Loading...
HomeMy WebLinkAbout20120431 Ver 1_Approval Letter_20120508Akvll�wl MC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Governor Director May 8 2012 Chatham County NCDWQ Project No 20120431 SR 2162 (Mark Teague Road) State Project No 8C 019109 APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS Mr Richard W Hancock NCDOT Division 8 902 N Sandhills Blvd Aberdeen NC 28315 Dear Mr Hancock P E Division Engineer Dee Freeman Secretary You have our approval in accordance with the conditions listed below for the following impacts for the purpose of implementing roadway improvements to SR 2162 (Mark Teague Road) in Chatham County Stream Imnnets in the Cane Fear River Basin Site Station Permanent ^ Temporary Permanent Temporary Total Stream (ac) Fill in Fill in Fill in Fill in Stream Impacts Intermittent Intermittent Perennial Perennial Impact Requiring W1 006 Stream Stream Stream Stream (linear ft) Mitigation linear ft linear ft linear ft) linear ft linear ft S1 24 +25 L 24 20 0 0 44 0 Total 24 20 0 0 44 0 Total Stream Impact for Project 44 linear feet W.+1 -11 lmn�rfc in tht- ('ant- Fear River Rnsin (non riverime) Site Fill Fill Excavation Mechanized Hand Clearing Area under Total Wetland (ac) (temporary) (ac) Clearing (ac) (ac) Bridge Impact (ac) ac ac W1 006 0 0 0 0 N/A 006 Total 006 0 0 0 0 N/A 006 Total Wetland Impact for Project u 06 acres The project shall be constructed in accordance with your application dated received May 1 2012 After reviewing your application we have decided that these impacts are covered by General Water Quality Certification Number 3886 This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers In addition you should acquire any other federal state or local permits before you proceed with your pi oject including (but not limited to) Sediment and Erosion Control Non Discharge and Water Supply Watershed regulations This approval will expire with the accompanying 404 permit 225 Green St Suite 714 Fayetteville NC 28301 5043 Phone 910433 33001 FAX 910486 0707 Internet www rimaterquality oral An Equal Opportunity Affirmative Action Employer 50 Recycled 10/ Post Consumer Paper l,A NonrthCarohna V'turial`l� f This apps oval is valid solely for the purpose and design described in your application (unless modified below) Should your protect change you must notify the NCDWQ and submit a new application If the property is sold the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all the conditions If total wetland fills for this project (now or in the future) exceed one acre or of total impacts to streams (now or in the future) exceed 150 linear feet compensatory mitigation may be required as described in 15A NCAC 2H 0506 (h) (6) and (7) For this approval to remain valid you must adhere to the conditions listed in the attached certification and any additional conditions listed below Condition(s) of Certification Project Specific Conditions 1 For the 20 linear feet of streams being impacted due to site dewatermg activities the site shall be graded to its preconstruction contours and revegetated with appropriate native species General Conditions Unless otherwise approved in this certification placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches to allow low flow passage of water and aquatic life Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis equilibrium of wetlands or streambeds or banks adjacent to or upstream and down stream of the above structures The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWQ If this condition is unable to be met due to bedrock or other limiting features encountered during construction please contact NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required 3 If concrete is used during construction a dry work area shall be maintained to prevent direct contact between curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills 4 During the construction of the project no staging of equipment of any kind is permitted in waters of the U S or protected riparian buffers 5 The dimension pattern and profile of the stream above and below the crossing shall not be modified Disturbed floodplams and streams shall be restored to natural geomorphic conditions 6 The use of rip rap above the Normal High Water Mark shall be minimized Any rip rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage 7 The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval 8 All work in of adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags rock berms cofferdams and other diversion structures shall be used to prevent excavation in flowing water 9 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the inti oduction of other pollutants into the stream 10 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels lubricants hydraulic fluids or other toxic materials 11 No rock sand or other materials shall be dredged from the stream channel except where authorized by this certification 12 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited 13 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law If NCDWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated or that further conditions are necessary to assure compliance NCDWQ may reevaluate and modify this certification 14 All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3 1 unless otherwise authorized by this certification 15 A copy of this Water Quality Certification shall be maintained on the construction site at all times in addition the Water Quality Certification and all subsequent modifications if any shall be maintained with the Division Engineer and the on site project manager 16 The outside buffer wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification 17 The issuance of this certification does not exempt the Permittee from complying with any and all statutes rules regulations or ordinances that may be imposed by other government agencies (i a local state and federal) having ,jurisdiction including but not limited to applicable buffer rules stormwater management rules soil erosion and sedimentation control requirements etc 18 The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of discovery 19 Upon completion of the project (including any impacts at associated borrow or waste sites) the NCDOT Division Engineer shall complete and return the enclosed Certification of Completion Form to notify NCDWQ when all work included in the 401 Certification has been completed 20 Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction 21 There shall be no excavation from or waste disposal into ,jurisdictional wetlands or waters associated with this permit without appropriate modification Should waste or borrow sites or access roads to waste or borrow sites be located in wetlands or streams compensatory mitigation will be required since that is a direct impact from road construction activities 22 Erosion and sediment control practices must be in full compliance with all specifications governing the proper design installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards a The erosion and sediment control measures for the project must be designed installed operated and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual b The design installation operation and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual The devices shall be maintained on all construction sites borrow sites and waste pile (spoil) projects including contractor owned or leased borrow pits associated with the project c For borrow pit sites the erosion and sediment control measures must be designed installed operated and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual d The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act 23 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification C If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing You may obtain the petition form from the office of Administrative hearings You must file the petition with the office of Admiinsti ative Hearings within sixty (60) days of receipt of this notice A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8 00am and 5 OOpm except for official state holidays The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings The petition may be faxed provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission The mailing address for the Office of Administrative Hearings is Office of Administrative Hearings 6714 Mail Service Center Raleigh NC 27699 6714 Telephone (919) 733 2698 Facsimile (919) 733 3478 A copy of the petition must also be served on DENR as follows Mr William Cary General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh NC 27699 1601 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act if you have any questions please contact Mason Herndon at (910) 308 4021 ec Art King Division 6 Environmental Officer Ronnie Smith US Army Corps of Engineers Wilmington Field Office Gary Jordan US Fish and Wildlife Service Travis Wilson NC Wildlife Resources Commission Sonia Carrillo NCDWQ Central Office File Copy Sincerely jLk � q4lw� Charles Wakild Director NCDWQ Protect No County Applicant Project Name Date of Issuance of 401 Water Quality Certification Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules and any subsequent modifications the applicant is required to return this certificate to the 401 Transportation Permitting Unit North Carolina Division of Water Quality 1650 Mail Sei vice Center Raleigh NC 27699 1650 This form may be returned to NCDWQ by the applicant the applicant s authorized agent or the project engineer It is not necessary to send certificates from all of these Applicant s Cert fcation I hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Agent s Certification Date I hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Date Engineer's Certification Partial Final I as a duly registered Professional Engineer in the State of North Carolina having been authorized to observe (periodically weekly full time) the construction of the project for the Permttee hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Date Registration No