HomeMy WebLinkAbout20120351 Ver 1_Approval Letter_201204111'1'�A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman
Governor Director Secretary
April 11, 2012
Peaden's Grill
Mr. Terry Peaden
2399 North Memorial Drive
Greenville, NC 27834
DWQ Project # 12 -0351
Pitt County
Subject Property: Peaden's Grill off North Memorial Drive
Tar - Pamlico River Basin, Tar River, Parker Creek (TAR 05, 28 -95; NSW, C)
AUTHORIZATION of Tar- Pamlico River Buffer Rule (15A NCAC 02B.0259)
Authorization Certificate
Dear Mr. Peaden:
You have our authorization, in accordance with 15A NCAC 02B .0259 and any conditions listed
below, to impact approximately 480 ft2 of Zone 2 of the protected riparian buffers for the purpose
of constructing the proposed picnic shelter area at the subject property as described within your
application dated April 3, 2012. In addition, you should obtain or otherwise comply with any
other required federal, state or local permits before you go ahead with your project including (but
not limited to) Erosion and Sediment Control, Non - discharge regulations.
This authorization is for the purpose and design that you described in your application. If you
change your project, you must notify us and you may be required to send us a new application. If
the property is sold, the new owner must be given a copy of this authorization letter and is
thereby responsible for complying with all conditions. This authorization requires you to follow
the conditions listed below.
The Additional Conditions of the Authorization are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
North Carolina Division of Water Quality Internet: www.ncwaterqualit .or
943 Washington Square Mall Phone: 252 -946 -6481 One
Washington, NC 27889 FAX 252- 946 -9215 NofthCarofina
An Equal opportunity /Affirmative Action Employer— 50% Recycled /10% Post Consumer Paper ;V19turaliff
00 u
An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive
velocities through the protected stream buffers and will not re-concentrate before discharging
into the stream as identified within 15A NCAC 2B .0233(5)..
3. Certificate of Completion
Upon completion of all work approved within this authorization, and any subsequent
modifications, the applicant is required to return the attached certificate of completion to the
401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality,
1650 Mail Service Center, Raleigh, NC, 27699-1650.
4. The project area is covered with a layer of gravel and vegetation. This area is currently being
used for auxiliary parking. The proposed project area is considered impervious with ongoing
use; therefore, no mitigation for Zone 11 buffer impacts will be required.
Any disputes over determinations regarding this Authorization Certificate (associated with the
approved buffer impacts) shall be referred in writing to the Director for a decision. The
Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150. This
Authorization Certificate shall expire five (5) years from the date of this letter.
This letter completes the review of the "No Practical Alternatives" determination under 15A
NCAC 2B .0259. This letter does not authorize any impacts to either Waters of the United States
or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC
Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. If you
have any questions, please telephone Roberto Scheller of the Washington Regional Office at 252-
948 -3944 or Amy Chapman of the 401 Oversight/Express Unit at 919-807-6364.
S' cerely,
Charles Wa
Enclosures: Certificate of Completion
cc: Kinsey Holton, PE, City of Greenville, P.O. box 7207, Greenville, NC 27858
Corps of Engineers Washington Field Office
DWQ 401 Oversight/Express Unit
File copy
Filename: 12-0351