Loading...
HomeMy WebLinkAbout20110896 Ver 1_More Info Received_20111031b�')q %, ��- � � q � Belvedere Property Management LLC Peter J Tally Vice President October 31 2011 Jennifer S Frye Enforcement Project Manager Wilmington Regulatory Field Office U S Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 1343 RE Action ID No SAW 2011 00624 Dear Ms Frye This letter follows my letter of October 21, 2011, in which we mchcated our intent to provide to you by November 1, 2011, plans for mitigation of unavoidable wetlands impacts to wetlands in connection with the project by Orton Plantation Holdings, LLC After numerous consultations with our experts and extensive internal evaluations of alternatives to avoid and minimize wetland impacts, we believe we have formulated a plan that utilizes in an ecologically beneficial way the on site environmental assets presented by Orton Plantation and will result in greater wetlands functionality while supporting our project purpose We had hoped to meet with you and representatives of the other permitting agencies to present our plan It was our understanding, based on statements by Ken Jolly at our meeting on August 3, 2011, with representatives from the Corps of Engineers and the Division of Water Quality that a preliminary meeting was recommended in advance of the submittal of documents We concur with Mr Jolly that a preliminary informal presentation is the most efficient way to proceed, so that we can get the benefit of and respond to the continents and suggestions of the permitting agencies to ensure a thorough and complete plan Informed by the feedback from the agencies, we would be in a better position to assemble a refined final plan for further review by all interested agencies and members of the public It is unfortunate that your schedule does not permit your meeting with us at this time We nevertheless expect to present our plan to the Division of Water Quality and the Division of Coastal Management We would much prefer to have your participation, as your input is critical to the project I hope that you might be able to adjust your schedule to participate, or to timely engage in a separate discussion with our consultants In any event we anticipate finalizing the plan following our evaluation of and response to 1251 Avenue of the Amencas 17i° Floor New York NY 10020 comments by the permitting agencies Our plan will be presented by our consultants, Steve Morrison and Christian Preziosi of Land Management Group and John Dorney of Atkins Let me reiterate our gratitude for your patience in this process Please feel free to contact me if we can make some alternate arrangement to get the benefit of your comments on our proposed mitigation plan, or you may contact our consultants directly, Steve Morrison at Land Management Group (910 452 0001) or John Dorney at Atkins North America Inc (919 431 5260) Of course, if your counsel wishes to discuss regulatory or legal issues, please have him contact our legal counsel for this project Craig Bromby, at 919 899 3032 ince a yo s, Peter Tal Vice President Orton Plantation Holdings, LLC c Eric Klein Craig Bromby Steve Morrison John Dorney Doug Huggett Ian McMillan Ken Jolly 78308 000002 EMF US 37758772v1