HomeMy WebLinkAbout20120331 Ver 1_More Info Letter_20120420fi EFA
CR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Waklld PE Dee Freeman
Governor Director Secretary
April 20 2012
DWQ Project # 12 0331
Franklin County
CERTIFIED MAIL 7010 1870 0001 3307 2992
RETURN RECEIPT REQUESTED
Richard Brown
Progress Energy Carolinas
410 South Wilmington Street PEB 2
Raleigh NC 27601
Subject Property Progress Energy Carolinas Franklinton 115 K Substation Expansion
Cedar Creek [030402 28 29 (1 5) WS II NSW]
REQUEST FOR MORE INFORMATION
Dear Mr Brown
On April 2 2012 the Division of Water Quality (DWQ) received your application dated March 28 2012 to fill or
otherwise impact 0 012 acre of 404 wetland (permanent impacts) 60 linear feet of intermittent stream channel
(permanent impacts) and 335 square feet of Zone 2 Tar Pamlico River basin protected riparian buffer for the
expansion of a substation The DWQ has determined that your application was incomplete and /or provided
inaccurate information as discussed below The DWQ will require additional information in order to process your
application to impact protected streams and buffers on the subject property This project is on hold and incomplete
until we receive the additional information requested below If we do not receive the requested information your
project will be formally returned as incomplete Please provide the following information so that we may continue
to review your project
Additional Information Requested
1 Please enumerate and show extent of all impacts on the plans
2 Please show all stormwater conveyances (ditches swales etc ) on the plans
3 Please refer to GC3884 Condition 9 (at the following link
http //portal ncdenr org c /document hbrary/g_et file'?uuid= 6d2d8934 c84d 4f6c 82ed
4adb68dad680 &groupId= 38364) with regard to the following comments
North Carolina Division of Water Quality
Internet www ncwaterquality org
Raleigh Regional Office
1628 Mail Service Center
NorthCarolina
�VatmallY
Surface Water Protection Phone (919) 791 4200 Customer Service
Raleigh NC 27699 1628 FAX (919) 788 7159 877 623 6748
An Equal Opportunity /Affirmative Action Employer — 50/ Recycled /10 / Post Consumer Paper
Page 2
a Please explain why the stream channel cannot be returned as close to original pattern profile or dimension
of the stream
b The plans state that work will be conducted in the channel during dry weather conditions However please
explain how you will accomplish this (ie pump around etc ) and how water will be only returned to the
new channel when stabilized Will you be utilizing cofferdams sandbags rock berms or another
diversion structure in the channel while work is being performed? If so please include on plans If not
please explain
c Please provide justification and any calculations used to determined the extent of the rip rap coverage
Please submit five copies of this information within 30 calendar days of the date of this letter Please send
additional information to DWQ Central Office, Attn Karen Higgins, 1650 Mail Service Center, Raleigh,
NC 27699 1650 If we do not receive this requested information within 30 calendar days of the date of this
letter your project will be withdrawn and you will need to reapply with a new application and a new fee If you
need additional time to compile the information requested above please email Lauren Witherspoon
(lauren wtherspoon @ncdenr gov) requesting an extension and indicate a new date for submittal
This letter only addresses the application review and does not authorize any impacts to wetlands waters or
protected buffers Please be aware that any impacts requested within your application are not authorized (at this
time) by the DWQ Please call Lauren Witherspoon at 919 791 4251 if you have any questions regarding this
letter or would like to set up a meeting to discuss this matter
Sincerel i
C16) /I �- fj'J
Danny Smith
Raleigh Re onal Office Supervisor
Surface Water Protection Section
cc DWQ Raleigh Regional Office File Copy
WeBSCaPe — 1650 Mail Service Center
William (Buzz) Bryson — Progress Energy Carolinas 410 S Wilmington Street TPP 14 Raleigh NC 27601
Filename 12 0331_Progress Energy Franklmton 115KV Expanswn_401_NBR_On Hold