TBD
Wetlands
80
TBD
Ponds
16
TBD
Total Wetlands/Ponds
96
TBD
All Segments I -85 to I -485 (Approximately 14,400 acres) — VERIFIED & DELINEATED
Streams
Perennial
279
TBD
Intermittent
135
TBD
Total Streams
414
TBD
Wetlands
387
TBD
Ponds
58
TBD
Total Wetlands/Ponds
445
TBD
Note: These totals are for jurisdictional resources within the 1,400 -foot study corridor boundaries. Segment 3
resources have not yet been completely field verified.