HomeMy WebLinkAbout20120142 Ver 1_Approval Letter_20120510r
t
A�
NCDENR
North Carol na Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakdd P E
Governor Director
May 10 2012
Dr Greg Thorpe PhD Manager
Protect Development and Environmental Analysis
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh North Carolina 27699 1598
Dee Freeman
Secretary
Subject 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL
CONDITIONS for the proposed widening and new lane construction from US 74 (Rockmgham/Hamlet Bypass)
to US 220 (Ellerbe Bypass) in Richmond County Federal Aid Project No NHF 0220(4) State Protect No
8 1580802 TIP R 3421A B & C
NCDWQ Project No 20120142
Dear Dr Thorpe
Attached hereto is a copy of Certification No 3916 issued to The North Carolina Department of Transportation (NCDOT)
dated May 10 2012
If we can be of further assistance do not hesitate to contact us
Sincerely
�C arles Wakild
Director
Attachments
cc Ronnie Smith US Army Corps of Engineers Wilmington Field Office (electronic copy only)
Richard Hancock PE Division 8 Engineer
Art King Division 8 Environmental Officer
Chris Mihtscher Environmental Protection Agency (electronic copy only)
Travis Wilson NC Wildlife Resources Commission (electronic copy only)
Mason Herndon NCDWQ Fayetteville Regional Office
File Copy
Transportation and Permitting Unit
1650 Mad Service Center Raleigh North Carolina 276991650
Location 512 N Salisbury St Raleigh North Carolina 27604
Phone 919 -807 -63001 FAX 919 - 807 -6488
Internet www rimateraualdv om
An Equal Opportunity 1 Affirmative Action Employer
NorthCarohna
Naturally
401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL
CONDITIONS
THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92 500 and 95 217 of
the United States and subject to the North Carolina Division of Water Quality (NCDWQ) Regulations in 15 NCAC 2H
0500 This certification authorizes the NCDOT to impact 14 45acres of,junsdictional wetlands and 13 569 linear feet of
,jurisdictional streams in Richmond County The project shall be constructed pursuant to the application dated received
February 10 2012 This certification only authorizes construction of Section C of the project The authorized impacts
are as described below
Stream Impacts in the Yadkin Pee Dee River Basin
Site
Location
Permanent
Fill in
Intermittent
Stream
(linear ft)
Temporary
Fill in
Intermittent
Stream
(linear ft)
Permanent
Fill in
Perennial
Stream
(linear ft)
Temporary
Fill in
Perennial
Stream
(linear ft)
Tom Stream
Impact
(linear feet)
Stream
Impacts
Requiring
Mtigation*
(linear ft)
R -3421
A re hmina
1
24 +55/26+90 FLY
364
364
364
2
94 +45/98 +20I73
1097
1097
1097
3
12+60/14 +55 LPC
676
676
676
4
108 +12 /109+601 73
511
511
511
5
10+04 /12+05 RPD
435
435
435
7
33 +10/44 +51 L2-REV
1247
100
1 347
1 247
8
132 +75/135 +72 US 74
187
187
187
TOTAL
0
0
4,517
100
4,617
4,517
R-
421B rehmma
1
148+07 & 150+96 U
24
15
39
0
2
12+90 Y4- & 42 +86 SR1
28
40
68
0
3
166+62 &168+00 Lr
759
37
796
759
4
178 +71 L
352
26
378
352
5
216+69 U
645
20
665
645
7
229+82 L-
610
20
630
610
8
236 +34 U
832
90
922
832
11
15 +33 Y5
47
10
57
0
TOTAL
0
0
1 3,297
258
3,555
3,198
R -3421 C
5
380 +50 U
278
20
298
278
8
435+00 L (LT)
629
10
639
629
9
435+00 L,(RT)
463
20
483
463
12
23+00 SR5
40
10
50
0
13
462 +70 U (LT)
205
20
225
0
14
14+00 YIORPD
538
10
548
538
16
8+00 YIORPD
61
61
0
17a/b
473+00 L-(LT)
381
10
606
10
1 007
606
18
485 +50 L-
208
17
225
0
18
484 +90 L (RT)
10
10
0
19
489+40 L-
199
22
221
0
20
502+60 L
191
24
215
0
21
509+50 U
279
167
446
279
23
518+60 L,(RT)
449
21
470
449
24
534 +50 L,(RT)
212
8
220
0
26
14+07 Y8
41
20
61
0
27
25+00 Y8REV
196
22
218
196
TOTAL
1 446
111 1
3,540 1
300
%597
3 438
PROJECT TOTAL.
1 446
111
11 354
658
1
11 153
Mitigation for intermittent streams is not required for this project as the FONSI was signed prior to October 16 2009
Total Stream Impact for Project 13 569 linear feet
Wetland Impacts in the Yadkin Pee Dee River Basin
Site
Location
Wetland
Type
YPe
(ac)
Fill
(temp.)
(ac)
Excavation
Mechanized
Clearing
(ac)
Hand
Clearing
(ac)
Total
Wetland
Impact (ac)
Impacts
Requiring
Mitigation (ac)
R -3421A (Preltmma
2
94+45/98+20173
Ripanan
076
076
076
6
125+90/127+50173
Rbpanan
019
006
025
025
7
33 +10/44 +51 L2REV
Rtpanan
001
005
009
015
015
8
132 +75/135 +72 US 74
Riparian
003
006
009
009
TOTAL
099
000
005
021
000
125
125
R 3421B rehmma
1
148+07 & 150+96 L-
Riparian
022
003
025
025
3
166+62 &168+00 L-
Riparian
003
003
003
4
178 +71 L-
Riparian
008
001
009
009
6
226 +70 U
Ripanan
058
<0 01
058
058
8
236 +34 L-
Riparian
020
<0 01
020
020
9
302 +79 L-
Riparian
037
005
042
042
10
304 +32 L- & 13 +93 Y5RPC
Ripanan
106
005
1 11
1 11
11
15 +33 Y5
Riparian
<0 01
<0 01
002
002
12
353 +20 Lr
Riparian
179
013
192
192
TOTAL
434
000
000
028
000
462
462
R 3421C
1
354 +45 L-
Riparian
003
005
008
008
2
355 +25 L- (LT)
Ripanan
016
004
020
020
3
373 +40 L- (LT)
Riparian
017
002
019
019
4
376 +50 L-
Riparian
069
010
079
079
5
380+50 L-
Riparian
130
001
014
145
145
6
385 +50 L, (LT)
Non Rip
<0 Ol
001
001
001
7
398 +50 L•
Riparian
258
<0 01
008
266
266
8
435+00 L- (LT)
Riparian
019
007
005
031
031
9
435+00 U (RT)
Riparian
059
001
007
067
067
10
451+00 L- (RT)
Rbpanan
083
009
092
092
12
23+00 SR5
Riparian
016
<0 01
016
016
16
8+00 YIORPD
Riparian
002
001
003
003
24
534 +50 Lr (RT)
Riparian
007
001
001
009
009
25
109+30 SR4- (LT)
Riparian
<0 Ol
001
001
001
26
14+07 Y8
Riparian
<0 01
<0 Ol
002
002
002
28
68 +54 Y9SBL- (RT)
Non Rip
<0 01
000
000
29
14 +50 SR2 (RT)
Non Rip
006
001
007
007
30
18 +20 SR2
Riparian
027
006
033
033
31
22+00 SR2
Riparian
016
002
018
018
33
11 +50 Y14-
Riparian
011
012
023
023
34
118+00 SR4- 1
Riparian
014
<0 01
004
018
018
TOTAL
751
000
012
095
000
858
858
PROJECT TOTAL
1284
000
0 17
144
000
1445
14 45
Total Wetland Impact for Protect 14 45 acres (14 37 acres riparian/0 08 acres non riparian)
Open Water Impacts in the Yadkin Pee Dee River Basin
Site
Location
Permanent Fill in Open
Waters (ac)
Temporary Fill in
Open Waters (ac)
Total Fill in Open
Waters (ac)
11
11+00 YIOLPD (RT)
035
035
12
23+00 SR5
003
003
15
28+00 SR4-
124
124
16
8+00 Yl ORPD
099
099
22
511 +50 L, (LT)
012
012
32
59+00 YBREV (LT)
004
004
TOTAL
277
000
277
Total Open Water Impact for Protect 2 77 acres
The application provides adequate assurance that the discharge of fill material into the waters of the Yadkin Pee Dee River
Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards
and discharge guidelines Therefore the State of North Carolina certifies that this activity will not violate the applicable
portions of Sections 301 302 303 306 307 of PL 92 500 and PL 95 217 if conducted in accordance with the application
and conditions hereinafter set forth
This approval is only valid for the purpose and design that you submitted in your application dated received February 10
2012 Should your project change you are required to notify the NCDWQ and submit a new application If the property is
sold the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying
with all the conditions If any additional wetland impacts or stream impacts for this project (now or in the future) exceed
one acre or 150 linear feet respectively additional compensatory mitigation may be required as described in 15A NCAC
2H 0506 (h) (6) and (7) For this approval to remain valid you are required to comply with all the conditions listed below
In addition you should obtain all other federal state or local permits before proceeding with your project including (but
not limited to) Sediment and Erosion control Coastal Stormwater Non discharge and Water Supply watershed regulations
This Certification shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit
Conditions of Certification
Project Specific Conditions
1 The NCDOT Division Environmental Officer or Environmental Assistant will conduct a pre construction meeting
with all appropriate staff to ensure that the project supervisor and essential staff understand the potential issues with
stream and pipe alignment at the permitted site NCDWQ staff shall be invited to the pre construction meeting
2 Mitigation
Compensatory mitigation for 3 438 linear feet of impact to streams is required We understand that you
have chosen to perform compensatory mitigation for impacts to streams through the North Carolina
Ecosystem Enhancement Program (EEP) and that the EEP has agreed to implement the mitigation for the
project EEP has indicated in a letter dated January 17 2012 that they will assume responsibility for
satisfying the federal Clean Water Act compensatory mitigation requirements for the above referenced
protect in accordance with the EEP Mitigation Banking Instrument signed July 28 2010
Compensatory mitigation for impacts to 8 58 acres wetlands (8 50 acres riparian 0 08 acres non riparian) is
required We understand that you have chosen to perform compensatory mitigation for impacts to wetlands
through the North Carolina Ecosystem Enhancement Program (EEP) and that the EEP has agreed to
implement the mitigation for the project EEP has indicated in a letter dated January 17 2012 that they will
assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for
the above referenced project in accordance with the EEP Mitigation Banking Instrument signed July 28
2010
3 At locations where ponds will be drained proper measures will be taken to dram the pond with limited impact to
upstream and downstream channel stability as well as to native aquatic species Proper measures will be taken to
avoid sediment release and/or sediment accumulation downstream as a result of pond draining If typical pond
draining techniques will create significant disturbance to native aquatic species additional measures such as
collection and relocation may be necessary to prevent a significant fish kill NCDOT shall consult with NC Wildlife
Resources staff to determine if there are any sensitive species and the most appropriate measures to limit impacts to
these species The permittee shall observe any natural channel re establishment or utilize natural channel
construction techniques to ensure that the jurisdictional stream channel above and below the drained pond remain
stable and that no additional impacts occur within the natural stream channel as a result of draining the pond
Unless otherwise approved in this certification placement of culverts and other structures in open waters and
streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater
than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches to allow
low flow passage of water and aquatic life Design and placement of culverts and other structures including
temporary erosion control measures shall not be conducted in a manner that may result in dis equilibrium of
wetlands or streambeds or banks adjacent to or upstream and down stream of the above structures The applicant is
required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWQ If this
condition is unable to be met due to bedrock or other limiting features encountered during construction please
contact NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be
required
5 If multiple pipes or barrels are required they shall be designed to mimic natural stream cross section as closely as
possible including pipes or barrels at flood plain elevation and/or sills where appropriate Widening the stream
channel should be avoided Stream channel widening at the inlet or outlet end of structures typically decreases
water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage
6 Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes
aquatic life passage Bioengineermg boulders or structures should be properly designed sized and installed
7 The stream channel shall be excavated no deeper than the natural bed material of the stream to the maximum extent
practicable Efforts must be made to minimize impacts to the stream banks as well as to vegetation responsible for
maintaining the stream bank stability Any applicable riparian buffer impact for access to stream channel shall be
temporary and be revegetated with native riparian species
8 Pipes and culverts used exclusively to maintain equilibrium in wetlands where aquatic life passage is not a concern
shall not be buried These pipes shall be installed at natural ground elevation
9 When final design plans are completed for R 3421 Sections A and B a modification to the 401 Water Quality
Certification shall be submitted with five copies and fees to the NC Division of Water Quality Final designs shall
reflect all appropriate avoidance minimization and mitigation for impacts to wetlands streams and other surface
waters No construction activities that impact any wetlands streams or surface waters located in R 3421 Sections A
or B shall begin until after the permittee applies for and receives a written modification of the 401 Water Quality
Certification from the NC Division of Water Quality
General Conditions
10 If concrete is used during construction a dry work area shall be maintained to prevent direct contact between
curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be discharged to
surface waters due to the potential for elevated pH and possible aquatic life and fish kills
11 During the construction of the project no stagmg of equipment of any kind is permitted in waters of the U S or
protected riparian buffers
12 The dimension pattern and profile of the stream above and below the crossing shall not be modified Disturbed
floodplams and streams shall be restored to natural geomorphic conditions
13 The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval
14 Unless otherwise approved in this certification placement of culverts and other structures in open waters and
streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than
48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches to allow low
flow passage of water and aquatic life Design and placement of culverts and other structures including temporary
erosion control measures shall not be conducted in a manner that may result in dis equilibrium of wetlands or
streambeds or banks adjacent to or upstream and down stream of the above structures The applicant is required to
provide evidence that the equilibrium is being maintained if requested in writing by NCDWQ If this condition is
unable to be met due to bedrock or other limiting features encountered during construction please contact NCDWQ
for guidance on how to proceed and to determine whether or not a permit modification will be required
15 The use of rip rap above the Normal High Water Mark shall be minimized Any rip rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage
16 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from
the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags rock
berms cofferdams and other diversion structures shall be used to prevent excavation in flowing water
17 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream
18 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels lubricants hydraulic fluids or other toxic materials
19 No rock sand or other materials shall be dredged from the stream channel except where authorized by this
certification
20 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters
is prohibited
21 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any
other appropriate requirements of State and Federal law If NCDWQ determines that such standards or laws are not
being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated
or that further conditions are necessary to assure compliance NCDWQ may reevaluate and modify this certification
22 All fill slopes located in , jurisdictional wetlands shall be placed at slopes no flatter than 3 1 unless otherwise
authorized by this certification
23 A copy of this Water Quality Certification shall be maintained on the construction site at all times In addition the
Water Quality Certification and all subsequent modifications if any shall be maintained with the Division Engineer
and the on site project manager
24 The outside buffer wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities Impacts to
areas within the fencing are prohibited unless otherwise authorized by this certification
25 The issuance of this certification does not exempt the Permittee from complying with any and all statutes rules
regulations or ordinances that may be imposed by other government agencies (i a local state and federal) having
,jurisdiction including but not limited to applicable buffer rules stormwater management rules soil erosion and
sedimentation control requirements etc
26 Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by
the end of the growing season following completion of construction
27 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
Certification
28 There shall be no excavation from or waste disposal into .jurisdictional wetlands or waters associated with this
permit without appropriate modification Should waste or borrow sites or access roads to waste or borrow sites be
located in wetlands or streams compensatory mitigation will be required since that is a direct impact from road
construction activities
29 Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design installation and operation and maintenance of such Best Management Practices in order to protect surface
waters standards
a The erosion and sediment control measures for the project must be designed installed operated and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual
b The design installation operation and maintenance of the sediment and erosion control measures must
be such that they equal or exceed the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual The devices shall be maintained on all construction
sites borrow sites and waste pile (spoil) projects including contractor owned or leased borrow pits
associated with the project
c For borrow pit sites the erosion and sediment control measures must be designed installed operated
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual
d The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act
30 The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of
discovery
31 Upon completion of the project (including any impacts at associated borrow or waste sites) the NCDOT Division
Engineer shall complete and return the enclosed Certification of Completion Form to notify NCDWQ when all
work included in the 401 Certification has been completed
32 Violations of any condition herem set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties This Certification shall become null and void unless the above conditions are
made conditions of the Federal 404 and/or Coastal Area Management Act Permit This Certification shall expire
upon the expiration of the 404 or CAMA permit
If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing
You may obtain the petition form from the office of Administrative hearings You must file the petition with the office of
Administrative Hearings within sixty (60) days of receipt of this notice A petition is considered filed when it is received
in the office of Administrative Hearings during normal office hours The Office of Administrative Hearings accepts filings
Monday through Friday between the hours of 8 00am and 5 00pm except for official state holidays The original and one
(1) copy of the petition must be filed with the Office of Administrative Hearings
The petition may be faxed provided the original and one copy of the document is received by the Office of Administrative
Hearings within five (5) business days following the faxed transmission
The mailing address for the Office of Administrative Hearings is
Office of Administrative Hearings
6714 Mail Service Center
Raleigh NC 27699 6714
Telephone (919) 733 2698 Facsimile (919) 733 3478
A copy of the petition must also be served on DENR as follows
Ms Mary Penny Thompson General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh NC 27699 1601
This the 10th day of May 2012
DIVISION OF WATER QUALITY
Z--
C arl ak
Director
WQC No 003916
Beverly Eaves Perdue
Governor
NCDWQ Protect No
Applicant
Protect Name
��
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Charles Wakild P E
Director
Date of Issuance of 401 Water Quality Certification
County
Dee Freeman
Secretary
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules and
any subsequent modifications the applicant is required to return this certificate to the 401 Transportation Permitting
Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh NC 27699 1650 This form
may be returned to NCDWQ by the applicant the applicant s authorized agent or the project engineer It is not
necessary to send certificates from all of these
Applicant s Certification
I hereby state that to the best of my abilities due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and
specifications and other supporting materials
Signature
Agent s Certtfication
Date
I hereby state that to the best of my abilities due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and
specifications and other supporting materials
Signature Date
Engineer s Certification
Partial Final
I as a duly registered Professional Engineer in the State of North
Carolina having been authorized to observe (periodically weekly full time) the construction of the project for the
Permittee hereby state that to the best of my abilities due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials
Signature
Date
Transportation and Permitting Unit
1650 Mail Service Center Raleigh North Carolina 276991650
Location 512 N Salisbury St Raleigh North Carolina 27604
Phone 919 -807 -63001 FAX 919 -807 -6488
Internet www rimaterguality org
An Equal Opportunity 1 Affirmative Action Employer
Registration No
One
NorthCarohna
Nahmallb,