Loading...
HomeMy WebLinkAbout20120125 Ver 1_Approval Letter_20120323Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Governor Director Secretary • I Tracey H. Cox Pam K. Cox 7253 Free Union Church Rd. Pinetown NC 27865 DWQ Project # 12-0125 Beaufort County Subject Property-, Tracey Cox Property-The Creek (Whitley Tract) Jack Creek [TARO T. 29-34-35-4 - SC, NSW] Approval of 401 Water Quality Cercation (GC3641) and Authorization Certificate per the Tar-Pamlico River Buffer Protection Rules (15A NCAC 2B.0259) w ith Addonal Condons I see Aft L A 1619 r w1h] AAIL - Lei North Carolina Division of Water Quality Internet: www.ncwaterqtiality.org 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NofthCarohna An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper ;Vk7tUAt7I1ff Tracey Cox- The Creek AMA TO ' Page 2 of 5 get or otherwise comply with any other federal, state and local requirements 'd before you go ahead with your project including (but not limited to) erosion anu sediment control regulations and CAMA. Also.. this approval to proceed with your proposed impacts • to conduct impacts to waters as depicted in you-[ 0 0 application shall expire upon expiration of the 404 or CAMA Permit, The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other *impacts are approved including incidental impacts: All stormwater conveyance shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream as identified within 15A NCAC 2B .0259 (5). If this is not possible, it may be necessary to provide Amount Approved Plan Location or units Reference Stream (feet) 404 Wetlands 0.01 (acres) Plats included with CAMA Wetlands 0.01 (acres) CAMA Major Application Waters 0.03 (acres) Plats included with CAMA Major Application Buffers 1,250 (square ft.) Plats included with CA MA Major Application All stormwater conveyance shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream as identified within 15A NCAC 2B .0259 (5). If this is not possible, it may be necessary to provide -The CreeK Page 3 of 5 stormwater facilities that are considered to remove nitrogen(and phosphoru if in the Tar-Pamlico River Basin). This may require additional approval fro this Office. I 3. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification (GC) 3641. ----a No impacts shall occur to Zone 1 of the protected riparian buffers (except for uses and activities designated as "exempt" within 15A NCAC 02B .0259), unless otherwise approved by the DWQ I`illl ii 1 11 Am 0 M The final, written stormwater management plans (including a signed and notarized Operation and Maintenance Agreement) must be implemented and the stormwater management facilities shall be constructed and operational before any permanent building is occupied at the subject site. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division • Water Quality. Where a State Stormwater Permit (in accordance with 15 A NCr-\, is required, this permit may be considered to meet this condition. Erosion and sediment control practices must be in full compliance with all 0 specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained • all construction sites, borrow sites, and waste pile (spoil) Tracey Cox- The Creek Page 4of5 projects, including contractor -owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and /or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 7. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 8. Certificate of ComrDletion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699 -6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 1506. Tracey Cox- The Creek Page 5 of 5 This letter completes the review of the Division of Water Qualify under Sectio 401 of the Clean Water Act and the Tar-Pamlico riparian buffer protection rul as described within 15A NCAC 2B .0259. If you have any questions, pleas telephone Amy Adams of the Washington Regional Office at 252-948-3917 31 Ian McMillan of the Wetlands, Buffers, and Permitting Unit at 919-807-6364 IncE ncE For Chai Enclosures: Certificate of Completior GC 3641 cc: Corps of Engineers Washington Field Office DWQ 401 Oversight/ Express Unit DCM, Doug Huggett, Morehead Office D Moye, Washington District Office DLR, Pat McClain, Washington Regional Offict File copy M��M Me M