HomeMy WebLinkAbout20120415 Ver 1_401 Application_20120412ENGINEERS I PLANNERS I SURVEYORS
111 MacKenan Drive
CARY, NORTH CAROLINA 27511
(919) 469 3340
FAX (919) 467 6008
TO NCDWQ
1650 Mall Service Center
Raleigh, NC 27699 1650
WE ARE SENDING YOU
❑ Shop Drawings
❑ Copy of Letter
20120415
LMER OF U ° A MM0`> AI
DATE April 24, 2012
1 JOB NO 02120070
ATTENTION Laurie Dennison
PHONE # 919 807 6303
RE NRB Authorization
Linear Technology — Cary NC
3
4 24 12
1
❑ Attached via the following items
❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Change order ❑ Diskette ❑
COPIES
DATE
NO
DESCRIPTION
3
4 24 12
1
PCN Form
3
4 24 12
2
Impact Maps
3
4 24 12
3
Supplement Forms, BMP Calcs, Background Info, Photos
3
4 24 12
4
Town of Cary Approved Plans
THESE ARE TRANSMITTED as checked below
❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval
® For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ❑
❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
Attached is a Neuse Buffer Authorization request for Linear Technology in Cary NC
The site plans and stormwater management plans were approved by the Town in 2007 The BMPs
were designed based on 2007 standards One outfall is located within an existing sewer easement
and will not require additional disturbance of the buffer / /0)
Please feel free to call with any questions 4 � (% \
Hunter Freeman, PE I Z _ �? I,
COPY TO W &R FILE SIGNED
if enclosures are not as noted kindly notify us at once
0� W AT �q�G
LMJ> �
20120415
Office Use Only
Corps action ID no
DWQ project no
Form Version 13 Dec 10 2008
Page 1 of 11
PCN Form — Version 1 3 December 10 2008 Version
Pre - Construction Notification PC Form
A Applicant Information
1
Processing
la
Type(s) of approval sought from the
Corps
El Section 404 Permit E:1 Section 10 Permit
1 b Specify Nationwide Permit (NWP) number or General Permit (GP) number
1c
Has the NWP or GP number been verified by the Corps?
❑ Yes
❑ No
1 d Type(s) of approval sought from the DWQ (check all that apply)
❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization
1 e
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification
❑ Yes ® No
For the record only for Corps Permit
❑ Yes ❑ No
1f
Is payment into a mitigation bank or in lieu fee program proposed for mitigation
of impacts? If so attach the acceptance letter from mitigation bank or in lieu
fee program
❑ Yes
® No
1g
Is the project located in any of NC s twenty coastal counties If yes answer 1 h
below
❑ Yes
® No
1h
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2
Project Information
2a
Name of project
Linear Technology
2b
County
Wake
2c
Nearest municipality / town
Cary
2d
Subdivision name
Weston Oaks
2e
NCDOT only T I P or state
project no
3
Owner Information
3a
Name(s) on Recorded Deed
Linear Technology Corp
3b
Deed Book and Page No
12253 page 2744
3c
Responsible Party (for LLC if
applicable)
Dallas Ledlow
Vv
3d
Street address
15100 Weston Parkway Suite 202
3e
City state zip
Cary NC 27513
2012
3f
Telephone no
919 677 0948 �ENR yy
3g
Fax no
919 677 9814
a Mgr nc
an
3h
Email address
dledlow @linear com
Page 1 of 11
PCN Form — Version 1 3 December 10 2008 Version
4
Applicant Information (if different from owner)
4a
Applicant is
❑ Agent ❑ Other specify
4b
Name
4c
Business name
(if applicable)
4d
Street address
4e
City state zip
4f
Telephone no
4g
Fax no
4h
Email address
5
Agent/Consultant Information (if applicable)
5a
Name
Hunter Freeman
5b
Business name
(if applicable)
Withers & Ravenel
5c
Street address
111 MacKenan Drive
5d
City state zip
Cary NC 27511
5e
Telephone no
919 469 3340
5f
Fax no
919 467 6008
5g
Email address
hfreeman @withersravenel com
Page 2 of 11
PCN Form — Version 1 3 December 10 2008 Version
B Project Information and Prior Project History
1 Property Identification
1a Property identification no (tax PIN or parcel ID)
0765345905
lb Site coordinates (in decimal degrees)
Latitude 35 8241 Longitude 787861
(DD DDDDDD) ( DD DDDDDD)
1c Property size
5 61 acres
2 surface Waters
2a Name of nearest body of water (stream river etc ) to
Unnamed Tnb to Crabtree Creek
proposed project
2b Water Quality Classification of nearest receiving water
C NSW
2c River basin
Neuse
3 Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
Undeveloped but previously cleared and graded lot wooded perimeter
3b List the total estimated acreage of all existing wetlands on the property
000
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
3d Explain the purpose of the proposed project
Commercial Office Budding
3e Describe the overall project in detail including the type of equipment to be used
The project includes general site development (grading infrastructure parking and budding conctruction) The proposed
impact is for a new stormwater outfall downstream of a bioretention cell A second outfall is within an existing sewer
easement which was built in 1997
4 Jurisdictional Determinations
4a Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
❑ Yes ❑ No Unknown
project (including all prior phases) in the past?
Comments
4b If the Corps made the jurisdictional determination what type
❑ Preliminary ❑ Final
of determination was made?
4c If yes who delineated the jurisdictional areas?
Agency /Consultant Company
Name (if known)
Other
4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
5 Project History
5a Have permits or certifications been requested or obtained for
® Yes ❑ No El Unknown
this project (including all prior phases) in the past
5b If yes explain in detail according to help file instructions
Town of Cary site plan and construction drawing approvals in 2007
Page 3 of 11
PCN Form — Version 1 3 December 10 2008 Version
6 Future Project Plans
6a Is this a phased project? ® Yes ❑ No
6b If yes explain
Building construction may be phased however all stormwater systems have been designed for full buddout No additional
buffer impacts are anticipated in the future The southern pipe outfall is within an existing sewer easement and no
additional new disturbance is necessary within the buffer
Page 4 of 11
PCN Form — Version 1 3 December 10 2008 Version
C Proposed Impacts Inventory
1 Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands ❑ Streams tributaries ® Buffers
❑ Open Waters ❑ Pond Construction
2 Wetland Impacts
If there are wetland impacts proposed on the site then complete this question for each wetland area impacted
2a
2b
2c
2d
2e
2f
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps 404 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404 other)
(acres)
Temporary
W1 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g Total wetland impacts
000
2h Comments
3 Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this
question for all stream sites impacted
3a
3b
3c
3d
3e
3f
3g
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number
(PER) or
(Corps 404 10
stream
length
Permanent (P) or
intermittent
DWQ — non 404
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h Total stream and tributary impacts
000
31 Comments
Page 5 of 11
PCN Form — Version 1 3 December 10 2008 Version
4 Open Water Impacts
If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of
the U S then individually list all open water impacts below
4a
Open water
impact number
— Permanent (P)
or Temporary
4b
Name of waterbody
(if applicable)
4c
Type of impact
4d
Waterbody type
4e
Area of impact (acres)
01 ❑P ❑T
02 ❑P ❑T
03 ❑P ❑T
04 ❑P ❑T
4f Total open water impacts
000
4g Comments
5 Pond or Lake Construction
If pond or lake construction proposed then complete the chart below
5a
Pond ID
number
5b
Proposed use or purpose of
pond
5c
Wetland Impacts (acres)
5d
Stream Impacts (feet)
5e
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f Total
5g Comments
5h Is a dam high hazard permit required
❑ Yes ❑ No If yes permit ID no
51 Expected pond surface area (acres)
5j Size of pond watershed (acres)
r5-kMethod of construction
Page 6 of 11
PCN Form — Version 1 3 December 10 2008 Version
6 Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts
below If any impacts require mitigation then you MUST fill out Section D of this form
6a
® Neuse ❑ Tar Pamlico ❑ Other
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b
6c
6d
6e
6f
6g
Buffer impact
number —
Reason for
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P)
impact
Stream name
mitigation
(square feet)
(square feet)
or Temporary
required?
131 ®P ❑ T
Stormwater
outfall
Trib to Crabtree Creek
® Yes s
433
468
B2 ❑ P ❑ T
❑ Yes
❑ No
B3 ❑P ❑T
El Yes
❑ No
6h Total buffer impacts
61 Comments Stormwater outfall
D Impact Justification and Mitigation
1 Avoidance and Minimization
1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
The new outfall uses the smallest pipe necessary The second outfall is located within an existing sanitary sewer easement
and includes removal and replacement of an existing pipe in the same location
1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
Standard trenching construction techniques will be used to urnmize lateral space requirements
2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State
2a Does the project require Compensatory Mitigation for
❑ Yes ® No
impacts to Waters of the U S or Waters of the State?
2b If yes mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
❑ Mitigation bank
2c If yes which mitigation option will be used for this project?
❑ Payment to in lieu fee program
❑ Permittee Responsible Mitigation
3 Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type
Quantity
Page 7 of 11
PCN Form — Version 1 3 December 10 2008 Version
3c Comments
4 Complete if Making a Payment to In lieu Fee Program
4a Approval letter from in lieu fee program is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c If using stream mitigation stream temperature
❑ warm ❑ cool ❑cold
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non riparian wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5 Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permtttee responsible mitigation plan provide a description of the proposed mitigation plan
6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation
❑ Yes ® No
6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5
6f Total buffer mitigation required
6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank
permittee responsible riparian buffer restoration payment into an approved in lieu fee fund)
6h Comments
Page 8 of 11
PCN Form — Version 1 3 December 10 2008 Version
E
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1
Diffuse Flow Plan
la
Does the project include or is it adjacent to protected npanan buffers identified
® Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b
If yes then is a diffuse flow plan included? If no explain why
Yes No
❑
Comments Plans approved by Town of Cary
2
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
37%
2b
Does this project require a Stormwater Management Plan?
® Yes ❑ No
2c
If this project DOES NOT require a Stormwater Management Plan explain why
2d
If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan
The site will use 2 bioretention cells to control and treat runoff The discharge from the southern cell utilizes an existing
sanitary sewer easement and does not require any additional buffer disturbance
® Certified Local Government
2e
Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3
Certified Local Government Stormwater Review
3a
In which local governments jurisdiction is this project?
Town of Cary
® Phase II
3b
Which of the following locally implemented stormwater management programs
® NSW
❑ USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other
3c
Has the approved Stormwater Management Plan with proof of approval been
® Yes ❑ No
attached?
4
DWQ Stormwater Program Review
❑ Coastal counties
4a
Which of the following state implemented stormwater management programs apply
❑ HQW
❑ ORW
(check all that apply)
❑ Session Law 2006 246
❑ Other
4b
Has the approved Stormwater Management Plan with proof of approval been
attached?
® Yes ❑ No
5
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
® Yes ❑ No
5b Have all of the 401 Unit submittal requirements been met?
® Yes ❑ No
Page 9 of 11
PCN Form — Version 1 3 December 10 2008 Version
F
Supplementary Information
1
Environmental Documentation (DWQ Requirement)
la
Does the project involve an expenditure of public (federal /state /local) funds or the
❑ Yes
® No
use of public (federal /state) land?
lb
If you answered yes to the above does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c
If you answered yes to the above has the document review been finalized by the
State Clearing House? (If so attach a copy of the NEPA or SEPA final approval
letter)
❑ Yes
❑ No
Comments
2
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated
Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards
❑ Yes
® No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after the fact permit application?
❑ Yes
® No
2c
If you answered yes to one or both of the above questions provide an explanation of the violation(s)
3
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes
® No
additional development which could impact nearby downstream water quality?
3b
If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered no provide a short narrative description
4
Sewage Disposal (DWQ Requirement)
4a
Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from
the proposed project or available capacity of the subject facility
Page 10 of 11
PCN Form — Version 1 3 December 10 2008 Version
5 Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
❑ Yes ® No
habitat?
5b Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ® No
impacts?
❑ Raleigh
5c If yes Indicate the USFWS Field Office you have contacted
❑ Asheville
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6 Essential Fish Habitat (Corps Requirement)
6a WIII this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7 Historic or Prehistoric Cultural Resources (Corps Requirement)
7a WIII this project occur in or near an area that the state federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e g National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
8 Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA designated 100 year floodplain?
❑ Yes ® No
8b If yes explain how project meets FEMA requirements
8c What source(s) did you use to make the floodplain determination?
Dallas Ledlow (Owner)
%/ Z
Applicant/Agents Printed Name
Applicant/Agents Signature
Date
(Agents signature is valid only if an authorization letter from the applicant
is provided
Page 11 of 11
PCN Form — Version 1 3 December 10 2008 Version
II DESIGN INFORMATION
Permit Number
Pre development 1 yr 24 hr runoff
(to be orovided by DWQ)
A
o�oF WnrF999
r
r
~
NCDENR
`
55 757 ft2
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
Percent impervious
401 CERTIFICATION APPLICATION FORM
\ A
BIORETENTION CELL SUPPLEMENT
10 Inch
This form must be filled out printed and submitted
The Required Items
Checklist (Part Ill) must be printed filled out and submitted along with all of the required information
1 PROJECT INFORMATION
Is pre /post control of the 1 yr 24 hr peak flow required?
Project name
Linear Technologies
Contact name
Hunter Freeman PE
Phone number
919 469 3340
Date
April 18 2012
Drainage area number
A
II DESIGN INFORMATION
ft3
Pre development 1 yr 24 hr runoff
Site Characteristics
Post development 1 yr 24 hr runoff
ft3
Drainage area
81 021 ft2
Volume provided
Impervious area
55 757 ft2
0 05 In/hr
Percent impervious
688/ /
\ A
Design rainfall depth
10 Inch
`"%0 S$/
Peak Flow Calculations
133 ft
'.-
r ..
Is pre /post control of the 1 yr 24 hr peak flow required?
Y (Y or N)
SEAL
1 yr 24 hr runoff depth
3 in
v 02M42
1 yr 24 hr Intensity
Pre development 1 yr 24 hr peak flow
0125 in/hr
0 050 ft3/sec
rG �c+ •.
��j �'� NG I N � 4�i4 —
Post development 1 yr 24 hr peak flow
0170 ft3 /sec
/ / C �� \����
'1► /,
Pre /Post 1 yr 24 hr peak control
0120 ft3 /sec
Storage Volume Non SA Waters
Minimum volume required
3 702 0 ft3
Volume provided
3 912 0 ft3 OK
Storage Volume SA Waters
15 runoff volume
ft3
Pre development 1 yr 24 hr runoff
ft3
Post development 1 yr 24 hr runoff
ft3
Minimum volume required
0 ft3
Volume provided
ft3
Cell Dimensions
0 05 In/hr
Ponding depth of water
6 inches
Ponding depth of water
0 50 ft
Surface area of the top of the bioretention cell
3130 0 ft
Length
133 ft
Width
25 It
or Radius
ft
Media and Soils Summary
Drawdown time ponded volume
6 hr
Drawdown time to 24 Inches below surface
25 hr
Drawdown time total
31 hr
In situ soil
Soil permeability
0 05 In/hr
Planting media soil
Soil permeability
100 In/hr
Soil composition
/ Sand (by volume)
85/
/ Fines (by volume)
10/
Form SW401 Bioretenton Rev 8
June 25 2010
Insufficient ponding depth C?)
Insufficient surface area
OK
OK
OK
OK
Z� �3
Insufficient Increase Infiltration rate or Include underdrains
t�lxo�ua S ! �Itw>�uj
OK
OK
OK
Parts I and II Design Summary Page 1 of 3
/ Organic (by volume) 5/ OK
Total 100/
Phosphorus Index (P Index) of media
11 (unitless) OK
Permd Number
(to be provrded by DWQ)
Form SW401 Bioretention Rev 8
June 25 2010 Parts 1 and 11 Design Summary Page 2 of 3
Permit Number
(to be provided by DWQ)
Basin Elevations
Temporary pool elevation 345 50 fmsi
Type of bloretentlon cell (answer Y to only one of the two following
questions)
Is this a grassed cell'? N (Y or N)
Is this a cell with trees/shrubs? Y (Y or N) OK media depth
Planting elevation (top of the mulch or grass sod layer) 345 fmsi
Depth of mulch 2 inches OK
Bottom of the planting media sod 342 fmsl
Planting media depth 3 It
Depth of washed sand below planting media soil 0 25 It
Are underdrains being Installed?
Y
(Y or N)
How many clean out pipes are being Installed?
4
OK
What factor of safety Is used for sizing the underdrains? (See
10
OK
BMP Manual Section 12 3 6)
Additional distance between the bottom of the planting media and
1 ft
the bottom of the cell to account for underdrains
Bottom of the cell required
340 75 fmsi
SHWT elevation
fmsl
Distance from bottom to SHWT
340 75 ft
OK
Internal Water Storage Zone (IWS)
Does the design Include IWS
N
(Y or N)
Elevation of the top of the upturned elbow
fmsi
Separation of IWS and Surface
345 ft
Planting Plan
Number of tree species
3
Number of shrub species
2
Number of herbaceous groundcover species
0
OK
Additional Information
Does volume In excess of the design volume bypass the
Y
(Y or N)
OK
bloretentlon cell?
Does volume In excess of the design volume flow evenly distributed
Y
(Y or N)
OK
through a vegetated filter?
What Is the length of the vegetated filter?
20 It
Does the design use a level spreader to evenly distribute flow?
N
(Y or N)
Show how flow Is evenly distributed SnLLAA, V .
Is the BMP located at least 30 feet from surface waters (50 feet If
Y
(Y or N)
OK
SA waters)
Is the BMP located at least 100 feet from water supply wells?
Y
(Y or N)
OK
Are the vegetated side slopes equal to or less than 31 v
Y
(Y or N)
OK
Is the BMP located In a proposed drainage easement with access
Y
(Y or N)
OK
to a public Right of Way (ROW)?
Inlet velocity (from treatment system)
0 5 ft/sec
OK
Is the area surrounding the cell likely to undergo development In the
N
(Y or N)
OK
future?
Are the slopes draining to the bloretentlon cell greater than 20 / ?
N
(Y or N)
OK
Is the drainage area permanently stabilized?
Y
(Y or N)
OK
Pretreatment Used
(Indicate Type Used with an X In the shaded cell)
Gravel and grass
(flinches gravel followed by 3 5 It of grass)
Grassed swale
#VALUE'
Forebay
Other
X
Form SW401 Bio etent on Rev 8
June 25 2010 Parts I and 11 Design Summary Page 3 of 3
Permit No
(to be assigned by DWQ)
III � REQUIRED ITEMS CHECKLIST + � -,
Please indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will
result in a request for additional information This will delay final review and approval of the project Initial in the space provided to
indicate the following design requirements have been met If the applicant has designated an agent the agent may initial below If a
requirement has not been met attach justification
Pagel Plan
Initials Sheet No
1 Plans (1 50 or larger) of the entire site showing
Design at ultimate build out
Off site drainage (if applicable)
Delineated drainage basins (include Rational C coefficient per basin)
Cell dimensions
Pretreatment system
High flow bypass system
Maintenance access
Recorded drainage easement and public right of way (ROW)
Clean out pipe locations
Overflow device and
Boundaries of drainage easement
2 Plan details (1 = 30 or larger) for the bioretention cell showing
Cell dimensions
Pretreatment system
High flow bypass system
Maintenance access
Recorded drainage easement and public right of way (ROW)
Design at ultimate build -out
Off site drainage (if applicable)
Clean out pipe locations
Overflow device and
Boundaries of drainage easement
Indicate the P Index between 10 and 30
(DZ 3 Section view of the bioretention cell (1 = 20 or larger) showing
Form SW401 B oretention Rev 7 Part III Page 4 of 4
Side slopes 31 or lower
Underdrain system (if applicable) and
Bioretention cell layers [ground level and slope pre treatment ponding depth mulch depth fill media
depth washed sand filter fabric (or choking stone if applicable) #57 stone underdrains (if applicable)
SHWT level(s) and overflow structure]
4 A sods report that is based upon an actual field investigation sod borings and infiltration tests The
results of the sods report must be verified in the field by DWQ by completing & submitting the sods
investigation request form County sod maps are not an acceptable source of soils information All
elevations shall be in feet mean sea level (fmsl) Results of soils tests of both the planting sod and the in
situ sod must include
Sod permeability
Soil composition (/ sand / fines / organic) and
P index
1
5 A detailed planting plan (1 = 20 or larger) prepared by a qualified individual showing
A variety of suitable species
Sizes spacing and locations of plantings
Total quantity of each type of plant specified
A planting detail
The source nursery for the plants and
Fertilizer and watering requirements to establish vegetation
_
6 A construction sequence that shows how the bioretention cell will be protected from sediment until the
entire drainage area is stabilized
7 The supporting calculations (including underdrain calculations if applicable)
ILL
t n
8 A copy of the signed and notarized inspection and maintenance (I &M) agreement
j
!a
9 A copy of the deed restriction
Form SW401 B oretention Rev 7 Part III Page 4 of 4
Permit Number
(to be orovrded by DWQ)
FWA
OapE N1ATE9Ov
r? r
NCDENR °
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
BIORETENTION CELL SUPPLEMENT
This form must be filled out printed and submitted
The Required Items Checklist (Part ill) must be printed filled out and submitted along with all of the required information
i PROJECT INFORMATION
Y (Y or N)
Project name
Linear Technologies
Contact name
Hunter Freeman PE
Phone number
919 469 3340
Date
April 18 2012
Drainage area number
B
11 DESIGN INFORMATION
Y (Y or N)
Site Characteristics
3 in
Drainage area
52 272 ft2
Impervious area
32 870 ft2
Percent impervious
629/ /
Design rainfall depth
10 inch
Peak Flow Calculations
Is pre /post control of the 1 yr 24 hr peak flow required?
Y (Y or N)
1 yr 24 hr runoff depth
3 in
1 yr 24 hr intensity
0125 In/hr
Pre development 1 yr 24 hr peak flow
0 030 ft3 /sec
Post development 1 yr 24 hr peak flow
0110 ft3 /sec
Pre /Post 1 yr 24 hr peak control
0 080 ft3 /sec
Storage Volume Non SA Waters
ft3
Minimum volume required
2 230 0 ft3
Volume provided
2 814 0 ft3
Storage Volume SA Waters
92
A F1
_� � SSI �9/�..
S
�s2 �
i ti it o,
�`
15 runoff volume
ft3
Pre - development 1 yr 24 hr runoff
ff3
Post - development 1 yr 24 hr runoff
ft
Minimum volume required
0 ft3
Volume provided
ft3
Cell Dimensions
Ponding depth of water
6 Inches
insufficient ponding depth
Ponding depth of water
0 50 it
Surface area of the top of the bioretention cell
13400 ft'
Insufficient surface area t=MA
Length
52 ft
OK t
Width
30 It
OK
-or Radius
It
Media and Soils Summary
Drawdown time ponded volume
6 hr
OK
Drawdown time to 24 Inches below surface
25 hr
OK
Drawdown time total
31 hr
In situ soil
Soil permeability
0 05 in/hr
Insufficient Increase Infiltration rate or include underdrains
Planting media soil
U""OfOud"4 AD"
Sod permeability
100 In/hr
OK
Soil composition
/ Sand (by volume)
85/
OK
/ Fines (by volume)
10/
OK
Form SW401 Bioretention Rev 8
June 25 2010
Parts I and 11 Design Summary Page 1 of 4
/ Organic (by volume) S/ OK
Total 100/
Phosphorus Index (P Index) of media
11 (unitless) OK
Permit Number
(to be provided by DWQ)
Form SW401 Bioretention Rev 8
June 25 2010 Parts I and 11 Design Summary Page 2 of 4
6
Basin Elevations
Permit Number
(to be provided by DWQ)
Temporary pool elevation 346 00 fmsl
Type of bioretention cell (answer Y to only one of the two following
questions)
Is this a grassed cell? N (Y or N)
Is this a cell with trees/shrubs? Y (Y or N) OK media depth
Planting elevation (top of the mulch or grass sod layer) 345 5 fmsl
Depth of mulch 2 Inches OK
Bottom of the planting media soil 342 5 fmsl
Planting media depth 3 It
Depth of washed sand below planting media soil 0 25 ft
Are underdrains being installed?
How many clean out pipes are being Installed?
What factor of safety is used for sizing the underdrains? (See
BMP Manual Section 12 3 6)
Additional distance between the bottom of the planting media and
the bottom of the cell to account for underdrains
Bottom of the cell required
SHWT elevation
Distance from bottom to SHWT
Internal Water Storage Zone (IWS)
Does the design include IWS
Elevation of the top of the upturned elbow
Separation of IWS and Surface
Planting Plan
Number of tree species
Number of shrub species
Number of herbaceous groundcover species
Additional Information
Does volume in excess of the design volume bypass the
bioretention cell?
Does volume in excess of the design volume flow evenly distributed
through a vegetated filter?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute flow?
Is the BMP located at least 30 feet from surface waters (50 feet if
SA waters)?
Is the BMP localed at least 100 feet from water supply wells9
Are the vegetated side slopes equal to or less than 319
Is the BMP located in a proposed drainage easement with access
to a public Right of Way (ROW)?
Inlet velocity (from treatment system)
Is the area surrounding the cell likely to undergo development in the
future?
Are the slopes draining to the bioretention cell greater than 20 /
Is the drainage area permanently stabilized?
Pretreatment Used
(Indicate Type Used with an X in the shaded cell)
Gravel and grass
(81nches gravel followed by 3 5 It of grass)
Grassed swale
Forebay
Other
Y (Y or N)
4
OK
10
OK
1 f
OK
34125 fmsl
OK
fmsl
OK
34125 It
OK
N (Y or N)
fmsl
3455ft
3
2
0
OK
Y (Y or N)
OK
Y (Y or N)
OK
20 ft
N (Y or N) Show how flow Is evenly distributed Sn1.a UC"—
Y (Y or N)
OK
Y (Y or N)
OK
Y (Y or N)
OK
Y (Y or N)
OK
0 5 ft/sec
OK
N (Y or N) OK
N (Y or N) OK
Y (Y or N) OK
#VALUE'
X
Form SW401 Bioretention Rev 8
June 25 2010 Parts I and 11 Design Summary Page 3 of 4
Permit No
fto be assigned by DWQ)
III ;REQUIRED ITEMS CHECKLIST o
Please indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will
result in a request for additional Information This will delay final review and approval of the project Initial In the space provided to
indicate the following design requirements have been met If the applicant has designated an agent the agent may initial below If a
requirement has not been met attach justification
Pagel Plan
Initials Sheet No
�b 1 Plans (1 50 or larger) of the entire site showing
Design at ultimate build out
Off site drainage (if applicable)
Delineated drainage basins (include Rational C coefficient per basin)
Cell dimensions
Pretreatment system
High flow bypass system
Maintenance access
Recorded drainage easement and public right of way (ROW)
Clean out pipe locations
Overflow device and
Boundaries of drainage easement
Act— 2 Plan details (1 = 30 or larger) for the bioretention cell showing
Cell dimensions
Pretreatment system
High flow bypass system
Maintenance access
Recorded drainage easement and public right of way (ROW)
Design at ultimate build -out
Off site drainage (if applicable)
Clean out pipe locations
Overflow device and
Boundaries of drainage easement
Indicate the P Index between 10 and 30
a�
3 Section view of the bioretention cell (1 = 20 or larger) showing
Side slopes 31 or lower
Underdrain system (if applicable) and
Bioretention cell layers [ground level and slope pre treatment pondmg depth mulch depth fill media
depth washed sand filter fabric (or choking stone if applicable) #57 stone underdrams (if applicable)
SHWT level(s) and overflow structure)
4 A sods report that is based upon an actual field investigation sod borings and infiltration tests The
results of the sods report must be verified in the field by DWO by completing & submitting the soils
investigation request form County sod maps are not an acceptable source of soils information All
elevations shall be in feet mean sea level (fmsl) Results of soils tests of both the planting sod and the in
situ sod must include
Sod permeability
Sod composition (/ sand / fines / organic) and
P index
got
5 A detailed planting plan (1 = 20 or larger) prepared by a qualified individual showing
A variety of suitable species
Sizes spacing and locations of plantings
Total quantity of each type of plant specified
A planting detail
The source nursery for the plants and
Fertilizer and watering requirements to establish vegetation
6 A construction sequence that shows how the bioretention cell will be protected from sediment until the
entire drainage area is stabilized
.� 7 The supporting calculations (including underdram calculations if applicable)
Ir-o. , 8 A copy of the signed and notarized inspection and maintenance (I &M) agreement
IA 9 A copy of the deed restriction
Form SW401 Bioretention Rev 7 Part III Page 4 of 4
_� /SS
/
330""` -�' -- —
\ --340
\ \ W
\ a w
1
I 1�
I
✓ i
1 I \
I I
r
G
W
M
�W
Z
CL J
4
� S
J /
r / \
Z
O C
W Qom_
W
aa-
mm
i
°UX,
p
L —
�
l�
I
r
lu
5
j- W
w —�
a
0
ct
a
OOOOOOppppAp'poo W
'Ya00 oaN.
% oe
w CN d�Z W eo CN
W 00 c.i ee J
° Z
00000000p00 ° ° °° r
N
N
■
sy
s
J
r �
W ro
w T s�
J i
Q
No ■S
3�
U
C.. C
m
W
U
LL
U_
O
.. M o u
O
CA
O
Z
� � 2
mIX W
D
m
LLJ O � Z
ir d N J
LLJ Z W
2
N N
a 4
t
3 3nYN 60 w A-M wrm noun no\ an caw a,Na \av3 \bm 10 30V10 " a ss \0G V \
i
1
L
'I
•
�i
• .o
Zzw
LLJ LL.
IF
a
,
..w
m In
r
lu
5
j- W
w —�
a
0
ct
a
OOOOOOppppAp'poo W
'Ya00 oaN.
% oe
w CN d�Z W eo CN
W 00 c.i ee J
° Z
00000000p00 ° ° °° r
N
N
■
sy
s
J
r �
W ro
w T s�
J i
Q
No ■S
3�
U
C.. C
m
W
U
LL
U_
O
.. M o u
O
CA
O
Z
� � 2
mIX W
D
m
LLJ O � Z
ir d N J
LLJ Z W
2
N N
a 4
t
3 3nYN 60 w A-M wrm noun no\ an caw a,Na \av3 \bm 10 30V10 " a ss \0G V \
i
_ -moons -
Zpn6_ _
—QZ —
tz-
w Lai
W W
N N 1
O m
IWL OW m in
LLP
O O W W O Z Z NO
O m 3 N O
a Z W W a
0 I I I
I I
I I I
xx
4
rn z
CO U
O �00
00J�00
000
ID
rn
00
lIIINi�'
LL.
V
V
N
Ucn
�
a
a
J
�
j!
L.J
D
m
m
Z
�
FO
r
N
N
d
Z
Z
N
N
i
_ -moons -
Zpn6_ _
—QZ —
tz-
w Lai
W W
N N 1
O m
IWL OW m in
LLP
O O W W O Z Z NO
O m 3 N O
a Z W W a
0 I I I
I I
I I I
xx
4
rn z
CO U
O �00
00J�00
000
ID
0
/ I
� I
/ I
/ _ J
W
OW /
�z
i
/
/
L
It
�Q
J
Z�`
W,*.
�gg
r
6
D €
M
9V
■
s�
r
s
J
s
M
r
Wr
r
_v�
r
r
3s
5
CL
CQ
G
U
CL
C
r)
J
m
W
LL
U_
O
J
O
U
W
F—
Q
w
_Z
J
If
e
` 331 3AM3lA M 60 Oz W Awl A• W. AB\ on WW1 OMO \OM] \dp 10 Im- u — Si z \OG z \z \
0000
ril 01
lIIINi�'
0
/ I
� I
/ I
/ _ J
W
OW /
�z
i
/
/
L
It
�Q
J
Z�`
W,*.
�gg
r
6
D €
M
9V
■
s�
r
s
J
s
M
r
Wr
r
_v�
r
r
3s
5
CL
CQ
G
U
CL
C
r)
J
m
W
LL
U_
O
J
O
U
W
F—
Q
w
_Z
J
If
e
` 331 3AM3lA M 60 Oz W Awl A• W. AB\ on WW1 OMO \OM] \dp 10 Im- u — Si z \OG z \z \
E
m
° ° °p0000000ppppp r
Wp ° °° /`/LOS�
Z LAJ
vLf.
Z L`
a o W W3
WW W W N °off $W W C Z Vo W r y CZ ga
3WW Q � (v�O W ►
g mZ o ° °° d ° ° O�J�o ° °° > ; I
W W w t/1 V1 p °OOpopp00000p000 ° ° ° °p °° '
lz
W W M
a W O N
323 a i W W a $
�0 Qir,z
[GQOw I ( I
w 3
�� J W i 9
ONO ' I V 0 r 4
x F' U ° o
W W I
V_1W�a I I a
xZ Z
W ,R ( u
=zCL
13D
0
�z I I � I 1 111 II I(I!
M // / I i z 1 1 I I III I
wm I I I
LLJ
Wa IJ (I 111(1 m
\ o /
I II
/
�
\
�
IX
CL
Z N ..
II ►I II I o
0- / \ / / m / m >'� I t ► III
U /
/ \ r� / ' I ► I ► I 1 I
croon - -_ ILL—]
=�cNC J/ / \ \ -- — — / / / /r // /l/ II <
u
/i
0 II 00 00 — _ — — — — — '' / _ � ' � /j // / / ^ — LL
w�� � 330=
Wfejr-
�/�
w
-ir`
ts-
O U
Z
O/
ULLJ r,0
LW OV
A
Q w
O N. �Z U� FW
3W � W� �� F-3 W— / !
(� M W (/� W
O— vrn II OW w} C 9
W = 3 a I
� a
O — 0W
3 Z m
0: LLI
0 pN °
V) N }
Q
F—
Z
N
z
331 VA z60.0 W Aq- 6* Ww %\ on W. OW \M \bM 10 f6 " u CG Oz \09 z V \
0
91-
PF.
.Pt
as
Print - Maps
Ung Maps
Weston Oaks Ct, Cary, NC 27513
Linear Technology BMP B outfall
i
On the go) Use m binq.com to find maps.
directions. businesses. and more
PagelofI
I Bird's eye view maps can't be printed, so another map view has been substituted.
http: / /www. bing.comlmapslprint.aspx ?mkt= en- us &z =19& s= b &cp =3 5.823 3 8 7,- 78.786323 ... 4/17/2012
ti
�i
ti''�esti:n
1
i
100 2,0 400 Feet
PIN
0765345905
Real Estate ID
0334539
Map Name
076514
Owner
LINEAR
TECHNOLOGY
CORP
Mailing Address 1
C/O DAVID WILKINS
Mailing Address 2
1630 MCCARTHY
BLVD
Mailing Address 3
MILPITAS CA
95035 -7417
Deed Book
12553
Deed Page
2744
Deed Date
5/18/2007
Deeded Acreage
5.61
Assessed Building
Value
$0.00
Assessed Land Value
$781,990.00
Total Assessed Value
$781,990.00
Billing Class
CORPORATE
LISTING
Property Description
L04 RCMB
WESTON OAKS
BM2007 -00900
Heated Area
Site Address
160 WESTON OAKS
CT
City
Cary
Township
CARY
Year Built
0
Total Sale Price
$0.00
Sale Date
Type and Use
Design Style
Land Class
VACANT
Old Parcel Number
--
� OF
l �
U =
�H C:4 WAU
COUNTY
0
n
a
n
U) 0 Z
0 v m
m 3
CD
A
0
rnD
CD n N �
C O
N
c
N
N
O
O
O
CD
CD
O
>u �
a �
o'
7 O
0
( (D W
0 v
m �
C. 0
0 A
C. '< z
0
V
OD
A
v
(•71
A
Z
D
O
fV
v
0
V
A
O
O
O
O
0
V
rb
A
O
O
O
O
C
O
v
W
A
V
O
O
O
O
R-!
0
V
A
O
0
0
0
035° 48'30,00" N 035° 49'00.00" N 035° 49'30.00" N 035° 50'00.00" N
Qa _
i._ e e w
s
f
• J
31
.�> f' ,
e ,
Y
I _ ,.
•
4 1,
4 or
035° 48' 30.00" N 035° 49'00.00" N 035° 49'30.00" N 035° 50'00.00" N
0
V
W
A
r�
O
O
O
O
O
V
W
A
OD
O
O
O
O
C
O
V
A
V
O
O
O
O
E--4
0
V
Oo
A
C?
O
0
0
0
Project Name Linear Technologies
City /State Cary NC
STORMWATER BMP A BIO RETENTION (35% TN Removal)
Land Use
Area
(ac)
% IA
Imp Area
(ac)
Impervious
1 28
98
1 3
Open Space
058
0
0 0
0 79
367486
Open Space
058
Totals
186
639
13
Total % Impervious Surface Area = 674 °/
Surface elevation = 3450 feet
Surface area provided = 0 072 acres
3130 sq ft
1 Inch Runoff Volume Calculation
Project # 2070095
Date 19 Apr 07
Using the Composite Curve Number Method as Described by McCuen 1982
Where S = (1000 /CN) 10 = Ultimate Soil Storage
Q* _ (P 0 2 *S)2 /(P +0 8. S) = Runoff Depth
P = Rainfall Depth
Land Use
Area (ac)
CN
P (in)
S (in)
Q* (in)
Runoff Volume
Impervious
1 28
98
1
020
0 79
367486
Open Space
058
61
1
639
0 01
2674
Totals
186
370161
1 Inch Runoff Volume Calculation
S = 0 085 acre -ft
3702 cu ft
Water quality pool elevation=
Bottom of Bio Retention =
Void Ratio in Plant Bed =
Depth of Surface Storage =
Total storage volume provided =
34550 feet
34100 feet
4000 /6
6 in
0151 acre -ft
6573 cu ft
Protect Name Linear Tehcnology
City/State Cary NC
STORMWATER BMP A Bioretentlon Cell
BIORETENTION UNDERDRAIN SIZING
From BMP Manual Chapter 5 7
# 4 Pipes
D = diameter of underdram
# 6 Pipes
Q = underdram design flow (= 1 Ox filter media flowrate)
n = roughness factor
784
S = slope of underdrams
595
3
911
(Q n) (3/8)
666
D= 16
5)
4
722
(So
Bioretention Surface Area = 3130
sf
Media Infiltration Rate = 1
in/hr
Media Flow Rate = 0 072
cfs
Q (1 OX media flowrate) = 072
cfs
n= 0011
cf
S = 0 005
ft/ft
D (recommended) = 706
in
If D is less than
# 4 Pipes
If D is less than
# 6 Pipes
513
2
784
2
595
3
911
3
666
4
1013
4
722
5
Max pondmg Depth = 6
in
775
6
Depth of Sod 48
in
82
7
Volume of Water in Sod = 5008
cf
BIORETENTION DRAWDOWN CALCULATIONS
Proiect # 2120070
Date 18 Apr 12
Media Flow Rate = 0 072
cfs limiting factor
Media Infiltration Rate = 1
in/hr
Volume of Water Drained in 12 hours
3130 cf
Volume of Water Drained in 48 hours
12520 tf
Bioretention Surface Area = 3130
sf
Max ponding Depth = 6
in
Volume above sod = 1565
cf
Volume of Water Drained in 12 hours > Volume stored above sod therefore
water will drain into sod within 12 hours
Bioretention Surface Area = 3130
sf
Max pondmg Depth = 6
in
Volume above sod = 1565
cf
Depth of Sod 48
in
Void Ratio 40%
Volume of Water in Sod = 5008
cf
Total Volume to be drained = 6573
cf (volume above sod + volume in sod)
Volume of Water Drained in 48 hours 12520
cf
Volume of Water Drained in 48 hours > Total Volume therefore water will drain +24
into sod within 48 hours
Project Name Linear Technologies
CijytState. Cary NC
STORMWATER BMP B BIO RETENTION (35% TN Removal)
Land Use
Area
(ac)
% IA
Imp Area
(ac)
Impervious
077
98
0 8
Open Space
043
0
0 0
079
221066
Open Space
043
Totals
1 2
639
0 8
Total % Impervious Surface Area = 629 %
Surface elevation — 3455 feet
Surface area provided — 0 031 acres
1340 sq ft
1 Inch Runoff Volume Calculation
Project # 2070095
Date 19 Apr -07
Using the Composite Curve Number Method as Described by McCuen 1982
Where S = (1000 /CN) 10 — Ultimate Soil Storage
Q* _ (P 0 2 *S)2/(P +0 8 *S) — Runoff Depth
P = Rainfall Depth
Land Use
Area (ac)
CN
P (in)
S (in)
Q* (in)
Runoff Volume
Impervious
077
98
1
020
079
221066
Open Space
043
61
1
639
0 01
1983
Totals
1 2
223049
1 Inch Runoff Volume Calculation
S = 0 051 acre -ft
2230 cu ft
Water quality pool elevation=
Bottom of Bio Retention —
Void Ratio in Plant Bed —
Depth of Surface Storage =
Total storage volume provided —
34600 feet
341 50 feet
40000/
6 in
0 065 acre -ft
2814 cu ft
Prolgct Name Linear Tehcnology
City/—State City/—State Cary NC
STORMWATER BMP B Bioretention Cell
BIORETENTION UNDERDRAIN SIZING
From BMP Manual Chapter 5 7
D = diameter of underdram
# 4 Pipes
Q = underdrain design flow (= 1 Ox filter media flowrate)
n = roughness factor
513
S = slope of underdrains
784
2
595
3
911
(Q n) (3 /8)
666
D = 16
s)
4
722
(So
Bioretention Surface Area = 1340
sf
Media Infiltration Rate = 1
in/hr
Media Flow Rate = 0 031
cfs
Q (1 OX media flowrate) = 031
cfs
n= 0011
S = 0 005
ft/ft
D (recommended) = 513
in
If D is less than
# 4 Pipes
If D is less than
# 6 Pipes
513
2
784
2
595
3
911
3
666
4
1013
4
722
5
775
6
82
7
BIORETENTION DRAWDOWN CALCULATIONS
Media Flow Rate = 0 031 cfs limiting factor
Media Infiltration Rate = 1 in/hr
Volume of Water Drained in 12 hours 1340 cf
Volume of Water Drained in 48 hours 5360 tf
Bioretention Surface Area = 1340 sf
Max pondmg Depth = 6 in
Volume above sod = 670 of
Volume of Water Drained in 12 hours > Volume stored above sod therefore
water will drain into soil within 12 hours
Bioretention Surface Area =
1340 sf
Max pondmg Depth =
6 in
Volume above sod =
670 cf
Depth of Sod
48 in
Void Ratio
40%
Volume of Water in Sod =
2144 cf
Total Volume to be drained =
2814 cf
Volume of Water Drained in 48 hours
5360 cf
Proiect # 2120070
Date 18 Apr 12
(volume above sod + volume in sod)
Volume of Water Drained in 48 hours > Total Volume therefore water will drain +24
into sod within 48 hours
35 49' 31"
35° 49' 22"
Hydrologic Soil Group —Wake County, North Carolina
Q Q
Map Scale. 1 1 ,230 if printed on A size (8.5" x 11 ") sheet. iO
r�' I
e N Meters
m A 0 10 20 40 60 m
N Feet
0 45 90 180 270
USDA Natural Resources Web Soil Survey 4/19/2012
Conservation Service National Cooperative Soil Survey Page 1 of 4
35° 49 30"
350 49' 22"
Z
_O
H
O
LL
Z
Ca
C
Q)
a)
N
X
LO
C6
a)
N
Q
0
a
m
c
a
O
Cl)
N
N
U
U)
CL
m
m
O O N
3
L) O C
O
M U N IOU
U
o a
U N (L)
(L) n m a) m
a m a)
N E m m N
w p o,N E
a) on
m m O_ m
_a N E 3 m
m aJ p C
> I oL 3
() = N O
o h
C C
aT) ° o a)
T �
m N y n a
n m o m >
m E mEL
oa.cv
C
O @ ~ O
(n a) U
m E a) a) f0
C O) a E .L
C
m :3 U ur
m N_
WEnr n u
CL
m
E
f0 UO
O)
U a) N
m N �
.O U
a) m C
N a)
CL C 3 Q
E U O y Z
— Z
L V1
on r-
U U �
m a)
a) 33 c
C on zz- O
O () a N
a)
r �
N 3 D
CO m
z
m E
Y T N
c �) Z i
O m u)
?E Erna)
N _
N O O C
N N U U)
m m ] L p
a E rn�CS)
m
I
a)
L
m
3 c o
m
>
a) 7
m
O
_C
a) O
C E
0
Q
O
O)
Y a)
c
m E
m
m
T
N L O
co
a) n
U
L
'LU
A
U o
7
-r- E ✓�
N
a
L p N
j
w
o
r
3 m
O N
d
N
I
Z r`p
o(L)Qa
^
C L
T
o
N >
3
S (
o
E?' m am)
O
O C
U o
Q
p L E L
n � a) T
Y
a)
N
LL
p
� ° a) m
°
I
M
>
3
-
L.. rn
a)
N
N
m
L 0 C
a
rd
N
E
c
t
m
N p
O >+ p
Co p
a
Q m
m
s n�
m
a
I N
Z Q
7 T
m
m
L a O
V)�
a
>
°)
a)EmE
L
U) rn
0
H° .E o
a)
O
m
>
m
0
Q
m
c
m
Z
co
U
L
'LU
A
m
cu
W
a C
V
O
��
^
C L
N
Q
U)
S Q Q m 00 U Z: UU O Z
C
U
m
rn
to
Q-'
8 TD
J
Q4f
m
❑000000
N
LL
p
LL
m
C
rl
}}
0
Vi
a O
N
0
c
t
Z
p
a rn
G
a
3
A
f-
Hydrologic Sod Group —Wake County North Carolina
Hydrologic Soil Group
Hydrologic Soil Group— Summary by Map Unit — Wake County North Carolina (NC183)
Map unit symbol
Map unit name
Rating Acres In AOI
Percent of AOI
CgC2 Cecil gravelly sandy loam 6 to 10
percent slopes moderately eroded
B 22
430/6 '
LdC2 Lloyd loam 6 to 10 percent slopes
moderately eroded
B 06
110/
WwF Wilkes loam 20 to 45 percent slopes
D 23
460/6
Totals for Area of Interest 51
11000/
Description
Hydrologic sod groups are based on estimates of runoff potential Sods are
assigned to one of four groups according to the rate of water infiltration when the
sods are not protected by vegetation are thoroughly wet and receive precipitation
from long duration storms
The soils in the United States are assigned to four groups (A B C and D) and
three dual classes (A/D B/D and C /D) The groups are defined as follows
Group A Soils having a high infiltration rate (low runoff potential) when thoroughly
wet These consist mainly of deep well drained to excessively drained sands or
gravelly sands These soils have a high rate of water transmission
Group B Soils having a moderate infiltration rate when thoroughly wet These
consist chiefly of moderately deep or deep moderately well drained or well drained
soils that have moderately fine texture to moderately coarse texture These soils
have a moderate rate of water transmission
Group C Soils having a slow infiltration rate when thoroughly wet These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture These soils have a slow rate of water
transmission
Group D Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet These consist chiefly of clays that have a high shrink swell
potential soils that have a high water table soils that have a claypan or clay layer
at or near the surface and soils that are shallow over nearly impervious material
These soils have a very slow rate of water transmission
If a sod is assigned to a dual hydrologic group (A/D B/D or C /D) the first letter is
for drained areas and the second is for undrained areas Only the soils that in their
natural condition are in group D are assigned to dual classes
Rating Options
Aggregation Method Dominant Condition
USDA Natural Resources Web Sod Survey 4/19/2012
2m— Conservation Service National Cooperative Sod Survey Page 3 of 4
Hydrologic Sod Group —Wake County North Carolina
Component Percent Cutoff None Specified
Tie break Rule Higher
UNatural Resources Web Sod Survey 4/19/2012
am— Conservation Service National Cooperative Sod Survey Page 4 of 4
I
' 1 1
! s
'
t
t
,
1 � ,
1 #
r
I �,
t + l
r
4 I
1 ;
` � 1
t
4 �
1
f I
,f W !
� I
o i
m LL i
i 1
I , Q
t i 0,\ t
t
I
r
>- uj
i - Co
1 uj ppi
I UJ
i V ��
G.)C7
TOWN OF CART® —''r # ; Cw
PINss 076514237973 f i
DH 6344 PG 186
8M 1994 PG 1885
USE. PARKLAND
0
�p
{
W
LC} • t !� A 1r l SIORET
pcs �.j001
4
50' PLD BUFF
,BIB
O
APPROX. LOCATION
OF FEMA FLOOD LINE' 1�
AS SHOWN ON WAKE
COUNTY CIS DIGITAL I 1
INFORMATION 1
ww atltlq .afgHay..vatlglvv............ �q maal)avlasav .................
{13
CHECKED JUN 2 6 2097
N/F HIGHWOODS .SERVICES, INC,
PIN: 0765342760
De 7672 PG 185 / EINI 999 PG 1976
ZOi� POD M� .R / L VACANT
_ sib
N 0 0 a 3x'24 "E
wH 4tlustivsivveapwaogv{®ar
PHASE TWO ° PLAINT LIST'
NOT PHAS= 11 PLANTING TO BE PRICED E
INSTALLED CJRING PHASE 11.
LAS
SCIEt+1T1FlC
COMMON I
CITY I COND. I
Sim I REQUAREIMENT
CANOPY TREES
CA scimY TREES
APB
ACER RUBRUM `SRANDYWINE'
RED MAPLE
O
BEB
MIN, 2a CAL. DECIDUOUS
TREE
PT
PINUS TAEDA
LOBLOLLY PINE
O
ma
4' MIN. HT.
EVERGREEN TREE
OS
QUERCUS SHUMARDII
SHUMA12D OAK
.0
BEB.
MIN. 2' CAL. DECIDUOUS
TREE
OP
QUERCUS PFELLOS
WILLOW OAK
5
8EB
MIN. 2 CAL, LDECIDUOUS
TREE
GB
GINKGO BILO@A
GINKGO
6
BEB
MIN. 2' CAL.
OECID OUS TREE,
PLANT MAL
LT
LIRIODENDRON TULIPIFERA
TULIP POPLAR 1,0
SEB
E?EB
MIN. 2' CAL DECIDUOUS
TREE
LNYRc STORY TREES
LIW
,LA�ERSTRQ -MIA INDICA
W i IV'
RED RACKET
APE MYRTLE
O
BEB
MIN 2' CAL.
DECIDUOUS TREE
SHRUBS
ice
ILEX CORNUTA 'SURFORD €I'
DWARF BURFORD HOLLw
t9
CONT,
MIEN.
38'NT ' EVRGRN
VSA SHRUB
JCT
tUN Pe RUS GHINENSI
HOLLYWOOD JUNIPER
4
CONT,
tA1
' y : EVERGREEN
SHRUB
RUM
YR
RANPHIIOLEPIS UMBE 1-A I A
YUCCA RECURVIFQLIA
INDIAN HAWTHORNS
SOFT LEAF.YUCCA
44
8
CONT.
CONT.
Iii
2d i iT;,
36Gj
EVERGREEN SHRUB
EVERGREEN SHRUB
ML
MUHLENBERGIA LlbikaHEIMERI
LINDHEIMER'S MUHLY
23
CONT.
M!N
32a01tT"
CONT.
MC
MUHLENBERGIA CAPILLARIS
PINK MUHLY GRASS
21
CONT.
37
38Gt'gs "
MAN. 3 GAL"
PO
PENNISETUM 0121 iTALE
ORRIAENTAI FOUNTAIN
7g
CONT.
MIN-
�qq'
ICK
K� ERATA CYLIBNDRICA VAR.
APANESE BLOODGRAS
34
CONT.
U+IkN
1
3 GA
N. 12
=Lw COV6?
GROUT Xl COVER
LM
LIRIOPE MUSCARII
MAJESTIC LIRIOPE
2.5' POTS, PLANT IV O.C.
.IlI�G/
Cf/
3' DOUBLE-$HREDDED =1NE BARK
54D
Soo
T -10 BERMUDA
INS TALL PER MANUFACTURE'S
BMP ONLY
Se�D
5C9D
PIEDMONT GOLD FESC(.E
INSTALL PER MANUFACTURE'S
dw
Spa
PIEDMONT GOLD FESCLE
G1 @ TAG CERTIFi10
INSTALL PER MANUFACTURE'S
SPECIFI TkONS
BIOQETENTION - 8
TD
TAXODIUM DISTtCHUM
BALD CYPRESS
2
BEB
MIN.
FULL. HEAD
CV
CHIONANTHUS VIRGINICUS
WHITE F12INGETREE
2
CONT,
. 7LMM_J N.
�`j+
WELL FORMED
IG
ILEX GLABiRA
INKSERRY
S
CONT.
4t[ ; '
4 H : MI .
CCS
E CORNUS
RED-OSIER DOGWOOD
16
CONT.
_A . MIN .
_AL, MIN.
rte'
{
t 1
1 'l
W 14GWWOODS SERVICES, INC.
s
`t
l s
S +
t
i
Pigs 0765$51175 ; st
i
08 8622 PG 2599 / 8M 2(030 PG 821 t t
ZONED, POD M-Q / USE, VACANT
4 ` a
'"' ° -•a. `'tea• t
"�" .•� 20 FT. UTILITY
EASEMENTCtYP)
SIGN `i "•"••H4q. .- ...... ()�
GB
t
SEED
3) YR (3) TIP } `
11) ICK I t tt.�
VA
LA41 , ' ti 1 Cal ""t
a
(2) JOT (14 -RUM (5) LIW
1 ; e ( ?} MC (29) ML !f (41) JCB
l` (9) RUM 'r• i� � m srmgm �nmmmmmr Boa m r ® rmaa mwrm msan,maaamm rmrmrmsrmmaegsmrmo °m aasanwaa�aa�i(�aesones w
zt (1) QP I
109) MC Dcccoc-
1 ! I 1 r (1) QP 1 N � z
SEED) 1
t l
(8) RUM I I �, ? 'I r (1) OPi # ��'� (1) LT I t� W
t t
i
rf/
N/F HIGHW00DS SERVICES, INC.
o-~~.. �,.. -• PINtt 0765354167
DD 7672 PG 185 / 8M 1949' PG 1416, LOT 4
INSTALL ry4`' TALL: COBLC?LLY PINES, PLANT \1'0J' O.C. zos PM vacANT
S00° 36`24 "UV /�\ 513.2
gvaetltlsH.t- :v�.aftlRpgv�HVlfvaf.p41®wmvp HatlW VVAptl waiwtlava.® fH® tlaN. vawapOpatlw v4® fasvgq�wv.vwava.tlagvlfavPqpOVV ®aw.lwgbgwavvwvvwtivwptlqaaw�.Y S(.� avmsaavgptl.baHtlntli�vv --T -------------- vp va..va-- --- --- ----------- ---- -- pia--- -{e,.f�gpv►tltlpaav ®vtlpggp tiv�avaRVga ....aiCVagaN.. ..........................
PHASE C NE - PLANT LIST, —' _. -. _ - + l"�
TOWN OF CARY
P1NO 0765347755
DB 4178 PG 86 / BM 1986 PG 1950
USE- PARKLAND / GREENWAY
2 in
0
low,!s.
GENERAL NOTES,
CANOPY TREES SHALL Be PLANTED A MINIMUM DISTANCE OF 5"
FROM SIDEWALKS OR B.O.C„ 10' FROM LIGHT POLES AND 10' FPM
ELECTRICAL
TRANSFORMERS.
NO GRADING, DEVELOPMENT, OR LAND DISTURBING ACTIVITIES
SHALL OCCUR WITHtN THE BUFFER DR WITHIN THE TREE
PROTECTION FENCE AREA UNLESS APPROVED BY THE PLANING
DIRECTOR OR TOWN COUNCIL, (7.Z.3(4) -2).
SLOPE$ GREATER THAN 311 SHALL BE STABILIZED WITH JAPANESE
EUONYMOUS,
TO MINIMIZE DAMAGE TO EXISTING TREES NEAR THE INTERIOR
EDGE OF SUFFERS AND STREETSCAPF..S THE CONTRACTOR SHA -L
CUT MINIMUM 2' TRENCHES ALONG THE LIMITS OF DISTURBANC;Eo
SO AS TO CUT, RATHER THAN TEAR ROOTS.
ALL RMUIRED TREES ARE TO BE AT LEAST 2' CALIPER AND &
TALL AT THE TIME OF INSTALLATION. ALL REQUIRED SHRUBS
MUST BE AT LEAST 18' TALL AND 3-GALLON SIZE AT TI-E TIME OF
INSTALLATION.
THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE
SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE.
INSPECTION PRIOR TO THE CERTIFICATE OF OCCUPANCY (CO)
SCHEDULED. THE FENCING SHALL BE REMOVED PRIOR TO FtNA;'_.
SITE INSPECTION FOR THE CO.
ALL TREES AND SHRUBS TO BE MULCHED WITH 3'
DOUBLE- SHREDDED PINE BARK.
ALL PUD BUFFERS SHALL MIST OR EXCEED THE TOWN OF CAR'w'
TYPE 8 BUFFER STANDARD. SEE
DETAIL 3/ SEET L -501.
TOWN OF CAPY NOTES.,
1, ALL PLANT MATERIALS ON PUBLIC RIGHT -OF -WAY SHALL Be
PRIVATELY MAINTAINED. THIS SHAD: INCLUDE PREVENTION OF
SIGHT, SIDEWALK, ROADWAY OR OTHER PUBLIC OBSTRUCTION.
2. ALLOW A MINIMUM OF THREE FOOT SEPARATION BETWEEN
LANDSCAPED AREAS AND PARKING AREAS TO ALLOW FOR
VEHICLE OVERHANG.
3. THE TOWN OF CART REQUIRES THATt 'THE OWNERS OF THIS
PROPERY AND THEIR AGENTS, HEIRS, OR ASSIGNS SHALL BE
RESPONSIBLE FOR THE INSTALLATION, PRESERVATION AND
MAINTENANCE OF ALL PLANTINGS AND PHYSICAL FEATURES
SHOWN ON THIS PLAN. THE OWNERS SHALL BE RESPONSIBLE
FOR ANNUAL MAINTENANCE OF TIE VEGETATION TO INCLUDE
BUT NOT BE LIMITED TO,
1. PERFORMANCE BASED BEST MANAGEMENT PRACTICES
FERTILIZATION, PROGRAM
Z PRUNING W /IN PROPERY LIMITS PER ANA/ANSI SPECIFICATIONS,
3, ENVIRONMENTAL PEST MANAGEMENT
4. MULCHING PER NCLCA SPECIFICATIONS
5. INTEGRATED MOWING / MAINTENANCE SCHEDULE
b. PROTECTION OF THE ROOT ZONES FROM EQUIPMENT.
CONSTRUCTION AND RELATED MATERIALS ETC.
7, PERFORMANCE BASED INTEGRATED IRRIGATION SCHEDULE
UTILIZING TOC'S RECLAIMED WATER IRRIGATION SYSTEM
8, OTHER CONTINUING MAINTENANCE OPERATIONS AS NECESSARY
TO ENSURE THE OPTIMAL ECOLOGICAL HEALTH OF THE SITE.
FAILURE TO MAINTAIN ALL PLANTINGS IN ACCORDANCE WITH
THIS PLAN MAY CONSTITUTE A VIOLATION OF THE LAND
DEVELOPMENT ORDINANCE AND MAY RESULT IN FINES,'
LABEL
50ENTIMC
COMMON
=QTY
COND.
SIZE . REQUkRE
CANOPY TREES
ARB
ACER RUBRUM 'BRANDYWINE
RED MAPLE
4
BEB
MIN. 2" CAL. DECIDUOUS
TREE
PT
PINUS TAEDA .
LOBLOLLY PINE
135
BEB
d' MIN. WT. EVERGREEN
TREE
QS
OUERCUS SHUMARDit
SWUMA20 OAK
2
BEB
MIN. 2' CAL, .DECIDUOUS
TREE
OP
QUERCUS PHELLOS
WILLOW OAK
6
BEB
MIN, T CAL. DECIDUOUS
TREE .
GB
GINKGO BILOBA
GINKGO
6
BEB
MIN. 2` CAL, D
IDUOU TREE,
LT
LIREODENDRON TULIPIFERA
TULIP POPLAR
2 1
SEB
MIN. 2' CAL I DECIDUOUS
TREE
UNDERSTORY TRIMS
LIW
1V�ffl 9VTROEMIA INDICA
RED RA M
5
SEB
MIN. 2" CAL.
DECIDUOUS TREE
SHRUBS
ICB
ILEX CORNUTA 'BU RFORDII'
DWARF "FORD HOLLY
48
CONT.
',M: BHT.' EVRGRN
VGA SHRUB
JOT
.T(. -dIP RUA P R NENS 15
HOLLYWOOD JUNIPER
$
CONT.
L`
EVERGREEN SHRUB
RUM
RAPHICLEPiS UMBELLATA
INDIAN HAWTHORNE
62
CONT.
EVERGREEN SHRUB
TR
YUCCA RECURVIFOLIA
SOFT LEAF YUCCA
8
CONT.
- tvM1lN. 16•GA�"
EVERGREEN SNUB
ML
MUWLENBE201A LINDHEIMERI
LINDWEIMER'S MUHLY
31
CONT.
MC
MUH.ENBERGIA CAPILLARIS
PINK MUHLY GRASS
37
QONT.
MAN. 3 GAL"
PO
PENNISETUM ORIENTALS
ORAIENTAL FOUNTAIN
GR
0
CONT.
�qq'
ICK
It 'ERATA EYLINDRICA.VAR.
K 1 I I FRED BAR N
JAPANESE.SLOODG12ASS
31
CONT.
11 i2 HAT
=Lw COV6?
LM
LIRIOPE MUSCARII
MAJESTIC L121OPE
2,5' POTS, PLANT t8' O.C.
.IlI�G/
3' DOUBLE - SHREDDED PINE BARK
54D
T•10 BERMUDA
INSTALL CPER MANt�ACTURE'S
ATI
% p ONLY
Se�D
PIEDMONT GOLD FESCUE
JE=
INSTALL PER ('. MANUFACTU RE'S
dw
PIEDMONT GOLD FE CUE
NC CI TAG (; IF
IN TALL PER MANUFACTURE S
IFICATIONS
191CRETENTION - A
TD
TAXODIUM DISTIC14UM
BALD CYPRESS
6
BW
2; CAL.
MIN.
FULL HEAD
GV
CHiONANT+4US VIRGINICUS
WHITE FRINGETREE
4
CONT.
F-14 L.
NNIN,
WELL FORMED
IG
ILEX GLABRA
INKBERRT
8
CONT.
4 H : MI .
CCS
ggfWAE CORNUS
RED -OSIER DOGWOOD
16
CONT.
_AL, MIN.
TOWm OF CA�1
P1Ntt O765S59653
Ds 75224 PG 427
U PAQKLAND / GIE34WAY
3.75
0 I7.5 15 30 60 90 FEET
1" - 30` SCALE
SEALS
MASTM MYLAR %2 MI'iTAL 05107 /07
SOUTH WATER EASMC-NT OS/W07
FINAL I
M'•
cw�_sy SCS, MAY L-40'
170"R CONSTRUCTION .. • • ;
M nil Of nil Q I _r) I I
TREE
SHRUB PLANTING TRL
L-501 NTS
Rl-()Il 51-011 81-011 NOTES:
WITH ADJAC
AND FLUSH
DO NO, PAINT SYMBOL 2. MARK PAVE
IN SPACE (TYP,) ACCESSIBLE
TO BE WHI
3. SITE COND
SPACES M
WITH LAND
4. INSTALL C
ACCESSIBLE
SLOPE CURB -) DELETED. C
WITH RAMP CONC. CURB WITH FACE
STOP
CURB & VAN SLOPE C
GUTTER WITH RAM
BETWEEN RAMPS IS ON GRADE
ENT SPACES & ACCESS AISLES
WITH SIDEWALK.
r
:MENT TO CLEARLY DELINEA;;
SPACES & AISLES. PAINT MA,:RKING
TE, 4" WIDTH.
ITIONS & NUMBER OF ACCESc`,BLE
Y VARY. ADJUST AS REQUIRED. VERIFY
3CAPE ARCHITECT AS NEEDED.
ONCRETE CURB STOP @ EACH
: SPACE WHERE CURB IS
ENTER CURB STOP IN SPACE
OF STOP NEAREST WALK 2` ;t WALK.
JRB
P
SIDEWALK 2/ MAX.. CROSS. SLOPE
CURB & GUTTER
RAMP:
L = 8t-011
S = 6.251 VAN ACCESSIBLE SIGN,
XS = 21 MAX. SEE 6/L-501
TYPICAL ACCESSIBLE PARKING SPACES LAYOUT
NTS
SEE PLAN FOR LENGTH
OF RAMP
HDCP SIGN ACCESSIBLE SPACE; INSTALL
1' BACK OF WALK. SEE ACCESSIBLE PKG.
SPACE SIGN DETAIL7/L-501,
WEATHERPROOF SIGN AS SHOWN ABOVE, ORANGE, UV-RESISTANT
SEE NOTES FOR CONSTRUCTION AND HIGH-TENSILE STRENGTH
SPACING DATA, 51-011 POLY BANICADE FABRIC
SIGN
INSTALL TREE PROTECTION FENCE
Tree Protection Areo
00 NOT ENTO & SIGNAGE PRIOR TO CALLING FOR
. . ... .. THE INITIAL ON-SITE INSPECTION BY THE
TOWN OF CARY ZONNING INSPECTOR
CD
S UB GRADE,
POST MAY BE EITHER 4" DIA. PINE,
2" DIA OAK, OR 1.33 LB/LF STEEL
NOTES
- WARNING SIGNS TO BE MADE OF DURr3LE, WEATHERPROOF MATERIAL.
- LETTERS ARE TO BE 3" HIGH MINIMUML CLEARLY LEGIBLE AND SPACED AS DETAILED.
- SIGNS ARE TO BE PLACED NO GREAT—';._,,,R THAN 200' ON CENTER.
- PLACE SIGN AT EACH END OF LINEAR TREE PROTECTION AREAS
AND 200'ON CENTER THEREAFTER.
- FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER,
PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA.
- ATTACH SIGNS SECURELY TO FENCE COSTS AND FABRIC.
- MAINTAIN TREE PROTECTION FENCE T1 ROUGHOUT DURATION OF PROJECT.
- ADDITIONAL SIGNS MAY BE REQUIRED E:Y THE TOWN OF CARP'S
INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITION.
L-501) NITS
SEC110NI
U v 1
1. SIDEWALK
a4
BETWEEN RAMPS IS ON GRADE
ENT SPACES & ACCESS AISLES
WITH SIDEWALK.
r
:MENT TO CLEARLY DELINEA;;
SPACES & AISLES. PAINT MA,:RKING
TE, 4" WIDTH.
ITIONS & NUMBER OF ACCESc`,BLE
Y VARY. ADJUST AS REQUIRED. VERIFY
3CAPE ARCHITECT AS NEEDED.
ONCRETE CURB STOP @ EACH
: SPACE WHERE CURB IS
ENTER CURB STOP IN SPACE
OF STOP NEAREST WALK 2` ;t WALK.
JRB
P
SIDEWALK 2/ MAX.. CROSS. SLOPE
CURB & GUTTER
RAMP:
L = 8t-011
S = 6.251 VAN ACCESSIBLE SIGN,
XS = 21 MAX. SEE 6/L-501
TYPICAL ACCESSIBLE PARKING SPACES LAYOUT
NTS
SEE PLAN FOR LENGTH
OF RAMP
HDCP SIGN ACCESSIBLE SPACE; INSTALL
1' BACK OF WALK. SEE ACCESSIBLE PKG.
SPACE SIGN DETAIL7/L-501,
WEATHERPROOF SIGN AS SHOWN ABOVE, ORANGE, UV-RESISTANT
SEE NOTES FOR CONSTRUCTION AND HIGH-TENSILE STRENGTH
SPACING DATA, 51-011 POLY BANICADE FABRIC
SIGN
INSTALL TREE PROTECTION FENCE
Tree Protection Areo
00 NOT ENTO & SIGNAGE PRIOR TO CALLING FOR
. . ... .. THE INITIAL ON-SITE INSPECTION BY THE
TOWN OF CARY ZONNING INSPECTOR
CD
S UB GRADE,
POST MAY BE EITHER 4" DIA. PINE,
2" DIA OAK, OR 1.33 LB/LF STEEL
NOTES
- WARNING SIGNS TO BE MADE OF DURr3LE, WEATHERPROOF MATERIAL.
- LETTERS ARE TO BE 3" HIGH MINIMUML CLEARLY LEGIBLE AND SPACED AS DETAILED.
- SIGNS ARE TO BE PLACED NO GREAT—';._,,,R THAN 200' ON CENTER.
- PLACE SIGN AT EACH END OF LINEAR TREE PROTECTION AREAS
AND 200'ON CENTER THEREAFTER.
- FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER,
PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA.
- ATTACH SIGNS SECURELY TO FENCE COSTS AND FABRIC.
- MAINTAIN TREE PROTECTION FENCE T1 ROUGHOUT DURATION OF PROJECT.
- ADDITIONAL SIGNS MAY BE REQUIRED E:Y THE TOWN OF CARP'S
INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITION.
L-501) NITS
SEC110NI
i
x
NTS
RESERVED
PARKING
STANDARD HANDICAP
SIGN PARKING SIGN:
ONE/SPACE COMPLY w/ 2" X 2" SO. ALUMINUM
NCSBC R 7-8 & R7-80 POST,I/s" THICK WALLS
"VAN ACCESSIBILE" SIGN
TO BE VISIBLE ABOVE
PARKED VAN
O
STD. R7 -81) "MAX PENALTY 5100"
6" 3000 PSI CONCRETE
AROUND POST
NOTE, INSTALL SIGN IN LANDSCAPE AREA V-0"
BEHIND -SIDEWALK AT FACE OF PARKING SPACE.
CENTER SIGN IN FRONT OF SPACE,
VAN ACCESSIBLE PARKING SPACE SIGN
NTS
is
V' SCHEDULE 40 PVC SLEEVE
I. INSTALL I* PVC PIPE VERTICALLY FROM EACH END OF
SLEEVE TO 4- ABOVE FINISH GRADE AS S140VVN ABOVE
WHEN AREA ABOVE SLEEVE MUST BE BACKPILLED PRIOR
TO INSTALLATION OF ROGATION OR 01-82 PIPING.
2 CAP EACH END OF SLF=EVE SECURELY WITH DUCT OR
SIMILAR TAPE IF AREA ABOVE SLEEVE IS BACKFILLED PRIOR
TO INSTALLATION OF 112RIGATIONOR OTHER PIPING.
3. SLEEVE UNDER WALKS - MINIMUM COVER FROM TOP
OF SLEEVE TO FINISH GRADE MAY BE REDUCED TO 12%
NOTE ELECTRICAL SLEEVE MUST BE 24' BELOW GRADE.
"91 IRRIGATION SLEEVE DETAIL
L-501J NTS
5'-2%
INVEQTED U RACK
PAVING SEE
SITE PLAN
TYPICAL SPACING
8* DIA. X 15" CONCRETE
M FOOTING
,
ANCHOR TO
SUBSURFACE
NOTES,
2" DIAMETER, MINIMUM SCHEDULE 10. 16 GAUGE
STEEL PIPE WITH DIPPED AND BAKED BLACK
POLYVINYL FINISH. 180 DEGREE BENDS 1N A
PATTERN TO PROVIDE FOUR VERTICAL
POSTS A WIDTH OF 20a' APART FROM CENTER
TO CENTER. INSTALLED HEIGHT OF 35". -
ANCHOR TO SUBSURFACE
BICYCLE PARKING AND RACK
L-50V NITS
Design PA
Architecture
j Landsxpe Arc0ecture
WA PlannIng
%45) 467 GRAVEL,
CPAM RILL 11BO Interior Design
LAWSCAPE AWA 00 Box 1308 300 South Dawson Street
STANDARD HANDICAP SIGN
RESERVED PARKING SIGN, ONE
PARKING PER SPACE COMPLY WITH
NCSBC R 7-8 & R7-80
STD. R7-88 "MAX PENALTY $100"
2" X 2" 80. ALUMINUM
POST,'/a" THICK WALLS
6" 3000 PSI CONCRETE
AROUND4POST
NOTE* INSTALL SIGN IN LANDSCAPE AREA
BEHIND SIDEWALK A71 FACE OF PARKING SPACE..
CENTER SIGN IN FFRONT OF SPACE.
ACCESSIBLE PARKING SPACE SIGN
NITS
a4
i
x
NTS
RESERVED
PARKING
STANDARD HANDICAP
SIGN PARKING SIGN:
ONE/SPACE COMPLY w/ 2" X 2" SO. ALUMINUM
NCSBC R 7-8 & R7-80 POST,I/s" THICK WALLS
"VAN ACCESSIBILE" SIGN
TO BE VISIBLE ABOVE
PARKED VAN
O
STD. R7 -81) "MAX PENALTY 5100"
6" 3000 PSI CONCRETE
AROUND POST
NOTE, INSTALL SIGN IN LANDSCAPE AREA V-0"
BEHIND -SIDEWALK AT FACE OF PARKING SPACE.
CENTER SIGN IN FRONT OF SPACE,
VAN ACCESSIBLE PARKING SPACE SIGN
NTS
is
V' SCHEDULE 40 PVC SLEEVE
I. INSTALL I* PVC PIPE VERTICALLY FROM EACH END OF
SLEEVE TO 4- ABOVE FINISH GRADE AS S140VVN ABOVE
WHEN AREA ABOVE SLEEVE MUST BE BACKPILLED PRIOR
TO INSTALLATION OF ROGATION OR 01-82 PIPING.
2 CAP EACH END OF SLF=EVE SECURELY WITH DUCT OR
SIMILAR TAPE IF AREA ABOVE SLEEVE IS BACKFILLED PRIOR
TO INSTALLATION OF 112RIGATIONOR OTHER PIPING.
3. SLEEVE UNDER WALKS - MINIMUM COVER FROM TOP
OF SLEEVE TO FINISH GRADE MAY BE REDUCED TO 12%
NOTE ELECTRICAL SLEEVE MUST BE 24' BELOW GRADE.
"91 IRRIGATION SLEEVE DETAIL
L-501J NTS
5'-2%
INVEQTED U RACK
PAVING SEE
SITE PLAN
TYPICAL SPACING
8* DIA. X 15" CONCRETE
M FOOTING
,
ANCHOR TO
SUBSURFACE
NOTES,
2" DIAMETER, MINIMUM SCHEDULE 10. 16 GAUGE
STEEL PIPE WITH DIPPED AND BAKED BLACK
POLYVINYL FINISH. 180 DEGREE BENDS 1N A
PATTERN TO PROVIDE FOUR VERTICAL
POSTS A WIDTH OF 20a' APART FROM CENTER
TO CENTER. INSTALLED HEIGHT OF 35". -
ANCHOR TO SUBSURFACE
BICYCLE PARKING AND RACK
L-50V NITS
Design PA
Architecture
j Landsxpe Arc0ecture
WA PlannIng
%45) 467 GRAVEL,
CPAM RILL 11BO Interior Design
LAWSCAPE AWA 00 Box 1308 300 South Dawson Street
STANDARD HANDICAP SIGN
RESERVED PARKING SIGN, ONE
PARKING PER SPACE COMPLY WITH
NCSBC R 7-8 & R7-80
STD. R7-88 "MAX PENALTY $100"
2" X 2" 80. ALUMINUM
POST,'/a" THICK WALLS
6" 3000 PSI CONCRETE
AROUND4POST
NOTE* INSTALL SIGN IN LANDSCAPE AREA
BEHIND SIDEWALK A71 FACE OF PARKING SPACE..
CENTER SIGN IN FFRONT OF SPACE.
ACCESSIBLE PARKING SPACE SIGN
NITS
STANDARD HANDICAP SIGN
RESERVED PARKING SIGN, ONE
PARKING PER SPACE COMPLY WITH
NCSBC R 7-8 & R7-80
STD. R7-88 "MAX PENALTY $100"
2" X 2" 80. ALUMINUM
POST,'/a" THICK WALLS
6" 3000 PSI CONCRETE
AROUND4POST
NOTE* INSTALL SIGN IN LANDSCAPE AREA
BEHIND SIDEWALK A71 FACE OF PARKING SPACE..
CENTER SIGN IN FFRONT OF SPACE.
ACCESSIBLE PARKING SPACE SIGN
NITS
NOTE* INSTALL SIGN IN LANDSCAPE AREA
BEHIND SIDEWALK A71 FACE OF PARKING SPACE..
CENTER SIGN IN FFRONT OF SPACE.
ACCESSIBLE PARKING SPACE SIGN
NITS
O
US
US
O
C4
4,
3
B:
No.
1 REV
town of cary
pink} 076514237973
DB 6394 pg 186
bm 1994 pg 1888
use. parkiand
Lision
PIPING
I W, -F- I L- - - - - - - - - - - -
Date
+APPROX LOCA-nON
Designer
scale
Drawn By
Date
3/10/07
Checked By
job No.
W&R
2070095-00
RECLAIMED WATER LINE HAS NOT BEEN
FIELD SURVEYED, CONTRACTOR TO FIELD
VERIFY LOCATION AND MATERIAL PRIOR TO
CONSTRUCTION
REMOVE EXISTING
BLOWOFF AND INSTALL
8" TEE WITH VALVES
8"X8"X6" TEE WITH VALVE
EX. CATCH. BASIN
TO BE REMOVED
1 1/2- WATER M
n/f highwoods services, Inc.
pin# 0765351175
DB 8622 pg 2599 / EM 2000 pg 827
ZONED. PDD MTj / use: vacant
SEWER SURV EYENE
HAS NOT BEEN FIELD
��l 1 1/1 1 iff-11 I I 1(r-41%, I-- A\ \1 ib\O %
50' PUD BUFFER
50' PUD BUFFER BM 1999 PG 1976
BM 1999 PG 1976 n/f highwoods services, Inc. n/f highwoods services, Inc.
pin# 0765344763 pin# 0765354167
D8 7672 pg 185 / BM 1999 pg 1976, lot 5 D8 7672 pg 185 / 8M 1999 pg 1976, lot 4
ZONED. PDD Mjr / use: vacant ZONED: PDD Mir / use: vacant
WAKE COUNTY
CARY
town of cory
pin# 0765347785
DB 4178 pg 86 / bm 1986 P9 1980
use.- parkland / greenwoy
IES SITE
NORTH CAROLINA
SITE 'UTILITIES
m
Sheet No.
RAV F. N F. L 1 r% 14
WITHERM LU %J I
ENGINEERS I PLANNERS I III'ORS
111 MacKenan Drive Cary, North Carolina 27511 tel: 919469-3340 bx- 919-467-6M www.withersravenelxOm OFF
z
0
d
U
FrG
d
N
r-
0
N
N
b
O
m
a
4 t 1
� � e
t
i
8" MIN.
f.
PARKING LOT
18"
WHEEL STOP (TYP.) CL
0
1" MIN.
#57 STONE, MIN. 6" THK 0 EOP.
TOP OF STONE SHALL BE 1" BELOW
EDGE OF PAVEMENT
/— MANHOLE RING AND COVER
�'. FLUSH WITH GRADE
VOID SPACE (ALL SIDE C.O.
STEEL SUPPORT
SOIL MEDIA.
85 --85% WASHED SAND
� 8--127 FINES (SILT + CLAY)
PERFORATED OR 3-5% ORGANIC MATTER
SLOTTED 1" PVC 2" 2" TO 4"
177777 :77 7 'L
- 777777777
a e¢
24"
6" SUMP I ''
END CAP STEEL SUPPORT
6 "x 1 TEE
CHOKING STONE (TYPICALLY #8 OR #89 WASHED)
Designer
NI &R
SC-2-JA
1"=30'
Drawn By
DZT4
PAP
3/10/07
Checked By
Jots No.
W &R
2070095.00
BIO RETENTION OR
LANDSCAPED
FILTER STRIP
4'x4' I.D. CATCH BASIN
WITH GRATE TOP
12�� 4
d
6" TO 8"
VWASHED #57 STONE OR. SIMILAR
WASHED SAND
PERFORATED UNDERDRAIN PIPE
I CARP WAKE COUNTY
IES SITE
NORTH CAROLINA
PLAN MEAL
I s $A$
SECTION A —A
Rio Rao Ammn-
Infb
Elev
Planting Surface
3130 sf
345.00
Water Quality Pool
3837 sf
345.50
Storage. Volume
6573 cf
--
Underdrain
6' PVC
341.00
Riser Crest
4'x 4' Box
345.50
Outlet Pipe
15" RCP
341.00
4'x4' I.D. CATCH BASIN
WITH GRATE TOP
12�� 4
d
6" TO 8"
VWASHED #57 STONE OR. SIMILAR
WASHED SAND
PERFORATED UNDERDRAIN PIPE
I CARP WAKE COUNTY
IES SITE
NORTH CAROLINA
PLAN MEAL
I s $A$
SECTION A —A
Rio Rao Ammn-
SEAL
028942
i
f
Basin
Apron
Basin
Rip Rag
Rip Rap
Base
Total Q
Length
Length
Depth
Height
Thickness
Width
Pipe Outlet
(cfs)
L (ft)
A (ft)
D (ft)
H (ft)
T (ft)
W (ft)
Rip Rap Size
FES -1
7.20
8.50
4,20
0.85
1.67
1.60
1,25
Ci. B (8„ d50)
FES -10
1 28.63
12.00
1 5.90
1 1.20
2.90
1.50
2.003
Cl. B (8" d50)
SEAL
028942
i
f