Loading...
HomeMy WebLinkAbout20120412 Ver 1_Site Plan_20120426Strickland, Bev From: Rob Normandy [rormandy @wkdickson.com] Sent: Thursday, April 26, 2012 2:46 PM To: Daniel Ingram; Strickland, Bev Cc: Scott Sigmon Subject: RE: Wiseman Stormwater Drainage - DWQ# 12 -0412 I have uploaded the Wiseman Design plans as requested below. The files can be located here: \ \WEB \ftp \public\Raleigh - Public\ Charlotte \Wiseman\PCN\Preliminary Wiseman Design 3- 12- 12.pdf Username: raft Password: ra10312 Sometimes the direct link to the files does not work. In that case you can access the files from our website: www.wkdickson.com under the link "client resources ", then "Click here for public FTP site" on the left. The username and password will provide access. Navigate to the Raleigh - Public folder, then to the Charlotte \Wisemand \PCN folder. If you have any questions give me a call. Thanks, Rob Normandy, PE WK Dickson - Raleigh Office 720 Corporate Center Dr. Raleigh, NC 27607 Office: (919) 782 -0495 x5638 Direct: (919) 256 -5638 Fax: (919) 782 -9672 www.wkdickson.com THE ELECTRONIC FILES PROVIDED BY W.K. DICKSON & CO., INC. (WKD) TO RECEIVING PARTIES ARE FOR COORDINATION PURPOSES ONLY. THE RECEIVING PARTY AGREES NOT TO USE THESE DRAWINGS AND DATA, IN WHOLE OR IN PART, FOR ANY PURPOSE OTHER THAN THE REFERENCED PROJECT. THE ELECTRONIC MEDIA IS FURNISHED WITHOUT GUARANTEE OF COMPATIBILITY WITH THE RECEIVING PARTY'S SOFTWARE OR HARDWARE, AND WKD'S SOLE RESPONSIBILITY FOR THE ELECTRONIC MEDIA IS TO FURNISH A REPLACEMENT FOR DEFECTIVE DISKS WITHIN THIRTY (30) DAYS AFTER DELIVERY TO THE RECEIVING PARTY. USE OF THESE MATERIALS FOR MODIFICATION, EXTENSION OR EXPANSION OF THIS PROJECT OR ON ANY OTHER PROJECT, UNLESS UNDER THE DIRECTION OF WKD SHALL BE WITHOUT LIABILITY TO WKD AND WKD'S SUBCONSULTANTS. BECAUSE DATA STORED IN ELECTRONIC MEDIA FORM CAN BE ALTERED, EITHER INTENTIONALLY OR UNINTENTIONALLY, BY TRANSCRIPTION, MACHINE ERROR, ENVIRONMENTAL FACTORS, OR BY OPERATORS, IT IS AGREED THAT THE RECEIVING PARTY SHALL INDEMNIFY, DEFEND, SAVE HARMLESS WKD, WKD'S SUBCONSULTANTS, AND THE OFFICERS AND EMPLOYEES OF ANY OF THEM FROM AND AGAINST ANY AND ALL CLAIMS, LIABILITIES, DAMAGES, LOSSES AND COSTS, INCLUDING, BUT NOT LIMITED TO COSTS OF DEFENSE, ARISING OUT OF CHANGE OR MODIFICATIONS TO THE DATA IN ELECTRONIC MEDIA FORM IN THE RECEIVING PARTY'S POSSESSION OR RELEASED TO OTHERS BY THE RECEIVING PARTY AND FOR ANY USE OF THE ELECTRONIC MEDIA AND PRINTED HARD COPY DRAWINGS AND SPECIFICATIONS OUTSIDE THE LICENSE GRANTED BY THIS PROVISION. SHOULD THE RECEIVING PARTY DISAGREE WITH STATEMENTS CONTAINED HEREIN, PLEASE ADVISE US IN WRITING WITHIN TEN (10) DAYS AFTER RECEIPT OF THE DATA OR THIS DISCLAIMER STANDS AS WRITTEN. From: Daniel Ingram Sent: Thursday, April 26, 2012 11:40 AM To: Rob Normandy Subject: FW: Wiseman Stormwater Drainage - DWQ# 12 -0412 From: Strickland, Bev [ mai Ito: bev.stricklandCa)ncdenr.gov] Sent: Thursday, April 26, 2012 10:09 AM To: Daniel Ingram Subject: Wiseman Stormwater Drainage - DWQ# 12 -0412 Mr. Ingram, Please provide a data CD or ftp site with a full size version of the signed plans in TIF Group 4 format (black and white 300 dpi, not grayscale or color) for the project listed above. If the plans are too large to store in TIF format, they can be stored in PDF. Thanks Beverly Suiddand, Achn"strative Officer Division of Water Quality - Progymn Development N.C. Depmthnent of Fmvi oinnent and Nathnal Resoinces Mail Senice Center 1650, Raleigh, NC 97699 -1650 Phone = 919-807-6350 Entail Address: Be�.Shichland' «'ucdein.o� Phone = (919) 807 -6', 50 E- rllarl colt esporlderlce to atld lionl this adds css illar he sul?yctto tht- Nolrli Calolihd PUNIC 1?t -001ds Larr-3r1d miiJ- be disclosed to tjli zd pamcs. CoverSheet .......................................................... ............................... 1 GeneralNotes and Details .................................. ............................... 2 Typical Sections and Storm Drainage Summary ............................. 3 Plan& Profile ................................................ ............................... 4-15 PlanDetails ................................................. ............................... D1- D3 StructuralDetails ........................................ ............................... S1- S11 Traffic Control Plans ........................... ............................... TC1- TC5 ErosionControl .................................... ............................... EC1- EC7 UtilitySheets ............................................... ............................... Ul- U9 TOTAL SHEETS 50 VICINITY MAP NTS GPS BENCHMARKS 0 vw DICKSON community infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (919) 782 -0495 NC Licence No. F -0374 Office Locations: North Carolina Georgia South Carolina • 010 CHARLOTTEM ENGINEERING &PROPERTY MANAGEMENT Construction Plans of Proposed WISEMAN STORM WATER IMPROVEMENT PROJECT PROJECT NUMBER: 671 -OS -709 Project Features: THIS PROJECT CONSISTS OF: GRADING, DRAINAGE PIPE & STRUCTURES, PAVING, CONCRETE FLAT WORK, CHANNEL IMPROVEMENTS, UTILITY RELOCATIONS & STREAM RESTORATION - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 2012 NCDOT STANDARD SPECIFICATIONS LOCATION MAP NTS Plan View ................. 40 80 120 Plan View ................. iiiiia 20 40 60 Horz. Profile ............ Vert. Profile ............. Cross Section ........... 0 0 30 Contract Administration Storm Water Construction Know what's below. Call before you dig. Storm Water - Project Manager Landscape Management Storm Water - Water Quality CDOT - Design CDOT - Traffic Control CMU Proposed Property Line ... ............................... Existing Property Line .... ............................... Maintained as R/W Line . ............................... F /W Existing Structures ........... ............................... Fence................................. ............................... _X _X x Slope Stake Line .............. ............................... c F Temporary Construction Easement ............. e e e Sanitary Sewer Easement ............................ SSE SSE Storm Drainage Easement ............................ SDE SDE Conservation Easement .. ............................... CE CE CE Existing Easement .......... ............................... E E Existing Minor Contour ............................... Existing Major Contour ............................... Proposed Minor Contour ............................. Proposed Major Contour ............................. sao Existing Gas Line ............ ............................... G G Existing Water Line ........ ............................... W W Existing Sanitary Sewer . ............................... SS SS Existing Underground Telecommunications UT Existing Underground Electric ..................... ou Existing Underground Television ................. TV Existing Storm Drainage ............................... --------- - - - - -- Proposed Storm Drainage p g ............................. Existing Tree ............................................................ ............................... ExistingWater Meter .............................................. ............................... WM ❑ MB ExistingMail Box .................................................... ............................... ❑ Existing Gas Meter .................................................. ............................... WV Existing Water Valve I< GV Existing Gas Valve .................................................. ............................... I< O Existing Sanitary Sewer Manhole ......................... ............................... Proposed Sanitary Sewer Manhole ....................... ............................... (9 Existing Sanitary Sewer Cleanout O C. 0. Existing Storm Drain Manhole .............................. ............................... O Proposed Storm Drain Manhole ............................ ............................... • Existing Storm Drain Flared End Section (FES) . ............................... ExistingCatch Basin ............................................... ............................... Proposed Double Catch Basin ................................ ............................... ExistingA/C Unit ..................................................... ............................... AC ExistingUtility Pole ................................................. ............................... 'a GuyWire .................................................................. ............................... Proposed Utility Pole ............................................... ............................... 'W ExistingLight Pole ................................................... ............................... ProposedLight Pole ................................................. ............................... IronPin ..................................................................... ............................... 0 ExistingFire Hydrant ............................................. ............................... ProposedFire Hydrant ........................................... ............................... ExistingDrop Inlet ................................................... ............................... 0 ProposedDrop Inlet ................................................. ............................... AccessibleRamp ...................................................... ............................... WCR TreeProtection ........................................................ ............................... ProposedGuardrail .......................................... ............................... Proposed Curb & Gutter, Conc. Drive, Sidewalk .......................... Proposed Asphalt Pavement ................................... ............................... ProposedRip Rap Ditch .......................................... ............................... Proposed Gravel .................... Proposed Pavement Removal APPROVED Bid Set No. CITY ENGINEER DATE 0 1 O • O V O E�+ U W h O a N z w 0 x a w h 0 N w z 'o a N J H w 0 Id N 0 z c v+ a� 0 c v m c v+ m 0 c v E w 00 Q rn N O o 0 N rn U z M rnm< 1 o Q 'PO o N 00W d GENERAL NO TE S GENERAL NOTES ABBREVIATIONS OS STATION DESCRIPTIONS PROPOSED CURB ELEVATION: GENERAL UTILITIES NOTES. #............ •••••••••••••••••••••••••NUMBER MONO ......... .....................MONOLITHIC SHEET DESCRIPTION SHEET NUMBER STATION ID ABAND ...... ......................ABANDONED mph ................................ MILES PER HOUR THE CONTRACTOR SHALL SET AND ADJUST PROPOSED CURB ELEVATIONS AS NECESSARY TO ENSURE 1. CONSTRUCTION METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH CHARLOTTE UTILITIES A \C .... ............................AIR CONDITIONER MTL ................................. METAL BRAEWICK PLACE CULVERT 4 1 +62 TO 4 +62 PROPER LONGITUDINAL GRADE FOR DRAINAGE. THE CONTRACTOR SHALL RETAIN EXISTING PAVEMENT, STANDARDS AND SPECIFICATIONS, UNLESS OTHERWISE NOTED. A.D ........... ......................ALGEBRAIC DIFFERENCE N ..................................... NORTH/NORTHING CROSSWINDS ROAD CULVERT 5 6 +08 TO 9 +78 UNLESS OTHERWISE NOTED. 2. ALL CONTRACTORS WORKING ON CMU PROJECTS ARE REQUIRED TO OWN A COPY OF THE DESIGN ASPH ...... ........................ASPHALT NAD 83. ..........................NORTH AMERICAN MANUAL AND SHALL KEEP A COPY ON THE JOB SITE AT ALL TIMES. APPROX ........ ..................APPROXIMATELY DATUM 1983 STREAM REACH 5 6 16 +25 TO DRIVEWAYS AND SIDEWALKS: 3. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING ALL APPROPRIATE PARTIES AND ASSURING BB ........... .........................BOTTOM OF BANK NTS NOT TO SCALE VALLEY GROVE CLOSED SYSTEM 7 0 +00 TO 4 +22 THAT UTILITIES ARE LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CALL NC ONE -CALL .................................. (PREVIOUSLY ULOCO) AT 1- 800 - 632 -4949 FOR UTILITY LOCATING SERVICES 48 HOURS PRIOR TO B /C ...... ........................... BACK OF CURB 0 /H ...... ...........................OVER HEAD ARROW LANE CLOSED SYSTEM 8 0 +00 TO PROPOSED DRIVEWAY ENTRANCE DIMENSIONS ARE FROM EXPANSION JOINT TO EXPANSION JOIN. MATCH COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING BIT .............. .....................BITUMINOUS OC ................................... ON CENTER STREAM REACH 4 9 2 +27 TO 3 +77 REPLACEMENT MATERIALS TO THE EXISTING SURFACE ACCORDINGLY. UTILITIES PRIOR TO CONSTRUCTION. BM ......... ..........................BENCH MARK ORN ..... ............................ORN NEW HAMPSHIRE CLOSED SYSTEM 10 -11 32 +85 TO 39 +11 4. IF THE PROPOSED WATER AND /OR SANITARY SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION BOC OF CHANNEL v o ° c - CONCRETE DRIVEWAYS: 6 -INCH MINIMUM THICKNESS PORTLAND CEMENT CONCRETE (3600 PSI) PLACED A (VERTICALLY OR HORIZONTALLY) FROM GAS MAINS, THE CONTRACTOR SHALL CALL PIEDMONT NATURAL ........ .........................BOTTOM PAVT ......... .......................PAVEMENT MISSION HILLS RD CLOSED SYSTEM 12 -14 40 +55 TO 46 +62 � -- MINIMUM OF 4 FEET BEHIND THE BACK OF CURB UNLESS OTHERWISE SHOWN ON THE DRAWINGS. GAS COMPANY AT (704) 525 -5585 AND INFORM THEM. BRG ......... ........................BEARING PC ................................... PRESSURE CLASS ° o 0 0 o v 5. EXIST. SANITARY SEWER LATERAL & WATER SERVICE LOCATIONS (NOT ALL SHOWN) ARE APPROXIMATE CB ......... ..........................CATCH BASIN PERM ............................... PERMANENT _j U U o - ASPHALT DRIVEWAYS: AND ARE TO BE FIELD VERIFIED PRIOR TO CONSTRUCTION. CONTRACTOR SHALL RELOCATE ANY C &G ..... ...........................CURB AND GUTTER PG ................................... PAGE L? RESIDENTIAL: 2 -INCH MINIMUM COMPACTED THICKNESS ASPHALT CONCRETE SURFACE COURSE, TYPE SEWER LATERALS & WATER SERVICES AS NEEDED PRIOR TO STORM PIPE CONSTRUCTION. CE ................ ...................CONSERVATION EASEMENT PI OF INTERSECTION �v c o woo N SF -9.5B, OVER 4 -INCH MINIMUM COMPACTED THICKNESS AGGREGATE BASE COURSE (ABC). ........... ..........................POINT .. v o z cn cD UTILITY COORDINATION: CL ............. ......................CLEARANCE PK ................................... PK NAIL SET ;0_1 COMMERCIAL: 2 -INCH MINIMUM COMPACTED THICKNESS ASPHALT CONCRETE SURFACE COURSE, C/L ....... .........................CENTER LINE PP ................................... POWER POLE c 0 TYPE SF -9.513, OVER 4 -INCH MINIMUM COMPACTED THICKNESS ASPHALT CONCRETE INTERMEDIATE CLDSM ....... ......................CHARLOTTE LAND DEVELOPMENT PROP ............................... PROPOSED y�j v > COURSE, TYPE I- 19.013. CONTRACTOR SHALL CONTACT NC ONE -CALL AT 1- 800 - 632 -4949 FOR UTILITY LOCATIONS PRIOR TO STANDARDS MANUAL PT .......... ..........................POINT OF TANGENCY i.i - PER NCDOT SECTION 610 TO TIE PROPOSED CONCRETE APRONS TO THE EXISTING ASPHALT DRIVES. CONSTRUCTION. CONTRACTOR SHALL ALSO NOTIFY THE CITY OF CHARLOTTE UTILITY COORDINATOR OF CMP ............ .....................CORRUGATED METAL PIPE PVI......... ..........................POINT OF VERTICAL INTERSECTION IMPENDING WORK. THE UTILITY COORDINATOR SHALL BE CONTACTED AT THE FOLLOWING ADDRESS (48 r- - GRAVEL DRIVEWAYS: 6 -INCH MINIMUM COMPACTED THICKNESS INCIDENTAL STONE BASE PER NCDOT HOURS PRIOR TO CONSTRUCTION): CMPA .......... .....................CORRUGATED CMU METAL PIPE ARCH MECKLENBURG r ...................................... RCBC .......... ..................... RADIUS REINFORCED CONCRETE BOX CULVERT a � L � z M U p I SECTION 545 TO TIE PROPOSED CONCRETE DRIVE APRON TO EXISTING GRAVEL OR DIRT DRIVE. ........... ......................CHARLOTTE �" L` MR. GARY STANSBURY UTILITY DEPARTMENT RCP ............ .....................REINFORCED CONCRETE PIPE w cD - SIDEWALKS: 4 -INCH MINIMUM THICKNESS IN ACCORDANCE WITH NCDOT 848 (6 -INCH MINIMUM THICKNESS AT DRIVEWAY CROSSINGS PER CLDSM STD. 10.22). 600 EAST FOURTH STREET CHARLOTTE, NC 28202 -2844 C.O. ... ....CLEAN ....................... CONC OUT RD ........ ...........................ROAD RELOC....... a c � rn Q N � � Of 0 o z O I (704) 336 -2667 ........ .......................CONCRETE .......................RELOCATE �� z a) CONST .......... ...................CONSTRUCTION REQ'D ............................... REQUIRED Of _ 0 DRAINAGE STRUCTURES• ORGANIZATIONS THAT MAY OWN FACILITIES THROUGHOUT THIS PROJECT ARE: CPP ............ .....................CORRUGATED PLASTIC PIPE RT .................................... RIGHT v w .. J • DUKE POWER COMPANY DCB ........ .........................DOUBLE CATCH BASIN R/W \ ROW ....................RIGHT OF WAY O oN Q � O PIEDMONT NATURAL GAS DB ........ ...........................DEED BOOK S ...................................... SOUTH U N < z GRADES, ELEVATIONS AND LOCATION SHOWN ARE APPROXIMATE. AS DIRECTED BY THE ENGINEER, THEY BELL SOUTH DBL ........ .........................DOUBLE SAN ................................. SANITARY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. WEEP HOLES ARE TO BE CONSTRUCTED QUEST DI ......... ...........................DROP INLET SID ................................... STORM DRAIN IN ALL DRAINAGE STRUCTURES, WEEP HOLES SHOULD BE ON 8' CENTER WITH A MINIMUM OF 1 WEEP HOLE TIME WARNER CABLE DIA SIDE .................................. STORM DRAINAGE EASEMENT PER WALL. WEEP HOLES ARE TO BE COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF ICG TELECOM GROUP, INC ........... .......................DIAMETER FILTER FABRIC FILLED WITH #78 STONE. THERE WILL BE NO SEPARATE PAYMENT FOR THIS WORK. MCI DW ............ .......................DRIVEWAY SF .................................... SQUARE FOOT STATION, OFFSETS AND ELEVATIONS REFER TO THE CENTER OF DROP INLETS, MANHOLES AND JUNCTION TELICS DIM ............ ......................DIMENSION S/R FENCE ..................... SPLIT RAIL FENCE BOXES, AND THE MIDPOINT OF THE GRATE FOR CATCH BASINS. UPON APPROVAL BY THE ENGINEER, CHARLOTTE UTILITIES E ................... ...................EAST /EASTING SS ................................... SANITARY SEWER CONTRACTOR MAY SUBSTITUTE BRICK STRUCTURES WITH PRECAST STRUCTURES. NORTH CAROLINA DEPARTMENT OF TRANSPORTATION CHARLOTTE DEPARTMENT OF TRANSPORTATION EA ........ ...........................EACH STA ................................. STATION ACCESSIBLE RAMPS. ELEV .......... ......................ELEVATION STD ................................. STANDARD THE LOCATIONS OF EXISTING UTILITIES SHOWN ON THE PLANS ARE FOR THE USE OF THE CONTRACTOR IN EOP ...... ...........................EDGE OF PAVEMENT SUE ................................. SEWER UTILITY EASEMENT PROVIDING PROTECTIONS FOR THE UTILITIES DURING CONSTRUCTION OPERATION. THE CITY, DESIGN ESMT ........ .......................EASEMENT SW SIDEWALK ACCESSIBLE RAMPS SHALL BE RECONSTRUCTED WHEN DISPLACED BY CONSTRUCTION ACTIVITIES USING CONSULTANT, AND /OR AGENT SHALL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OR LOCATION, SIZE, ................................... CLDSM STD. 10.31 A & B, 10.32 A & B, 10.33 A & B, AND /OR 10.35 AS APPROPRIATE. PROPOSED CURB DEPTH OR COMPLETENESS OF THE INFORMATION. BEFORE BEGINNING CONSTRUCTION, THE CONTRACTOR ETCB ......... ......................ELONGATED THROAT CATCH BASIN SY ................................... SQUARE YARD SHALL BE DEPRESSED AT INTERSECTIONS TO PROVIDE FOR FUTURE ACCESSIBLE RAMPS. SHALL CONTACT EACH OF THE UTILITY OWNERS IN THE AREA OF CONSTRUCTION RELATIVE TO THEIR ERCP .......... .....................ELLIPTICAL REINFORCED CONCRETE PIPE TAN ................................. TANGENT UTILITY LOCATIONS. THE CONTRACTOR SHALL PROTECT ALL UTILITIES FROM DAMAGE CAUSED BY EXIST ........ .......................EXISTING TB ................................... TOP OF BANK SUBSURFACE PLANS: CONSTRUCTION OPERATIONS AND /OR RELATED WORK OF THE CONTRACTOR OR HIS AGENTS. THE F /C OF CURB TCE ................................. TEMP CONSTRUCTION EASEMENT CONTRACTOR SHALL HOLD THE CITY HARMLESS FOR ANY INCONVENIENCE OR DELAY CAUSED BY THE ...... ...........................FACE OPERATIONS OF OTHERS PERFORMING THE ABOVE WORK. NECESSARY ADJUSTMENT OR RELOCATION OF FES ......... .........................FLARED END SECTION TEMP ............................... TEMPORARY A SUBSURFACE INVESTIGATION WAS PERFORMED BY S &ME ON OCTOBER 27, 2010. TO OBTAIN A COPY OF EXISTING UTILITIES, EXCEPT FOR CONTRACT ITEMS, WILL BE PERFORMED BY THE UTILITY SERVICE PROVIDER. FH ........ ...........................FIRE HYDRANT TP ................................... TRAVERSE POINT THE GEOTECHNICAL REPORT, CONTACT THE CITY AND REFERENCE JOB #1351 -10 -064. IN ADDITION, THE THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHERS IN ORDER TO PROVIDE SATISFACTORY F /L ....... ...........................FLOW LINE T /W ................................. TEST WIRE CONTRACTOR SHALL MAKE HIS /HER OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. THE CITY PROGRESS OF THE PROJECT. FOC ....... ..........................FIBER OPTIC CABLE TYP ................................. TYPICAL IS NOT RESPONSIBLE FOR SUBSTRUCTURE CONDITIONS ENCOUNTERED BETWEEN BORING LOCATIONS. PIEDMONT NATURAL GAS (PNG) REPRESENTATIVE MUST BE PRESENT PRIOR TO AND DURING ANY GV ....... ............................GAS VALVE U /G ................................. UNDER GROUND TREES, SHRUBS AND HEDGES. CONSTRUCTION WITHIN THE AREA OF EXISTING GAS MAINS. HORIZ ......... .....................HORIZONTAL VC .................................... VERT VERTICAL CURVE VERTICAL THE CONTRACTOR SHALL COORDINATE THE ADJUSTMENT OR RELOCATION OF GAS MAINS WITH PNG. PNG INT ................ ...................INTERSECTION ................................ MUST BE NOTIFIED TWO WEEKS IN ADVANCE OF CONSTRUCTION. ALL ADJUSTMENTS AND REALLOCATIONS INV .......... .........................INVERT VCP ................................. VITRIFIED CLAY PIPE THE CONTRACTOR SHALL REMOVE TREES, SHRUBS, AND HEDGES WITHIN THE LIMITS OF DISTURBANCE WILL BE PERFORMED BY PNG. IP .......... ...........................IRON PIN SET W ..................................... WEST UNLESS SHOWN ON THE PLANS TO BE PROTECTED. WHEN ROOT PRUNING IS NECESSARY, CUT ROOTS JB ............. .......................JUNCTION BOX W / ................................... WITH CLEANLY USING A DISC TRENCHER OR OTHER APPROVED METHOD IN ACCORDANCE WITH SECTION 01000 OF A BELL SOUTH REPRESENTATIVE MUST BE PRESENT PRIOR TO AND DURING ANY CONSTRUCTION WITHIN THE JCC COMMUNITY CENTER WB BOTTOM WIDTH THE CITY OF CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS. PRUNING SHALL BE PER THE LATEST AREA OF EXISTING BELL SOUTH CABLES. ......... .........................JEWISH ................................... STANDARD OF THE LANDSCAPE CONSTRUCTION STANDARDS MANUAL (TYP.) USE PLYWOOD FORMS WHEN L ............. .........................LENGTH WBKF ............................... BANKFULL WIDTH TREE ROOTS ARE ADJACENT TO PROPOSED CURB & GUTTER OR SIDEWALK. USE CLD STD. 40.11 FOR THE CONTRACTOR SHALL SUPPORT AND PROTECT ANY EXISTING UNDERGROUND UTILITIES ENCOUNTERED LF ........... .........................LINEAR FOOTAGE WM ................................... WATER METER BRIDGING TREE ROOTS. TREES SPECIFIED BY THE PLANS TO HAVE ASPHALT CURBING MUST USE CLD STD. DURING TRENCH EXCAVATION AND/OR PIPE INSTALLATION. CONTRACTOR TO USE EXTREME CAUTION WHEN / LOD ......... .........................LIMITS OF DISTURBANCE W VAULT .........................WATER VAULT � ii 40.13. TREE PROTECTION SHALL BE IN ACCORDANCE WITH CLD STD. 40.02. WHEN THE TREE IS CLOSE TO WORKING IN AREAS NEAR DUKE POWER TRANSMISSION LINES. THE CONTRACTOR SHALL COORDINATE LT THE WORK AREA TREE PROTECTION CLD STD. 40.12 SHALL BE USED. WORKING IN THE AREA OF THE DUKE POWER TRANSMISSION LINES WITH ED WILLIAMS OF DUKE ENERGY AT ......... ...........................LEFT WV ......... ..........................WATER VALVE as (704) 382 -2664. lb ........... ..........................POUND YI ..................................... YARD INLET m CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY PRIOR TO REMOVING ANY TREES. IN ADDITION, ALL LP .......... ..........................LIGHT POLE 60p .................................. SIXTY PENNY NAIL SET TREES LOCATED WITHIN THE LOD THAT ARE TO REMAIN AFTER CONSTRUCTION SHALL BE INSPECTED BY EROSION CONTROL: LN.. LANE ............. ...........................FOOT g THE CITY TO VERIFY THEY ARE SUITABLE TO REMAIN. MAX ......... ........................MAXIMUM ........... ...........................INCH o FOLLOWING CONSTRUCTION STAKING THE PROJECT TEAM (CONTRACTOR, CITY INSPECTOR, CITY ARBORIST SEE SHEETS EC1 -EC7 FOR EROSION CONTROL NOTES PLANS AND DETAILS. MH ........... ........................MANHOLE AND CONSULTANT, IF APPLICABLE) WILL HOLD AN ON -SITE MEETING TO ENSURE THE LIMITS OF , , MIN .......... ........................MINIMUM DISTURBANCE AND THAT TREES PROPOSED FOR PROTECTION ARE CLEARLY IDENTIFIED. THE TEAM WILL TOTAL DISTURBED AREA: X ACRES WALK THE PROJECT AREA AND AGREE ON THE TREES TO BE PROTECTED AND THOSE TO REMOVE, DISCUSS PROPOSED CONSTRUCTION ACTIVITIES, AND IDENTIFY ANY ADDITIONAL TREES TO PROTECT THAT WERE NOT MINIMUM EROSION CONTROL MEASURES SHALL BE CONSTRUCTED AND PERMITTED REQUIREMENTS (WHERE ORIGINALLY MARKED AS SUCH. THE CONTRACTOR WILL BE GIVEN APPROVAL FOR TREE REMOVAL, IN NECESSARY) SHALL BE IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND WRITING, AFTER APPROPRIATE TREE PROTECTION HAS BEEN INSTALLED AND BEFORE ANY CLEARING OR DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, U.S. SOIL CONSERVATION SERVICE, CITY OF CHARLOTTE REMOVAL CAN BEGIN. EROSION CONTROL ORDINANCE, AND THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. THE CONTRACTOR ASSUMES RESPONSIBILITY FOR "IN- KIND" REPLACEMENT OF TREES DAMAGED THAT HAVE CONTRACTOR SHALL NOT DISTURB ANY AREAS OUTSIDE OF THE DESIGNATED EASEMENT AREAS. rT�4�:�:-niLOWING ST NDA "S'' BEEN MARKED FOR PROTECTION OR NOT MARKED FOR REMOVAL. TREE PROTECTION BARRICADE SHALL BE HIGH DENSITY POLYETHYLENE FABRIC, ORANGE, FOUR FEET IN STORM DRAINAGE PIPE & GRADING NOTES: HEIGHT. INSTALL PER MANUFACTURERS SPECIFICATIONS WHERE SHOWN ON THE PLANS. TREE PROTECTION BARRICADE SHALL BE INSTALLED BEFORE ANY DEMOLITION OR CONSTRUCTION BEGINS IN THE AREA AND STANDARDS AND THE LATEST REVISION THERETO ARE APPLICABLE TO THIS SHALL NOT BE REMOVED UNTIL CONSTRUCTION IS COMPLETED AND AS DIRECTED BY THE OWNER. MAINTAIN PROJECT TOPOGRAPHY, EXISTING CONDITIONS GROUND, EXISTING TREES, STORM DRAINAGE PIPES & SAN. PROJECT AND BY REFERENCE ARE CONSIDERED A PART OF THESE PLANS. NCDOT STANDARDS TREE PROTECTION BARRICADES THROUGHOUT CONSTRUCTION. SEWERS VERIFICATION WAS PROVIDED BY WK DICKSON. ADDITIONAL UTILITIES HORIZONTAL AND VERTICAL LOCATIONS (EXCEPT SAN. SEWER), NOTED ON PLANS, PROVIDED BY ON- TARGET, INC. SHALL BE USED. CHARLOTTE MECKLENBURG LAND DEVELOPMENT STANDARDS MAY BE USED IF MAIL BOXES: THERE IS NOT AN APPLICABLE NCDOT STANDARD. PIPE INVERT ELEVATIONS HAVE PRECEDENCE OVER SLOPES. HOWEVER, SLOPES SHALL NOT BE DECREASED FROM THOSE SHOWN ON PLAN WITHOUT PRIOR APPROVAL FROM THE ENGINEER. NCDOT: THE CONTRACTOR SHALL REMOVE AND RESET ALL MAIL BOXES AS REQUIRED BY SECTION 107 -12 OF THE °a NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. COORDINATE THIS WORK WITH THE U.S. ALL STORM DRAINAGE PIPE TO BE CLASS 3 REINFORCED CONCRETE UNLESS OTHERWISE NOTED. PIPE STD. NO.: TITLE: a a w c POSTAL SERVICE. LENGTHS INDICATED ON PLAN ARE APPROXIMATE ONLY. 838.63 REINFORCED BRICK ENDWALL (SINGLE 66 ") cn � N v a A O w FENCES AND WALLS: NO SOIL DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, TRENCHING, OR OTHER LAND DISTURBING ACTIVITY SHALL BE PERMITTED BEYOND LIMITS OF GRADING WITHOUT PRIOR APPROVAL FROM 838.80 840.01 PRECAST CONCRETE ENDWALL (SINGLE BRICK CATCH BASIN (12" THRU 12" THRU 72 ") 54 ") z THE OWNER AND CITY ENGINEERING DEPT. 840.14 CONCRETE DROP INLET (12" THRU 30 ") 3 x F 840.16 DROP INLET GRATE v d THE CONTRACTOR SHALL REMOVE AND RESET FENCES AND WALLS AS NOTED ON THE PLANS AND /OR AS THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE CITY OF CHARLOTTE ANY DISCREPANCIES FOUND 840.26 BRICK GRATED DROP INLET TYPE 'A' (12" THRU 72 ") w DIRECTED BY THE ENGINEER AND SHALL BE RESET OUTSIDE THE RIGHT -OF -WAY. THE EXACT LOCATION BETWEEN ACTUAL CONDITION AND CONSTRUCTION DOCUMENTS AND SHALL WAIT FOR INSTRUCTION FROM 840.32 BRICK JUNCTION BOX W/ OPTIONAL MANHOLE (12" THRU 66 ") c AND DIMENSIONS TO THESE ITEMS TO BE REMOVED OR DISTURBED DURING CONSTRUCTION SHALL BE THE CITY INSPECTOR PRIOR TO PROCEEDING. RECORDED AND PHOTOGRAPHED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL BE 840.51 BRICK MANHOLE (12" THRU 36 ") A REQUIRED TO COORDINATE WITH HOME OWNERS FOR INSTALLATION OF TEMPORARY PET FENCES. MANHOLE RIM ELEVATIONS SHOWN ON THE PLANS ARE APPROXIMATE. NEW MANHOLE RING AND COVERS 840.52 PRECAST MANHOLE 4', 5', AND 6' DIAMETER (12" THRU 48 ") o SHALL BE INSTALLED FLUSH WITH THE SURROUNDING GRADE SO AS TO AVOID DAMAGE TO MOTOR VEHICLES 840.66 DRAINAGE STRUCTURE STEPS SIDE SLOPES: DURING CONSTRUCTION. THEY ARE TO BE ADJUSTED TO MATCH THE SURROUNDING PROPOSED GRADE PRIOR 840.71 CONCRETE AND BRICK PIPE PLUG o TO PLACING THE NEW SURFACE COURSE. 840.72 PIPE COLLAR j o A A 846.01 CONCRETE CURB, GUTTER AND CURB & GUTTER c z z W cn LIMITS OF PROPOSED SLOPES ARE INDICATED IN THE PLANS, DETAILS AND STANDARD DRAWINGS. THE THE CONTRACTOR SHALL BACKFILL OPEN EXCAVATIONS AT THE END OF EACH WORKING 862.02 GUARDRAIL INSTALLATION O a can MAXIMUM FILL SLOPE SHALL NOT EXCEED A 3:1 (HORIZONTAL TO VERTICAL) UNLESS DESIGNATED BY THE DAY. AT DRAINAGE STRUCTURE LOCATIONS, THE EXCAVATION SHALL BE COVERED WITH METAL PLATES 1525.01 PRECAST SANITARY SEWER MANHOLES cno a. ENGINEER. CUT SLOPES GREATER THAN 2:1 WILL BE USED ONLY AS DIRECTED BY THE ENGINEER AND AT WHEN PRACTICAL OR COMPLETELY ENCLOSED WITH SAFETY NETTING. CHARLOTTE LAND DEVELOPMENT STANDARDS: a. THE SPECIFIC LOCATIONS SHOWN ON THE PLANS. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE TO CURRENT OSHA REGULATIONS. EXISTING SANITARY SEWER AND WATER LINE: ALL PROPOSED GRADES ARE FINISH GRADES. STD. NO.: TITLE: 10.19 CURB TRANSITION - PRELIMINARY DESIGN - FOR WATER AND SEWER LOCATES THE CONTRACTOR SHALL CALL C.M.U. AT 704 - 336 -2564 (WATER) OR TRAFFIC CONTROL: 10.22 CONCRETE SIDEWALKS 704 - 357 -6064 (SEWER). 10.25A RESIDENTIAL DROP CURB TYPE I DRIVEWAY WITH PLANTING STRIP (2' - 6" C &G) NOT RELEASED FOR L v "WORK 10.2513 COMMERCIAL DROP CURB TYPE II DRIVEWAY WITH - PLANTING STRIP (2' 6" C &G) w AN INSPECTOR FROM CHARLOTTE UTILITY DEPARTMENT SHALL BE NOTIFIED BY THE CONTRACTOR 48 HOURS TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE 2006 EDITION OF THE AREA TRAFFIC 10.27 RESIDENTIAL DRIVEWAY (TYPE I) FOR VALLEY GUTTER Q PRIOR TO THE BEGINNING OF WATER AND /OR SANITARY SEWER WORK. CONTROL HANDBOOK" (WATCH) AND THE TRAFFIC CONTROL PLANS ON SHEETS TC1 -TC5. 10.29 CATCH BASIN FRAME IN VALLEY GUTTER CONSTRUCTION WHERE SANITARY SEWER AND WATER LINES ARE ENCOUNTERED, THE CONTRACTOR SHALL USE CARE IN STOCKPILING NOTE: 20.03 BRICK DOUBLE CATCH BASIN (15" THRU 36 ") 0 LI J 20.27 RIPRAP DITCHES WORKING AROUND OR NEAR THEM. IF AN EXISTING SEWER OR WATER LINE IS DAMAGED, THE CONTRACTOR 30.14 TEMPORARY STREAM CROSSING SHALL IMMEDIATELY REPLACE THE SEWER OR WATER LINE AT HIS EXPENSE WITH PC 350 DUCTILE IRON 50.04A TYPICAL HANDRAIL Q PIPE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY STANDARDS AND SPECIFICATIONS. THE ANY ONSITE STOCKPILING IS TO BE COORDINATED AND APPROVED BY A CITY INSPECTOR. THE STOCKPILE Of CONTRACTOR SHALL REPLACE A MINIMUM OF 10 FEET OF SANITARY SEWER LINE AND /OR WATER LINE WITH WILL BE PROVIDED WITH GROUND COVER 15 WORKING DAYS UPON COMPLETION OF ANY PHASE OF WORK. • 0 Z PC 350 DUCTILE IRON PIPE WHEN DRAINAGE PIPE COMES WITHIN 18 INCHES OF SAID LINES VERTICALLY OR MULCH WILL BE TACKED WITH EMULSIFIED ASPHALT. ~ z 10' HORIZONTALLY. SAW CUTS: w J Q ALL WATER VALVES & BOXES, WATER METER BOXES, WATER VAULTS, SANITARY SEWER MANHOLES, AND CHARLOTTE MECKLENBURG UTILITIES: 11f CLEANOUTS IN THE CONSTRUCTION AREA ARE TO BE ADJUSTED TO THE FINISHED GRADE BY THE z CONTRACTOR. THE CONTRACTOR SHALL SAW CUT EXISTING ASPHALT AND /OR CONCRETE SURFACES PRIOR TO REMOVAL Q Li IF THE WATER METERS ARE TO BE RELOCATED HORIZONTALLY, THEY SHALL BE MOVED TO AN AREA BEHIND UNLESS OTHERWISE DIRECTED BY THE ENGINEER. SAW CUT WIDTH SHALL BE 1 FOOT MINIMUM FROM THE STD. NO.: TITLE: below. 0 W EXISTING EDGE OF PAVEMENT. SAW CUT PAVEMENT SHALL BE REPLACED AS WELL AS ADDITIONAL Know what's THE PROPOSED CURB. IF RELOCATED METER IS IN DRIVE OR SIDEWALK, CONTRACTOR WILL PROVIDE AND PAVEMENT REQUIRED TO TIE -IN TO FACE OF PROPOSED CURB AND GUTTER. WATER STD. 29 VERTICAL BEND Call INSTALL CONCRETE METER BOXES. SEWER STD. 16 PIPE ENCASEMENT before you dig. 0 PAVEMENT DEGRADATION FEE: WATER AND SEWER LINES ARE TO REMAIN ACTIVE AT ALL TIMES DURING CONSTRUCTION. IF THIS IS NOT POSSIBLE, THEN CONTRACTOR SHALL FOLLOW C.M.U. POLICIES, PROCEDURES, STANDARDS AND SPECIFICATION MANUAL. CDOT HAS DETERMINED THAT NO PAVEMENT DEGRADATION FEE IS TO BE ASSESSED IF DETAIL 1/D2 IS CONSTRUCTION SHALL BE IN ACCORDANCE SEWER LATERALS ARE TO BE RECONNECTED PER C.M.U. SPECIFICATIONS. USED. WITH CHARLOTTE MECKLENBURG LAND CONSTRUCTION EQUIPMENT WEIGHT SHALL NOT EXCEED 16,000 LBS. INSIDE OF EXISTING SANITARY SEWER EASEMENT. STOCKPILE /STAGING AREAS ARE NOT TO BE LOCATED WITHIN THE EXISTING SANITARY SEWER DEVELOPMENT AND /OR NCDOT STANDARD Ln EASEMENT. NO COFN TRUDAYN MATERIALS SHALL BE LEFT WITHIN THE EXISTING SANITARY SPECIFICATIONS. x N o NTH ATMEN FOR w w r W U D N W 0 Q Z_ Q O I c v+ .N a� c v E a� 3 c v+ .N a� O c v E N v Q U Q O O M N N O O ri O N w Q 2 U O R d } O U N O N O M Z Q i Q 00 Z H m O w d =MAP2E m v m SS MANHOLE I I CATCH BASIN / TOP R /M= 631.67 / /j ; NOW 01�FORME LY I TOP RIM= 632.71 (A)INV IN= 619.91 Q / DENN KELVNE w BOTTOM GRATE= 632.06 �S I TOP GRATE= = 632.33 (B)INV /N =619.6 RCP 15" INV. IN= 628.09 / W AND HENHUI ZHEN (A )RCP OUT =619 48 Z ( ) / SSE / 135- 093 -89 \ o (B)RCP 18" INV. OUT= 627.75 N (B I / o DB 22609/PG 834 © I / 8835 IDLEWILD RD /8" \� T (C) (A) N FOUNDATION PROTECTION REMOVE AND REPLACE - SSE -� SSE \ �32 / SE DOCUMENTS DFOR ODETAILS I 72 SY OF EXIST- - / L CONCRETE DRIVEWAY 13 DOGVu / REMOVE DEBRIS / �' I I � I I u1 No in 631- I I N o Z\ 1 S EE I SEE NOTE 4 ® NOW OR FORMERLY I I RYANT NELSON ALL / o s' IVACY 135- 093 -88 O Y -G cP E < \ FE C e DB 26463/PG 281 s' AsH^ e E e ® 8831 IDLEWILD RD TOP ELE e . NOTES: NOW 9R�ORMERLY j - - �, 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY ELIA�EbRGE AND MARY I I d S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. ��Q / KRANI Is 6��� I \ g SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE 135 -09_ � o rD L p / DB 19941/PG 945 ti \ NOW OR FORMERLY APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. o� / 8823 IDLEWILD RD v FOUNDATION PROTECTION I \ KAMELOT LLC A) REMOVE AND REPLACE SEE NOTE 2 AND CONTRACT cn \ 135 - 092 -01 2. CONTRACTOR TO INSTALL FOUNDATION PROTECTION (SEE SPECIAL PROVISIONS 6331 I � ° 58 LF OF 2' -0" DOCUMENTS FOR DETAILS m o rmn ° DB CROSS 26337/PG 936 FOR FOUNDATION PROTECTION REQUIREMENTS) PRIOR TO EXCAVATION FOR THE a- c 3200 CROSS WINDS RD QZ VALLEY GUTTER PER CLDSM REMOVE AND mD- FOLLOWING BUILDINGS: CATCH BASIN 10.1713 AND 10.19 REPLACE 21 SY OF TOP RIM= ATE= CONCRETE PATIO D' `' ` 8835 IDLEWILD RD BOTTOM GRATE= 632.52 G7 D \ 8831 IDLEWILD RD TOP GRATE= = 632.71 - fn (A)RCP 54" INV. IN= 623.01 (B)RCP 54" INV. OUT= 622.69 REMOVE AND REPLACE 6 rn 1 (C)RCP 18" INV. IN= 627.41 55 SY OF EXIST_ N (n J m 8823 IDLEWILD RD CONCRETE DRIVEW AY C � m Z 8819 IDLEWILD RD I Z I PROP YI 3212 BRAEWICK PL II I I OOF018 6 RCP ` - CONCRETE SIDEWALK 1 II\ _ X Now OR FORMERLY o �m SEE AIL 4/S2 3. CONTRACTOR TO SUBMIT SEALED SHOP DRAWINGS FOR REINFORCED CONCRETE ,0 r I WITH PIPE CHARLOTTA R GRIFFIN I ELEV = 631.50 ) BOX CULVERT. 7 III NCDOT STD R �Q I 135-092-35 08393/ G 1 J� NV (186 RCP) = 627.Q� 840.72 I = DB 08393/PG 103 I CATCH BASIN co 4. CONTRACTOR TO REMOVE AND REPLACE EXISTING DECK AS NEEDED. REPLACE 8819 IDLEWILD RD 15 MAPLE TOP RIM= 632.95 o BOTTOM GRATE= 632.30 PROP 11 LF OF � co EXISTING DECK WITH LIKE AND KIND. leTOP GRATE= = 632.55 \ ��� \ \ \ \� \� ����� \ \\ x,18 RCP ®0.44% +vwv?,c 2 _ _ _ � � INE CATCH B�s1N o `� , __ - - - - - l w000 pRAIN EASEMENT � ME �' NTAL �IRAIL /Iy / 3 = 63 .09 4"E - -E'er AS ° _e DOUBLE 4' & 3° BIRCH 3 BOTTOM TE = 32. 4 4' OAIN LINK S BLD SEE MB 20 PG 599 ♦ HE OR N SDE �� 4" M E �\ \ 640 ATGUM SDE TOP GRATE = 632. GTE DETAILS - r \N�, (2' R OF M 1 ULAR BLOCK WALL (A) 54" INV. IN = 22.98 NTAt -R W MDVE Sx SEES ET S1 FOR „ X PR REMOEPLACE s E (IMF m p� 4" INV. OUT = 22.69 ° ° M L. ♦ \ / LF 0 I RAIL FENCE I- \ (IS 2" TO 4" ORNAMENTA ROW SO \\\ \ OSSFfS SECTIONS 10 638 EE SHEET 16 FOR �6 s soar, -� s oAK BW 1 e e e e \ \� E`C 2 N e -I-- e 3 CEDAf V d�nn W CATCH BASIN ° Q \0 e 1 e TOP RIM = 632.98 8" ORNAMENTAL J' 10" \\ t� NOW OR FORMERLY _ 9 e- e e e CO o PROP 10 LF OF ° 636 � �" •C' BOTTOM GRATE = 632.35 �J � ONyV 6, MARK F BEALL e " I \ (A) 54" INV. IN 6= 624.27 0 \ CS e N 12" RAPEMY TILE 2 } `18 RCP ®2.05% E S ` \ \ U' 135- 092 -02 PROP 8 DIP \ i NOW OR FORMERLY 0 > 3 633 (B) 54" INV. OUT = 624.23 5 ® \ �, WILD s 634 SANITARY SEWER \ PLAY �0 DB 07751 /PG 717 WITH STEEL ISA13ELLA J40RONIECKI �1 � -� ` l oc\ OUBLE 14' RRY � / o�, \ �\ \ kROUND � X3206 CROSS WINDS RD ENCASEMENT N w, / i13 093 -87} 1 \ / / �+ ss� ��N BW 1 NOW OR FOR \ \ \ \\ „ A DB 19719 PG 15 (A) RJ�c \ END: 0+35 / P E QUIP. SEE SHEET U3 < \ / 15" CHERRY REMOVE AND REPLACE c sE \ ATHRYN A GIL \\ 632 \ 7" OA! 3212 BRAEWICK P L 62 LF OF 2' -0" () \ 135- 092 -33 �� y ° �\ HEAD LL �- 17" ELM X \\ \ REMOVE EXIST c�nY I \ VALLEY GUTTER PER CLDSM °� (B) \ ( 09109/PG 81 �0 14' wE M \ 7 " \"\ �R�' ti� P = 631.48 e (*16 5 BRAEWICK PL s HEADWALL �' 10.176 AND 1.0.19 G \ \ E G �2 630 �' FOUNDATION PROTECTION \ ` G �� \ o l SEE NOTE 2 AND CONTRACT � 14" woo I \ VEABL ED FE w000 \ DOCUMENTS FOR DETAILS DoueLu< o"c = \ PROP 25 LF OF ELM \ D AND R� SHE ��F �y O \s cS 0 v 11 \ � w� I 18 RCP 0 0.99% I NTRACTOR 6 e �9 \\ x 8 P ' n 628 O 12" tihZAP MYRTLE "MAPLE S5� / \ \ \ SEE SHEET U3 FOR WATER '� �j� \ s0� 6" P P v ` `Y G \ LINE RELOCATION PLAN 3 cD �, �o 50 N w000 17" OAK SSE �P REM D REPLACE c ��\ ss vA ) ` / �� y� \ �' 626 s \ SHED a 19 / / / \ 58 SY OF ASPHALT � 2 0 � REMO AND R�PL�E 78 \ / ,a 551-: F NOW OR FORMERLY Eo � 1 0 ���iii � \\ �- I \ \ / S -e2 PAVEMENT F \ \ / \ 9 BRADFORD PEAR LF OF � PRIVAC FENCE o �'o \ %C MECKLENBURG COUNTY\ uA s OD 2 \ -9 Fs o� / % G 624 135- 093 -97 N SE R MVO S5� / SS MANHOLE \ O� /\ � "'0 o y(N� a \�� / / O DB 05966 PG TOP RIM = 633.17 �L ] / / 16" MAPLE / N SSE SPN v1P� G SSA (A)INV IN = 626.97 s �O /� ° 564 IDLEWILD RD P�gL�GN� OF / (B)INV IN = 627.37 �� o� G 622 N 15 DER Ft \G 600 I SSE C✓ (C)INV OUT = 626.86 \���\ L ��� V N SE 0 PG / �vo�O �� G / r N 2 \PI s„ MIM 1 r 2 SSE C/ l oo 7 �AOY 620 \ Mg 8" MAPLE (,/ \ o !� 'rJ �� / 6 F EN R \ N (BJ ss SEE SSE/ I \\ / / \ '� �f`�� / NOW OR FORMERLY `�6'- W000 Sp e \ SS MA HOLE (A) I ® \ / pR�1E \\ �v�fsy ` G BETTY LEAN SHROPSH TOP RI = 632.26 SSE \ cRE�E �\ \\ yon �J 135 - 092 -32 Q� e/ 618 (A)INV 1 =622. / c�`' / ooss G / \\ DB 10960/PG 876 20" PINE e \ ( )INV o T 221 BRAEWICK PL R e - 637 (B )INV \ c /NOW OR FORRLY a-�_ 616 \ ` WOOD / 16" SWEET UM o \ I DENNIS IANNONE / 135 - 092 -31 < F DB 23347/PG 346 VBL. ` 614 ` \\ / X3227 JQRA PL \ SHED \�� \ 11 612 NOW OR FORMERLY JOSE 0 MARTINEZ 135 - 092 -03 DB 10550/PG 194 3212 CROSS WINDS RD 650 648 646 644 642 640 I 638 m a 636 Q J a 634 C v 632 0 C v E 630 0 % 628 c .y v 626 v c v E 1 624 m w 648 "___■ c i 646 622 � U L 0 JUV v Q 642 j 620 v � oZ) o a ozcncD o M N 618 N • 638 N v > D r� � o N 616 O 614 N U r� y�Q 612 �U� Q ORO 0 N / =0O OUm d ■__mf�_ 648 "___■ c N 646 v p o U L 644 JUV v 642 o o 640 oZ) N ozcncD a1 75 "d • 638 v > D r� � 7 of w QI Z M 0 636 U o Ld o w� L� a C QNIO 634 w O r� Z O 0- N u a_ Co c p r- U Know what's below. 632 a C E Call before you dig. r� O O� N Q a; U U I, of _Z: w 630 L) E rn 628 o r- 626 A L1 L Z 0 oa = x Q 9 N 1 0 W a ■�i'ii�iiii f�i7 ■1���1���■ a � Nq� mmm ■MI 1111111=111IMM■ ■■ NMI ■■ ■ ■I I I ■ ■_ _ ■MI M1111=1 n�,9mm 1�E -1- 1111111=111IMM■ ���M■ - ,___■ �■�mm■ mmm NMI MMMME ■■ I►i������■ ■M-0 �_,______■ ■__--` • ' 110 LF 01 F _ CP 0 2. • ■___,_ __■ ■___,______■ ■___�l��if1M tM__■ -0 +25 0 +00 0 +50 BW 1 PROFILE 650 648 c N 646 v p o U L 644 JUV v 642 o o 640 oZ) N ozcncD a1 75 "d • 638 v > D r� � 7 of w QI Z M 0 636 U o Ld o w� L� a C QNIO 634 w O r� Z O 0- N u a_ Co c p r- U Know what's below. 632 a C E Call before you dig. r� O O� N Q a; U U I, of _Z: w 630 L) E rn 628 o r- 626 650 648 646 644 642 640 638 636 634 632 630 628 626 624 622 620 618 616 614 612 610 0 +75 624 - PRELIMINARY DESIGN - 622 NOT RELEASED FOR 620 CONSTRUCTION 618 616 0 5 10 614 Vertical Scale: 1" = 5' 1 +00 1 +50 2 +00 2 +50 3 +00 3 +50 4 +00 4 +50 5 +00 5 +50 6 +00 MAIN ALIGNMENT 0 20 40 Horizontal Scale: 1" = 20' Ld U Q � 3:O O z (n Ld LL] Z > Q O LL] Z W W Ld U Q J mm Ld U_ J D LiJ U Q m G4 Ln O T_ o v v c N v p o U L d JUV v a� o o C ZC oZ) N ozcncD a1 75 "d C 0 v > D r� � 7 of w QI Z M o U o Ld o w� L� a C QNIO (If U O Z r� Z c 0- N u a_ Co c p r- U C7 E �J r� O O� N Q a; U U I, of _Z: Ld U Q � 3:O O z (n Ld LL] Z > Q O LL] Z W W Ld U Q J mm Ld U_ J D LiJ U Q m G4 Ln O T_ .O N d Q o N Ca W \ x r� x a r� Q L) rn o r- A L1 L Z 0 oa = x Q 9 N 1 0 W a a � Ld U Q � 3:O O z (n Ld LL] Z > Q O LL] Z W W Ld U Q J mm Ld U_ J D LiJ U Q m G4 Ln O T_ N N O X U N d J n c rn N c v E i c v+ .y 0 C v E 0 o Q O M N N N O O N � N rn m M r0F -X 1 Q Q ORO D %F- U O E3 5; n f \ 6 K 5" MA E \ o o \ \ 2' APE YRTLE \ \ \ oo DOUBLE 3 MA L NE \ 15" PINE DOUBLE 11" PIN SWEETGUM 1 PINS > 9 \ \ 6" CR EMYR E stn \ ,10. 1�1 656 j F7,� y� � oFy c^ \ 4" MAPLE \ �77� 5 0 � 654 \ 24 EDAR y0� \ \ 652 EXIST \ INV.- 630.3 \ / 650 \� TO' OPLAR�* Z, W, W w0 0 + M-� E­4 111111E TOP GRATE- = \6 45 (A)CMP 72" INV \IN= 625�60� s`' � c�sF' Slff - REMOVE AND REPLACE-f48 1 CW2 \ �� L — /�/ 624 LF OF 6' PRIVACY F e REMOVE AND \ END: REPLACE 579 Y OF \ PROP 9 LF OF ASPHALT PAVEMENT 18" RCP ® 1.08% \ } \ W o A�� �� aR��� / �� �/ul c 622 C� PROP 90' ND 6 �� \ \ / \ 2" ORN °R� // $ \ o °a P / / EXIST GAS NE TO a \:.� �' \ / / / 12 ^ BE RELOCA BY PROP SEWER / 0 RS '4 0� / \ REPLACEMENT /� P� NOW OR FORMERLY \ \ 2G\� G °s �= �\ SEE SHEET U4 � / PROP 17 �le% OF GENINE M DONOVAN �j� Ss�� 1�s�� 135 - 092 -04 10 X 6 RCBC ® \ / DB 25393 PG 499 C �J 1 \ / R 0 CROSS WINDS RD CIO REPLACE Rl�y� OF \x / \ ONCRETE DKIVEWAY C ss 8" RCP ® 1.1 PROP 13 LF OF 18" RCP ® 1.58% TIE I TO PR P 10'X6 -0 +25 0 +00 CW1 PROFILE 6 +00 6 +50 7 +00 7 +50 8 +00 8 +50 9 +00 9 +50 10 +00 MAIN ALIGNMENT 656 654 652 650 648 646 644 642 640 638 636 634 632 630 628 626 624 622 620 618 LO Pr4� E­1 �1 x O O O + Zo N U) NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 2. CONTRACTOR TO INSTALL PERMANENT FOUNDATION PROTECTION (SEE SPECIAL PROVISIONS FOR FOUNDATION PROTECTION REQUIREMENTS) PRIOR TO EXCAVATION FOR THE FOLLOWING BUILDINGS: 3206 CROSS WINDS ROAD 3212 CROSS WINDS ROAD 3215 CROSS WINDS ROAD 3221 CROSS WINDS ROAD 3. CONTRACTOR TO SUBMIT SEALED SHOP DRAWINGS FOR REINFORCED CONCRETE BOXES AND PRE -CAST CONCRETE BENDS. 656 656 654 654 652 652 650 650 648 648 646 646 644 644 642 642 640 640 638 638 636 636 634 634 632 632 630 630 628 628 626 626 624 624 622 622 aon 656 654 652 650 648 646 644 642 640 638 636 634 632 630 628 626 624 622 620 0 +50 0 +60 -0 +25 0 +00 0 +50 CW2 PROFILE Know what's below. Call before you dig. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' �� Ld U Q � O 12 a_ �� O z V) Ld 12 Z ; Q O LL] � V) a- C W ' w L1 J x � N 'o w off. a d 0 Q O U LL] >z_> D (f) U O U w L0 o T_ C: p 0 ,C: O p O WW U L 0 N JUU fn -13 0 c wooa) v ozcn0 Pp c 0 LLI C� U Of p of w QI L Z M y u o o � �V N o o w ' a C QN O Of U O Z r>% OZ 1 N c 3 � CNO c r` U OU C7 E a'J w O o� NQ 5;0 U I-, O_ _Z �� Ld U Q � O 12 a_ �� O z V) Ld 12 Z ; Q O LL] � V) a- C W ' w L1 J x � N 'o w off. a d 0 Q O U LL] >z_> D (f) U O U w L0 o T_ WW N W N fn w�l � N w \ Q U x a a w U O) O r- ,n �° z cO �� Ld U Q � O 12 a_ �� O z V) Ld 12 Z ; Q O LL] � V) a- C W ' w L1 J x � N 'o w off. a d 0 Q O U LL] >z_> D (f) U O U w L0 o T_ p L0 2 U X c rn .N N C3 C v 0 N c v+ a� 0 c 0 aEi Q Q � O Q M M N O N O O N O O j N } % Z M Vl Q 4`U� Q p O •Z D OUX (L NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND W/SEMAN DRIVE BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK 10 c \ _ _ _ _ = M/ M/ A 50, PUBLIC R R I PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE o G�x G G M� �w S &ME PROJECT NO. 1351 -10 -064. w 24' OA O 18" OAK AM — R / VV n' RAW R /W R W I NOW OR FORMERLY 9�3 )D S,S ORNAMENTAL 20 FABIO CASTILLO & WIFE 50" I � � \ 18" ETGUM NOW OR FORMERLY I r 1 135 - 063 -16 \ SS 17" SWEETGUM 0 I GLENN A LOVE & WIFE NOW OR FORMERLY I I 33303WIS MAN DR 135 - 063 -18 / )D ODD DB 03676/PG 423 NORA M NELSON ENO. 135 - 063 -17 TRIPLE DO 0 3316 WISEMAN DR 'cc� TRIPLE SWEETGUM DB 08353/PG 895 �?3 10" S� TGUM� 19 3324 WISEMAN DR 7eiss I I 12 NOW OR FORMERLY I r'�� SARAH AND RYAN FOX £�zSSgOObN/ NOW OR FORMERLY I I o c^ 135 - 063 -15 3 >o W/ sl�i JANET J LAMB \ c� DB 15568/PG 169 NN u �� bW d01 �/ 135- 063 -19 ss O DB 03313/PG 116 I I ` X15, U) 3300 VALLEY GROVE RD 0 3310 WISEMAN DR I h � O O = �' on 8" OAK 3 "MAGNOLIA DECK \ \ STEPS I 012" \ \ \ \ \ \ r / 19" OAK o 2" PINE _ o \ G GM 5� 10" ASH PINE I o 1 \ \ TRIPL�WEETGUM G \ O O ° �el \ �, — I o o \ \ \ 2" PINE 8" OAK O X pJ G 12" PINE \ \ \ 32" OAK 27" OAK � 11" MAPLE \ © P TER \ 9" ASH \ O\ \ \ / 3" PINE o� i _ \ 30" oA END PROP STREAM \_0 30" OAK o PLANTER\ DECK BANK STABILIZATION 2" ORNAMENTAL S \ \ \ \ \\ \ / 0 O 0 U3 ' \ STA 17 +95 — 1, ,5 \ \ 2" PINE +'� 0 ° \ \ SEE DETAIL 1/D1 1"-ORNAUENTAL \ \ O / wo \ \ \ 14" MAPLE \ \ 22" OAK 14" MAPLE -� 1" MAPLE \ 3`-cEDAR \ o ° 32" OAK \ \ 14" OAK \ P� <v 12" BLACKGUM 1" ORNAMENTAL \ (�� �\ \ � 8" MA O /+ \ PERM. \ --_12" WILD HERBY- PS — WOOD \ \ \ \ \ \ \ 1"O NANENTAL I t ° ? \ \ \ \ 26" SWEETGUM SHED %1� __ \ o \\ \ \ \ � — _ / ----T8" OAK \ \ \ MOVL \ o 4 \ \ FF 662.21 \ \ \ \ WOOD \ \ I T � I t \ \ GRN- ANENTAL w GARDEN SHED \ t 2" 9" PECAN ° \ 6 3 PINE p 1" ORNAMENTAL _ QAK 2 LOCUST BEGIN PROP STIR o \-Q o \ BANK STABILIZATION \ J e AcrE \ �' STA 16 +25 � — e e pp � � e � \ �� � _ O \ \ \ \ � _ _ _ — ---END-PROP STREAM 5 ° HOLLY / t15" MAGN IA__ \ \ ° BANK STABILIZATION / e�l / \ \ \ ro / ~ \ \ \ �\ - STA 5" PINE "OAK SEE DETAIL 1 D1 e � / � \I \ \ _ e / \ \ \ \ \ \ \ \ \ \ \ \ Z SEE DETAIL 1/D1 \ \ \ 1 r S� 3" AS SD _ PLANT R \ \ \ \ 34" OAK \ 30" 0 \ 7 RRE�,DBUD e — w / / �� OE \ 18 +00— \ \ —� E \ ` \ \ \ \ \ \ \ \ OF \ 0 15" BLACKGUM o ° OF 50/ ` \ \\ \ I \ \ / '1�+ \ \ \� —650_ _ \ \ \ \ \ \ \ \ — \ �� e e \ 9° BI cH�� 54 ;UM I �E / / / ' / — — - = 4 - -F� ��♦ \ \ \� e \ \ \ \ \ \ 3" HICK RYm e e / \ \ NOW OR`FORMERL \ ° I /, / \� \ \ \ \BxS�� 3G• I \ \\ \\ � %4\ORG5N063 TI\RE�AK + O�6" BLACKGU SWING } 10' 4 \\ D (/��C� E \ \ \ 3 LOCUST 6" SH ° 21+ 0 RAINgG TY q/v \ \ \ _ ` \ DB 007 /PG \921 1 14" WI R �1,h�0 _ / / / 18" PINE \ sEE M E eqs \ _ — _ / 0 3 16 VAL EY GRO\ RD lL // / / \\ e �4 p Fti1ENT \ \ \ \ BEGIN PROP STREAM � �\ — R / _ \ - G -,\3" BANK STABILIZATION = �� CH€� O 8" PINE S� \ \ \\ ` \47 ' \ e M \ ILD CHERRY 4 " WILLOW — STA40 +55 O 10� 4 -- _ — 4 a'�PrNE o /i e f _ \\ \ \\ 9x0 \ \ \ \ SEE DETAIL DL �j 10" t$QNWOOD \ \\ \ \ \\ \ o E-4 16+5U DOT \ �\ `\ " L K� �, ` ` 3" SYCAMORE 2 ORIN A / // / W e -2-9„9 +50 E \ °a„ Locust — _ 1" °° OW / SSE E \ \ _ jT� — _ / / / �JCSE 1 " SH LEAF MALE SS SSE �4SS0 D X� +00- �I: / \ \ \ \\ \ FL�' S�C— \ SSE SSE / / i� (() SSE CJ \ 6" WALNU� - _ \\ = // / O LE ��S S$A— SS SSE SSE SSE \ �° \ _ 8 AS�Ph _ — — _ _ _� \�1X E SSE i SS SS (B >� SS MANHOLE SS / SSE SSE _ �` ° 5" WAL�IS / SIDE s S0 0: q r , 10J ASH SS O PUBLIC 22" ASH 36" OAK _/— 6" SWEETGUM \ \ h+�l 10" ASH SSE p� 5S TOP RIM= 649.85 So P E 6" ROCK 5" �AT \ S LO ' �E SSE 1666 SS ° \ S o�gEi RE � � (B)INV IN- 643.85 S� SSE„ DOUBLE 12" & 5S �� �IANI1 — —_ e SSE � SSE � _ � 1 � \\ \ \\ q SSE _ OUTCROP � ° + '`.T^^� - 8 �ICP— \ \ 3= F MA LE P _ 12" MABNOI- yy O SS / SS i— MA S 20 PI (C)If+I OUOUT= 643.65 20 ASH ue�l E SH LEAF MAPLEY� SS \ e _ SSE 12" MAGNOL 12" HICK�Y ° UBLE 6" IRONWOOD ° 6" PIN \ \♦ \\ \ ^' �" WILLOW 10' ON 15 ASH LE F MAPLE S SSE /— SS �� e e SSE SSE CASH o 14" RY ° 6 "E soF` \ \ \\ \ SSE SSE O SSE SS SSE %NWOOP(�, SSE SE \\\ / / SSE SSE \ 8" VCP SS e S� �u� / / ° /— 6" SSE 6" IRONWOOD \ / — S � \ _� CMUD SS e / S 3 SSEGNOLIA AGNOLIA 12" SWEETGU 6" PLE / E m O \\ 35" COTJVOOD J SSE JOB�6 SS ° ° 6'" IRONWOO� o ° / J � O OSSE SSE 5" MAGNOLIA 6�� SS / 7" IRONWOOD ° \ \�♦ \\ O DOUBLE & m o �SE�3 o SSE 18" DOUBLE ELM S � / BEGIN PROP ',STREAM I SSE SS SSE o 9) 7' IRONWOOD \ ASH LEAF PILE T SE 15" _FINE F 26" ASH LEAF MAPLE SSE Sgt / / \\ y0 � o BANK STABILIZATION 16" MAPLE ` \ 22" ASH SSE � SSE SS 12" PECAKI SSE 0 \ '\ \ 36" OAK / — \ \ \ \ s ry; STA 16+ \ SSE SS / ° Rod \ / 10" AS H \ ^ L s SEE DETAIL 1 1 E s X� o" E, ss NOW OR FORMERLY 8" ELM °o OPT 13' PECAN / / / LAYS T END PROP STREAM / _ Sy SSE, �= —� Ss (A) F�8" ELM 6 OAK 7 OAK \ \\ KIT CARSON WOODELL III 6" MAPLE \ \` / / ` g�E S / 6" POPLAR m ♦ S \ \ / / SSE S- 6" 135 - 063 -04 �, / — BANK STABILIZATION / � �� \o DB 03673 PG 146 ASH LEAF PLE & 10" BILE �� / STA19 +50 / t� / �p SSE SS XSS 7" BIRCH / 6' IRONWOOD S LE MA E UE s / \ \ \ 3400 ARROW LN 0 0 12" ASH SFE ED TAIL 1/D1 / / / / SS F \DAR 10" IR wo goF � F o 3 I \ 8" MAPLE UE / — / SS M LE _� \SF�\ \ OAK 6" P NE s � / / TOP RIB 656.20 / S 12" ASH /, ♦ 651 UE I / / (A I IN= 649.50 / F 7" BIR ° \ 10" WILD CHERRY / 6' PECAN 6" ASH /\ �� / ( 1V OUT= 649.20 / / \ SS o� S F 8" ENv1\ 7" SWEETGUM _6" WILD1kiERRY \ \ C { —650— — MAPLE 21' OAR �� lL���v>� / m ✓O �S \ TRIPLE CHESTNUT OAK \ Ss9`76 v ° 7" HICKORY 8" ELM PERM. ♦ \ �-yZ\ / 14" MAPLE �XC / / \ �"2�,� 6 �4 6" ASH / SHED �� y���/ GARAGE F.F. I / SSfi ° S \ v> 14" OAK 6' O RY S / FF =652.2 J ELEV.= 657.41 _ 6" SWEETGU / \ ♦ �� �n��� 8" ASH LEAF MAPLE L 15" & 10" / / _ WI HERRY Y \ \� \ 9_'�ASH F , y� 2 \w� / / ® 2" ORNANENTAL 6" CHERRY — J �Pp /iu�' /TOA / \ 6" BRADFORD PEAR L 652— DOD i'L SEE SHEET 8 \p`'o ss 1 „ qAK s osss °!F 17 I DECK — �j9G, —FOW DRAINAGE, �� •p9 G ss.soo NOW OR FORMERLY I 2" ORNANENTAL / / / ��PI pF SWALE �\ ��i9�%/ o o GARY W JUSTICE s Fys ,o NE IMPROVEMENTS cF \ 135 - 063 -05 o sIP DB 09816/PG379 \ uE F '� \\ , A -- 3405 ARRO L / �" -PIS �\\ NOW OR FORMERLY x � � / � � oD P _ F — — 655 TtiF A Ts s I SAMUEL E CASE JR & J \ i9Q_S \- J 9" SWEETGUM I I 9" SYCAMORE 135 - 063 -06 DB 03843/PG 297 (B O I o 3411 ARROW LN 0 + T Wr� E-4 i_ O M O E­4 � W O + V1 V) F \ 9 s ♦ �v. O 9 A E 52 / / / / / / Know what's below. - o 18" MAPLE \\ _v� 16" SWEETGUM I I 6'p\ NOW OR FORM \ \♦ F 6 %_ p \\ o I I R�CF SUSAN GAIL MARCHI " 7 Call before you dig. 1 C 13 20" MAPLE ' B 08280/PG 344 \♦ _ s — — — ° I SEE SHEET 8 9 ARROW LN m FOR PROP STORM ' _ _ / �, DRAINAGE 17" SWEET9dl - PRELIMINARY DESIGN - NOW OR FORMERLY \ ♦ \s mss �o — _ _ _ _ NOT RELEASED FOR KIT CARSON WOODELL III \ \ WEETG gyp CONSTRUCTION 135-063-L-4- 16' E AR — -63 03673/PG 146 — �& 11 sdvvc sw TG�Ff� e7— ��_ e — 5' 4TRRG T _ F \ / 0 20 40 I w LANE Horizontal Scale: 1" = 20' ,o_ Elf Ld � LLJ U Q � O Elf :2 a_ Elf oF-- Z Ld z w Q O/ LLJ Elf a- We 0 x . U LLJ Q LLJ ry V) O L0 � N N N Q U Q aO U M E-� a w w Q U O O n O Ca Ca Uj O W = CC Q a N I o t(0 a Elf Ld � LLJ U Q � O Elf :2 a_ Elf oF-- Z Ld z w Q O/ LLJ Elf a- We 0 x . U LLJ Q LLJ ry V) O L0 J J Q M a J A I C O .N a>' 0 C v E C rn a� 0 C v aEi a� 0 0 Q Q � � Q O O M N N N N O O O N / N ir 1-1 c-) m M / O +�+F-Er JU Q Q a�0 ZE � 0 (5v5n / REMOVE AND REPLACE I / J q6IN �� y //1/ASH / / / " "ter' / 450 LF OF 2 -0 NOW OR FORMERLY ° K / / / VALLEY GUTTER PER CLDSM SARAH AND RYAN FOX � 2' SWEETGUM / / / 10.17B AND 10.19 36 OAK 6 OAK \ � " WZ H Y / / / 135 - 063 -15 O I ° )j/ / / / / / / NOW OR FORMERLY DB 15568/PG 169 m I / O� I MORGAN THERESA K 54 3300 VALLEY GROVE RD 0 o W 10 POP 11 F / // / / �p� 135- 063 -13 i A3 I nl O APPROX. 75' TO SS M OLE CO �� ° I l // /// / / / / /� / / 3316 VALLEY /GROVE( RD / / I V� NEARES T REMOVE AND REPLACE Cl) TJ RIM= 66.30 18" A i / j / / _600 SY OF EXIST / / / �7/ 7 A J I / / / (A INV IN-=65 .7�0 / / / / ��4�ww / 20" PINE a W W ASHPALT PAVEMENT RR1a / / p w PER DETAIL 1 2 r/ B)I V OUT =6 0 „ WEE �JM 2 0 / / �6 0 / F / / / / / / / / /8%�ASH / // z / / t� /vw/ A - w _ AC 5�R1A� / / / CATCH BASIN / m 2Q�P E 1 7 I Ci o 24" NE / TOP RIM- 668.89 / / m 1 3 W / / / O 2" AMENTAL �� / / / / I SC (B) / // / / BOTTOM GRATE= 6 77 G W a W / z C TOP GRATE = X660.05 ENIN R �� PROP 86 LF OF i / / / / 6 / (A) 12" RCO INV. IN = 666.4 / WID m / _L SC / I \ (A) / /�/ L2"- HICKORY / rp6 61 / 5' STREET( DOUBLE MAPL m�_ �W / / 18" R6P ® 2.0996 ��r..�• -"^ 4 +22 / /12' P PLAR / B P 15" INV. OUT= 66 .06 / E EtAl 43 -3 / CATCH �CsIN / �- ASEM pC 5 - � R � � � w �� � / 16 q,.�.00/ O 1 65 /9 �j TOP 665.68 / / / SEE MB ---� `� - 2" DAR O BO OM GRATE - X63.08 / 3 W �/ / ' G J% .... �E � n / �HEA � /TO�RATE � 665.30 / � /w/ w L / G / iTQ(' 62.43 / (A)RCP 18" NV. IN= 659.77 / -� 3 L / / / 3 +50 G G se 9 � (B)CPP INV. OUT= 65922 / R / IMOSA / W A WEARES7 W �i G E E �- j / w J / / �1 / / / 3 +0� G / / / 3 ;� -� -� R�(w- - / R/w ,6 _ - - - �RpVE� sc G / / B w ��` - EY / / / ( ) W WM / 8 SWEETGUM -� W _� VP LL / --"'' .0 / o / /� W 5 / / �E CATCH BASIN W W W % % IY� R SG Z'f SS m / TOP RIM= 665.55 r- f 14 50, Pu SG • / s/ R /w ....... o....... 1 ,� o / VALLEY GROVE �� / BOTTOM GRATE- 665.00 J / G SS z D \u z / / I I (A) TOP GRATE 665.13 {- O /' m L m END: 4 +22 RCP 15" INV. IN= 661.00 / / /�� ` 2 +�� �� G S3�- cL. p /� m O / Oq m RCP 18" INV. OUT= 660.76 / . " "" G / / 3 / 0 _ J `LA`x� 0+ 0 S0 SC �--„"" 5 0+ / / SG SG � +5 G ss v P ss /R / w / i / / m m I a ` 25MSY OF EXIST PLACE I I �` < '1 +00 -� o - / / 13 CONCRETE DRIVEWAY 1 1 13 ' -- ss 0 SEE NOTE 2 W ...... S c [ -.. e} o' G ss/ REMOVE AND REPLACE RC / VE= 273.0 G Ss / 17 SY OF EXIST sgu G'' /GAS VAL- w 30 TREE ss = _ _..... .... (ANTI / NEB G ss R� / CONCRETE DRIVEWAY SS MANHOLE G� G - j / / / / I PROP 66 LF OF TOP RIM= 676.38 SS I^� (B) (A) G _ Gs = c L� ss 3 / / o 18" RCP ®1.2296 (A)INV IN= 674.38 /VV �s SS �Ss - Ste- S 05 S°v )R / / / / / z (B)INV IN= 671.48 - E ('IA/ - - - A� / /E / ET WIDENING m PROP 73 LF OF I (C)INV OUT= 669.53 / E / V V _ - 5 SERE m 18" RCP ® 2.47% VALLEY GROVE e / -E I E II F_ MB 14 PG 547 BEGIN: 0+00- - - SEE m REMOVE AND REPLACE / oegGooD / I I PROP 74 LF OF I 15 SY OF EXIST z I / MAGNOLIA I I 18" RCP ® 2.42% I ' CONCRETE DRIVEWAY � D " / �O /D� CRAPEM RTLE� I I I w w SS MANHOLE REMOVE MSY PLACE OF EXIST { TOP RIM= 670.76 (D (A)INV IN= 664.01 l _ I (B)INV OUT= 663.91 CONCRETE DRIVEWAY NOW OR i /EPHRAIM B FORMERLY ELROM - � / / / � / I \ � I I MU OD OR JAMES H ANNUSH 135- 06�L1�- � � / I \ � REMOVE AND REPLACE 135 - 061 -08 DB 07607/PG 818 I SS MANHOLE I I 16 SY OF EXIST I NOW OR FORMERLY DB 20369/PG 179 )3 VALLEY . ROVE R TOP RIV--- 666.91 I I CONCRETE DRIVEWAY /7 I (A)IN IN= 662.81/ 0 24 I w MICHAEL P DONNELLY 3301 VALLEY GROVE RD (B V OUT-6y.71 I I w ~ D13 107792 /PG 924 / 3309 VALLEY GROVE RD z (� NOW OR FORMERLY / NOW OR FORMERLY I Q a- MEGHAN AND STEPHEN HARDESTY DONNA S MCALISTER 135 - 061 -10 135 - 061 -11 I 9 m DB 20408/PG 201 DB 14668/PG 980 -;5-; _ : 3315 VALLEY GROVE RD / I / 3319 VALLEY GROVE RD I I Q Lo Uj 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 664 662 660 658 656 654 652 -0 +50 0 +00 0 +50 1 +00 1 +50 2 +00 VALLEY GROVE PROFILE 2 +50 3 +00 3 +50 4 +00 NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 2. DRIVEWAY REPLACEMENT FOR 3301 VALLEY GROVE ROAD SHALL EXTEND TO THE PREVIOUS SAWCUT LINE APPROXIMATELY 20' FROM THE ROAD AND BE PERPENDICULAR TO THE EDGE OF THE DRIVEWAY. 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 664 662 660 658 656 654 652 650 4 +50 Know what's below. Call before . ou dig. 9 - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' v o o •� � 7 - v 0 0 0w _j C) 0 N N ZVL C O O N 0 O Z Ul U MM h+"I 0705 l C Q Cd 0 > of � L 7 a � Z U � ( o ri O a 17 Q� cV O U O Z a T Z 0_ (V U C of ao c ODU 0 U �J J O O (V Q U L�. U I- (If_Z A U rn O n (n ° z En O 2 O M. I r to 0 15 0 14 0 (o 00 00 (Op D M U 13 o rr mV)LN II it- en to (o N d: ^ a 0 v (O O O� U mUH Z 00 oo II II 00 M C) C-) II too 1 cMOCMO 00 U N� II = = a (o O P_ �� Z O ^^ + ZZ O O D U ev 0 Q > -- mN II cai O = Cr W Z_ Z_ Op0 � U NO II N: cnQQ >> J H t1' Z Z EXIST 8" VCP -- + i .... ........... - -� -i :- ..... i i� I LF OF ,.: -- :y�` .. 18 "RCP ®2.09 �- PRO......66 I LF ST E VCP - 2.2 f ,- Cp - - 4 .. . -_ c F { � " RCD 0 1.6 % TIE IN PROP 15" RCP SEE DETAIL 1/S2 -0 +50 0 +00 0 +50 1 +00 1 +50 2 +00 VALLEY GROVE PROFILE 2 +50 3 +00 3 +50 4 +00 NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 2. DRIVEWAY REPLACEMENT FOR 3301 VALLEY GROVE ROAD SHALL EXTEND TO THE PREVIOUS SAWCUT LINE APPROXIMATELY 20' FROM THE ROAD AND BE PERPENDICULAR TO THE EDGE OF THE DRIVEWAY. 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 664 662 660 658 656 654 652 650 4 +50 Know what's below. Call before . ou dig. 9 - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' Q:J LLJ U ~ LLJ 0 12 a_ O z LLJ LLJ Q 0 LLJ Q:f a- i x � 0�0 ¢ Q o N w a a ¢ C) Ld 0 U LLJ > LLJ O(/) 0 (� Ld J Q , L J O T_ v o o •� � 7 - v 0 0 0w _j C) 0 N N ZVL C O O N 0 O Z Ul U MM h+"I 0705 l C Q Cd 0 > of � L 7 a � Z U � ( o ri O a C Q� cV O U O Z a T Z 0_ (V U C of ao c ODU 0 U �J J O O (V Q U L�. U I- (If_Z Q:J LLJ U ~ LLJ 0 12 a_ O z LLJ LLJ Q 0 LLJ Q:f a- i x � 0�0 ¢ Q o N w a a ¢ C) Ld 0 U LLJ > LLJ O(/) 0 (� Ld J Q , L J O T_ f]� 0w N N N \ EW U U sll V) Q U E- a L�. A U rn O n (n ° z En O 2 O M. I r to Q:J LLJ U ~ LLJ 0 12 a_ O z LLJ LLJ Q 0 LLJ Q:f a- i x � 0�0 ¢ Q o N w a a ¢ C) Ld 0 U LLJ > LLJ O(/) 0 (� Ld J Q , L J O T_ O Q d Q J A I c O N D c v E 3 / c v+ U) 0 c v aEi v 0 0 Q Q � 0 Q O O M N N N N O 0 N 0 / N ¢ rn 0 m M a) pCm) w �pU Q Q a (no O oc�5 n ,E�/ // 6" CHERRY c 22" ASH / 21 R FORMERLY E CASE JR & 1� / SS MANHOLE 5 0� 135 - 063 -06 ���' / J(A) TOP RIM= 667.89 o \ DB4101 ARROC y���� �°^ (B)INV OUT66204 �5� \ LAYSE ` / 16" MAPLE J ` 2" ORNANENTAL REMOVE AND REPLACE �Q 25 LF OF 2' -0" VALLEY `'���0 od GUTTER PER CLDSM `°/ F � �/ (B) NC / 10.17B ANf' 10.19 �,�' // / ss ss ej 2" ORNANENTAL / / / P�pv��� // / nn / / \ 9" SYCAMORE \ 20" MAPLE/ / / / / PQQ� �/ I/ ­6 3 3 / � / / / W // goy / Q el / / \ 9" SYCAMORE PROP 97 LF OF ..... 684 682 680 678 676 674 672 670 668 666 664 662 660 658 656 654 652 650 648 646 AT 1 8' k 4' X 118" N P_ REMOVE AND REPLACE GUTTER PER CLDSMLLEY / 10.1713 AND 10.19 42 i 49 20 I / i SS MANHOLE TOP RIM= 663.21 (A)INV IN= 657.11 (B)INV OUT= 657.01 1 10" PINE I/ 28" OAK O OW LANE :4+43 NOW OR FORMERLY KEE MARGARET T 135 - 063 -03 DB 09013/PG 704 3410 ARROW LN _ TIE IN PROP 15" RCP SEE DETAIL 1/S2 S A Nil TARY SEWER 0 +75 1 +00 1 +50 2 +00 2 +50 3 +00 ARROW LANE PROFILE 3 +50 4 +00 684 682 680 678 676 674 672 670 668 666 664 662 660 658 656 654 652 650 648 646 645 4 +50 4 +75 NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. Know what's below. Call before you dig. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' �� � U Q � 0 12 IZ 0 �z Ld LJ Q / 0 LiJ � IZ 0 W co w W x d Q O N W a a � R W � Q U) J (f Q 0 Ld 0 Q J U O Ln �W N N N -11 N w \ Q U x a a r� Q U rn O r- t Z 2 co �� � U Q � 0 12 IZ 0 �z Ld LJ Q / 0 LiJ � IZ 0 W co w W x d Q O N W a a � R W � Q U) J (f Q 0 Ld 0 Q J U O Ln 2 U C O a� C v N N c v+ C v N i Q o a N C4 O O N O p � cV M �~ Z M yUQ v0� �w O Q j0 m p OmZ d i / / 2" HOLLY SS MANHOLE SS ( ) R / ✓V / TOP RIM= 675.49 B A) (A)INV IN= 664.75 ( SS SS� (B)INV IN= 664.73 _ R (C)INV OUT= 664.64 (C) �W RAW I A51 30 RCP W /FES GQ 29 Go/ NV. 667.18 W - j /� / /�° NOW OR FORMERL //0 NOW OR FORMERLY- `� /// L NDER AND EMMA BARAH `, �� 30I - �9PE-Z- PRI.�CILIANO �° �, // ��, X 135-061-26 663 �. I DB 11034/PG`•957 - / O 135 - 061 -27 / / bM WER RD / SUNFLOWER RD NOW OR FOR L '- - - w �� o WENDY L SIMS 135- 061 -25 M LY D0 � PETER 135-061-24 0 SUNFLOWER O 2112 \ / DB 70763/PG 414 o CEDAR w 12 "�R�PEMYRTL � `' %� ; /� � \ -�_ 6" Locust f 8218 SUNFLOWER RD J 1 A o - 4» OLL >11 T ac GARAGE \ 7" YRUCE _ / - ° / \ E.E. � ELEV 675.38 7 S�RUCE W _ �� / 5° -C R. - MAPLE AREA CAPED ��� OPAD w. �7" SPRUCE\ P T 5OLLY B J A, /V � O�EMYRTLE � v _ 7" PRUC VBL. T SWEETGUM 6 R �q _ - �.,�. WOOD SHED OAK - 10 °CR/LF__ i \ 4' SWEE TGU ° NOW-OR-FORMERLY _FPHkAIM B PELLPM 135- 061 -12 / D 076 PG 818 �- F 323 VALLEY ROVE RD 36 SWEE, �y y f C' 4° ASH( CONC. PAD / - - �F1 14 ",�6H - BEGIN.-0 +00 f `BEGIN PROP STREAM - BANK STABR ZATION �f STA 25 +92 i ,SEE DETAIL 1/D1 , z - 7kf m ,- 18" CEDAR �� 6" CONC HEAD WALL S _ TOP- '665.24 665 - INV = 658.63 8" CEDARS S� 4' CHAIN -LINK FENCE 5+50'_ -- 660 - - - -- - S t9b __,_ ss \ SSE ` --�_ ". e (A) , o co Sse ` -,HEAD WALL - _ A E TOP y 665.24 _ E BOT = 658.84 - -- e_ e e e e 27" 0< 1 PINE T� TRIPLE MAPLE - -- - -- - -_ _18 PINE / �E 0 MALE -- -67 14 PINE o 77�11_ _ i 13" PINE 10" 2"--CEDAR- REMOVE EXIST RIPRAP AND O /< 0 C AFEMYRTLE SS MAI*QLE - � M _ TOP RIM 6693'0 '� �_- - 1 R„ SWEETG'Oly --._ ��� �, ��' - - _ _ _ -TOP N­563.70 "•-- _ ----- - - 13IAIV OUT= 663�58- 675 ---_ - - O f ��_ 6" MAPLE 8" ASH - - _ ��F� � -__ --�$� �� ---- -- ERIL�L PIPE SQ -_ -- - SD� lQ� _ - TOP ELEV•'�84 49 - - - - - -- - E CBOT ELE -V=&Q 48 - - -E Sp 12' K - - _ - END PROP_ STREAM BANK STABILIZATION__ A 4° BIRCH 670 �- _ - STA 28 +70 � � � `` yZ' - - __ r'�X� SEE DETAIL 1/D1 E e e e 0 - 0" MAP 11" SWEETGUM 21" OAK F __SDE SDE SDE E 28 +50 - 8" ASH E V 6 E 29 +00 7„ AS - -- -- `- - -- - - - - - - - - MAPLE F\ 9 SIT I- - - - -� - PROP ROCK 6" MAPLE 10 MAPLE E - _ A =VANE, _ v � / � 1 E _ _ SEE DETAIL 1fD3� �E 6" SWEETGUM o 8" 0, Sp E 8DE SDE SS MANHOLE \ f 5 "BIRCH / �F TOP RIM= 669.24 0 8" PINE / 6" ASH - - (A)INV IN= 663.24 - i SH 8" A 6" SWEETGUM \(B)INV OUT= 663.14 PROP RIPRAP 16" OAK CLASS 1 / `�� 3 - - 0 - 530'X18'X24" 8" ASH - - -- of F 6" swEETO / PER CLbSM 20123 20" POPLAR 7 L 6" POLAR 00 0 10 SoF 1 POPLAR �6° HICKORY 31 ��0� / NOW OR F�RMERLY °F 135 -�6 61 -15 3" OAK DB 08F27 /1`13 204 / \ / 9" CAK 0", 508 SUNFLOWER RD Y `�F 1" CA (0 15',--'RCP INV - 667.58 H Spy \ p� 12" EXIST BATCH BASIN 8" OAK TOP RIM = 673.94 F` / ! BOTTOM GRATE = 673.35 TOP GRATE = 673.60 12'I' PL "x TOP /(A)15" RCP INV. IN = 669.7 A2 \ P/ To,- (B)15" RCP INV. OUT - 66'f94 4' PINE\� % 9' MAPLE 17- CA -J� Y / CIO / _ - -,,.- a rout -- _ ��� 1 vNv' LINE- CHAMEL- -BANK BATH - - SHED i - _ - 3 - � \�� A", �( � �EX� vP� - ,� MAPLE S� 20" MAC E �� j0 _ P�A6 09� EROSION CONTROL MATTING _ -- _ - -� / Mve� _ v / �° � - o DoE l METAL 8" HICKORY �� PINE b HI ORY V 666.4 �S1 LOATH PL WINGS. o _ / �\ ,. SEE DETAILS 4lD1 (SHORT, 16" PINE, - - SHED , �9" PINE-, � - " - - - SHRUBS ONLY) 5/01 8 PINE _ - - - ° - 9° PINE \ / - 6' ASH - - - - - 6" PINE \ o \ m �E11 CATCH BASIN ' \gyp O_ o� _QHICKO�R - < �o TOP RIM = 674.32 A o / i - Ay�OAK '� -.._6» CEDAR �� \ �� _ 67 / - 7" HICKORY \ 2$� \F n �� �TTOP GRATE = 673.92 \ \V�>) �\ GG ��21" / 'r 9" PINES (B�/)15 RCP INV. OU 670.32 - z2' MAPLE - o NOW OR FORMERLY + T AK r - 7" PINE" HANS FAASSEN / 8" CEDAR ° " 8 PINE _ � 135 - 061 -14 � �\ - _ C OAK __ DB 03778/PG 198 (A) _ 8518 SUNFLOWER R s W SF1 OAK V / - \ 0 �� / 4" PINE 5555 - CATCH BASIN / / - - TOP RIM = 673.59 -� - -- -- OR FORMERLY F n\ BOTTOM GRATE = 673.00 / S 21 OAK - ANS FAASSEN & WIFE - - l` TOP GRATE = 673.20 (A)\ 135 061 13 � (A)30" RCP INV. IN = 666.99 "0 7, o r �J � o \ l�n �0 AA DB 03423/PG 309 _- (B)30" RCP INV. OUT = 666.90 / 55 8526 SUNFLOWE ` ' / EXIST CATCH BASIN EXIST CATCH BASIN TOP RIM = 674.36 P� Sc� BOTTOM GRATE = 673.77 ^\ TOP RIM = 673.79 TOP GRATE = 674.00 V BOTTOM GRATE = 673.14 TOP GRATE = 673.18 (C) (A)30" RCP INV. OUT = 667.93 6L y /0-`1\ F� I� �G� SS MANHOLE O�SCP TOP RIM= 675.46 (A)INV IN= 669.66 (B)INV IN= 669.31 0��� (C)INV OUT= 669.21 �j C3 Q� 676 674 [:�f�a M- 111l 668 666 664 662 660 NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 2. EXISTING FENCES WITHIN THE TEMPORARY EASEMENT AREA SHOULD BE REMOVED ONLY AS NEEDED FOR CONSTRUCTION. FENCES ARE TO BE REPLACED BACK TO ORIGINAL LOCATION UNLESS OTHERWISE NOTED. FENCES ALONG THE CHANNEL SHOULD BE REPLACED ALONG THE TOP OF THE PROPOSED CHANNEL BANK. IA IA 0 +05 0 +50 1 +00 1 +50 SF1 PROFILE Know what's below. 0111 before you dig. 6f 6f 6f 6f 6f 6: 1+8C - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' � 0 0 o 0 0 0 N U L L- _j00 v rn °��� rn U N +' L O c Z woZ) •• v 0ZV)0 � Q PIZ 07(5 v > M Of L x .2 W a L Z LLJ� o �Uy O a aN �0 0! U O z r± 0Z 1 N C of 00 C C E 0C��U Ld �J O p J NQ p�U Cz. U I- D _Z IA IA 0 +05 0 +50 1 +00 1 +50 SF1 PROFILE Know what's below. 0111 before you dig. 6f 6f 6f 6f 6f 6: 1+8C - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' 0) O L O O O (O F-- U LLJ �O a_ Elf O F-- /~ W V / z w Q O LLJ Q:f (n a- 01 0 i x m Z 2 as N f1, Io■ U w L LLJ (n L/ 0 T_ oa Q W O a a _O N N U N U M Q M x c.� x a Cz. U 0) O L O O O (O F-- U LLJ �O a_ Elf O F-- /~ W V / z w Q O LLJ Q:f (n a- 01 0 i x m Z 2 as N f1, Io■ U w L LLJ (n L/ 0 T_ oa Q W O a a 704 702 700 698 696 694 692 ':it, i� CL 1 688 L 0 686 Z c rn U) 684 0 C 682 E 0 r) 3 680 C rn •U) 678 O 0 676 0 C C 0 U) _ 0- o 0 674 m 698 0 N L � 01 0 oo � o :3 0 Q 672 U a oQ 670 M N 0 rn C N N � C� N O o 668 0 N N 694 jN 666 QI rA ` , ,:a Q 0) p 0 M m 692 698 a- cI U F_O I� 00 C: OU UX .2,C; UQ Q C7 U 0 W ^J rn L_ N 0 690 /�: U I- of _Z: O o E5 a \ 32 V \ REMOVE AND REPLACE V I I CD I \\ \ \ \ 36 NOW OR FORMERLY NOW OR FO I FREDERICK W HANS SR \� OS A FU LF OF 2' -0" VALLEY I PROP 24 LF OF 135- 061 -40 38 GLORIA F \ NOW OR FORMERLY GUTTER -PER CLDSM 18" RCP ® NOW OR FORMERLY DB 06�9\3/PG 436 1 1 JONATHAN M EAVES 1_ 'Q47 AND 10.19 3 I I 4.12% BETTY JEAN MONTGOMERY \ 0 4 4 4�iAMPSHIRE DR 1 1 G 1 135 - 061 -39 34 W HAMP HI-F 135 - 061 -20 OP WATE NE SEE I I I DB 06134 PG 111 DB 23622 PG 791 PROP PIPE _ 8�16� U F OWEL` R �� _ IS LET U5 I NCDOT STD I \ 3432 N MIRE R 0 000000 \ 37 PERMANENT STORM PROP 18 LF OF / �� - 3 840.71 ° 8" MYRTL J DRAIN EASEMENT \X 6 X 4 RC0.56% % ' I \ GROUT 01 REM I�OVE�IND REPL E / SEE MB 22 P� e � \�e X�ROP 25 LF OF o RE E l �F 54" C 4�8 LF�OF 2'- el - p E ST CATCH ASIN EXIST C TCH BASIN �p \\ \ Abe —p — uE MOVE 60 LF TOP `AIM= 679.95 TOP RIM 680.04 \ VALLEY GUTTE� - - -L 1 2��F If�CLTE� \ \.�- HEAD WALL T �F EXIST 54" I TOP GRATE= 6756 TOP RA = 679.61 .1� D - \ \ \ �6" TRIPL[ S 6{tMOf - �� E 67 4 68 3 CMP I BOTTOM GRATE- 67 .35 BOTTOM G ATE- 679_43 1 e 17" M - \ \ fi- SWEE��UivE- —_ \ (A)15 RC INV. OUT- 676.27 —\/ -; . '� - - - _'= 32 PINE I e— / _..., .. �_ H -4� -Q_ I \ - _- ..r...:. _ � e -� • ��•�� •�' � —° � END: )+24 e _ —' „ e \ - SEE NQTE 2 d 7" BRADFORD PE \ / �P - \ �MANHOLE 1 TOP RIM =6 0.55 10" RADFORD PEAR � a 3� (A)INV IN =74.87 N _ -�' / / (B)INV OUT- 74.59 PP�OP 26\LF OF R W w - -- —CLASS IV 111111111 R,CP ® a' _ .: NH 2 6a� ° 3 2.12% _ 'M� 0 A ° rANHs J A NH 30 END:Q +24 3 m� E D +26 w �... ° M VIN 674. �� W 3 0 w .... '.. N rte.. \ / 3 }INV IN= 673.93 - 5 30 31 / o �- INU aur= 673.73 \ p / w X \ 9" BRADFORD PEAR L M ' -F .��; .:. W A W P ST () M .- R R SEXIST CATCH BASIN \ - c� ` \TOP RIM= 682.80 S Nk1JLE _ AND / ' TOP -GR- ATE = 687.50 TO - 83� 8 V / ( )BOTTOM GRATE- 66782.02 (A)IN N -676.9 / PROP 24 LF OF �B) 5 RCMP INV. OUT= 677.48 (11" M b�= 676.83 \ 11' MAPL E 2. 8% IV 18" RCP ® �ROP�PI e PER STD e _ \ ; ° MAPLE e \� 840.71 e — e T -PROP 106 LF OF NH 5 66" RCP ® END• 0 +24 39 / NOW OR FORMERLY CHARLES K RIVARD 135- 061 -42 DB 22182/PG 068 3406 NEW HAMPSHIRE DR PROP 24" LF OF CLASS IV RCP® 1.16% N 08796 w ....... z 3 .> ,r �.+,,•�" cam$ fib � � # 1� w / NH 5 3— �,� [� 1. ...=; � w/� r . . . . . . . . : : : : : : ..... .... .:. ... : : : : : :: : : : : : : : : : : : : ::::... ..''. T c�( -•� - / C/� M _ W. - EXIST CATCH BASIN -. 5 / o _--! Q +� w w { _ %B L, 35 ...... : : : : : : : : ::::::::........ TOP RIM�&82.76 A // ( r '` .. W ..... ^ur _.a. �;,'rh) t s 5 ti .......::: : : : : : : : : : : ::::3 i - -- -- -- - - _ PER SEE DETAIL IN SI 04 �OLLY \ s ° lull g„ ° '-1z\--REMOVE AND REPLACE \ �C` 32 S�( OF CONCRETE s s \ I 'QRIVE%� 35 0 F� A s \ I I o "' fK1APLE NH 1 \ �6�g' SNOW OR FORMERLY \ SSX,m EXIS� HE WALL M 9" W LO \ END: 0+82 NATIONAL MEDICAL SERVICES PROP 82 LF OF � TOP= .42 EXrST 4�"' C P 13k-064-25 60" RCP ® 7, M�GI 1," 76\5• 4 0�t2 \HICK tY DB 0 522/PG 449 5.66% MM 4���� 38� \ 3423 NE HAMPSHIRE DR 8 GUM\ Q� .A \ \ \ `SF/Q R< /C S \15 `9, yA(U LQW I s � '9G, �iC, � 11 G) q / 1% F I 22 �of F ��A93,,pp� \ \� 110„ 8,. 6 ILL W / II c n II Coo m L m - II II III III I I I I I I I Coco =_ I I �IIII II I I Cn01 W_ O N o a-> U � 1 °' tC cC m m m x 3 m I I p w10-10_ I I I Q I I I I _ MW1010 8 1 1 1 1 1 oag »> I cnt� zz E EXIS ING 8" SANITARY S 32 +50 33 +00 'IX 4' ROBC 33 +50 70 34 +00 34 +50 35 +00 35 +50 36 +00 36 +50 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 -0 +25 0 +00 0 +50 NH 1 PROFILE NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 2. CONTRACTOR TO REMOVE AND GRID STUMPS OF 10" BRADFORD PAIR AND 17" MAPLE LOCATED AT 3424 NEW HAMPSHIRE DRIVE. PROFILES FOR ALIGNMENTS NH 3, NH 4, 8c NH 5 ARE SHOWN ON SHEET 11 PROP 24 LF OF 18" RCP 4.12% STINGI 8" 672 -0 +25 0 +00 0 +50 670 NH 2 PROFILE 668 666 - PRELIMINARY DESIGN - NOT RELEASED FOR 0 20 40 CONSTRUCTION Know what's below. Horizontal Scale: 1" = 20' CaII before you dig. 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 665 1 +00 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 665 0+75 0 5 10 Vertical Scale: 1" = 5' Sri 0 C C lt _ 0- o 0 0 U o 0 m 698 704 N L � 01 Z Z c oo � o :3 0 •• 0 OZ(nCD o 696 702 0 rn C Ld � C� U � a' � CL N N W 694 700 w QI rA ` , ,:a Z r7 LLJ 0 O U o p — a C 692 698 a- cI U C 00 C: OU C� E C7 U W ^J rn o 690 696 I- of _Z: h a 688 694 w 686 692 .--I 684 690 W U Z t- Cn 682 688 a + W M CD w 680 686 -IL-11 L) FFF� Z N 678 684 w 676 682 674 680 672 678 670 676 668 674 666 PROP 24 LF OF 18" RCP 4.12% STINGI 8" 672 -0 +25 0 +00 0 +50 670 NH 2 PROFILE 668 666 - PRELIMINARY DESIGN - NOT RELEASED FOR 0 20 40 CONSTRUCTION Know what's below. Horizontal Scale: 1" = 20' CaII before you dig. 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 665 1 +00 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 665 0+75 0 5 10 Vertical Scale: 1" = 5' LLJ U Q � O a_ O z LLJ \W Q / :2 O LLJ �o w w m m Q a N � a LLJ LLJ ■ O LLJ J RE O L l Sri 0 C C _ 0- o 0 0 U o 0 m JCjU o N N L � 01 Z Z c oo � o :3 0 •• 0 OZ(nCD o 0 rn C Ld � C� U � a' � CL N N W Ca w QI rA ` , ,:a Z r7 LLJ 0 O U o p — a C aN 0 of C) O Z Z a- cI U C 00 C: OU C� E C7 U W ^J rn o °a a,c� U I- of _Z: LLJ U Q � O a_ O z LLJ \W Q / :2 O LLJ �o w w m m Q a N � a LLJ LLJ ■ O LLJ J RE O L l m _ o ¢ o Q rn N W Ca M x U h a w Q U Cn 0 n Lo ZO Z N LLJ U Q � O a_ O z LLJ \W Q / :2 O LLJ �o w w m m Q a N � a LLJ LLJ ■ O LLJ J RE O L l N Z J d I L O Z c N a� 0 c v 0 r) c rn .U) a� 0 c 0 0 U) 0 0 Q a � o! a 0 O M M N N N O 0 0 N N Q rn jm M O ., OUQ Q L_ N 0 /�: U O oc55 n / '4 °° BRADFORD PEAR / APANESE MAPLE 0 W CD CIO Mw W E 21 �1 F c w 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 OW OR FORMERLY JEROME BROOKS 135 - 064 -22 DB 07355/PG 181 3405 NEW HAMP /IR FOUNDATION PROTECTION SEE NOTE 2 AND CONTRACT DOCUMENTS FOR DETAILS REMOVE AND REPLACE 151 SY OF CONCRETE DRIVEWAY , V* /e // / / X v2° O REMOVE AND s1 49 / 1" OR REPLACE 1584 SY OF SS M� OLE / �,, ASPHALT PAVEMENT T RIM= 3.1 UCH \ �NV 687.7 //(B)IN UT X887.27 \ \ \ / 9" GUM no 10" MAPLE < 0C.O\ co\ ° 4" `� \ \ SEE SHEET U6 ��� V 1 FOR PROP SEWER 0 F d& / � l � \ \ ��i \ OAK REM ND REPLA ■ O \3 K VALLEY 0 TT€f� PER 6 °'I\[�RA ORD�PEAR W OR FORMERLY CLDSW 10. B A D 10.19 \ RAIG A WITKOWSKI 5� OAK n 135- 064 -19 \ REMOVE AND REPLACE 09423/PG 70 — �..... 205 LF OF 4' CONCRETE \ 331 HAMPS I R 34 SIDEWALK (THIS SHEET)\ 3n REMOVE AND REPLACE/ ° N 132 SY OF CONCR \ DRIVEWAY oc.o. 2" ORN \ ROCK t 2" ORN / I / ,/ 41 OR FORMERLY / PATRICIA A LEWIS ° OF\ 135 - 064 -20 / \ s' WILLO ` 15" OAK \ ` DB 16103/PG 3327 NEW HAM DR u p DECK 2GROUt � / \ / 10" GUM LOCATION JF / / 6' MAPLE o Cc. j / lo­-WLtCm =685_\ ° 6" _ / g�2 p�ORM OR ESD /� �>j / / �z �o ° 39 +50�„ °\ \ ` ASH ^' 892 Al/� f � / — \ \ \C ERRY 12° GUM IN 3g +50 ASeM '/v / / j j \� 6 WILLOW >3 W n ..... k ............ 11 MAPLE :°::::::..........:: ::.:::::::: ::::::::::::::::::::::::::..... 7 POFCkR I ' / "" � � " ssssssss:::::.::::`'sssssssss sssssssssssssssssssssssss 12 SDE """"'..- X- x.•....,� � / 11 POPLAR 10 GUM ° r , SD E �. 0 1h- 'x-'11 E / SDE ..s.. / SDE E ( 8 CEDAR 7„ CAI„ GUM ` S T N"'GUM 54" CMP 685— UT G 3" PVC ING SD 7 INE ° INV.— 679.93 0 �7„ GUM 7" POPLAR m r , F ELECTRICAL h+-1 PROTRUDING D ° 11 EL 12 GUM e e FROM GROU/G�I W00()F ED ° UT 81, G+/U ° e e e "eIv1APLE 5" GUM — � � 5' ELM 10" GUM I / /8" PIN j PROP 151 LF OFiM PLAYGROUND 66 RCP ®� / 3.33% ° 9 iaFFMOS 0 SS MAiQ�OLE / Cy 15" GUM j J� / RIM =695 — ° (A)P+V IN= 685.0& /(B)INV �6�5.11 11" GUM SHED J� _�E)INV OUT=—a84. 0 GUM ° Q ° 12" OAK m 12" OAK S I� SSE t SSE CSSE SSE SSE SSE SSE iS J� (A) SS 15' PUBLIC SANITARY �I 51 (B) ss SEWER RIGHT OF WAY— ss s 5 / GS (C) SEE MB 21 PG 501 8 vcP ° 14" �AK ° \ v— SSE SSE ¢s ccr \ _ 11 37 +00 37 +50 38 +00 38 +50 39 +00 MAIN ALIGNMENT 704 702 700 698 696 694 692 690 688 IN W 686 Z 684 a W 682 680 W W 678 676 674 672 670 668 666 710 708 706 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 664 662 o co = II II � • ■ -i i-._�m - -.- 26 LF OF CLASS IV 18" RCP 0- —vtiv vtvv NH 3 PROFILE SEE SHEET 10 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 664 662 660 0 +45 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 664 662 mmmmm 704 94 _�__m_ 92 700 � 698 88 mm_.-_ 696 86 694 11101. _E rn M_ 82 690 80 688 78 686 76 M_. 684 74 -_ 682 72 680 70 h 678 68 �. :_ 11�1111111N_ Im 674 64 F�fis?'M 672 62 w Cz. • 1q. Q U _ ___.-_ _m L Z N ONE I mm m NONE o -I —IIIr m .•• • __ __ _____ CD CID _____ mmmm� _____ _____ CID _____ _____ NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 2. CONTRACTOR TO INSTALL FOUNDATION PROTECTION (SEE SPECIAL PROVISIONS FOR FOUNDATION PROTECTION oo REQUIREMENTS) PRIOR TO EXCAVATION FOR THE FOLLOWING BUILDINGS: 98 4401 NEW HAMPSHIRE DRIVE 96 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 6 0 7 6 0 -0 +10 0 +00 0 +40 -0 +10 0 +00 0 +40 NH 4 PROFILE NH 5 PROFILE SEE SHEET 10 SEE SHEET 10 704 94 702 92 700 90 698 88 o ¢ 696 86 694 84 Q rn 692 82 690 80 688 78 686 76 684 74 682 72 680 70 h 678 68 676 66 674 64 672 62 w 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 6 0 7 6 0 -0 +10 0 +00 0 +40 -0 +10 0 +00 0 +40 NH 4 PROFILE NH 5 PROFILE SEE SHEET 10 SEE SHEET 10 -0 +25 0 +00 0 +50 NH 6 PROFILE 1+00 710 708 706 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 1 +50 1 +75 Know what's below. Call before you dig. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' N o ¢ o Q rn U h a w Cz. Q U 0 L Z N 0_ Cn to CD CID 00 00 � CID 0 0 IC .... a .. U m w � 'm to ASSO v�oll= _ 00 00 20D I nn00 0� 0 N M 11 11 0 Zme ZZ U iZ a....� w :00000 Roo O!W� w in co N + II 2 J OM�vvv U Z Z Z NAT R Y I: I X. 1 ! I 0 i......... �; xx PROP 24 LF OF 18" F CP 11.11 U76 -0 +25 0 +00 0 +50 NH 6 PROFILE 1+00 710 708 706 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 1 +50 1 +75 Know what's below. Call before you dig. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' W O 12 a_ O z LJ L\LJ Q / O IZ m m Q a N � a Ld U E-' W � w � x LLJ LL] (2 � ■ -. 3:O LJ J G=. L J o � N o ¢ o Q rn U h a w Cz. Q U 0 L Z N 0_ W O 12 a_ O z LJ L\LJ Q / O IZ m m Q a N � a Ld U E-' W � w � x LLJ LL] (2 � ■ -. 3:O LJ J G=. L J o � 8" ASH ° 14" MAPLE 7" MAPLE 0 010" ASF / 6" MAPLE 12 CEDAR e-692- FOR FOUNDATION PROTECTION - SEE NOTE 2 AND CONTRACT DOCUMENTS cDETAILS � "ASH 7" ASH REMOVE AND 5 ASH 7" c M _ REPLACE 31 LF OF 6' 6g0, _ PRIVACY FENCE AND GUM 15" CA j _690 FENCE -6gg_ \m \ \ 13" ELM/ ) ° — qn' PnF SF \ S� 6 CHERRY 5 —Ri -C 1 = 6E I 12" G 0 6 5 4" OAK / 0 ° 7" PECAN 14 0 TV i / / FENG 11" OAK /� %R�VACY — -LASS 7kO REMOVE AND' �\ REPLACE 46 LF OF M ` PRIVACY FENCE 696\ \ _ 13" 11�SH \ o E EE PROP 27 LF OF---,,,,, s 6' 1-y 24" RCP MVBL 1.57 %\ \ 1 METAL SHED I \ p44 1 CONC. PAD I PL�GIUND _ J < c 3 FE\�G \ 3os X 5 ✓\� �- NOW OR FORMERLY JOSEPH N TISSUE 135 - 051 -39 D 26 /PG 236 \ I 430 RINGTON LN DRMERLY — \ ROSE \ \ 1 -38 LPG 838 CATCH BASIN JGTON \ `\ \ TOP RIM= 692.63 TOP GRATE= 692.31 � BOTTOM GRATE= 692.00 { 4, \ (lA)24" RCP INV. IN= 686.61 i 13) ` (B 2 '.RCP INV. OUT= 686.48 REMOVE AND REPLACE 12 SY OF CONCRETE DRIVEWAY / / \ DCD !1l nCLJ in 97 \ I 20' PDE SEE \ ' GUM 1 \ \ MB 21 PG 20 1 °PINE\ 24" RCP ` 7' IINV. = 9 .92 \ `° i ° 7� OAK EL 7" �ILD HE 1 \ " AS 12° PINE 6" OAK \0 C ° �\ \ 7" PI E b`ELM . 9" E 17" POPLAR \ 13" OAK X 4' /LT –Qn „` ry 9” ELM �r —x� 9" 5" ELM AD WALL REMOVE AND \ TOP 699. ° REPLACE 17 LF OF 3: \ 3" CHI \ PLIT RAIL FENCE 0 � /V � 4 � \ � � 2" CHERRY " RN \� \ \ 5" CHERRY J� 4" MYRTLE REMOVE AND ° REPLACE 9 LF OF 1" ORN SPLIT RAIL FENCE °3" MYRTLE YRTLEy CONC. PAD G P J / NOW OR FORMERLY ° 5" RED BUD OGER SCOTT SEL S 5" RED BUD 35- 051 -40 I/ 1 4 4 /PG 6 / 430 42\4/PG 7 PROP WATER LINE SEE SHEET U7 ' REMOVE AND REPLACE 7 SY OF CONCRETE DRIVEWAY PER CLDSM 10.27 / 8 CR P TLj 8" MAPLE / 0 REMOVE 49 LF OF EXIST 24" RCP EE ET U7 FOR / Y SEWER 6 CR! :MENT / REMOVE AND I/_ / I REPLACE 370 SY 25 LF OF (THIS SHEET) OF 6" BR ® ASPHALT PAVEMENT 6 CRAPE MRYTLE iz 8' MAPLE REMOVE AND k REPLACE 17 SY OF CONCRETE DRIVEWAY PER CLDSM 10.27 MATCHLINE STA 42 +80 SEE SHEET 13 OAK 46 \ NOW OR FORMERLY LILLIE MCAFEE 135 - 051 -41 DB 13920/PG 436 4313 MORINGTON LN / NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 2. CONTRACTOR TO INSTALL FOUNDATION PROTECTION (SEE SPECIAL PROVISIONS FOR FOUNDATION PROTECTION REQUIREMENTS) PRIOR TO EXCAVATION FOR THE FOLLOWING BUILDINGS: 4302 MORNINGTON LANE 4304 MORNINGTON LANE 716 0 p v o 5 0 U >_ L- 0 a 0 0 0 v o O Z ++ C i ZI O O O N 0 0Z(10 CD I+�I S b rn c 0 LLI � 0 > o � U VNL� o c CW a � C C Q N O � 0_O OZ ' WZ N U 714 C 0_ 00 c 2 a � E 0 � (D VU ^o W J 0 lit ONQ �O U r- 0_ —Z r� Q U 0) O 714 Ca Ca Lr) O Q o = x y as N I W a FI WITH � a � IN ITU MA RIAL 712 712 7 E (ISTING CHANN L BED 710 710 0 04 708 M m M 04 eq eq 708 F0 v rn ' pp O N 0) to 706 1'7 Z � �.° 00 II 706 O 00 00 —(0 co M CL pz 00 m 0 U II II 00 I LO co x to ui M a a 704 L O M O CO .. a. 0 � �`' v _ 702 X . (o co Z U w o CLZCACD w Z - a. 0 0In .. 702 m O totOIM v' .. tL Z Z — 700 O o M C4 -CL :y Nin >> > in N U) POP RIF E GRA E = m n Co 700 �� - - - c CO 17IRDUSZE DETA L M NM O N v E 698 + Cn U N to co 2 6 v U) CQ 698 Co U Z d� 3 / »> 11 o co 696 �--I a N a - - - H 2 FILL 11 a It ? r,; 696 EXIST 2" PVC EXIST 8" V P o MATE IAL SEE SHEET U He t 694 .. u w 694 SEE SHEEr U7 E EXIS NG _ — - U) rn ' 4 "RP® 690 w692 REn 1.57% MRU MAW 1-011 690 - - ' P CONTM 1-4 } I. CA .............................................. 688 ..::::::::::..... _ ..........................:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::: ::......... .. .. ._. 688 '. .....:.'.i: ..':'; .. a ;,•,_ ..., .,.., ...`; :.: �. Q . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ - - -- - --- E -. I I - ..... M .. i Q TIE IN EXIST 24 RCP }........ ................: 686 I r ...... : :::::::::::::::::::::::: ... . ! : I .._ _...,. O M SEE D S2 :...�....,..,... I ...,- ..�,.�..,.n t ... ,... �.. . }. 686 _ ............ . _.�....,.._. ........................................................................... .............................................................. ................. ... ....................... . .................................... ............................ . . N . .. . 684 ... ...........................I ....- . .. .....,.,.....,....,..e..f...t ... .f..., ......, I ...................................................................................... . ....................... ............ ............. ....................................................... .............................................. .. ........ .............................. . ......................................... . ............... N-- o �- — T. = — _.,. 17 684 . ` I ....... o C-4 682 1 .:::::::...................................... ::::::::::::::::::::....... PROP 177 LF OF IKI p � OF 682 OR�p 4 9 SEE DETAIL 1ZS2 .50% rn M RFFLE 680 M Am 00147ROL 680 M �'i �mO 00 Q Q 678 678 d N 4 F- 40+50 41 +00 41 +50 42 +00 42 +50 /5" o o c� 5 a MAIN ALIGNMENT 6' 1-y 24" RCP MVBL 1.57 %\ \ 1 METAL SHED I \ p44 1 CONC. PAD I PL�GIUND _ J < c 3 FE\�G \ 3os X 5 ✓\� �- NOW OR FORMERLY JOSEPH N TISSUE 135 - 051 -39 D 26 /PG 236 \ I 430 RINGTON LN DRMERLY — \ ROSE \ \ 1 -38 LPG 838 CATCH BASIN JGTON \ `\ \ TOP RIM= 692.63 TOP GRATE= 692.31 � BOTTOM GRATE= 692.00 { 4, \ (lA)24" RCP INV. IN= 686.61 i 13) ` (B 2 '.RCP INV. OUT= 686.48 REMOVE AND REPLACE 12 SY OF CONCRETE DRIVEWAY / / \ DCD !1l nCLJ in 97 \ I 20' PDE SEE \ ' GUM 1 \ \ MB 21 PG 20 1 °PINE\ 24" RCP ` 7' IINV. = 9 .92 \ `° i ° 7� OAK EL 7" �ILD HE 1 \ " AS 12° PINE 6" OAK \0 C ° �\ \ 7" PI E b`ELM . 9" E 17" POPLAR \ 13" OAK X 4' /LT –Qn „` ry 9” ELM �r —x� 9" 5" ELM AD WALL REMOVE AND \ TOP 699. ° REPLACE 17 LF OF 3: \ 3" CHI \ PLIT RAIL FENCE 0 � /V � 4 � \ � � 2" CHERRY " RN \� \ \ 5" CHERRY J� 4" MYRTLE REMOVE AND ° REPLACE 9 LF OF 1" ORN SPLIT RAIL FENCE °3" MYRTLE YRTLEy CONC. PAD G P J / NOW OR FORMERLY ° 5" RED BUD OGER SCOTT SEL S 5" RED BUD 35- 051 -40 I/ 1 4 4 /PG 6 / 430 42\4/PG 7 PROP WATER LINE SEE SHEET U7 ' REMOVE AND REPLACE 7 SY OF CONCRETE DRIVEWAY PER CLDSM 10.27 / 8 CR P TLj 8" MAPLE / 0 REMOVE 49 LF OF EXIST 24" RCP EE ET U7 FOR / Y SEWER 6 CR! :MENT / REMOVE AND I/_ / I REPLACE 370 SY 25 LF OF (THIS SHEET) OF 6" BR ® ASPHALT PAVEMENT 6 CRAPE MRYTLE iz 8' MAPLE REMOVE AND k REPLACE 17 SY OF CONCRETE DRIVEWAY PER CLDSM 10.27 MATCHLINE STA 42 +80 SEE SHEET 13 OAK 46 \ NOW OR FORMERLY LILLIE MCAFEE 135 - 051 -41 DB 13920/PG 436 4313 MORINGTON LN / NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 2. CONTRACTOR TO INSTALL FOUNDATION PROTECTION (SEE SPECIAL PROVISIONS FOR FOUNDATION PROTECTION REQUIREMENTS) PRIOR TO EXCAVATION FOR THE FOLLOWING BUILDINGS: 4302 MORNINGTON LANE 4304 MORNINGTON LANE MH 1 PROFILE 0 20 40 Horizontal Scale: 1" = 20' 716 0 p v o 5 0 U >_ L- 0 a 0 0 0 v o O Z ++ C i ZI O O O N 0 0Z(10 CD I+�I S b rn c 0 LLI � 0 > o � U VNL� o c CW a � C C Q N O � 0_O OZ ' WZ N U 714 C 0_ 00 c 2 a � E 0 � (D VU ^o W J 0 lit ONQ �O U r- 0_ —Z r� Q U 0) O 714 Ca Ca Lr) O Q o = x y as N I W a FI WITH � a � IN ITU MA RIAL 712 712 E (ISTING CHANN L BED 710 710 0 04 708 04 eq eq 708 rn ' N 0) to 706 ,.t � �.° 00 II 706 O M pz 00 00 704 co x to ui 704 M .. a. 0 � �`' v _ 702 . (o co U w o CLZCACD w Z - a. 0 0In .. 702 m O U tL Z Z — 700 O o M C4 -CL :y in N Co 700 �� NM O N 698 + U N to co 2 6 v CQ 698 Co Lj- r11 0aa Z d� »> 696 �--I a N a - - - r,; 696 SEE SHEET U t 694 .. . w 694 _ 692 ' 4 "RP® 690 w692 1.57% MRU MAW 1-011 690 ' P CONTM 1-4 CA 688 W _ 688 M .. i TIE IN EXIST 24 RCP 686 ...... : :::::::::::::::::::::::: ... . ! : SEE D TAIL 1 S2 CONTROL SEE 686 I -4 684 4 � I — T. = — _.,. 684 . ` I ....... 682 .:::::::...................................... ::::::::::::::::::::....... IKI p OF 682 OR�p 4 9 SEE DETAIL 1ZS2 M 6 C R 680 Am 680 678 678 676 676 -0 +25 0 +00 0 +50 1 +00 1 +50 2 +00 MH 1 PROFILE 0 20 40 Horizontal Scale: 1" = 20' LLJ U I-- LLJ Q � O a_ O V) 5� L z LLJ LLJQ O Cf) IZ W w x Lli IL I) J Z W O Cl) (� O � U o LO 0 p v o 5 0 U >_ L- 0 a 0 0 0 v o O Z ++ C i ZI O O O N 0 0Z(10 CD I+�I S b rn c 0 LLI � 0 > o � U VNL� o c CW a � C C Q N O � 0_O OZ ' WZ N U C 0_ 00 c 2 a � E 0 � (D VU ^o W J 0 lit ONQ �O U r- 0_ —Z LLJ U I-- LLJ Q � O a_ O V) 5� L z LLJ LLJQ O Cf) IZ W w x Lli IL I) J Z W O Cl) (� O � U o LO N o N W Q � M U h a a r� Q U 0) O Ca Ca Lr) O Q o = x y as N I W a � a � LLJ U I-- LLJ Q � O a_ O V) 5� L z LLJ LLJQ O Cf) IZ W w x Lli IL I) J Z W O Cl) (� O � U o LO is c■ Z J d I L L O Z c rn N a� 0 c v E N 3 v c rn .U) 0 c 0 E 0 U) 0 0 Q Q � � Q 0 O M M N N N O O 0 N W \ Q rn jm M O ., OUQ Q L_ N 0 /�: U O 6 c55 n 720 718 716 714 712 710 708 706 704 702 700 698 696 694 692 CQ O v-4 690 �Jw 688 aCQw W w 686 E 684 W w 682 680 18" OAK' \ 12'2M\2 GUM N 3 W I NOW OR FORMERLY o , 40 EDWARD D MCCRAY CATCH BASIN \ TOP RIM= 700.27 I �k 135 - 051 -42 4 TOP GRATE= 699.94 AR DB 06335/PG 624 4317 x (A)RCP GRATE= 699.69 I MORINGTON LN ® 42" INV. IN= 692.30 / (B)RCP 42" INV. OUT= 692.22 ik 46 \ NOW OR FORMERLY �� ' J A BASINGER JR I I I� / NOW OR FORMERLY I ' 135 - 051 -43 co c.l \ C LILLIE MCAFEE \\ \ \ \ P�D 135 - 051 -41 z I ,___ _.._ DB 05466/PG 418 Q /� MA TCHLjNE ALIGN MENT MIS -2 SEES FEET 14 — 0 � mr_rv^L.r_ 441 Lx yr 2' -0" VALLEY GUTTER _ ```" PER CLDSM 10.178 d8" DOU E MAPLEQ / / NOW OR FORMERLY o /22" ELM / V� JAMES DOUGLAS X �� / _— 135 - 051 -35 3" cEgAR \ 4 1 DB 07101 /PG 414 / " O 4312 MORINGTON LN G {F� / {\ \ SEE SHEET U8 FOR WATER LINE RELOCA110N i } 6"" CRAPE MYCIE ® / F � R RLN O ORN E ERLY O o 13-05 O 11" OAK B 10727/PG 5 8 / O I � � O / 6 MISSION HIIL S D >�'�/ / GUM iF" rri"tC o s' IV 11 LL_ REMOVE AND \� REPLACE 158 LF OF \ / 2' -0" VALLEY GUTTER PER CLDSM 10.178 Ll / SS MANHOLE TOP RIM= 702.11 (A)INV IN= 691.85 (� (B)INV IN= 691.88 \ (C)INV IN= 691.81 VOA / (D)INV OUT= 691.71 \MJ 12 37AW7d / \ SS ° ' V : c T \ e / \ 40' SS Q100 \ 100 /C S9 '3� 179\,0 �o NOW �R\ ERLY °P 14" BIRCH MANUEOY6 BR fA Q 135 — r �0895 /P� 152 ° 4411 SHENO\ \CT DBE 13" MAPLE \ / — M/�A i MAPLE \ I NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 43 +00 43 +50 44 +00 44 +50 45 +00 MAIN ALIGNMENT 45 +50 46 +00 46 +50 47 +00 47 +50 720 718 716 714 712 710 708 706 704 702 700 698 696 694 692 690 688 686 684 682 680 Know what's below. Call before you dig. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' Ld U LiJ O 12 a_ O �z Ld LLJ Q / O a- W w CO CO Q a N � a ry Ld _jCr) J Z Q O Cr) (n O C/) U O Ln v O C C v U o U � � O JCjU v N N L � � Z D oO O •• 0 OZ(n0 o INNI 0 Vl c Ld � U U z L.L i o p — C a � aN o a' C, OZ Z a _ cV C � 00 co: Cm c 0 C7 U &to W ^J O OCV Q p;U I- of _Z: Ld U LiJ O 12 a_ O �z Ld LLJ Q / O a- W w CO CO Q a N � a ry Ld _jCr) J Z Q O Cr) (n O C/) U O Ln N o INNI Q rn x U x a w w Q U O n L Z N M co Ld U LiJ O 12 a_ O �z Ld LLJ Q / O a- W w CO CO Q a N � a ry Ld _jCr) J Z Q O Cr) (n O C/) U O Ln Z J n I L 0 Z c rn N a� 0 c v 0 3 c rn .U) a� 0 c 0 0 U) 0 0 Q a � 0 O M M N N N O O O N / N Q rn jm M O ., OUQ Q L- N 0 /SL) o oc55 n 724 722 720 718 716 714 712 710 708 706 704 702 �1 700 [­4 a ; k w 698 ww U F•r•1 696 F-1 9!4 � W 694 692 690 688 686 W W � rT, I NOW OR FORMERLY I MOHAMMED B HOSSAIN 135- 051 -45 I DB 05466/PG 413 8210 MISSION HILLS RD NOW OR FORMERLY I BANK ONE 135- 051 -44 / 12978/PG 271 8216 MISSION HILLS RD DB 0006— 000 0 11" 8" PINE10" O,NK GUS" C}qK I I , \ CATCH BASIN I / TOP RIM= 701.85 ° / 8" INE o TOP GRATE= 701. 5 11" OAK o I CO BOTTOM GRATE= �01. 2 11 ill (A)RCP 36" INV. IN= 96.74 V 1�0 OAK 2" I 12" OAK U / (B)RCP 15" INV. �N 98.05 / r1O" OAK ° 3 " 9" Of Z I (C)RCP 42" INV. 0 T 696.66 L ° REMOVE AND I 12 "I OA 11 REPLACE 123 LF OF I ol1" B ADFORD PEAR I 2 GUo e��2,.��_, I .1 OAK / 0 `t..J' 5" ELM S " 7 L9" OAK RN I ur'N IL j 8" QRADFORD PEAR ( j' PRIVACYFr08320/PG E PER CLI /// —��' 1­0 N. 3" CHERRY REMOVE AND CLUSTER REPLACE 9 SY OF I 2" ORN CONCRETE DRIVEWAY _ PER CLDSM 10.27 \�2� °yr 7 MEADOWDALI QJU / I 1 ORN o _ BOTTOM GRATE= 704.60 \ i, (A)RCP INV. IN= 699.49 I 3)RCP 36�V. OUT= 699.15 I I \ 4} -- 0I M a o� V 'I �I INOW OR FORMERLY s MOHAMMED B HOSSAIN 135- 051 -46 DB 05758/PG 904 8204 MISSION HILLS RD _E SS MANHOLE TOP RIM = 705.29 \ (A)INV IN= 698.39 (B)INV IN= 698.34 (C)INV OUT= 698.14 4YRT \ PROP CB. TOP NCDOT 8o0ti01 W b / INV (PROP 3 R 697.50 M _ OY, P) = X97.70 NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 2. CONTRACTOR TO COORDINATE WITH PIEDMONT NATURAL GAS PRIOR TO CONSTRUCTION REGARDING EXISTING GAS LINE TO DETERMINE IF TEMPORARY RELOCATION WILL BE REQUIRED. REMOVE AND REPLACE 129 LF OF 2' -0" VALLEY GUTTER PER CLDSM 10.178 REMOVE AND REPLACE 122 LF OF 4' CONCRETE SIDEWALK REMOVE AND REPLACE 15 SY OF CONCRETE DRIVEWAY PER CLDSM 10.27 SEE NOTE 2 9' �NE % 1 14" OAK OP ftPj 699.45 8238 ADOWDALE I / �\ G ( CONCRETE DRIVE 3 8" MLE \ �i' LNU RCp -0 +25 0 +00 0 +50 1 +00 IN EXIST 42" 1 +50 EXIST 83 VCP 2 +00 MH 2 PROFILE 2 +50 3 +00 3 +50 4 +00 J � GF FFNCF DECK � ABOVE GROUND POO L 57 NOW / OR FORMERLY DOUGLAS G FLOWE 135- 051 -08 8232 MEADOWDALE LN DB 05940/PG 884 �X L 8" WALNUT .1 rn 0) 11 1 INV.= 704.74 9" WALNUT 9" 2GU �3 II a II o ¢ o p u III MLL T MM U m n h a r. o! o_ w 0 n A G4 a a» Q U II�� O n �� Ca Lr) U� Ld ar°' = �'• Q 0 GG Urnc� -- N I o W a co 0L) a 0 >° 00 Q» Mme. 0� �N aZ c� -- ONO W�. (n ON+ I X —� N + II x cn a o_ O .... m'W:��� n cinc ZZ f ; -0 +25 0 +00 0 +50 1 +00 IN EXIST 42" 1 +50 EXIST 83 VCP 2 +00 MH 2 PROFILE 2 +50 3 +00 3 +50 4 +00 J � GF FFNCF DECK � ABOVE GROUND POO L 57 NOW / OR FORMERLY DOUGLAS G FLOWE 135- 051 -08 8232 MEADOWDALE LN DB 05940/PG 884 �X L 2 :4+34 \ 12" BIRCH 0\ 4 ' Know what's below. Call before you dig. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' 8" WALNUT HEAD WALL TOP= 708.87 INV.= 704.74 9" WALNUT 9" 2GU �3 2 :4+34 \ 12" BIRCH 0\ 4 ' Know what's below. Call before you dig. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' � [-- � U LLJ Q � O 12 a_ O �z Ld LLJ Q O a- W w Ld U) I­ �Cr) J V) Z Q O (%) U) O Cr) U o Ln N o ¢ o Q rn U h a w G4 Q U O n O Ca Lr) W o = �'• Q 0 GG N I o W a co a � [-- � U LLJ Q � O 12 a_ O �z Ld LLJ Q O a- W w Ld U) I­ �Cr) J V) Z Q O (%) U) O Cr) U o Ln N Z O F- 0 W N I c D+ .N a� O c 0 E c .N a� C v E 3 0 0 Q Q O O � M N N N O O N � N ir rn m M O U % U O oc�5 n 6 +00.00 0".UU 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618 00 0".UU 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 5 +25.00 0140.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618 00 01+U. UU 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 4+63.00 0".UU 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 616 00 0".UU 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 616.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 644.00 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618 00 6 +04.70 644.00 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 5 +50.00 0'+Z. U U 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618 00 0'+Z. U U 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 4 +75.00 01+0. UU 644.00 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 616 00 01+0. UU 644.00 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 616.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 5 +75.00 04000 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618 00 04000 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 5 +00.00 01+U. UU 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 616 00 01+U. UU 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 616.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 Know what's below. 0111 before you dig. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' 8 C 0 O C 0 p O CaW JC)U O N (D rn N +' C Z � �70 O O 0 0ZCncD r�l b 07(5 0 > ed Of o � of LLJ a = Z M y c� ( o p �V o eo w � Ln N a) 6 of U O Z >' 0 a� c E 0_ N U 00 C � C E �U U E It W �J J TOP OF MOD LAR BL CK U I- D'_Z G, L1 WALL HEADWALL PROPOSED TO TIE 5 E INTO CL EV = 632.00 STOM I BOTTOM PROP OF CHANNEL SED E V = 62C00 PRO OSED BLOCK ODULA WALL CONCRETE STON 0 LEVEL CRUS NG PAD ED 6 (TYP) PRO RIP OSED CLASS AP (24N 1 MIN) 644.00 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 5 +50.00 0'+Z. U U 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618 00 0'+Z. U U 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 4 +75.00 01+0. UU 644.00 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 616 00 01+0. UU 644.00 642.00 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 616.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 5 +75.00 04000 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618 00 04000 640.00 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 5 +00.00 01+U. UU 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 616 00 01+U. UU 638.00 636.00 634.00 632.00 630.00 628.00 626.00 624.00 622.00 620.00 618.00 616.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 Know what's below. 0111 before you dig. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION 0 5 10 Vertical Scale: 1" = 5' 0 20 40 Horizontal Scale: 1" = 20' rn O LO ZZ O O n c0 Q:� [-- W U w Q � O O z �w LLJ Q w E� 1 W u l Z o� Q N a. Z 0 C) O U G=. Ln O T_ Q a d 8 C 0 O C 0 p O CaW JC)U O N (D rn N +' C Z � �70 O O 0 0ZCncD r�l b 07(5 0 > ed Of o � of LLJ a = Z M y c� ( o p �V o eo w � Ln N a) 6 of U O Z >' 0 a� c E 0_ N U 00 C � C E �U U E It W �J J O p NQ �;U U I- D'_Z rn O LO ZZ O O n c0 Q:� [-- W U w Q � O O z �w LLJ Q w E� 1 W u l Z o� Q N a. Z 0 C) O U G=. Ln O T_ Q a d CaW N N N r�l N w \ Q c� x a G, L1 I rn O LO ZZ O O n c0 Q:� [-- W U w Q � O O z �w LLJ Q w E� 1 W u l Z o� Q N a. Z 0 C) O U G=. Ln O T_ Q a d v a� 0 C v 0 r) c rn a� 0 c 0 0 U) 0 0 Q a tr � o Q 0 N 0 0 N N U 0 M "-mQk.i U� O�Z 0 M OW- U d Scientific Name Common Name Zone 1 Quercus phellos Pillow Oak Diospyros virginiana Persimmon Fraxinus Green Ash Carpinus caroliniana Ironwood Asimina triloba Pawpaw Staphylea trifolia Bladdernut Betula nigra River Birch Platanus occidentalis Sycamore Ain us serrulata Tag Alder Scientific Name Common Name Zone 1 Cephalanthus occidentalis Button Bush Itea virginica Virginia willow Viburnum dentatum var. lucidum Southern arrowood viburnum Sambucus canadensis Elderberry Physocarpus opulifolius Ninebark Ilex verticilatta Winterberry holly Corpus amomum Silky dogwood Aronia arbutifolia Red chokeberry Viburnum dentatum var. lucidum Southern arrowood viburnum Ilex verticilatta Winterberry holly Aronia arbutifolia Red chokeberry Symphoricarpos orbiculatus Coral berry Callicarpa americana Beautyberry 0 12" MAX. OR TWO I O z_ �w to Q NODULES EXPOSED o CONSTRUCTION NOTES: \ / 1 0 w to a 1. INSTALL EROSION CONTROL MEASURES AND TREE PROTECTION AS SHOWN ON PLAN. THE \ ESTABLISHED PLANT SHOWN CONTRACTOR MAY MODIFY OR RELOCATE EROSION CONTROL MEASURES TO MAKE ADJUSTMENTS / \ FOR INFORMATION ONLY FOR UNFORESEEN FIELD CONDITIONS. ALL RELOCATION SHALL HAVE THE APPROVAL OF THE ENGINEER. INSTALL SPLIT 2" x 4" x 30" DEAD STOUT 2. CLEAR AND GRUB AREA OF ALL TRASH AND EXOTIC /INVASIVE VEGETATION. o STAKES PER SPECIFICATIONS 3. APPROXIMATE STOCKPILE AREAS MAY BE RELOCATED OR ADJUSTED WITH THE APPROVAL OF THE ENGINEER. C7 4. PRIOR TO ROUGH GRADING STREAM BANK, HARVEST AND STOCKPILE THE TOP 6 INCHES OF o. O U TOPSOIL. 'F 5. WHEN GRADING PER DETAILS, OVER EXCAVATE BY 4 INCHES TO ALLOW FOR THE APPLICATION OF STOCKPILED TOPSOIL. p. O 6. STABILIZE GRADED BANKS WITH SEED AND MULCH. \ BANKFULL 7. INSTALL EROSION CONTROL MAT PER MANUFACTURER'S INSTRUCTION. ELEVATION 8. INSTALL PLANTS AS DESCRIBED IN PLANTING NOTES ON THIS SHEET. \ o..0. V) ALL PLANTING AREAS COIR FIBER \ � � MATTING z Q EXISTING EROSION CONTROL MATTING SHALL NOT BE CUT WITH PLANTING IMPLEMENTS. THE GROUND . P (/) w SMALLEST OPENING NECESSARY TO ACCOMMODATE EACH PLANT SHALL BE CUT INTO THE �J FABRIC USING A SHARP KNIFE OR SHEARS. 30" LIVE CUTTING W PLANT ZONE 1 (DORMANT) a, NOTE: Q > Y PLANTS SHALL BE INSTALLED IN STAGGERED ROWS. PLANT SPACING FOR ZONE 1 SHALL IF USING WOVEN COIR A O BE APPROXIMATELY EIGHT FEET (8.0') ON CENTER WITH A SPACING OF FOUR FET (4.0') FIBER MAT, INSTALL W BETWEEN ROWS. AT LEAST 50 PERCENT OF ALL PLANTS USED SHALL BE FROM ONE LONG STRAW MULCH GALLON OR LARGER CONTAINERS. AT LEAST 50 PERCENT OF PLANTS IN ZONE 1 SHALL BE BENEATH MAT. _ A SHRUB SPECIES. CONTRACTOR SHALL SHALL PICK 4 TYPES OF TREES AND 4 TYPES OF SHRUBS FROM THE LISTS ABOVE. - PRELIMINARY DESIGN - NOT RELEASED FOR LIVE STAKING BANK STABILIZATION PLANTINGS CONSTRUCTION ro D 1 NOT TO SCALE D 1 NOT TO SCALE NOTES: 1. INSTALL LIVE STAKES EVERY 2 TO 3 FEET ON A TRIANGULAR SPACING 2. DRIVE LIVE STAKES IN AT A RIGHT ANGLE TO THE STREAM BANK USING A DEAD BLOW HAMMER w J 3. LIVE STAKES SHOULD BE DRIVEN DEEP / U Q N ENOUGH TO REACH THE GROUNDWATER 0 ¢ Q TABLE \ U to \ ca � 0 U M 4. STAKES SHOULD HAVE A DIAMETER IN THE " \ z RANGE OF 0.5" TO 1.5" oo Y2 -1 Y2" x I INSTALL EROSION CONTROL ra LINER OVER SEED PER SEEDING SCHEDULE \ rn U 0 12" MAX. OR TWO I O z_ �w to Q NODULES EXPOSED o CONSTRUCTION NOTES: \ / 1 0 w to a 1. INSTALL EROSION CONTROL MEASURES AND TREE PROTECTION AS SHOWN ON PLAN. THE \ ESTABLISHED PLANT SHOWN CONTRACTOR MAY MODIFY OR RELOCATE EROSION CONTROL MEASURES TO MAKE ADJUSTMENTS / \ FOR INFORMATION ONLY FOR UNFORESEEN FIELD CONDITIONS. ALL RELOCATION SHALL HAVE THE APPROVAL OF THE ENGINEER. INSTALL SPLIT 2" x 4" x 30" DEAD STOUT 2. CLEAR AND GRUB AREA OF ALL TRASH AND EXOTIC /INVASIVE VEGETATION. o STAKES PER SPECIFICATIONS 3. APPROXIMATE STOCKPILE AREAS MAY BE RELOCATED OR ADJUSTED WITH THE APPROVAL OF THE ENGINEER. C7 4. PRIOR TO ROUGH GRADING STREAM BANK, HARVEST AND STOCKPILE THE TOP 6 INCHES OF o. O U TOPSOIL. 'F 5. WHEN GRADING PER DETAILS, OVER EXCAVATE BY 4 INCHES TO ALLOW FOR THE APPLICATION OF STOCKPILED TOPSOIL. p. O 6. STABILIZE GRADED BANKS WITH SEED AND MULCH. \ BANKFULL 7. INSTALL EROSION CONTROL MAT PER MANUFACTURER'S INSTRUCTION. ELEVATION 8. INSTALL PLANTS AS DESCRIBED IN PLANTING NOTES ON THIS SHEET. \ o..0. V) ALL PLANTING AREAS COIR FIBER \ � � MATTING z Q EXISTING EROSION CONTROL MATTING SHALL NOT BE CUT WITH PLANTING IMPLEMENTS. THE GROUND . P (/) w SMALLEST OPENING NECESSARY TO ACCOMMODATE EACH PLANT SHALL BE CUT INTO THE �J FABRIC USING A SHARP KNIFE OR SHEARS. 30" LIVE CUTTING W PLANT ZONE 1 (DORMANT) a, NOTE: Q > Y PLANTS SHALL BE INSTALLED IN STAGGERED ROWS. PLANT SPACING FOR ZONE 1 SHALL IF USING WOVEN COIR A O BE APPROXIMATELY EIGHT FEET (8.0') ON CENTER WITH A SPACING OF FOUR FET (4.0') FIBER MAT, INSTALL W BETWEEN ROWS. AT LEAST 50 PERCENT OF ALL PLANTS USED SHALL BE FROM ONE LONG STRAW MULCH GALLON OR LARGER CONTAINERS. AT LEAST 50 PERCENT OF PLANTS IN ZONE 1 SHALL BE BENEATH MAT. _ A SHRUB SPECIES. CONTRACTOR SHALL SHALL PICK 4 TYPES OF TREES AND 4 TYPES OF SHRUBS FROM THE LISTS ABOVE. - PRELIMINARY DESIGN - NOT RELEASED FOR LIVE STAKING BANK STABILIZATION PLANTINGS CONSTRUCTION ro D 1 NOT TO SCALE D 1 NOT TO SCALE N O I rn 'v a� 0 c v E N 3 r) c rn .U) N 0 c 0 E N rn 0 0 Q U a o Q O M N N O O N / N } U 0 M +/N+ M U � W OciZ o N M i� o 0 OUW- d U I.J DI IVIVmiuuJ uVIVI.RCIC ourwm r- VVVRJC, I IrC Jr—z:i.JH I IV LBS /SY /INCH DEPTH. 0 8" BITUMINOUS CONCRETE INTERMEDIATE COURSE, TYPE 119.013 114 LBS /SY /INCH DEPTH TO BE PLACED IN TWO 4" LIFTS PAVEMENT PATCHING DETAIL F) NOT TO SCALE CHANNEL DIMENSION AT RIFFLES CULVERT SHEET Wb (bottom width) Wbkf (bankfull width) BANKFULL DEPTH LN-c7u v G c� TYPE 2 FILTER ASS 1 RIP RAP FABRIC 6' MINIMUM BOULDERS FILL VOIDS SECTION A — A' WITH # 5 STONE Fl OF NON WOVEP FI LTEF SILL ROCK N M 0 I 'v a� 0 c v E N 3 c rn .U) 0 c 0 E N U) / 0 0 a i a o Q O N N O O N / N U 0 M mQ U � OciZ o N M C) 0 OUW- d rvvL PLAN VIEW THIS SYMBOL DENOTES CRITICAL ELEVATION ON STRUCTURE. CHECK DIMENSION AND CRITICAL ELEVATION TABLE (ABOVE) OR PROFILE FOR EXACT ELEVATION X"��Z Y 3 PRIMARY ROCK DIMENSIONS: X. LONGEST DIMENSION Y. SHORTEST DIMENSION Z. INTERMEDIATE DIMENSION N 0 MATERIALS NOTES: 1. ROCKS MUST HAVE AN INTERMEDIATE DIAMETER (Z) OF AT LEAST 24" FOR HEADERS AND 24 -30" FOR FOOTERS. SILL ROCKS SHALL HAVE AN INTERMEDIATE DIAMETER OF AT LEAST 18 ". ALL ROCKS SHALL BE APPROVED BY ENGINEER PRIOR TO INSTALLATION 2. WIDTH OF HEADER AND FOOTER ROCKS (X) MUST BE AT LEAST 36 ". DEPTH OF HEADER AND FOOTER ROCKS (Y) MUST BE AT LEAST 24 ". WIDTH AND DEPTH OF SILL ROCKS MUST BE AT LEAST 10 -12" 3. ROCKS SHALL BE COMPRISED OF ANGULAR, FLAT OR CUBED ROCK OBTAINED FROM A SOURCE THAT IS APPROVED BY THE ENGINEER PRIOR TO CONSTRUCTION 4. ROCK SHALL BE OF SUFFICIENT HARDNESS TO RESIST WEATHERING AND SHALL BE FREE OF CRACKS AND OTHER STRUCTURAL FAULTS. IN NO INSTANCE SHALL CONCRETE BE ALLOWED 5. FILTER FABRIC SHALL MEET SPECIFICATIONS FOR TYPE 2 NCDOT FILTER FABRIC ACCORDING TO NCDOT STANDARD SPECIFICATION 1042 -2 A C B C G - (BANKFULL ELEVATION HEADER ROCK ELEVATION AS SPECIFIED ON PROFILE AND ABOVE TABLE (TYP.) FOOTER SEE MATERIAL ROCK NOTES FOR SECTION A -A ROCK SIZES NON WOVEN TYPE II FILTER FABRIC (TYP. ) CONSTRUCTION NOTES: 1. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF DROP STRUCTURE ARM, BETWEEN THE ARM AND STREAM BANK 2. INSTALL FILTER FABRIC THE FULL LENGTH OF THE STRUCTURE STARTING AT THE UPSTREAM END, AND THEN DOWNSTREAM PAST THE LAST DROP STRUCTURE POOL TO A MINIMUM OF THREE FEET 3. PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. FOOTER ROCKS SHALL BE FIRMLY KEYED INTO THE STREAMBED. TOP OF HEADER CROSS ROCK(S) SHALL BE PLACED 0.2' ABOVE PROPOSED STREAM BED ELEVATION WITH THE WEIR HEADER ROCK PLACED AT PROPOSED STREAMBED ELEVATION 4. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS 5. ROCKS SHALL BE PLACED IN A LINEAR FASHION, AND SHALL BE PLACED WITH TIGHT, CONTINUOUS SURFACE CONTACT BETWEEN ADJOINING ROCKS. ROCK SHALL BE PLACED SO AS TO HAVE NO SIGNIFICANT GAP BETWEEN ADJOINING ROCKS. A COMPLETED ROCK VANE ARM HAS A SMOOTH, CONTINUOUS FINISH GRADE RUNNING IN AN UPSTREAM DIRECTION FROM THE BANKFULL ELEVATION TO THE STREAMBED 6. KEY SILL ROCKS INTO THE BANK A MINIMUM OF 5' 7. USE COBBLE SUBSTRATE MATERIAL EXCAVATED FROM CHANNEL BED TO FILL GAPS BETWEEN AND ON THE UPSTREAM SIDE OF ROCKS AND TO LINE POOL BEDS. IF ADEQUATE SUBSTRATE MATERIAL IS NOT AVAILABLE, USE A MIX OF CLASS A AND CLASS B STONE. SEALING WEIR ROCK(S) IS CRITICAL TO SUCCESS OF STRUCTURE 8. AFTER ALL HEADER AND FOOTER ROCKS HAVE BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH SUBSTRATE MATERIAL TO THE ELEVATION OF THE TOP OF THE HEADER ROCK 9. AFTER INSTALLATION OF ALL ROCK IS COMPLETE, CONTRACTOR SHALL RESHAPE THE BANK SLOPES AND STREAM BED TO THE SPECIFIED ELEVATIONS. ALL UNSUITABLE AND SURPLUS ROCK WILL BE REMOVED FROM THE SITE 10. UPON COMPLETION OF THE ROCK VANE, THE CONTRACTOR SHALL PLACE STABILIZING VEGETATION AS SHOWN IN THE PLANTING PLAN CENTERLINE OF STREAMBED TOP OF BANK FLOW ► HEADER ROCK FOOTEF< rwl r\ L SECTION C -C LOCATION MULTIPLE DROP ROCK A -VANE DIMENSIONS AND CRITICAL ELEVATIONS STRUCTURE REACH STA A (FT) B (FT) C (FT) D (FT) E° F (FT) G (FT) H (FT) I (FT) J (FT) K (FT) L (FT) M° CGl N O N \ F N O W - Q O v z x E� a w r� Q � I � ROCK A -VANE DETAIL CONSTRUCTED POOL JUST DOWNSTREAM OF A -VANE ARM CALLOUT DESIGNATIONS: A. BANKFULL WIDTH B. STREAMBED WIDTH C. DISTANCE FROM BOTTOM OF BANK TO TOP OF BANK D. WEIR SPACING E. ANGLE OF ARM TO BANK F. LENGTH TO KEY SILL INTO BANK G. BANKFULL ELEVATION H. MAX POOL DEPTH I. WEIR HEADER ELEVATION J. WEIR DROP K. DISTANCE FROM WEIR TO BED L. LENGTH OF VANE ARM M. INCLINE SLOPE OF VANE ARM - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION w J � CGl N O N \ F N O W - Q O v z x E� a w r� Q � I � rn O n Lf) O O O n co � [-- Ld U W Q � O a_ O � � Z W 12 Z ; Q O LI_J � (,()a- w � W Q x z it CL1 � Q a N a (/) J Q W o n CL1 Q a d N I 'v a� 0 c v E N 3 c rn a� 0 c 0 E N U) 0 0 Q U a °O Q M N N N O O 0 N / N } U 0 M U � O�Z 0 N m 0 O OUW- d N N I 'v a� 0 c v E N 3 c rn a� 0 c 0 0 U) 0 0 Q a o Q M M N 0 0 N / N U 0 M 4' ki U W O�Z 0 � m o 0 OUW- d "' PLAN OF COVER NOTES: 1. ALL CONCRETE TO BE 3600 PSI; MORTAR JOINTS = 1/2" t1/8" THICK. 2. THE POURING OF BASE SLAB TO BE ACCOMPLISHED BY FORMING. 3. ALL YARD INLETS OVER 3' -6" IN DEPTH SHALL BE PROVIDED WITH STEPS AT 12" ON CENTER VERTICALLY. 4. CONCRETE BLOCK OR JUMBO BRICK WILL BE PERMITTED. 5. FOR 8' -0" IN DEPTH OR LESS USE 8" WALL. OVER 8' -0" IN DEPTH USE 12" WALL TO 6 FT. FROM TOP OF WALL, AND 8" WALL FOR THE REMAINING 6 FT. OF WALL. 6. ALL PIPES IN YARD INLET STRUCTURE SHALL BE STRUCK EVEN WITH THE INSIDE WALL, GROUTED AND BRUSHED SMOOTH BAR SIZE Ld (INCHES) HOOK LEG 3 13 7 4 17 9 5 21 11 6 26 14 7 37 16 8 43 18 9 53 23 10 65 25 11 78 28 [EXISTING j 1 /2" > 1 CULVERT w 1.. APRON CULVERT a SLAB SLAB NEW 1 1/4" BACKER ROD I I ~ JOINT FILLE WINGWALL COMPATIBLE WITH 1 1/4" BACKER ROD _j z Q SEALANT COMPATIBLE WITH SEALANT JOINT FILLER LLB z Lv ISOLATION JOINT BETWEEN APRON AND CULVERT SLAB Q i U ISOLATION JOINT BETWEEN WING WALL AND CULVERT DETAIL X O D NOT TO SCALE W ICY- n-1 DEVELOPMENTAL LENGTH FOR STANDARD REINFORCING BARS NOT TO SCALE (,()D- 7. WEEP HOLES SHALL BE PLACED IN BACK WALL WITH FILTER FABRIC OR STONE ON BACK SIDE. - PRELIMINARY DESIGN - 4 YARD K__5_- GENERAL STRUCTURAL DETAILS NOT RELEASED FOR _ NLET DETA L S2 NOT TO SCALE CONSTRUCTION z o S 2 NOT TO SCALE u% M N I 'v a� 0 c v E N 3 c rn a� 0 c 0 E N U) 0 0 Q U a °O Q M M N N O O N / N } U 0 M U � O�Z 0 N m 0 O OUW- d N I 'v a� 0 c v E N 3 c rn a� 0 c 0 E N U) 0 0 Q U a °O Q M � N N O O N / N } U 0 M U � O�Z 0 N m 0 O OUW- d Lo N I 'v a� 0 c v aEi rn c rn a� 0 c 0 0 rn 0 0 Q a O Q M Lo N O O N N U 0 M 4ma U w o °Z o � m o 0 OUW- d MANHOLE FRAME AND GRATE PER NCDOT STD 840.54. SEE PLAN SHEET 5 FOR FRAME AND GRATE ELEVATIONS. GROUT MASONRY CHIMNEY AS REQUIRED PROVIDE MASONRY CHIMNEY AS REQUIRED TOP / SLAB 603.00 8" CONCRETE MASONRY UNIT BOND BEAM FILLED W/ 3000 PSI PEA GRAVEL GROUT & (2) # 5 ® BOTT. #5 VERT. ® 0' -8" O.C. - PROVIDE 2' -0" 90' HOOK ® TOP FLEXIBLE SEAL TO BE USED TO SEAL OPENING FOR STEEL SLEEVE (TYP. BOTH SIDES) APPROX ELEV - - SEE NOTE DOWEL ® EA. VERT - MATCH SIZE AND SEE SCHEDULE FOR LAP ® TOP & STD. 90' HOOK ® BOTT. (TYP.) 626.50 MANHOLE O SECTION 13-13 BAS•E PAD DETAILS ETE P. 14' -4" FRAME AND GRATE OT STD 840.54. SEE EET 5 FOR FRAME ,TE ELEVATIONS. T MASONRY JEY AS REQUIRED PROVIDE MASONRY CHIMNEY AS REQUIRED JCRETE MASONRY OND BEAM FILLED D0 PSI PEA GRAVEL & (2) # 5 ® BOTT. F. @ 0' -8" PROVIDE 2' -0" IK ® TOP CRETE ;Y UNIT APPROX ELEV - SEE NOTE NOTE: SEE SHEET U4 FOR PROPOSED SANITARY SEWER DETAILS. ELEVATIONS OF 8" DIP PASSING THROUGH JUNCTION BOX WILL BE DEPENDANT ON EXISTING ELEVATIONS FOUND IN THE FIELD DURING CONSTRUCTION. #6 ® 1' -0" EA i IA 17' SECTION C- C °-d 1' -4" 8" CONCRETE MASONRY UNIT BOND BEAM FILLED W/ 3000 PSI PEA GRAVEL GROUT & (2) # 5 @ BOTT. #5 VERT. @ 0' -8" O.C. - PROVIDE 2' -0" 90' HOOK @ TOP 8" CONCRETE MASONRY UNIT (TYP.) CUSTOM JUNCTION BOX WITH CATCH BASIN SCALE: 1/2" = 1' NV 626.50 8" CONCRETE MASONRY UNIT BOND BEAM FILLED W/ 3000 PSI PEA GRAVEL r-,Doi IT R, 071 u r, a R(1TT REF. NCDOT STD. 840.00 FOR CONCRETE BASE PAD DETAILS (TYP.) MANHOLE FRAME AND GRATE PER NCDOT STD 840.54. SEE PLAN SHEET 5 FOR FRAME AND GRATE ELEVATIONS. GROUT MASONRY CHIMNEY AS REQUIRED PROVIDE MASONRY CHIMNEY AS REQUIRED #6 ® 1' -0" O.C. BOTT. SECTION A- A - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION II IN 0 0) O Lo O O o n co � U LLJ Q � 0 a_ O W 12 z ; Q O W a- W Lo W / ^ x F-' a w w r� Q U N_ N U Q U M CL1 L1 � a a J Q w C) Q I.L U V) on /te V J CL1 Q a d -- - - - - - - - - - - - - - - - - - - - - - - - - - \ I I I I I 16" 0 STEEL SLEEVE I 8" DIP SEWER CASING PIPE WITH MIN. WALL THICKNESS OF I 0.250" I I I I F--��- \ GROUT FILL 0.3' / ...f i v, .' 'e '• • ° • °..•.. d .• '.• i 'e e• •.. 'A. °. .• n° #5 ® 1' -0" O.C. EA. WAY, TOP & BOTTOM 17' SECTION C- C °-d 1' -4" 8" CONCRETE MASONRY UNIT BOND BEAM FILLED W/ 3000 PSI PEA GRAVEL GROUT & (2) # 5 @ BOTT. #5 VERT. @ 0' -8" O.C. - PROVIDE 2' -0" 90' HOOK @ TOP 8" CONCRETE MASONRY UNIT (TYP.) CUSTOM JUNCTION BOX WITH CATCH BASIN SCALE: 1/2" = 1' NV 626.50 8" CONCRETE MASONRY UNIT BOND BEAM FILLED W/ 3000 PSI PEA GRAVEL r-,Doi IT R, 071 u r, a R(1TT REF. NCDOT STD. 840.00 FOR CONCRETE BASE PAD DETAILS (TYP.) MANHOLE FRAME AND GRATE PER NCDOT STD 840.54. SEE PLAN SHEET 5 FOR FRAME AND GRATE ELEVATIONS. GROUT MASONRY CHIMNEY AS REQUIRED PROVIDE MASONRY CHIMNEY AS REQUIRED #6 ® 1' -0" O.C. BOTT. SECTION A- A - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION II IN 0 0) O Lo O O o n co � U LLJ Q � 0 a_ O W 12 z ; Q O W a- W Lo W / ^ x F-' a w w r� Q U N_ N U Q U M CL1 L1 � a a J Q w C) Q I.L U V) on /te V J CL1 Q a d to N I 'v a� 0 c v E N 3 c rn a� 0 c 0 E N U) 0 0 Q U a °O Q M LO N N O O N / N } U 0 M U � O�Z 0 N m 0 O OUW- d r N I 'v a� 0 c v E N 3 c rn a� 0 c 0 E N U) 0 0 Q U a °O Q M cp N N O O N / N } U 0 M U � O�Z 0 N m 0 O OUW- d Go N I 'v a� 0 c v E N 3 c rn 0 c 0 E N U) 0 0 Q o Q M cp N O O N / N } U 0 M 4' ki U W O�Z 0 m OUW- d DOWE FOR ff-imull SEE PLA FRAME � ELEVATI C USE NCDOT STD. 840.03 PROVIDE MASONRY CHIMNEY AS REQUIRED TOP / SLAB 678.32 #6 @ 1' -0" EA WAY BOTT. 8" CONCRETE MASONRY UNIT BOND BEAM FILLED DRAINAGE STRUCTURE W/ 3000 PSI PEA GRAVEL STEPS NCDOT STD. GROUT & (2) # 5 @ BOTT. DETAIL 840.66 d ' #5 VERT. @ 0' -8" :., /�---------- - - - - -\ O.C. - PROVIDE 2' -0" / \ 90° HOOK @ TOP I I l I 8" CONCRETE I I I MASONRY UNIT (TYP.) I PROP 6' x 4' RCBC I I I I I I I � TOP FTG. \ / 668.80.. a' •. a•. d • •.a • 4 • d • • .° a °.. a. v v Q • 41 Ta #5 @ 1' -0" REF. NCDOT STD. O.C. EA. WAY, 840.00 FOR CONCRETE TOP &BOTTOM BASE PAD DETAILS 19' -6" SECTION B -B ° T 8" CONCRETE MASONRY UNIT BOND BEAM FILLED W/ 3000 PSI PEA GRAVEL GROUT & (2) # 5 @ BOTT. #5 VERT. @ 0' -8" O.C. - PROVIDE 2' -0" 90° HOOK @ TOP PROP 18" RCP FLOW 1' -4" 601 we I to] I womf OT .03 DOWEL @ EA. VERT - MATCH SIZE AND SEE SCHEDULE FOR LAP @ TOP & STD. 90' HOOK @ BOTT. (TYP.) ROVIDE MASONRY HIMNEY AS REQUIRED 8" CONCRETE MASONRY UNIT BOND BEAM FILLED W/ 3000 PSI PEA GRAVEL GROUT & (2) # 5 @ BOTT. #5 VERT. @ 0' -8" O.C. - PROVIDE 2' -0" 90° HOOK @ TOP 8" CONCRETE MASONRY UNIT (TYP.) CUSTOM JUNCTION BOX WITH CATCH BASIN. SCALE: 1/2" = 1' �:)Lu i i UIN SEE PLAN SHEET 5 FOR FRAME AND GRATE ELEVATIONS 8" CONCRETE MASONRY UNIT BOND BEAM FILLED W/ 3000 PSI PEA GRAVEL GROUT & (2) # 5 @ BOTT. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION II IN \ rn O n Lo O O o n co � [-- Ld U W Q � O a_ z (/) w 12 z W Q O/ LI_J � a— W W w (n x x a w w Q U N_ cn U Q U M oa L1 � a a J Q Li C) rill Q U cn o� oa Q a d rn N I 'v a� 0 c v E N 3 c rn a� 0 c 0 E N U) 0 0 Q U a °O Q M cp N N O O N / N } U 0 M U � O�Z 0 N m 0 O OUW- d O N I 'v a� 0 c v E N 3 c rn a� 0 c 0 E N U) 0 0 Q U a °O Q M I� N N O O N / N } U 0 M U � O�Z 0 N m 0 O OUW- d N I 'v a� 0 c v E N 3 c rn a� 0 c 0 E N U) 0 0 Q U a °O Q M I� N N O O N / N } U 0 M U � O�Z 0 N m 0 O OUW- d I H C 0 E a� c rn .N 0 C 0 E 0 0 a i a o a N o 0 N } j Z M �U� Q �p O aNZ 0 /� 0 O OUW- d r q� VICINITY MAP NTS FLAGGING AS NEEDED PER WATCH HANDBOOK FOR STREAM BANK STABILIZATION ACCESS HASE 'C4 -TC5 FLAGGING AS NEEDED PER WATCH HANDBOOK FOR STREAM BANK STABILIZATION ACCESS • CHARLOTTE_ ENGINEERING & PROPERTY MANAGEMENT Traffic Control Plans of Proposed WISEMAN STORM WATER IMPROVEMENTS PROJECT co UH�Y o q�S VI �P 4- 4 O O PROJECT NUMBER: 671 -OS -709 LOCATION MAP NTS PHASE TC3 MISSION HILLS PHASE V TC4 S UH�o�R \RO 0 PH, TC3 Qy CO v E IV G \C pt PHASE TC3 PHASE II TC3 M 60 A �i z LEGEND TRAFFIC CONTROL DEVICES %.MVA:. IVAVAVAT, MAMMA ........ 1 • WORK AREA /LANE CLOSURES TYPE I BARRICADE TYPE II TYPE III CONE DRUM FLAGGER BARRICADE M \ 194,21 1 STATIONARY OR PORTABLE SIGN Know what's below. 0111 before you dig. 0 Lo 00 co L U Q � 0 a_ 01-- � Z cn W Z w Q > 0 Ld Co a- W U W x � Z Of Q a N a 0 Z 0 U IN LL— LL Q L J o U a d CO 00 _ C C 0-- v 0-6 U � � 0 J(jU 0 Q O N F�0O C Z+' O O N a 0 Z(n0 F+�1 Ld 0 U) > d a 'sZ U NU� o o a � 0 wco �w a c aN�O Of U O Z OZ 1 0 .� a c Of CO � r E 0U U At W ^J 0 cq<p;0 U r- of —z: z 0 Lo 00 co L U Q � 0 a_ 01-- � Z cn W Z w Q > 0 Ld Co a- W U W x � Z Of Q a N a 0 Z 0 U IN LL— LL Q L J o U a d N_ Q O \ h Z U V) Q x x a w Q 0 Lo 00 co L U Q � 0 a_ 01-- � Z cn W Z w Q > 0 Ld Co a- W U W x � Z Of Q a N a 0 Z 0 U IN LL— LL Q L J o U a d N U H I U H c v E a� 3 C .rn y a� O C v E N O O Q U Q O Q M OD N N O O O N / N } j Z M m�Q �U� Q op O aNZ 0 / � o O 0 UOY d M U H I U H c v E a� 3 C v+ a� 0 C v E a� v 0 0 Q U Q O Q M 00 N N O O O N / N it } j Z M m�Q 0U� Q L. 0 O Z O o O 0 Uit d U H I U H C 0 E N 3 C rn a� 0 C 0 E a� Q U Q O Q M 00 N N O O N / N } U oM �M it U it OciZ c N /� O OUit a LO U H I U H c 0 E N a� C rn N C v E a� a� 3 0 0 Q U Q O ¢ M 00 N N O O N 0 / N } U oM Z +y+�Q W it Q 00 N F- M OUw a z J n 0 W I 0 N W c v E a� v c v+ U) V 0 c v E V U) 0 0 i 0 ¢ N N 0 0 N � N r U oM � F- 0 O °Z cn i� 0 0 OUW d EROSION CONTROL NOTES: IN GENERAL, CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 15. 1. REFER TO GENERAL NOTES ON SHEET 2. EXCAVATION AND GRADING SHALL BE PERFORMED USING EQUIPMENT FROM OUTSIDE OF THE EXISTING CHANNEL WHERE POSSIBLE. TEMPORARY 2. DISTURBED AREAS: CROSSINGS WILL BE USED AT LOCATIONS SPECIFIED ON THE PLANS. CROSSINGS MAY BE ADDED OR RELOCATED UPON APPROVAL FROM THE ENGINEER. 16. STORM DRAINAGE IMPROVEMENTS NOT COMPACT SOIL AROUND ROOTS OF TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. 17. BRAEWICK PLACE CHANNEL SHALL BE PERFORMED PRIOR TO INSTALLATION OF ROCK STRUCTURES AND XX AC CROSS WINDS ROAD APPROVAL OF THE ENGINEER ON ROUGH GRADING. XX AC VALLEY GROVE ROAD OF ROCK AND OTHER STRUCTURES, OBTAIN APPROVAL OF ENGINEER PRIOR TO FINE XX AC NEW HAMPSHIRE DRIVE BE REQUIRED TO COMPLETE THIS PROJECT SHALL NOT RELIEVE XX AC MISSION HILLS ROAD 20. XX AC ARROW LANE 0 XX AC TOTAL STORM DRAINAGE XX AC STREAM BANK IMPROVEMENTS w REACH 4 - STATION (26 +60 - 29 +50) XX AC REACH 5 - STATION (15 +80 - 20 +80) XX AC REACH 5 - STATION (10 +80 - 12 +60) XX AC REACH 6 - STATION (4 +55 - 6 +00) XX AC TOTAL STREAM RESTORATION aT+ XX AC TOTAL a,-- 0N0 c O 2 � (D X AC 1. ALL AREAS DISTURBED BY THE CONTRACTORS SHALL BE SEEDED PER THE SPECIFICATIONS SHOWN BELOW: 2. MULCH: USE SPECIFIED EROSION CONTROL BLANKET TO COVER THE SIDE SLOPES OF THE CHANNEL. APPLY 3000 LB /ACRE GRAIN STRAW AND ANCHOR STRAW ON ALL OTHER DISTURBED AREAS. 3. REVIEW CONSTRUCTION SEQUENCE FOR ADDITIONAL EROSION CONTROL MEASURES. 4. CONSTRUCTION ACCESS AREAS SHOWN ARE TO GUIDE CONTRACTOR DURING CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH ENGINEER IF ALTERNATIVE CONSTRUCTION ACCESS ROUTES WILL IMPROVE EFFICIENCY OF CONSTRUCTION. EROSION CONTROL: 1. INSTALL PERMANENT VEGETATIVE COVER AND THE LONG -TERM EROSION PROTECTION MEASURES OR STRUCTURES AS SOON AS PRACTICAL IN THE CONSTRUCTION PROCESS. APPROPRIATE EROSION CONTROL MEASURES MUST BE PLACED BETWEEN THE DISTURBED AREA AND AFFECTED WATERWAY AND MAINTAINED UNTIL PERMANENTLY VEGETATED. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION CONTROL MEASURES RELATED TO THE CONSTRUCTION SITE. 3. AT A MINIMUM, EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH APPLICABLE STATE AND LOCAL REGULATIONS. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY LOCAL GOVERNING AGENCIES. 4. CONTRACTOR MUST TAKE THE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO THE PAVED ROADWAY FROM CONSTRUCTION AREAS. DAILY REMOVAL OF MUD /SOIL MAY BE REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE REMOVAL OF ANY SOIL TRACKED INTO THE PUBLIC RIGHT -OF -WAY. 5. THE LOCATIONS OF SOME EROSION CONTROL MEASURES MAY HAVE TO BE ALTERED FROM THOSE SHOWN ON THE PLANS IF DRAINAGE PATTERNS CHANGE DURING CONSTRUCTION. 6. PROVIDE FOR HANDLING THE INCREASED RUNOFF CAUSED BY CHANGED SOIL AND SURFACE CONDITIONS. USE EFFECTIVE MEANS TO CONSERVE EXISTING ON -SITE SOIL INCLUDING THE USE OF DIVERSION DITCHES. 7. ALL DISTURBED AREAS SHALL BE SEEDED. USE TEMPORARY PLANT COVER, MULCHING, AND /OR STRUCTURES TO CONTROL RUNOFF AND PROTECT AREAS SUBJECT TO EROSION DURING CONSTRUCTION. CHANNEL BANKS SHALL BE SEEDED DAILY UPON COMPLETION OF FINAL GRADING. 8. ALL SEDIMENT AND EROSION CONTROLS ARE TO BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND AFTER ANY STORM EVENT OF GREATER THAN 0.5 INCHES OF PRECIPITATION DURING ANY 24 -HOUR PERIOD. MAINTENANCE OF SEDIMENT TRAPPING STRUCTURES SHALL BE PERFORMED AS NECESSARY PER THESE INSPECTIONS. SILT FENCING AND DIVERSION DITCHES SHALL BE INSTALLED AS SHOWN ON EROSION CONTROL SHEETS. 9. STABILIZATION MEASURES SHALL BE INITIATED AT THE END OF EACH DAY IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. EXCEPT WHERE CONSTRUCTION ACTIVITIES SHALL BE REINITIATED WITHIN 21 CALENDAR DAYS. 10. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND /OR OFFSITE SEDIMENTATION. CONTRACTOR SHALL REMOVE ALL TEMPORARY CONTROL DEVICES ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. A MAXIMUM OF 1000 LINEAR FEET OF STREAM MAY BE DISTURBED AT ANY ONE TIME. 11. SILT FENCING TO BE INSTALLED AROUND INDICATED SPOILS AREAS TO PREVENT LOSS OF SEDIMENT. 12. ASPHALT TACKIFIER SHALL NOT BE USED. 13. ALL NECESSARY MEASURES MUST BE TAKEN TO PREVENT OIL, TAR, TRASH, AND OTHER POLLUTANTS FROM ENTERING THE ADJACENT OFFSITE AREAS. 14. CONSTRUCTION ACTIVITIES MUST AVOID TO THE GREATEST EXTENT PRACTICABLE, ENCROACHMENT INTO ANY WETLAND /STREAM AREAS NOT DESIGNATED AS IMPACT AREAS. 15. ACTIVITIES MUST AVOID DISTURBANCE OF WOODY RIPARIAN VEGETATION WITHIN THE PROJECT AREA TO THE GREATEST EXTENT PRACTICABLE. REMOVAL OF VEGETATION MUST BE LIMITED TO ONLY THAT NECESSARY FOR CONSTRUCTION OF THE CHANNEL. i[: m► NZe7► �AI :1l1:4I_1 We] MTA0]is L11 Ile] ilk We] : 04107 ilk 6-1 1: iR011 Is] ilk ED] 21 :3:4 RATA 1 NMI :4 IT, IIa111:1 17. ANY GRADING BEYOND THE CONSTRUCTION LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE NORTH CAROLINA EROSION CONTROL ORDINANCE, AND IS SUBJECT TO A FINE. 18. PLEASE REFERENCE PLAN SHEET DETAILS AND NCDENR STANDARDS FOR CONSTRUCTION OF EROSION CONTROL MEASURES. VEGETATIVE PLAN: 1. EROSION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. 2. DISTURBED AREAS NOT AT FINAL GRADE, LEFT IDLE FOR TWO OR MORE WEEKS, SHALL BE TEMPORARILY VEGETATED. UPON COMPLETION OF FINAL GRADING, PERMANENT VEGETATION SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER). SEEDING SHALL BE IN ACCORDANCE WITH DETAIL 1 ON SHEET EC3. 3. ALL OTHER DISTURBED AREAS WILL BE STABILIZED BY PERMANENTLY VEGETATING WITH SEED AND MULCH AS RECOMMENDED BY THE PERMANENT SEEDING SPECIFICATIONS DUE TO THE RESTRAINTS ON THE LENGTH OF IMPROVEMENTS AND /OR DURATION OF EXPOSED DISTURBED AREAS. 4. ONCE PERMANENT VEGETATION AND EROSION CONTROL MEASURES ARE ESTABLISHED, THE CONTRACTOR SHALL SCHEDULE A FINAL INSPECTION IN ORDER TO OBTAIN A CERTIFICATE OF COMPLETION. AFTER APPROVAL, ALL REMAINING TEMPORARY EROSION CONTROL MEASURES MAY BE REMOVED. STREAM CONSTRUCTION NOTES: 1. OBTAIN EROSION CONTROL PERMIT FROM NCDENR - LAND QUALITY SECTION (704) 663 -1699 AND ALL OTHER APPROVALS NECESSARY TO BEGIN AND COMPLETE THE PROJECT. 2. STABILIZED GRAVEL ENTRANCE /EXIT AT THE SITE SHALL BE INSTALLED AS SHOWN ON THE PLANS AND DETAILS. AFTER ESTABLISHMENT OF THE CONSTRUCTION ENTRANCE /EXIT, ALL PERIMETER EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO CLEARING AND GRUBBING. 3. ALSO PRIOR TO CLEARING AND GRUBBING /CONSTRUCTION, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION. UPON RECEIPT OF CERTIFICATE OF COMPLIANCE, GRUBBING /CONSTRUCTION MAY BEGIN. FAILURE TO SCHEDULE AN ON SITE MEETING WITH THE CITY'S ENVIRONMENTAL COORDINATOR 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF CHAPTER 18 OF THE CITY CODE AND IS SUBJECT TO A FINE. 4. PERFORM GRADING OPERATIONS IN A MANNER AND SEQUENCE SO AS TO REDUCE UNNECESSARY DISTURBANCE OF SURFACE COVER. 5. FOR CONSTRUCTION OF CULVERT, FOLLOW PUMP AROUND SEQUENCE SHOWN ON DETAIL 2 /EC3. 6. CONDUCT PRE - CONSTRUCTION MEETING INCLUDING OWNER /ENGINEER, ASSOCIATED CONTRACTORS AND OTHER AFFECTED PARTIES 7. EROSION CONTROL MEASURES MAY BE PHASED -IN TO THOSE AREAS OF THE PROJECT CURRENTLY BEING WORKED ON. THE CONTRACTOR MAY MODIFY OR RELOCATE EROSION CONTROL MEASURES TO MAKE ADJUSTMENTS FOR UNFORESEEN FIELD CONDITIONS SO LONG AS PROPER CONSTRUCTION IS MAINTAINED TO ENSURE THE INTEGRITY AND USEFULNESS OF THE PROPOSED MEASURES. ALL RELOCATION SHALL HAVE THE APPROVAL OF THE ENGINEER. ALL DISTURBED AREAS ALONG CHANNEL BANKS SHALL BE STABILIZED WITH TEMPORARY SEED AND MULCH AT THE END OF EACH DAY. 8. IF IT IS DETERMINED DURING THE COURSE OF CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE (DESPITE THE PROPER IMPLEMENTATION AND MAINTENANCE OF EROSION CONTROL MEASURES), THE PERSON RESPONSIBLE FOR THE LAND DISTURBING ACTIVITY IS OBLIGATED TO TAKE ADDITIONAL PROTECTIVE ACTION. 9. AT LOCATIONS IN WHICH THE STREAM CHANNEL IS BEING MODIFIED, TEMPORARY COFFER DAMS AND BYPASS PUMPING WILL BE USED TO DE -WATER THE WORK AREA. 10. WHEN THE TOE HAS BEEN SUFFICIENTLY STABILIZED TO RESTRAIN EROSION ALL TEMPORARY COFFER DAMS WILL BE REMOVED FROM THE ACTIVE STREAM CHANNEL AND NORMAL FLOW RESTORED. ACCUMULATED SEDIMENT SHALL BE DISPOSED OF IN DESIGNATED SPOILS AREA PRIOR TO REMOVAL OF TEMPORARY COFFER DAM. ALL COFFER DAMS AND BYPASS PUMPING EQUIPMENT SHALL BE REMOVED FROM THE STREAM AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 11. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. RESTORATION MEASURES, SEEDING AND VEGETATION WILL BE INSTALLED ALONG THE CHANNEL LENGTH AS WORK PROGRESSES. 12. ALL EXCAVATED MATERIAL MUST BE PLACED AT A MINIMUM OF 5 FT FROM CHANNEL. SILT FENCES MUST BE INSTALLED AROUND ALL STOCKPILE AREAS. 13. TEMPORARY AND PERMANENT STABILIZATION OF ALL DISTURBED GRASSED AREAS AT THE TOP OF THE CHANNEL BANKS WILL BE IN ACCORDANCE WITH THE SEEDING AND MULCHING SPECIFICATION AS SHOWN ON VEGETATION PLAN. 14. IN GENERAL, CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 15. PROPOSED CHANNEL EXCAVATION AND GRADING SHALL BE PERFORMED USING EQUIPMENT FROM OUTSIDE OF THE EXISTING CHANNEL WHERE POSSIBLE. TEMPORARY SEDIMENT FENCE (SILT FENCE) CROSSINGS WILL BE USED AT LOCATIONS SPECIFIED ON THE PLANS. CROSSINGS MAY BE ADDED OR RELOCATED UPON APPROVAL FROM THE ENGINEER. 16. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OF TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. 17. ROUGH GRADING OF CHANNEL SHALL BE PERFORMED PRIOR TO INSTALLATION OF ROCK STRUCTURES AND FORD OR CULVERT CROSSINGS. PRIOR TO INSTALLING ROCK STRUCTURES OBTAIN APPROVAL OF THE ENGINEER ON ROUGH GRADING. m 18. UPON INSTALLATION OF ROCK AND OTHER STRUCTURES, OBTAIN APPROVAL OF ENGINEER PRIOR TO FINE GRADING. 19. IT SHALL BE UNDERSTOOD THAT FAILURE TO SPECIFICALLY MENTION ANY WORK THAT WOULD NATURALLY BE REQUIRED TO COMPLETE THIS PROJECT SHALL NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO PERFORM SUCH WORK. ® 20. ESTABLISH RIPARIAN VEGETATION AS SHOWN ON PLANS. w MAINTENANCE PLAN: 1. ALL TEMPORARY EROSION CONTROL AND SEDIMENT CONTROL PRACTICES WILL BE INSTALLED AS NOTED ON THE EROSION CONTROL DETAILS. 2. ALL SEDIMENT AND EROSION CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION ON A WEEKLY BASIS AND FOLLOWING EVERY RUNOFF PRODUCING RAINFALL EVENT. ANY REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN THE FUNCTION OF THE PRACTICE. 3. TRAPPED SEDIMENT SHALL BE PROPERLY REMOVED FROM THE UPSLOPE SIDE OF SEDIMENT FENCE WHEN SEDIMENT BUILDS UP TO A DEPTH OF 0.5 FEET. SEDIMENT FENCE SHALL BE REPAIRED AS NECESSARY TO MAINTAIN ITS FUNCTION. 4. REFER TO DETAIL SHEETS EC & EC FOR ADDITIONAL MAINTENANCE NOTES ON EROSION CONTROL STRUCTURES. LOD LIMITS OF DISTURBANCE TEMPORARY DIVERSION DITCH E i SEDIMENT FENCE (SILT FENCE) EC3 PS SEEDING (PERMANENT) 'O EC3 cM COIR FIBER MATTING (EROSION CONTROL MATTING) CHECK DAM Ecz ++ C TEMPORARY GRAVEL CONSTR. r2 Ecz m ENTRANCE /EXIT 0z(100 TREE PROTECTION E z INLET SEDIMENT FILTER E i ® STAGING AREA naT Know whch'a OW. Ca before you dig. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG LAND DEVELOPMENT AND /OR NCDOT STANDARD SPECIFICATIONS. - PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION ° r z Ld J Q U V) rn 0 r- o I z LO 0 0 to ll� I-- F-- U LLJ Q � O IZ O � Z (� Ld Z ; Q O wll� (/) IZ w w Q m Ld J 1 0 Q C) m N N °w \ � N w M 0 U m z 0 L W m Q W m Li o% m O Z O L( J U I— Z O O Z U) O Ld r__ w o U Ld m 0 w 0 m m w Q 0 p O o v o O U L L U v JUO U ++ C i ZI O �E O O N m v 0z(100 07,5 c U w 0 o w 0 o N ° UZ p i° `O ` I c w6 0 Q N _ (If C) 0Z m aT+ OZ I (D C :3 a,-- 0N0 c O 2 � (D E UU E filo ^U rnJ O o -1 NQ �U I- Of -Z ° r z Ld J Q U V) rn 0 r- o I z LO 0 0 to ll� I-- F-- U LLJ Q � O IZ O � Z (� Ld Z ; Q O wll� (/) IZ w w Q m Ld J 1 0 Q C) m N N °w \ � N w M 0 U m z 0 L W m Q W m Li o% m O Z O L( J U I— Z O O Z U) O Ld r__ w o U Ld m 0 w 0 m m w Q N U W I 'v a� 0 c v E N 3 c rn a� 0 c 0 E N U) 0 0 Q U a °O Q M O N N O O N / N } U 0 M U � O�Z 0 N m 0 O OUW- d M U W I 'v a� 0 C v E N 3 fn c rn .U) 0 C O 0 U) 0 0 a / 00 a N O O N / N U 0 M M U � W 0�Z m OUW_0- FLOW F r CLASS A INTAKE HOSE NOTES: STONE Scientific Name Common Name SEEDING MIXTURE 20 Ibs /acre of: SEE CHART Bushy Broomsedge SEEDING OPTIMAL SEEDING MONTHS: NOVEMBER, FEBRUARY, OR MARCH Sedge, Fringed 5% DATES Sedge, Shallow 5% Carex stricta Sedge, Tussock 5% SEEDING Temporary seeding will be required on all stream 25% Eragrostis spectabila Purple Lovegrass restoration areas disturbed following all land Muhlenbergia capillaris Hairawn Muhly 5% AMENDMENTS disturbing activities. 10% Panicum virgatum Switchgrass 10% All soil in planting areas shall be tested and the Little Blue Stem 10% Tripsacum dactyloides Eastern Gamagrass rate of fertilization and lining shall be in ® 4. THE PUMP - AROUND PUMP SHOULD ADEQUATELY CONVEY TEMPORARY SEEDING Total accordance with the test results. 100% MINIMUM 450 GALLONS / MINUTE 8 ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE ► / ♦o..o..i4I The planting of any species of fescue grass along MPERVIOUS 5. PERFORMANCE q =450 GPM ONLY TOP o 0 0 or adjacent to streams and channels is prohibited FOR STREAM BANK DIKE 6. DIKE MUST BE CONSTRUCTED OF NON- ERODIBLE MATERIALS STABILIZED REMOVING IMPERVIOUS DIKE. = unless otherwise approved by the Engineer. MIN. 12-1/2 GA. INTERMEDIATE SUCH AS SANDBAGS SEE DETAIL 3/7. POLYETHYLENE MEMBRANE ON 0 0 0 0 0 All areas shall be mulched for erosion control upon rmmnWinn of on— tnirtinn artivitiec nr nc directed 1. LINE ALL CHANNEL BANKS WITH EROSION CONTROL MATTING Scientific Name Common Name Percent Mix Andropogon glomeratus Bushy Broomsedge 5% Carex crinda Sedge, Fringed 5% Carex lurida Sedge, Shallow 5% Carex stricta Sedge, Tussock 5% Elymus virginicua Virginia Wildrye 25% Eragrostis spectabila Purple Lovegrass 10% Muhlenbergia capillaris Hairawn Muhly 5% Panicum clandestinum Deertongue 10% Panicum virgatum Switchgrass 10% Schizachyrium scoparium Little Blue Stem 10% Tripsacum dactyloides Eastern Gamagrass 10% ® 4. THE PUMP - AROUND PUMP SHOULD ADEQUATELY CONVEY TEMPORARY SEEDING Total M 100% Seed Mix A — Winter (Select at least 2) Scientific Name PUMP AROUND I EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND /OR Seeding Rate Echinochloafrumentacea Japanese Millet Apply at 25 lb /ac PUMP ISOLATED SECTIONS OF CHANNEL. Barley Secale cereale Winter Rye Seed Mix B — Summer (Select at least 2) 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS Browntop Millet Apply at 25 lb /ac Pennisetum glaucum Pearl Millet WORK FROM STREAM FLOW. German Foxtail Millet ( Foxtail bristlegrass) October through April Plant Winter Mix February 15 through April Winter Mix and Replant with Summer Mix in May May through September Plant Summer Mix AREA 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN NOTE: FILTER FABRIC o fertilizer. DE- WATERING BE STABILIZED IN ONE WORKING DAY. A MAXIMUM OF 1000 CONTRACTOR SHALL FOLLOW CONSTRUCTION 11. ♦��....� O PUMP FEET MAY BE DISTURBED AT ANY ONE TIME. SEQUENCE AS NOTED ON CONTRACT DRAWINGS. II..b..4.. i1..►..o.♦ E ® 4. THE PUMP - AROUND PUMP SHOULD ADEQUATELY CONVEY TEMPORARY SEEDING AND MULCHING M B MINIMUM 450 GALLONS / MINUTE 8 ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE ► / ♦o..o..i4I CL MPERVIOUS 5. PERFORMANCE q =450 GPM ONLY TOP o 0 0 ►..J►.♦ FOR STREAM BANK DIKE 6. DIKE MUST BE CONSTRUCTED OF NON- ERODIBLE MATERIALS STABILIZED REMOVING IMPERVIOUS DIKE. = R MIN. 12-1/2 GA. INTERMEDIATE SUCH AS SANDBAGS SEE DETAIL 3/7. POLYETHYLENE MEMBRANE ON 0 0 0 0 0 (SEASONAL) 1. LINE ALL CHANNEL BANKS WITH EROSION CONTROL MATTING FACE 20 MIL THICK 3'- 0» LEVEL WITH TOP OF o 0 SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND BANK OR AS NECESSARY 0 t s Cri ++ O n O c O a) WIRES NOTE: Snrn InKI CLASS A DISCHARGE HOSE 1 CLASS AS RIP LIRAP BATI THE NDOW DOWNSTREAM EENDFOFLTHEING A STONE O ��J ♦♦ S o z cD Seed Mix A — Winter (Select at least 2) Scientific Name Common Name Seeding Rate Echinochloafrumentacea Japanese Millet Apply at 25 lb /ac Hordeum sp. Barley Secale cereale Winter Rye Seed Mix B — Summer (Select at least 2) Panicum ramosum Browntop Millet Apply at 25 lb /ac Pennisetum glaucum Pearl Millet Setaria italica German Foxtail Millet ( Foxtail bristlegrass) October through April Plant Winter Mix February 15 through April Winter Mix and Replant with Summer Mix in May May through September Plant Summer Mix July 15 through September Summer Mix and Replant with Winter Mix in October SEEDING MIXTURE 80 Ibs /acre of tall fesue 100 Ibs /acre tall fescue (unscarified after August 15) VUM10 I RGAIVI vlr,G FIRJ I. OTHER NON- ERODIBLE MATERIAL FALL: August 25 — October 15 SEEDING Late winter. February 15 — April 15 Late winter: February 15 — April 15 O N a add 50 Ibs /acre of annual Kobe lespedeza ■. o 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP To extend spring seeding into June, add DATES 15 Ibs /acre hulled Bermudagrass 15 Ibs /acre hulled Bermudagrass* SEEDING Apply lime and fertilizer per soil rests, or 4000 Apply lime and fertilizer per soil rests, or 4000 AMENDMENTS Ibs /acre limestone and 1000 Ibs /acre 10 -10 -10 15' TO 20' RAP AND IMPERVIOUS DIKES AND STABILIZE DISTURBED AREAS FILTER FABRIC o fertilizer. L 11. ♦��....� O WITH SEED AND MULCH. WITH II..b..4.. i1..►..o.♦ E ® O TEMPORARY SEEDING AND MULCHING M B 8 ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE ► / ♦o..o..i4I CL NOTES TOP il.♦ ►..J►.♦ FOR STREAM BANK STABILIZATION STABILIZED REMOVING IMPERVIOUS DIKE. CREEK CROSSING - COFFER DAM R MIN. 12-1/2 GA. INTERMEDIATE STRUCTURAL STONE L, (SEASONAL) 1. LINE ALL CHANNEL BANKS WITH EROSION CONTROL MATTING OUTFALL CLASS (/) a_ WIRES NOTE: A STONE A WA C FRONT VIEW CONSTRUCTION I I � f I 1 4 SILT FENCE Q GENERAL NOTES: MAINTENANCE NOTES: EC3 NOT TO SCALE DOCUMENTS v w EC3 NOT TO SCALE FILTER FABRIC w U 4. p U STRUCTURAL STONE SHALE BE (CLASS 3. PLACE SEED & LIGHT MULCH W 8" OF CLASS A STONE CONTROL PURPOSES, 4. INSTALL EROSION CONTROL MATTING OVER 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1. FILTER BARRIERS SHALL BE INSPECTED BY THE CONTRACTOR Q GENTLE SLOPES STEEP SLOPES 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING SEED & MULCH c n rein nr can T rr�inr �irrnr Tn nr Ti rn�irn i ini iii i PRni nNGFn PAINFAI I ANY RFPAIRC mpmp'n CI-IAI I RF AAAnP' SEDIMENT CONTROL STONE SHALL BE N❑, 5 SILT BAG PROFILE v GRADE III - III= OR N❑, 57 ST ❑NE, EROSION CONTROL EXISTING CHANNEL ( FIBER M A TT N G) 2 PUMP AROUND 3 IMPERVIOUS DIKE 5 EC3 NOT TO SCALE EC3 NOT TO SCALE SEEDING MIXTURE 80 Ibs /acre of tall fesue 100 Ibs /acre tall fescue (unscarified after August 15) I II FALL: August 25 — October FALL: August 25 — October 15 SEEDING Late winter. February 15 — April 15 Late winter: February 15 — April 15 O N a add 50 Ibs /acre of annual Kobe lespedeza ■. o To extend spring seeding into June, add To extend spring seeding into June, add DATES 15 Ibs /acre hulled Bermudagrass 15 Ibs /acre hulled Bermudagrass* SEEDING Apply lime and fertilizer per soil rests, or 4000 Apply lime and fertilizer per soil rests, or 4000 AMENDMENTS Ibs /acre limestone and 1000 Ibs /acre 10 -10 -10 Ibs /acre limestone and 1000 Ibs /acre 10 -10 -10 N 1 fertilizer. L 11. ♦��....� O II..b..4.. i1..►..o.♦ 1 ® O TEMPORARY SEEDING AND MULCHING M B Q •• ► / ♦o..o..i4I ►..��.... NOTES TOP il.♦ ►..J►.♦ FOR STREAM BANK STABILIZATION U M :, ;. "1 VIEW MIN. 12-1/2 GA. INTERMEDIATE STRUCTURAL STONE L, (SEASONAL) 1. LINE ALL CHANNEL BANKS WITH EROSION CONTROL MATTING (/) a_ a WIRES NOTE: A WA OW FRONT VIEW CONSTRUCTION I I � f I 1 4 SILT FENCE GENERAL NOTES: MAINTENANCE NOTES: EC3 NOT TO SCALE DOCUMENTS v w EC3 NOT TO SCALE w U 4. p U STRUCTURAL STONE SHALE BE (CLASS 3. PLACE SEED & LIGHT MULCH W STONE FOR ER❑SI ❑N CONTROL PURPOSES, 4. INSTALL EROSION CONTROL MATTING OVER 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1. FILTER BARRIERS SHALL BE INSPECTED BY THE CONTRACTOR Q GENTLE SLOPES STEEP SLOPES 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING SEED & MULCH c n rein nr can T rr�inr �irrnr Tn nr Ti rn�irn i ini iii i PRni nNGFn PAINFAI I ANY RFPAIRC mpmp'n CI-IAI I RF AAAnP' SEDIMENT CONTROL STONE SHALL BE N❑, 5 i SEEDING MIXTURE 80 Ibs /acre of tall fesue 100 Ibs /acre tall fescue (unscarified after August 15) I II FALL: August 25 — October FALL: August 25 — October 15 SEEDING Late winter. February 15 — April 15 Late winter: February 15 — April 15 SEEDING N a add 50 Ibs /acre of annual Kobe lespedeza ■. o To extend spring seeding into June, add To extend spring seeding into June, add DATES 15 Ibs /acre hulled Bermudagrass 15 Ibs /acre hulled Bermudagrass* SEEDING Apply lime and fertilizer per soil rests, or 4000 Apply lime and fertilizer per soil rests, or 4000 AMENDMENTS Ibs /acre limestone and 1000 Ibs /acre 10 -10 -10 Ibs /acre limestone and 1000 Ibs /acre 10 -10 -10 N fertilizer. fertilizer. NOTE 1 SILT FENCE Ground Cover -- Wherever land disturbing activity is undertaken on a tract comprising more than one (1) acre, a ground cover sufficient to restrain erosion must be planted or provided within 15 working days or 90 calendar days. SEDIMENT CONTROL i f 1' - 6' MIN NOTE 2 ST ❑NE KEY IN EROSION CONTROL >- R' AAAX PROPOSED MATTING 0 8' BEYOND N Graded slopes and fills -- Within 21 calendar days, or completion of any phase of grading, whichever period is shorter, slopes shall be planted or otherwise provided with ground cover, devices, or structures sufficient to restrain erosion. C PERMANENT SEEDING SCHEDULE MIN. 10 GA. NOT FOR USE IN CHANNELS LINE WIRES TEMPORARY SEEDING FOR WARM AND COOL SEASON 1- 1I1 -1I EARLY SUMMER SEASON STEEP SLOPES I SEEDING MIXTURE 40 Ibs /acre of German millet 80 Ibs /acre of tall fesue (NOT TEMPORARY) 120 Ibs /acre Rye (grain) 80 Ibs /acre tall fesue (NOT TEMPORARY) I II May 1 — August 15 October 25 — December 30 SEEDING Refertilize if growth is not fully adequate. Between December 30 — February 15, DATES N a add 50 Ibs /acre of annual Kobe lespedeza ■. o Apply 4000 Ibs /acre straw or equivalent Apply 4000 Ibs /acre straw or equivalent • hydroseeding. hydroseeding. SEEDING Apply lime and fertilizer per soil rests, or 2000 Apply lime and fertilizer per soil rests, or 2000 AMENDMENTS Ibs /acre limestone and 750 Ibs /acre 10 -10 -10 Ibs /acre limestone and 750 Ibs /acre 10 -10 -10 N fertilizer. fertilizer. I FLOW T VARIABLE AS DIRECTED BY THE ENGINEER T I II I.■■■■■■■■■■■■■I TOP OF BANK N ~ w Ground Cover -- Wherever land disturbing activity is undertaken on a tract comprising more than one (1) acre, a ground cover sufficient to restrain erosion must be planted or provided within 15 working days or 90 calendar days. N a Ca w o w • I II I CHANNEL BOTTOM II. ♦►..1 ► ♦♦ U phase grading, period slopes shall be planted or otherwise provided with ground cover, devices, or structures sufficient to restrain erosion. N x w Ca 11. ♦��....� O II..b..4.. i1..►..o.♦ 1 ® O x M z FILL SLOPE Q •• ► / ♦o..o..i4I ►..��.... NOTES TOP il.♦ ►..J►.♦ SEEDING SCHEDULE U M :, ;. "1 VIEW MIN. 12-1/2 GA. INTERMEDIATE STRUCTURAL STONE 080 4 (SEASONAL) 1. LINE ALL CHANNEL BANKS WITH EROSION CONTROL MATTING (/) a_ a WIRES NOTE: A WA OW FRONT VIEW CONSTRUCTION I I � f I 1 I FLOW * DO NOT USE ON CHANNELS NOTE 1 1 3 MAX BANK KEY IN EROSION CONTROL MATTING 0.8' PROPOSED TOP OF BANK N ~ w Ground Cover -- Wherever land disturbing activity is undertaken on a tract comprising more than one (1) acre, a ground cover sufficient to restrain erosion must be planted or provided within 15 working days or 90 calendar days. N a Ca w o w • W U I— BEYOND TOP OF BANK CHANNEL BOTTOM w Z U phase grading, period slopes shall be planted or otherwise provided with ground cover, devices, or structures sufficient to restrain erosion. N x w Ca • O O ® O x M z FILL SLOPE Q •• SIDE viEw NOTES TOP SEEDING SCHEDULE U M :, ;. "1 VIEW MIN. 12-1/2 GA. INTERMEDIATE STRUCTURAL STONE rn (SEASONAL) 1. LINE ALL CHANNEL BANKS WITH EROSION CONTROL MATTING (/) a_ a WIRES NOTE: NOT FOR USE IN CHANNELS 2. PREPARE SOIL FOR SEEDING PER CONTRACT FRONT VIEW CONSTRUCTION 4 SILT FENCE 'B') SEEDING DETAILS EC3 NOT TO SCALE DOCUMENTS w EC3 NOT TO SCALE w U 4. p U STRUCTURAL STONE SHALE BE (CLASS 3. PLACE SEED & LIGHT MULCH W STONE FOR ER❑SI ❑N CONTROL PURPOSES, 4. INSTALL EROSION CONTROL MATTING OVER Q SEED & MULCH SEDIMENT CONTROL STONE SHALL BE N❑, 5 v GRADE III - III= OR N❑, 57 ST ❑NE, EROSION CONTROL MATTING ( FIBER M A TT N G) 5 �° o ¢ U) < 0 EC3 NOT TO SCALE I a * DO NOT USE ON CHANNELS NOTE 1 - -- 11 1 V -- 2' STEEL POST POST Know what's below. 1— Ground Cover -- Wherever land disturbing activity is undertaken on a tract comprising more than one (1) acre, a ground cover sufficient to restrain erosion must be planted or provided within 15 working days or 90 calendar days. O 6" MIN. COVER Cal l before dig. o WOVEN WIRE FABRIC SILT FENCE • W U I— SILT FENCE OVER SKIRT * cV you w SILT FENCE GEOTEXTILE FABRIC phase grading, period slopes shall be planted or otherwise provided with ground cover, devices, or structures sufficient to restrain erosion. w ANCHOR SKIRT AS q4 • O O ® O Q ; z FILL SLOPE Q •• SIDE viEw TOP SEEDING SCHEDULE M :, ;. "1 VIEW w rn * DO NOT USE ON CHANNELS NOTE 1 GRADE Know what's below. 1— Ground Cover -- Wherever land disturbing activity is undertaken on a tract comprising more than one (1) acre, a ground cover sufficient to restrain erosion must be planted or provided within 15 working days or 90 calendar days. O 6" MIN. COVER Cal l before dig. o (0 NOTE 2 Graded slopes and fills -- Within 21 calendar days, or completion of any of whichever is shorter, SILT FENCE OVER SKIRT * cV you w < z I phase grading, period slopes shall be planted or otherwise provided with ground cover, devices, or structures sufficient to restrain erosion. ANCHOR SKIRT AS O DIRECTED BY ENGINEER * Q ; SIDE viEw SEEDING SCHEDULE - PRELIMINARY DESIGN- w (SEASONAL) (/) a_ LLJ 1' - 6' MIN NOT RELEASED FOR NOT FOR USE IN CHANNELS FRONT VIEW CONSTRUCTION 4 SILT FENCE SEEDING DETAILS EC3 NOT TO SCALE EC3 NOT TO SCALE w U 4. p U W 0 W I 0 U) W C a E U) E 0 U) 0 0 CL 0 N C14 0 0 04 C-) M „- Z 0 00 U) Z F- m 0 0 c_) 0 W n USE TEMPORARY GRAVEL CONSTR. ENTRANCE/EXIT DURING CONSTRUCTION PLACE 40 LF OF SILT FENCE ALONG EDGE OF CONSTRUCT1120N1�_ ----------- IDLEWILD RD - - ------ ..... ....... . . ........ . ...... - --- — ------------ R/W a0l /N • / I I AD. -%N USE TEMPOR Y G AVEL . . . ..... . ...... r2 . .......... ... ........ I CONSTR. ENTR NCE XIT .... ....... . . ...... NO �,DURING CON UC ON ti -A j 1 01 `Ij L OF LILT ALONG EDGE OF PLACE1140 FENCE AL CONSTRUCTION v �ON ENTRANCE N S r6 F DISTUR . ...... ... LIMITS 0 -13A E USE RA 0 �2 XX.X . . . . ...... 0 CONSTR. ',ENTRANCE/E oo G il - 0�xl I i I 000ono IT 000 DURING CONSTRUCTION' I t 1 '0 \ 7 A N . . .... ,p �"\, M,� ik" 0 6 D 16CK -TEMPORARY OCK DAM _H .......... 7 i'zzx :��; Q_f EG2 0 00 "117/8"'qZ60 0 11 10 /f! 39i !/l, V 1f \S ...... . . .. . ...... .. ........ ` =fit 7" , �'p x 1. . .......... ................ ... rlo� �e 0 . ... ...... . . ..... ........... . . ..... .......... \A vy, ttt P6, L I 7i 3 taw Z I t-Q kl� W- 6- 1� KA 01' NOTES: 1. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S&ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S&ME PROJECT NO. X. W� A Ns- Ar xQ, - ....... 1� - .-I-1 �_J_ 11 .: - �111 � , " ��, v Vk 'A -e' "X\ 4, > N't 'J N I 111�110 LOD LIMITS OF DISTURBANCE TEMPORARY DIVERSION DITCH 3 SEDIMENT FENCE (SILT FENCE) 4 @ PS SEEDING (PERMANENT) 1 (@ cM COIR FIBER MATTING (EROSION CONTROL MATTING) r5 CHECK DAM 1 @ TEMPORARY GRAVEL CONSTR. 2 (@ m ENTRANCE/EXIT 0 Z (10 CD TREE PROTECTION 4 INLET SEDIMENT FILTER 5 STAGING AREA To i WW 1.4 E­4 9� Know whch'aloW. Ca before you dig. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION 0 40 80 Horizontal Scale: 1” = 40' CL> 47 O O Li _j O U) CD 0 0 Z LO 0 m 0 D O Q:� [-- Ld F-- U LLJ < --D 0 Q:� a_ LLJ o� 12 L.Li 0 (/)D- I- LLJ Ej Cn Ld 0 C) m C14 V) C) LLJ Ld I- < Y < V) U C) Ld O m m 0 0 Z Ld < V) > Ld = oo� M < V) 0 a_ m Ld a_ < I 0 0 0 Z 0 U) 0 Ld LL_ C) 0 C) 0 C) -5 0 L) L L_ 0 C) 0 _j C-) 0 �o Z ZI 0 Q�) m 41 0 0 Z (10 CD 7 0 C 0 Ld > 0 Q L.Li ro- 0 U N C: LLj r'-- 0 c a CN 0 (if C.) OZ 0 >,. 0Z I (D r. a- 64 a 0,- :E 00 0 E 0 _j 0 E _j C14 < C-) o w r- Of _Z CL> 47 O O Li _j O U) CD 0 0 Z LO 0 m 0 D O Q:� [-- Ld F-- U LLJ < --D 0 Q:� a_ LLJ o� 12 L.Li 0 (/)D- I- LLJ Ej Cn Ld 0 C) m C14 V) C) LLJ Ld I- < Y < V) U C) Ld O m m 0 0 Z Ld < V) > Ld = oo� M < V) 0 a_ m Ld a_ < I 0 0 0 Z 0 U) 0 Ld LL_ C) 0 �r IWO L I 7W W 1� � W V � W TW VL U) U W I U N W c v aEi VJ v+ 0 v E a� rn i 0 0 Q i N N 0 0 N / N U � M Ap¢ w WUm Q •0�Z N M OUZ d LOD 1 F+i .f ,,•..,, ,•„q •.y "x?aT... p ,xw....• } ~ s s^•Y"' • ... .tv 4 } ^•+,• ,,, �...._ ... •,., ww .xt, tw. .. y�,. '°,t''w'`.w r'..1 "^, ,... „„ t ».., i S .. •a. „„.::... -j` t ia.,.. ^6"”' mm >w {� s ,w t •y ....m ,..„w.. 'l „✓"' �. •.. .•.,,, ",. *,. tF'" ,. D ; "` vt,' "' "». ....w ...,...~t �" r..f.,w*.t, .. ,. i "`"`•"'' r' 4u�.....:.,..""" *i �',,, ^+, f � F� }" _ /A�,+`.t ``",,, a'.r• '."- t w... „, w,.., C '"� „� fi �'•,,'v?w',`, �'+awt ;,.-;, �.�,..}"......... -._. ..-. �,4 � r`'x t �`'t..,i •,. �j •ytin,. U.u” .,. .:.m'.' ";...: � z"'tt(.. ,�•" 't. "•+,,'„ •,,,„, `'•.., t, t .r t..o `' 'w r . „° �, ,.,. '�., °"r''r$ "t."twx.,?”' r" ,t`aN`w",... ....... m....... ex'" 'L. q' "„ ""•.. 1 t .,... -. ,. , ,d '''w `a �"` .y ''„ t' a., '''•, ''w' 'a*t> ,.,....... „� 4.. LOD .... �,,r `,, "+,�`,.,. `•„.. 'w .,.. r,r';. ''w, ` wt._ 'a'•tw,`. „�w'w.„'";,;�`",. y, t..»..„, ',,,. ti „'~t. „ '..,:` -' ».::.'`•. -:::” "x -...` 'a ® r x. a'..., "y,.v... ,r'"" u «xi ..•x', wt'' .�..Wi ...,s t rr'" „? `•*, _'� -..... - 'x?"xr;. �,,,''”" `,� , ,, ,• ? "-', ,.�' e ' o, x. r"� w, �. � .. ,. # # }.� � tom*. ^''�a*i #�,.. t S"`.'......_.... .,.._._. � , s �r .,x ..-„, i, w,''. "~,, y,, `"'... _ , w ... �...� .. ?' ,.. tr '''S•fi """`` � k .-t Y`� '„"„ i . �.�' , v x.... X"'m�...x " t'` t # „� t? i 't''x ,'t� ,,. t t "n' xP" •-... .... i ,� � "'t 4 ,.'w w,... " °e& . "^"'" ,,t � "..,w �'w, :r •,t• .. •.....w..,....,..,,. �",.,`` � ,,�.w -.., �..... r�. � •t � � "y,.,t'w't ., .,',t`a 6IB � ..__.� ,.+"'• '. 1 fix ;t e 't r' ..Y""'. a `."."t'•'..,.. 't i b. , 3 `",. t f it', �,'•. w., i< y� ,..,yw,,'`',,.,"_°�`.......... .w,m,, s i�, w xt "'*•.„ '`.:`. k:. •:R •,.. ?i 'w' f.., ',,;•r �'" t "•,..,...,�.,.„, �y 2. x.., .,,..,,t ,, 1, �','a'�,,tt''�at'i.s''a•„..>� 4 'i i ..�"" tw ` �•`.�''`'t., w "i ........ ......... USE TEMPORARY GRAY '''' „,. ?...f "' , `'a '`'m.. w,•... ... ��,., -�?': •;.i*' „N , , �� CONSTR. ENTRANCEFXIT�' f Xr ff.t'„ DURING CONSTRUCTION f ` . ...... ... 2 f t .. - -- --670 EC2 r ................ ............................ ,J pY, i ",,.� i •w,....... ""` i 'v' t,... *...:.t ,y,TFy;...: :.. �.,• ......._. ._.._ ... ........ .......... i,,.f„i ,nt '.... /� i ter. •• .......... �,n.h.i` t Y. .n 4. ®...... ,____ .......... ..... .-• 1 i — ....... .....,.._ - ........ ,,,...• , t ,r` t w...;,u'*,w' ....x[ ....�. ___..® ®... ... �i___.....®i F ww.. 44 s•' 4 i �,.r' ,, i �fSn "tN' \��� \\ 1 t�� 4 }t r•.f ...t It 2 ..✓•v' < {t ,m, i \" "+..,,, i., w.... •%. .. k.'++„ ...... ___. .. 't i .. ®P , .}. *'• •n.rt f ....PLACE••.,. OF SIFT ' m ........w .< . _...._ EEN.CE.....ALQ p OF „ . . . Y CE f .._ .......... _ ... AN \} ^` CON.. .......... -680.. _w.. t, TEMPORARY BLOCK AND GRAVEL STONE � w ....... � INLET SEDIMENT th ._ ..... 5 FILTER 1p �� in ✓ ✓� ti, � ..N � '� � �� 5 '�� � sk'''i � i {� tx' �•� �� �'�". O � � �'"a *,,. y''�''a,'}`q''v's ' ii.. "" '� � "'r'w ' USE TEMPORARY GRAVEL { CONSTR. ENTRANCE/EXIT eDURING CONSTRUCTION EC2 �.,,.�' �., ��•� �y'y f �: � � 'fir `�i, „i� ,.� ,� {� � t� � ';S ""`� � .. `�'• S O .w""'�� t. { LOD LIMITS OF DISTURBANCE + + TEMPORARY DIVERSION DITCH E i SEDIMENT FENCE (SILT FENCE) EC3 PS SEEDING (PERMANENT) EC3 cM COIR FIBER MATTING (EROSION CONTROL MATTING) e EC3 CHECK DAM G TEMPORARY GRAVEL CONSTR. ENTRANCE /EXIT Ecz TREE PROTECTION 4 EC2 INLET SEDIMENT FILTER 5 EC2 ® STAGING AREA ii, S .. F� L R I WW � W �r,BMW. �\ O all � W � - PRELIMINARY DESIGN- NOT RELEASED FOR V m CONSTRUCTION Know whch'a OW. Ca before you dig. 0 40 80 Horizontal Scale: 1" = 40' Li J Q 0 Cn 0) Q r- o I Z LA 0 0 (O D Q:� [-- F-- U Q � O a_ O Z (n Ld LIJ �O LL] Q:� cn a- 0--- 0 i_ Ln W UW W Q m w J Q C) m N N Ld 0 47 Ld Q N w M m 0 W Q N EL Ld O Z O U O V) O Ld LL_ o U W m 0 w 0 (L Q 0 p O c v p O L J0U 0 U • C Z ++ O O N m a OZ(n0 07.5 l U W > v � � L U 7 H Q_ L Z � O LL, 0-, U p I W C W I \ v QN �Z Of of ate+ O Z -. — C W N U 00 c OU C7 U W i.J J Q1 O O NQ �U U I- of _Z L R I WW � W �r,BMW. �\ O all � W � - PRELIMINARY DESIGN- NOT RELEASED FOR V m CONSTRUCTION Know whch'a OW. Ca before you dig. 0 40 80 Horizontal Scale: 1" = 40' Li J Q 0 Cn 0) Q r- o I Z LA 0 0 (O D Q:� [-- F-- U Q � O a_ O Z (n Ld LIJ �O LL] Q:� cn a- 0--- 0 i_ Ln W UW W Q m w J Q C) m N N Ld 0 47 Ld Q N w M m 0 W Q N EL Ld O Z O U O V) O Ld LL_ o U W m 0 w 0 (L Q ww w � x E-+ U) ,!!4 Fi w V L CD U W I N U N W c v aEi w c v+ 0 v E a� a, i 0 0 i N N 0 0 N / N U � M �o¢ w Q •0 Z D N M OUZ d 0'0 w R 1\N �R /W RrW RrW w w4° / a3rNO M/� /,/ £zz Od% NO3,"13 l83 r Rr RW I I R�W- W R/W r3Nns tizzy � � � 0SON11 B � /`F o J / b0 MON J �TEh as tld '0N00 5Z£ `JdWO 0S98O SNOVf / ti1,,ga rorro� 3Ntlf 5£L / /,b o �� coax LZ / -tenw �,'la3Wa03 a0 � I _ ' 9£9[9x1110 �NI(V) / Z4'499 =v9a d01 noNNVN ss / �s / 00 99'4[9x1110 �NI(9) 9Y'499 =Wla d0L � + s Y o� nj b \ 31+50 -- 31 +0 30 +00 30 +50 00 E \ 9L9 9d� e, tlNIVUO w \/- 3ax✓,x 3, / E / An 60 OOSB 6060 e0 �riv aNn-N i S31011 as a3M0)3NnS L4 L Z E), LOOOI 00 ® 2J0 \ 0 3Nn3n00Vf 1.3li01a \ A"la3Wa03 80 MON 0 580— & � O sc _ OE M 55 1 jN AND GRAVEL STONE s INLET SEDIMENT ECZ FILTER �S \ M� o n 8 n d ,off / /// R I� s= CONSTR. ENTRANCE%EXIT \ DURING CONSTRUCTiop1 EC2 dIM01JN(1S RIVV R/W �R /W 0 . � 00\ L Y /V � O �OPs, LOD PS CM LIMITS OF DISTURBANCE TEMPORARY DIVERSION DITCH E 2 SEDIMENT FENCE (SILT FENCE) EC3 SEEDING (PERMANENT) G COIR FIBER MATTING (EROSION CONTROL MATTING) EC3 CHECK DAM EC2 TEMPORARY GRAVEL CONSTR. ENTRANCE /EXIT Ecz e TREE PROTECTION 4 EC2 INLET SEDIMENT FILTER e EC2 STAGING AREA m-1-1 / ww off' �� o0 TEMPORARY BLOCK AND GRAVEL STONE 5 INLET SEDIMENT Ecz FILTER/ / -.0+82 \ ,F OF i.66% ye ScE � eewgY � sSE s� SSE S* 0 S* / TEMPORARY BLOCK AND GRAVEL STONE / INLET SEDIMENT s X FILTER Ecz 411"k °� ,,C�, _,`11? p 41 C. 4 4?/ / O � v \ / 0 OF x.91/ f �\ PROP\ F�1 �, > 6° P ®' $.33 W w SSE - X15 P m lrT�'1 \ J~ SS us / SSE SSE 1� W y, SSE � 9 `0, \ \ \ / 10, -D� USE TEMPORARY GRAVEL CONSTR. ENTRANCE/EXIT I DURING CONSTRUC11ON e2 c EC2 z T O O YO�ya I e ; � - PRELIMINARY DESIGN- NOT RELEASED FOR V m CONSTRUCTION Know whch'a OW. Ca before you dig. 0 40 80 Horizontal Scale: 1" = 40' F� O Li J Q U 0 0 I Z LO 0 0 Ld U F-- W Q � O a_ O Z (n Ld \LIJ Q / �O LL] Q:� cn a- 0--- 0 I— Q0 W U W W Q W J 0 Q C) m N N ow \ � N U Z 0 Ld re) m 0 W Q N EL Ld I O Z O U O cn O Ld LL_ o U W m 0 w 0 m m Q � o 0 v o O J �j U 0 U • C O O N m-1-1 OZ(10 0 -v 07.5 ) O U W > v � L N :,3 U H Q_ L Z O U U p I C Wr`n v aN�6 CZ) or O. c O a, So�' c O r E U (7 U J rn O O NQ �;U U I- of _Z O Li J Q U 0 0 I Z LO 0 0 Ld U F-- W Q � O a_ O Z (n Ld \LIJ Q / �O LL] Q:� cn a- 0--- 0 I— Q0 W U W W Q W J 0 Q C) m N N ow \ � N U Z 0 Ld re) m 0 W Q N EL Ld I O Z O U O cn O Ld LL_ o U W m 0 w 0 m m Q r- 0 W 1 C14 0 V) W E Sm E -LOD- TEMPORARY DIVERSION DITCH 3 (2 SEDIMENT FENCE (SILT FENCE) 4 @ SEEDING (PERMANENT) 1 G COIR FIBER MATTING (EROSION CONTROL MATTING) r5 Cq CM TEMPORARY GRAVEL CONSTR. O C) Ecz 0 N 0 4 0) 5 L;j F_ Wo 0 m < '0 0 a 0 Z (10 0 En Z F_ m 0 OUP1 CL LIMITS OF DISTURBANCE TEMPORARY DIVERSION DITCH 3 (2 SEDIMENT FENCE (SILT FENCE) 4 @ SEEDING (PERMANENT) 1 G COIR FIBER MATTING (EROSION CONTROL MATTING) r5 CHECK DAM 0 0 TEMPORARY GRAVEL CONSTR. ENTRANCE/EXIT Ecz TREE PROTECTION 4 INLET SEDIMENT FILTER 5 STAGING AREA FR Cl P t A A X� 4 4Z to 0 0 qqii 14 A0 fl) 'y "A > 0 \ X 0 1 . . ... .... . Know whch'alOW. Ca before you dig. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION 0 40 80 Horizontal Scale: 1" = 40' ENO O Li _j C/) 0) 0 r- 6 I Z LO O m 0 D � [-- Ld (_) F-- LLJ < --D 0 a_ O Z Cj) Ld 12 LLJ 0 LL] � Cn a- 0--- 0 I- LLJ LLJ C/) n C) m C14 V) 0 47 Ld LLJ I­ V) U p < 0 Ld re) m 0 Z Ld < V) m: Qw� W < I V) EL Li I 0 0 C) Z 0 V) 0 Q:f Ld LL_ 0 U m 0 LLJ 0 0 0 p 0 0 0 _j 0 U • C Z ++ :3 0 O 0 N a -1-1 0 Z (10 0 07.5 1) O 0 LL, > _:.3 LL LL, r- 0 . , p < N 0 of (-) 0 Z 0 Z a- N 00 Of 0 E U C7 U E _j 0 o -1 NQ C) (J r- of _Z O Li _j C/) 0) 0 r- 6 I Z LO O m 0 D � [-- Ld (_) F-- LLJ < --D 0 a_ O Z Cj) Ld 12 LLJ 0 LL] � Cn a- 0--- 0 I- LLJ LLJ C/) n C) m C14 V) 0 47 Ld LLJ I­ V) U p < 0 Ld re) m 0 Z Ld < V) m: Qw� W < I V) EL Li I 0 0 C) Z 0 V) 0 Q:f Ld LL_ 0 U m 0 LLJ 0 o' w O U U) / V) 0 0 V) / 0 0 Q U a o Q O N N N O O O N j O o' � U 0 41 U Vi � () 0 00 Q O Z O V) �m O O 0 UD' n A VICINITY MAP NTS INDEX OF SHEETS SHEET NO. 1 COVER SHEET SHEET N0. 2 PERMITS SHEET N0. 3 BRAEWICK PLACE SHEET N0. 4 CROSS WINDS RD SHEET N0. 5 NEW HAMPSHIRE DR SHEET N0. 6 NEW HAMPSHIRE DR SHEET N0. 7 MEADOWDALE LN SHEET N0. 8 MISSION HILLS RD SHEET N0. 9 MORINGTON LN NOTES: 1. CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH CHARLOTTE — MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. ALL CONTRACTORS WORKING ON CMUD PROJECTS ARE REQUIRED TO OWN A COPY OF THE DESIGN MANUAL AND SHALL KEEP A COPY ON THE JOB SITE AT ALL TIMES. 3. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING ALL APPROPRIATE PARTIES AND ASSURING THAT UTILITIES ARE LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CALL NC ONE CALL (PREVIOUSLY ULOCO) AT 1- 800 - 632 -4949 FOR UTILITY LOCATING SERVICES 48 HOURS PRIOR TO COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 4. IF THE PROPOSED WATER AND /OR SANITARY SEWER IS INSTALLED 12" WITHIN IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM GAS MAINS, THE CONTRACTOR SHALL CALL PIEDMONT NATURAL GAS COMPANY AT 704 - 525 -5585 AND INFORM THEM. 5. SANITARY SEWER LATERAL ARE TO BE INSTALLED AT A DEPTH NO GREATER THAN (5) FEET WHERE PRACTICAL AT THE PROPERTY LINE UNLESS INDICATED ON THE PLANS TO BE INSTALLED AT "MINIMUM SLOPE ". THE CONTRACTOR SHALL COORDINATE WITH THE DEVELOPER TO ENSURE THAT ALL LATERALS ARE ADEQUATE DEPTH TO BE FUNCTIONAL FOR THE LOT IN QUESTION (i.e. BASEMENT LOTS, ETC.). 6. WATER MAINS SHALL HAVE A MINIMUM COVER OF AT LEAST 36 ". 7. DUCTILE IRON PIPE (RED BRASS FOR 2 " WATER PIPE) REQUIRED FOR BOTH WATER AND SANITARY SEWER LINES ARE THE FOLLOWING CLEARANCES ARE NOT MET. WATER LINE CROSSING UNDER SEWER LINE (FOR ANY CLEARANCE). 18" VERTICAL SEPARATION FOR WATER LINE INSTALLED ABOVE SEWER LINE. (OR 18" VERTICAL SEPARATION IN SEPARATE DITCHES). WATER LINES SHALL HAVE 112" CLEARANCE WITH STORM DRAINS, GAS MAINS, TELEPHONE DUCTS, AND UNDERGROUND CABLES. 8. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING EXACT LOCATIONS OF SEWER AND WATER SERVICE CONNECTIONS TO WKDICKSON, INC. FOR ASBUILT RECORDS. 9. ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO NCDOT AND CMUD STANDARDS. 10. SHORING SHALL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMENDED. 11. CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES, USING FLAGMEN, ETC. AS NECESSARY TO INSURE THE SAFETY TO THE PUBLIC. 12. SIZE AND LOCATION OF EXISTING WATER AND SEWER LINES TO BE VERIFIED BY THE CONTRACTOR. 13. THE CONTRACTOR IS RESPONSIBLE FOR THE REPAIR AND OR REPLACEMENT OF ANY UTILITY DAMAGED DURING CONSTRUCTION. THE CONTRACTOR SHALL USE EXTREME CARE WHEN WORKING NEAR ALL UNDERGROUND AND OVERHEAD UTILITIES. DESIGN COMPANY: W.K. DICKSON PLANS PREPARED BY: W.K. DICKSON ADDRESS: 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 PHONE: (919) 782 -0495 DATE DESIGN COMPLETED: 6/2009 SURVEY COMPANY: W.K. DICKSON SURVEYED BY: W.K. DICKSON ADDRESS: 616 COLONNADE DRIVE CHARLOTTE, NC 28205 PHONE: (704) 334 -5348 DATE SURVEY COMPLETED: 4/2007 nI vI 1 niD R• - ADDRESS: - PHONE: - CONTRACTOR: - IKICPPrTnR• - INSIDE CHARLOTTE: ( ) YES ( ) NO: TOPO NO: - WK WDICKSON community infrastructure consultants NC Licence No. F -0374 720 CORPORATE CENTER DR. RALEIGH, NC 27607 (919) 782 -0495 Office Locations: North Carolina Georgia South Carolina 7.HARLU`TTE ]OVIOND A ZJTILITIE S CHARLOTTE, NORTH CAROLINA NGIN E RING DIVISION SANITARY SEWER SYSTEM IMPROVEMENTS 0 q <F <N z J D Z H F'' w W CD N o W g 6- pR s Ro �4Z2� o N PMPSN \R � NEB e FR Ro O � �O o Q� V� 2 �Q LOCATION MAP NTS Know what's below. Call before you dig. Existing Property Line .... ............................... Maintained as R/W Line . ............................... ExistingStructures .......... ............................... Proposed Edge of Pavement .......................... Fence................................. ............................... Existing Public Drainage Easement ............. Temporary Construction Easement ............. PermanentDrainage Easement .................... Permanent Conservation Easement ............. ExistingGas Line ............ ............................... ExistingWater Line ........ ............................... ExistingSanitary Sewer . ............................... Existing Underground Telecommunications Existing Underground Electric ..................... Centerlineof Channel ..... ............................... ExistingStorm Drainage . ............................... ProposedStorm Drainage .............................. SS UT LIE ProposedEndwall .................................................... ............................... Existing Tree ............................................................ ............................... N.C.R.L.S. (AS BUILT) N.C.P.E. WM ExistingWater Meter .............................................. ............................... ❑ ExistingWater Valve .............................................. ............................... WV I< ExistingGas Valve .................................................. ............................... GV I>4 - O Existing Sanitary Sewer Manhole .......................... ............................... - - ProposedSanitary Sewer Manhole ........................ ............................... ExistingStorm Drain Manhole .............................. ............................... ExistingTelephone Manhole .................................. ............................... O Existing Electric Manhole ...................................... ............................... O ExistingCatch Basin ............................................... ............................... 8 ExistingLight Pole .................................................. ............................... DATE AS BUILT: BY: ExistingUtility Pole ................................................. ............................... 'a GuyWire ................................................................ ............................... IronPin ..................................................................... ............................... 0 ExistingFire Hydrant ............................................. ............................... ProposedFire Hydrant ........................................... ............................... ExistingYard Inlet ................................................... ............................... 0 TreeProtection .............................................. ............................... ProposedWater Line ........ ............................... W W ProposedSanitary Sewer . ............................... -PRELIMINARY DESIGN- NOT RELEASED FOR APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. SUMMARY OF WATER MAINS & FIRE HYDRANTS SIZE LENGTH SIZE LENGTH 6" - - 2" - - TOTAL NO. OF FIRE HYDRANTS: - TOTAL NO. LOTS SERVED: - PROJECT NAME: WISEMAN STORM WATER IMPROVEMENTS WATERLINE RELOCATION CHARLOTTE, NC JOB NO: - DATE OF ACTIVATION: DATE AS BUILT: BY: CONSTRUCTION APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. SUMMARY OF SEWER MAINS & MANHOLES SIZE LENGTH SIZE LENGTH g" - - TOTAL NO. OF MANHOLES: 17 TOTAL NO. LOTS SERVED: - PROJECT NAME: WISEMAND STORM WATER IMPROVEMENTS SANITARY SEWER RELOCATION CHARLOTTE, NC JOB NO: - DATE OF ACTIVATION: DATE AS BUILT: BY: 12 D_ Lv I C 0 E N rn c N r) 0 E / 0 0 Q U Q 0_ O 0 N N 0 0 0 N / o- Q � U 0 Z M vU� A�O a-�m O O U Of II a s. n 1 0 7 SANITARY SEWER AND WATER MAIN REPLACEMENT APPLICATIONS APPLICATION FOR NON - DISCHARGE PERMIT GRAVITY SEWER MAIN EXTENSION CHARLOTTE- MECKLENBURG UTLITIES PROJECT NAME WISEMAN STORM WATER IMPROVEMENTS PROJECT CMUD PROJECT No.: PROJECT TYPE: ❑ NEW CONSTRUCTION ❑X RELOCATION ❑ MODIFICATION OF PERMIT No. ❑ OTHER VOLUME OF WASTEWATER GENERATED BY THIS PROJECT: 0 GPD ADDITIONAL GALLONS PER DAY BASED ON 190 gal. /day /single family household x households or 135 gal. /day /multi - family unit x units or is based on: WASTEWATER TREATMENT PLANT receiving WASTEWATER: ❑X McALPINE CR. (NC0024970) ❑ IRWIN CR (NC0024945) ❑ McDOWELL CR (NC0036277) ❑ SUGAR CR. (NC0024937) ❑ MALLARD CR (NC0030210) NATURE OF WASTEWATER 100 ° /o DOMESTIC %INDUSTRIAL % COMMERCIAL % OTHER ORIGIN OF WASTEWATER X SUBDIVISION ❑ COMMERCIAL ❑ SCHOOL ❑ INDUSTRIAL ❑ APARTMENTS /CONDO'S ❑ OTHER LIST ANY PARAMETER AND ITS CONCENTRATION THAT WILL BE GREATER THAN DOMESTIC LEVELS: IF WASTEWATER IS NON- DOMESTIC, DESCRIBE LEVEL OF PRETREATMENT: IF PRETREATMENT IS REQUIRED, HAS ONE BEEN ISSUED ❑ YES ❑ NO HAS ENGINEER DETERMINED THAT DOWNSTREAM SEWERS ARE CAPABLE TO HANDLE THIS FLOW? X YES ❑ NO PERMIT No. FOR SEWERS IMMEDIATELY DOWN STREAM PIPE DIAMETER OF SEWERS IMMEDIATELY DOWNSTREAM 8" HAS ENGINEER DETERMINED THAT NC DEM AND CMUD MINIMUM DESIGN STANDARDS ARE MET BY THIS PROJECT? X YES ❑ NO COMPLETE NAME AND ADDRESS OF ENGINEERING DESIGN FIRM WK DICKSON 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 TELEPHONE 919 - 782 - 0495 PROFESSIONAL ENGINEER'S CERTIFICATION I, SCOTT SIGMON, PE , ATTEST THAT THIS APPLICATION FOR SEWER RELOCATION FOR THE WISEMAN STORM WATER IMPROVEMENTS PROJECT HAS BEEN REVIEWED BY ME AND IS ACCURATE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. I FURTHER ATTEST THAT TO THE BEST OF MY KNOWLEDGE THE PROPOSED DESIGN HAS BEEN PREPARED IN ACCORDANCE WITH THE APPLICABLE REGULATIONS. ALTHOUGH CERTAIN PORTIONS OF THIS SUBMITTAL PACKAGE MAY HAVE BEEN DEVELOPED BY OTHER PROFESSIONALS, INCLUSION OF THESE MATERIALS UNDER MY SIGNATURE AND SEAL SIGNIFIES THAT I HAVE REVIEWED THIS MATERIAL AND HAVE JUDGED IT TO BE CONSISTENT WITH THE PROPOSED DESIGN. NORTH CAROLINA PROFESSIONAL ENGINEER'S SEAL, SIGNATURE, AND DATE: CMUD PROJECT No.: PLANT FLOW ALLOCATION RECORDED BY: PERMIT APPROVED BY: ISSUED: BARRY D. SHEARIN, P.E., CHIEF ENGINEER Know what's below. 0111 before you dig. No. I Date I By APPLICATION FOR PERMIT FOR WATER MAIN EXTENSION PROJECT NAME WISEMAN STORM WATER IMPROVEMENTS PROJECT CMUD PROJECT No.: PROJECT DESCRIPTION: WATER RELOCATION FOR STORM DRAINAGE IMPROVEMENTS DESIGNED BY: FIRM: WK DICKSON ENGINEER. SCOTT SIGMON, PE ADDRESS: 720 COPORATE CENTER DRIVE RALEIGH, NC 27607 PHONE: 919- 782 -0495 THIS APPLICATION IS MADE UNDER AND IN FULL ACCORD WITH THE PROVISIONS OF CHAPTER 130A -317 OF THE NORTH CAROLINA GENERAL STATUTES, AND SUCH OTHER STATUTES AS RELATED TO PUBLIC WATER SYSTEMS. CMUD HAS BEEN GRANTED AUTHORITY TO ISSUE PERMITS FOR EXTENSION OF WATER MAINS PURSUANT TO 15 A NCAC 18C.1801. THE APPLICANT AGREES THAT NO SIGNIFICANT CHANGE OR DEVIATION FROM THE PLANS AND SPECIFICATIONS APPROVED BY CMUD WILL BE MADE WITHOUT THE WRITTEN CONSENT AND APPROVAL OF CMUD OR ITS AUTHORIZED REPRESENTATIVE. A PROFESSIONAL ENGINEER LICENSED TO PRACTICE IN THE STATE OF NORTH CAROLINA SHALL SUBMIT A STATEMENT REFLECTING THAT ADEQUATE OBSERVATIONS DURING AND UPON COMPLETION OF CONSTRUCTION INDICATES THAT CONSTRUCTION WAS COMPLETED IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. PERMIT No. APPROVED CALL NC ONECALL\ BEFORE YOU DIG T 'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, DATE 5AfZ,1F,'T- ek�EA fN, FE_ Ck�fEF ENC3INEEF, C�4,4�LCTTE MEC <LEN5L�f;;��G L�TILIT'T- 1)EF=4f;;;�T�_1ENT 5100 5 00 ek4ffR) E5LYI::)e CIS ,4fRLOTTE, NORRTH C ,4fROLIN4 2x21& CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. Revision WKD - rev. version 1 on 4/08/02 -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION Job No. File No. WISEMAN STORM WATER PLAN Scales IMPROVEMENTS PROJECT — PROFILE Hor. - SANITARY SEWER & WATER MAIN Vert. PERMITS As Built Date Sheet Of WKD RHN RHN SAS SAS 3/9/12 Surveyed By Designed By Drawn By Project —Engr Approved By Date U2 U9 J m V U_ w a o% m c 0 E c aT 0 c 0 E 0 0 Q U Q D_ O O N N O O O N O_ Q � S U 0 CZ m Q 0 O_ C) 0 '-j__0 O U O_ 640 638 636 634 632 630 628 626 624 622 620 618 616 614 612 D co IF9 SS 6 (c) (A) SSL W L 0 C) REMOVE 40 LF OF EXIST 8' SEWER_v C PROP 40' 8" PC 350 1. 0 +00 0 +50 1+00 1+50 U — BRAEWICK PLACE SEWER PROFILE SEE SHEET 4 FOR STORM SEWER IMPROVEMENTS 640 638 636 634 632 630 628 626 624 622 620 618 616 614 612 610 2 +00 650 648 646 644 642 640 638 636 634 632 630 628 626 624 622 0 0 o� ft PROP 8" WATER VALVE BOX AND TRANSITION COUPLING PER CMU STD 1 STA 1+23.14 PROP 8" WATER ° VALVE BOX CMU STD 1 C \ �0 GO'a, 1M 22.5' DUCTILE IRON BENDS. ROUTE AS REQUIRED (TYP) EXIST WATER LINE PROP TRANSITION COUPLING 1 11�4 9 R - - - - - -1 PROP WATER VALVE BOX CMU STD 1 INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) 0 +00 0 +50 1 +00 U — BRAEWICK PLACE WATER LINE PROFILE NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN —OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 9. CONTRACTOR SHALL RECONNECT ALL WATER SERVICE LATERALS TO PROPOSED WATER LINE PER CMU STD 17. EXIST WATER LINE TO BE REMOVED TOP OF GROUND INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) GENERAL NOTES: 1. WHENEVER DEPTH OF COVER IS LESS THAN 24- INCHES, THE WATER LINE MUST BE ENCASED IN CONCRETE PER CMU STANDARD 7. 2. DO NOT USE ANCHOR RINGS ON PVC, CIP OR AC PIPE. INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) PROP. DUCTILE IRON PIPE, CLASS 350 (TYP) PROP TRANSITION COUPLING PROP WATER VALVE BOX CMU STD 1 EXIST WATER LINE CALL NC ONECALL BEFORE YOU DIG 650 1 VERTICAL OFFSET FROM STORM DRAINAGE PIPE 1-800-632-4949 UUTILITY 0'rn- 1 648 U 3 NOT TO SCALE 646 644 CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY 642 DEPARTMENT STANDARD SPECIFICATIONS. 640 638 636 634 632 630 628 626 624 622 620 1+50 1+58 Know what's below. 0111 before you dig. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' -PRELIMINARY DESIGN- CONSTRUCTION PROP 40' OF 1.17% _�_� EXIST 8" VCP TRANSITION C011121 INI,-. TRANSITION COUPLING CONCRETE PIER 0 LF OF 16" ENCASEMENT PIPE 0 +00 0 +50 1+00 1+50 U — BRAEWICK PLACE SEWER PROFILE SEE SHEET 4 FOR STORM SEWER IMPROVEMENTS 640 638 636 634 632 630 628 626 624 622 620 618 616 614 612 610 2 +00 650 648 646 644 642 640 638 636 634 632 630 628 626 624 622 0 0 o� ft PROP 8" WATER VALVE BOX AND TRANSITION COUPLING PER CMU STD 1 STA 1+23.14 PROP 8" WATER ° VALVE BOX CMU STD 1 C \ �0 GO'a, 1M 22.5' DUCTILE IRON BENDS. ROUTE AS REQUIRED (TYP) EXIST WATER LINE PROP TRANSITION COUPLING 1 11�4 9 R - - - - - -1 PROP WATER VALVE BOX CMU STD 1 INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) 0 +00 0 +50 1 +00 U — BRAEWICK PLACE WATER LINE PROFILE NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN —OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 9. CONTRACTOR SHALL RECONNECT ALL WATER SERVICE LATERALS TO PROPOSED WATER LINE PER CMU STD 17. EXIST WATER LINE TO BE REMOVED TOP OF GROUND INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) GENERAL NOTES: 1. WHENEVER DEPTH OF COVER IS LESS THAN 24- INCHES, THE WATER LINE MUST BE ENCASED IN CONCRETE PER CMU STANDARD 7. 2. DO NOT USE ANCHOR RINGS ON PVC, CIP OR AC PIPE. INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) PROP. DUCTILE IRON PIPE, CLASS 350 (TYP) PROP TRANSITION COUPLING PROP WATER VALVE BOX CMU STD 1 EXIST WATER LINE CALL NC ONECALL BEFORE YOU DIG 650 1 VERTICAL OFFSET FROM STORM DRAINAGE PIPE 1-800-632-4949 UUTILITY 0'rn- 1 648 U 3 NOT TO SCALE 646 644 CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY 642 DEPARTMENT STANDARD SPECIFICATIONS. 640 638 636 634 632 630 628 626 624 622 620 1+50 1+58 Know what's below. 0111 before you dig. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' -PRELIMINARY DESIGN- CONSTRUCTION V) 0 z [n V) O o% U I a c 0 E c aT 0 c 0 E 0 0 U D! O O ro N N 0 O 0 N O_ S U 0 CZ m Q 0 O_ 0 C) O '-j__0 O U O_ 654 652 650 648 646 644 642 640 638 636 634 632 630 628 626 624 622 PROP 8" WATER VA1_YE BOX AND TRANSITION COUPLING PER2 D1 ST + j PROP 2.5PDEG HORIZONTALL B N WIT RESTRAINED STA 6.73 I 0 ETGUM 20" MAP C aM 5SF- tt.il ID`�3C�y� S j� S5F vl SHE[ 1 NOW OR FORMERIi C) SS 135- 091 -15 D RAY POOLE & 1 oAPLE CLUMP 32 ROSS WIND58 RD 45' DUCTILE IRON BENDS. ROUTE AS REQUIRED (TYP) EXIST WATER LINE PROP TRANSITION COUPLING PROP WATER VALVE BOX CMU STD 1 INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) EXIST WATER LINE TO BE REMOVED -0 +25 0 +00 0 +50 1 +00 O 1 +50 U — CROSS WINDS SEWER x o N cD N (u Lq 00 (D O r- N i 0 o �, p U U m m U �' o Ln N T: �� � o o (000 2 rn .. 0000 o O � __ rao Cn O D s!n v ILI_ p O ,n tD x0 o �+ 0. 0 ; 00 () Q O > .. .. .. ... �O II o_O O0Q O'UVi— Z - D U) C_ O w Q 6 II ZO - >> ZZ o zcno - N N — 0I� _ ; 0 0 x o- oo� 0_mum O 0 0 NH 0 0.0 o- Ow 0.20 0 PROP. 213 LF OF 8" PC Dip 0- 0.. c 0 Of N H 0-NH 0.0! w� crow o' (n a- Of N Of (A SEE DETAIL 1/U4 „ EXIST ..g PROP COUPLING 0 8 A TER VALVE BOX AND TRANSITION PER CMU ',STD 1 RCBC SEE SHEET 5 �� EXIST 8 "VCP PROP 8 ". WATER CMU STD 1 VALVE BOX. R 8 PC 350 DIP -0 +25 0 +00 0 +50 1 +00 1 +50 U — CROSS WINDS SEWER PROFILE 654 652 650 648 646 644 642 640 638 636 634 632 630 628 626 624 622 620 2 +00 2 +25 652 650 648 646 644 642 640 638 636 634 632 630 628 626 624 622 620 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN -OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 9. CONTRACTOR SHALL RECONNECT ALL WATER SERVICE LATERALS TO PROPOSED WATER LINE PER CMU STD 17. 4't GENERAL NOTES: 1. WHENEVER DEPTH OF COVER IS LESS THAN 24- INCHES, THE WATER LINE MUST BE ENCASED IN CONCRETE PER CMU STANDARD 7. 2. DO NOT USE ANCHOR RINGS ON PVC, CIP OR AC PIPE. HORIZONTAL OFFSET FROM STORM DRAINAGE NOT TO SCALE 0 +00 0 +50 1 +00 1 +50 2 +00 2+ U — CROSS WINDS ROAD WATER LINE PROFILE 652 650 648 646 644 642 640 638 636 634 632 630 628 626 624 622 620 618 22.5' DUCTILE IRON BEND INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) PROP. DUCTILE IRON PIPE, CLASS 350 (TYP) PROP TRANSITION COUPLING 22.5' DUCTILE PROP WATER IRON BEND VALVE BOX CMU STD 1 EXIST WATER LINE INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) Know what's below. 0111 before you dig. CALL NC ONECALL BEFORE YOU DIG T O'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION Uj J Z o ... Fn wz� P- ¢ U ... W UM5 Z .. .. .. .. .. .. ... .. .. .. .. 0 Z .. w. O 0mO Z .. .. ... Q CoZZ+ _ 0 a0 M N N 0 _ + N N pLq J _ O N + N 0I� _ ; 0 0 x o- oo� 0_mum O 0 0 NH 0 0.0 o- Ow 0.20 0 PROP. 213 LF OF 8" PC Dip 0- 0.. c 0 Of N H 0-NH 0.0! w� crow o' (n a- Of N Of (A SEE DETAIL 1/U4 „ EXIST ..g PROP COUPLING 0 8 A TER VALVE BOX AND TRANSITION PER CMU ',STD 1 RCBC SEE SHEET 5 STA 2+35.98 PROP 8 ". WATER CMU STD 1 VALVE BOX. SIA 0+227,94 0 +00 0 +50 1 +00 1 +50 2 +00 2+ U — CROSS WINDS ROAD WATER LINE PROFILE 652 650 648 646 644 642 640 638 636 634 632 630 628 626 624 622 620 618 22.5' DUCTILE IRON BEND INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) PROP. DUCTILE IRON PIPE, CLASS 350 (TYP) PROP TRANSITION COUPLING 22.5' DUCTILE PROP WATER IRON BEND VALVE BOX CMU STD 1 EXIST WATER LINE INSTALL MECHANICAL JOINT RESTRAINTS AT ALL JOINTS (TYP) Know what's below. 0111 before you dig. CALL NC ONECALL BEFORE YOU DIG T O'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION Lv D_ _ O_ Q Ld z c 0 E c aT co Q) 0 c 0 Q) / 0 0 Q U Q O_ O O r� N N 0 O 0 N O_ Q � _ U 0 CnZ mQ 0 O_ 000 %moo O U O_ 706 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 '~I !V. EAVES C, _ ........ .. :)61 ..... 2 •,; 7, '2 /PG 9s 3 ,� °CVeEF` DID j m PROP 40 LF OF 8" DIP WATER LINE AND TRANSITION COUPLINGS MANTA}At.... EXL�......... � TT �E6 TOP 1 .=.. 1 PA 6 79,21 NV, SO 667,75 SS NOTES: IN 4 }'} D, C.' ­111 w. 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD } sE# C, _..r ff FO M RL SPECIFICATIONS. C, ITRFA,� C \ i \ " 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. IN 1 3 0., • 1R R € _�..�w, "*! `: '`� }` �i '` �` i Sew .i �sx} �aEav :tAr`,a:IFi �`t �. I _ C, > 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P AS AMENDED IN t , .. • -' ; i�, _- }.} TO DATE. r`> 3t ' 4 ^.w�. „„...x::: �`, '' .., ,, , ''•, :..rv• '�. tas OR F(: ?R�#ERI...`�` s.,t4'',;k A,� t. {�'v °# ;�'�� f f"�, a , "� i cy.. #::�;3S # Sri, #�i # -I f €�". P�...... - K s c, , , ;�.. �. ��� .,i Z Ti P RIM= 5'2,80 � SS MANHOLE F -i.) .RIti `'" "`" m :cvxu T IM�68 . 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED I THE MANUAL OF UNIFORM TRAFFIC 36 • � . 'k.os, A� 1��� . �D N N N W N N N M N N M r ? C .i .: fit. 38 ": ,'T T BO' 1, ` Vii .' � , (if O.R A � )INV IN= 676.9 y� r. i„t '.;' 3 ,, ^..'. ^. +, .P'F. A', i ..^...^ , , q'2 Y._i A) 5 :.r..µ, i�*rJ IN: : :: C}�i5. i.}x "¢, (A OUT= 676.83,, �''',...; NOW i. R t.i�'fi�?t #ERLY `',,,.''`•�� i �'` D 06 m.,�t�, PG .36 \ � ''i 1,.••, i ?,.� 'srs.e�,.,. `�i (B)INV OUT 676.83 •, } w } ! iv .... -~ CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). TT' r ^ v PEP NV. OUT' 477.4 I ; MAP r w PROP MH Ru I , , L 1••N MO 1T�OME �� �;.. { AIAI �F � o1Riu D \ � � � � NCDOT STD 1525.01 ` TA +4 1 RD 0 I,34/R1T 11" , _ ;�, \ x 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12 IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM S 0 2.9 ww..Ss 37 1 REMOVE E EXIST } m RIM = 680.00)' IRF ) M V w A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. Q _ w 3 I SEWER MH _.... x - INV OUT (8 DIP) - 673.74. T l .t.. w TE.. = 3 _w.. •• PROP MH It = INV IN (8" DIP) = 674.04. 'i..S J, 5 PROP MH NCDOT STD 1525.01 X 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. }' f N INV IN (EXIST 8" VCP) = 674.03 3 t =5 NCDOT STD 1525.01 STA -3 +55.73: "_ 3 ,c: _ B. I C' STA 2 +41.40# RIM = 682.84 x _ Fr }r• }t „ _ 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE � � 1 �X'u' CA --CH BASIS ;ExI�T �^.T�I -# u,^,�. €�# i RIM 1 r`'�...,... , O' LEI 6 95 TOP ?R 680 M 68 .25 ..,.. INV OUT (8 DIP) = 676.83 IOP ' , ass <` „4 PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. EtIiA 05"'79.66 F.� f .f { .... INV OUT (8 DIP) = 675.83w INV IN (8 DIP) = 677.03 s x ? TT3:iV , AT:. :- r7E. 12 - 7 A� CA) 17- MAPLE � � 8 (At1,.•" RC }i IN`s'. (:; #.s: 67f.#.:X't )..- i } INV IN (8" DIP) = 676.02 , ". REMOVE 101 LF i t - ~' (B ) ' 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE :OF EXIST 8 SEWER " m Z", BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS REMOVE 232 LF -,. ? , BRADFORD :PE � - � ARE APPROXIMATE. SEE S &ME PROJECT N0. 1351-10-064. r ! PROP MH: 1 x OF EXIST 8" SEWER ';? _ NCDOT STD 1525.01 TOPMRIN =680.55 a B`�AD�t`RD PEAR 3 3� I€ ... r STA 1+46.40 M f (A)INV IN= 674.87 3 RIM = 680.41 t i I - (B)INV OUT574.59i } , 1 f INV OUT (8 DIP) = 675.06 3 l t3 3 }.. �1 rv4 �, w 0 P 8 p ., P� p1P S'tANH4LEm.,, s I INV IN (8" DIP) = 675.26, 3, v:7+ 1,. " pC 3 4 .# I--I RIM= 6$0:03 „ S Q A , 4 IN= s74iD3 7" \P �O DIP' 3 , € #, ( iF N f :' m , �V IN= 673':93 % INV OUT = 673.73 \ 9 J 9 y \N y ,� 1 0 +50 "��`..,. � s�F.�:��L� PEAT � REMOVE EXIST � �,...� _ � r;.�w..� W ;/ '',;:,..,= ?'�s� {. �... � , , �.. ��.. � �.• a �, (A) ~• { eF , ' i SEWER MH p0 m,. ,,. "' t J'A;. A 1-E INAS #.. S msµ. ... ,� ,• EXIST CATCH BASIN g TO SS � TOP RQ= 682,76: B r£ .... 1,1 u € ,�� \SIA U +94.1b ,,,,,RIM = 680.14 INV OUT (8" DIP) = 674.55 it INV IN (8" DIP) = 674.75 SS MANHOLE TOP RIM= 680.74 (A)INV IN= 673.64 a• " (B)INV IN= 673.44" \ (C)INV OUT= 673.34 E C, NO'A' OR FORMERLY RICA,R O G PORTIILLO RA � XiST 4 N'V -= A ,sv 'X W° G uP,� TSB tk i 1 1 i 35 ) NOW OR #FORNIERL" NATIONA LE CAS SERVICES' 135-064-25 DE 6522/PG 449 3423 NEW HA1iv1t-"PHIR;: DR NOW OR FORMERLY 135..... SE 4 .....24 41-5 NE W HAMPSHIRE DR FOUNTAIN rY fps =i s s NOW OR FOR -SF RLY COI : R AN -..... 64 ... OR 08791/ y G ,. 48 SE sVEE HA1tAP$ .I;R 3 +00 3 +50 U - NEW HAMPSHIRE SEWER PROFILE .�.• } M�,1#�A.� rx, jAPA#E E MAPL r! �t i VIVI °iti r` 7' A �iI�,SEE S ET 1 R � ' t� PEAR L,STOR DRAINAEzE IMPR VEME1{NTS 12 B RADFORD . EAR A, M it coo \SIA U +94.1b ,,,,,RIM = 680.14 INV OUT (8" DIP) = 674.55 it INV IN (8" DIP) = 674.75 SS MANHOLE TOP RIM= 680.74 (A)INV IN= 673.64 a• " (B)INV IN= 673.44" \ (C)INV OUT= 673.34 E C, NO'A' OR FORMERLY RICA,R O G PORTIILLO RA � XiST 4 N'V -= A ,sv 'X W° G uP,� TSB tk i 1 1 i 35 ) NOW OR #FORNIERL" NATIONA LE CAS SERVICES' 135-064-25 DE 6522/PG 449 3423 NEW HA1iv1t-"PHIR;: DR NOW OR FORMERLY 135..... SE 4 .....24 41-5 NE W HAMPSHIRE DR FOUNTAIN rY fps =i s s NOW OR FOR -SF RLY COI : R AN -..... 64 ... OR 08791/ y G ,. 48 SE sVEE HA1tAP$ .I;R -0 +25 0 +00 0 +50 1 +00 1 +50 2 +00 2 +50 3 +00 3 +50 U - NEW HAMPSHIRE SEWER PROFILE M coo O (0 h r cfl cc? L7 tb r �0 MO II c0 . � 1" p N - . 11 00 6"t- r- II p nO p � it 0 ° 0 N Fn L6 11 0 L6 I O O 0 D � N O = � - 10 � O a - pr . - r00 �: � O O ? F- O o0 00 o - - CO o of u Q 00 II Zp =V) �� = ~N^ 00 tn�� + a0 0_O OOQ + II Ncn_p + � �+ O II O Z o_ ��..�I 0 0 a- O- 00Q� a U�_ >> zz Of0 a0° O? �p ZA a0 azcno LL - - �� Q � 0!UH- azcna » ZZ _ _ D 0 UH „? 0_UI -- >> a- v)cr_ ?z » ZZ _ 0 Z(na z - - - az(noc PROP 18" RCP SEE SHEET 10 - f - -PROP RG _ PR P 18 °__R RCP 0 C SEE SHEET 10 SEE SHEET 10 % � %f� %% �1���% PROP 95 F " P __ 350 $ G DIP 77777 ���� PROP 52' OF 8' PC 350 DIP p 0. 1% 7 P-3a 8 PC 35�fP ®0.60 0 PROP 43 OF 8 " PC 350 DIP @ 0.60% 8" ,PC 350 DIP @ 0.60% @ 0.07.- PROP 20 OF - I 8„ PC 350 DIP 0.60% PROP 18- RQP _ SEE SHEET 10 _ PR P 6' X 4' RCBC An - T G - -0 +25 0 +00 0 +50 1 +00 1 +50 2 +00 2 +50 3 +00 3 +50 U - NEW HAMPSHIRE SEWER PROFILE NEW HAMPSHIRE DRIVE SANITARY SEWER PROFILE SEE SHEET 10 FOR STORM SEWER IMPROVEMENTS 706 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 674 672 670 668 666 Know what's below. Call before you dig. 0 4 8 EEEEEI Vertical Scale: 1" = 4' 0 20 40 EEEEEI Horizontal Scale: 1" = 20' CALL NC ONECALL-N BEFORE YOU DIG T 0'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE W ITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION Lo Lo CO CYD W n c V L Lv O_ Q Ld z c 0 E c aT co Q) 0 c 0 Q) 0 Q U Q D! O O ro N N O O O N D- Q � U 0 Z CnmQ 0 O_ %moo O U O_ w ' B 558,50 p r 3 8 E r w „ �� a ; ",,Ax LAMP POSI (3 10” MAPLE ". ww 1 5 6 f' wf � )B 061 r1 /,P(.,-, S$ w t I l 34.0,C) AMIPIZ'k ', ;n's ,� Yea �, :-, ri'� •t` r``•t� DFORD PE ''r LAMP POST w { ,• A\ ""1 '1110 < I >r BRADFORD 706 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 cE BAR SEWER MH 2' ORN p L rvI" MFNy s i t ✓ ~} 1E GUM qt_ }is tJt`xK ,77 , ,' , C' BR b�06c PEAw PROP MH NCDOT STD 1525.01 STA 6 +02.83 RIM = 693.81 INV OUT (8 DIP) = 687.57 INV IN (EXIST 8" VCP) = 687.77 ,. Fr R O R IM E R I `' 1 # A W1 KtlWS .1 13,5 61. 19 ..y I.. 'tV. SI` .fix"+;.:. ,v '-s 5" W-LLOW � 4 +00 4 +50 5 +00 5 +50 NEW HAMPSHIRE DRIVE SANITARY SEWER PROFILE SEE SHEET 11 FOR STORM SEWER IMPROVEMENTS 6 +00 706 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN -OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. Know what's below. 0111 before you dig. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' 7 f CALL NC ONECALL-N BEFORE YOU DIG T 0 'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION t..Ft' G.{ ,rti °^` �'}F. 'Ii^y.'st'„^•t7i. .,r11 ni P{ R...AR L0 r 00 `o ri II i' � t / Zy . :. .......... ...._._ I nr• .7" . y 4 +00 4 +50 5 +00 5 +50 NEW HAMPSHIRE DRIVE SANITARY SEWER PROFILE SEE SHEET 11 FOR STORM SEWER IMPROVEMENTS 6 +00 706 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN -OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. Know what's below. 0111 before you dig. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' 7 f CALL NC ONECALL-N BEFORE YOU DIG T 0 'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION t..Ft' G.{ ,rti °^` �'}F. 'Ii^y.'st'„^•t7i. .,r11 ni P{ R...AR L0 r 00 `o ri II r` t GEDA �4 .7" . y co ^ 0_ II j (N r M CK� 00 E cn cn p Oul 41 cV M� +(0 ~10 a) II " w ~ O? 0 a O_U�— a_Zcna'? >> s a MAN Of TOP RIM {A�,'• 1 3 Gf i, (B il`s2 1N 685,11. {V� J 12' OAK 4 +00 4 +50 5 +00 5 +50 NEW HAMPSHIRE DRIVE SANITARY SEWER PROFILE SEE SHEET 11 FOR STORM SEWER IMPROVEMENTS 6 +00 706 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN -OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. Know what's below. 0111 before you dig. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' 7 f CALL NC ONECALL-N BEFORE YOU DIG T 0 'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION L0 r 00 `o ri II O co ^ 0_ II j (N r M CK� 00 E cn cn cV M� +(0 ~10 a) II " w ~ O? 0 a O_U�— a_Zcna'? >> EXIST 8" VCP 71/ 71717 ROPC 350 DIP 4.27% PROP 18" RCP Z /:Z/ / ZZ SEE SHEET 4 +00 4 +50 5 +00 5 +50 NEW HAMPSHIRE DRIVE SANITARY SEWER PROFILE SEE SHEET 11 FOR STORM SEWER IMPROVEMENTS 6 +00 706 704 702 700 698 696 694 692 690 688 686 684 682 680 678 676 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN -OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. Know what's below. 0111 before you dig. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' 7 f CALL NC ONECALL-N BEFORE YOU DIG T 0 'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION Z J Z O Z O c 0 E c aT 0 c 0 0 0 Q U Q O_ O O ro N N O O O N / Q � S U 0 Z CnmQ 0 O_ %moo O U O_ xi � r r 0 :..E ' 7' GUM A,v E NOW OR FORME"" € F D NNI OR �3872/PG 21 DECK E\ Lz f E 4707 MOFR, 1+'��TEh r `EE t ASH.. „E SHEET 12 FOR--\ STORM DRAINAGE AMPObVEMENTS { L 062541/PG 838 CAT0,4 TOP Rl 69163 E E z S yr" BOTTOM CRATE= 69100 1 (A)24" RCP INV, IN= 681F, ns /, „% % � A r ��J { } " ) # {:i #:h ' {. }U'#` h�#.r. A8 { / J � 1 � �a E EvE �) E E E 4 0 1 �rf AN ER 'LINE s ti MAIN EXISTING Al r aLIGND DEPTH E 15' a:AP�_ i D MAPL N # REMOVE EXIST wa E 4 SEWER MH .w.�.... s 1 a ,.,. t w , 1 15R ©P 20 t �F 2 PVC ,*ATEI4 r E w, p • { MAINTAIN °'EX'ISTING�, ALIGNMENT AND DEpT . Y , E 'M ;Srr BRADFORD D PEttB ? 1 1 — - -, — ,N FXIgT r Q !Zlh` ' a PROP MH NCDOT STD 1525.01 STA 0 +39.02 RIM = 693.03' y �� INV IN (8" DIP) = 688.59 ' E 5 �• T INV IN (8" DIP) = 688.67> t A INV OUT (EXIST 8" VCP) = 688.29 5 ww 4- SSE wF SSE 01, ; 1.v9 IZ i C IVfjpp{.��T SS 414 r.,. N,•' a' '',,, 43 8 2 M O R I ill E: O N E N '''•. �� '`" SSE S SE O'S' o yi 7 ssdo � 720 718 716 714 712 710 708 706 704 702 700 698 696 694 692 690 688 686 684 682 •� I9. � 3 n 0 { "x ' AD W, f TT" r :A .II , <Y" , CO Lo CO 04 W E-1 d' W vL VL 12 CEDAR 1 { I rn. i I N I i I i I i I I I o .. 00 CO.. 06 00 TFR�PLE­ ASH r.' AS Lci .. M a .. ,°n p iN u u oo.. ^ ^ E 00 p. cno� �00 .. .. p . ,°n'0) 0 o x w 00 Co f — ao° u O 0 Q 0-1 C) ZW FrzUZ o aoo a > O "'0 z?o > > > 7' GUM A,v E NOW OR FORME"" € F D NNI OR �3872/PG 21 DECK E\ Lz f E 4707 MOFR, 1+'��TEh r `EE t ASH.. „E SHEET 12 FOR--\ STORM DRAINAGE AMPObVEMENTS { L 062541/PG 838 CAT0,4 TOP Rl 69163 E E z S yr" BOTTOM CRATE= 69100 1 (A)24" RCP INV, IN= 681F, ns /, „% % � A r ��J { } " ) # {:i #:h ' {. }U'#` h�#.r. A8 { / J � 1 � �a E EvE �) E E E 4 0 1 �rf AN ER 'LINE s ti MAIN EXISTING Al r aLIGND DEPTH E 15' a:AP�_ i D MAPL N # REMOVE EXIST wa E 4 SEWER MH .w.�.... s 1 a ,.,. t w , 1 15R ©P 20 t �F 2 PVC ,*ATEI4 r E w, p • { MAINTAIN °'EX'ISTING�, ALIGNMENT AND DEpT . Y , E 'M ;Srr BRADFORD D PEttB ? 1 1 — - -, — ,N FXIgT r Q !Zlh` ' a PROP MH NCDOT STD 1525.01 STA 0 +39.02 RIM = 693.03' y �� INV IN (8" DIP) = 688.59 ' E 5 �• T INV IN (8" DIP) = 688.67> t A INV OUT (EXIST 8" VCP) = 688.29 5 ww 4- SSE wF SSE 01, ; 1.v9 IZ i C IVfjpp{.��T SS 414 r.,. N,•' a' '',,, 43 8 2 M O R I ill E: O N E N '''•. �� '`" SSE S SE O'S' o yi 7 ssdo � 720 718 716 714 712 710 708 706 704 702 700 698 696 694 692 690 688 686 684 682 •� I9. � 3 n 0 { "x ' AD W, f TT" r :A .II , <Y" , CO Lo CO 04 W E-1 d' W vL VL –0 +25 0 +00 0 +50 MORINGTON LANE SANITARY SEWER PROFILE SEE SHEET 11 FOR STORM SEWER IMPROVEMENTS 1 +00 1 +50 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE MULCH D OF EACH DAY. AND CONTRACTOR SHALL SEED AT THE E N N M N 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN -OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 9. CONTRACTOR SHALL RECONNECT ALL WATER SERVICE LATERALS TO PROPOSED WATER LINE PER CMU STD 17. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' CALL NC ONECALL-N BEFORE YOU DIG T 0 'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION I rn. i I N I i I i I i I I I o .. 00 CO.. 06 00 0) r, Ln (^ c6 o6 a-. -- Lci .. M a .. ,°n p iN u u oo.. ^ ^ 00 p. cno� �00 .. .. p . ,°n'0) 0 o x w 00 Co — ao° u O 0 Q 0-1 C) ZW FrzUZ o aoo a > O "'0 z?o > > > - iZi7 7i%ii liii iiPR i P 232 OF RC 3sn nip PROP 39' OF 8 PC 350 DIP Q 0.60 @ 0.61 T. — PROP �.. SEE.... 60" RCP HEET.12 –0 +25 0 +00 0 +50 MORINGTON LANE SANITARY SEWER PROFILE SEE SHEET 11 FOR STORM SEWER IMPROVEMENTS 1 +00 1 +50 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE MULCH D OF EACH DAY. AND CONTRACTOR SHALL SEED AT THE E N N M N 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN -OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 9. CONTRACTOR SHALL RECONNECT ALL WATER SERVICE LATERALS TO PROPOSED WATER LINE PER CMU STD 17. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' CALL NC ONECALL-N BEFORE YOU DIG T 0 'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION Lo 1-4 + E 1 51 `� � V L V) J J z O Cn c 0 E c aT 0 c 0 E 0 0 Q U Q O! O O r7 N N O O O N / Q � S U 0 Z m Q 0 O_ 0 C) O '-j__0 O U O_ ' )i. i C$i V tit.. EHYWAR.)' D MC RAY 1 ; $ 0 , ..... . 1::?R G: 6,3,3),',5 7PG 624 4317 if Cl { 0 0 CATCH BASIN 'OP R 694,12 CIP G RAT 693,80 BOTTOM %RA tz437 n ! RCP �W INV N= 684Z) w 0, s : ..„ ryu PROP MHO NCDOT STD 1525.01 STA 2 +70.88 RIM = 699.90 INV OUT (8" DIP) = 690.01 INV IN (8" DIP) = 690.21 1 Q D MATCHLINE STA 4 +55 SHEET U9 OAT Bx SN...... TOP CIRAITE­ 699,94 BOTTOM CRS' .= 539.59 R u " o N ROW OF 6' STU3 i TOP= 70229 t tt F .t 4 47 �tW r� f 1w 7 PROP MH - •• NCDOT STD 1525.01 �N C STA 3 +16.49 �........... SS RIM = 703.37 w --. ` �� INV OUT (8" DIP) = 690.45 =� 5" DIP �e� /C R��g SeaINV IN (8" DIP) = 690.65 IG w SS SS 11 1 f �, .•C AICfi E)ASlN, .. LO } I 'OP GRATA 700,04 - { ; B`70 GRATE- 699 ,'11`2 (A)RCP INV, IN= 794,## I 1 Q D (8)RCP i �h, ( C AV I` v, z7 T 93,91 II a- p 7 74 X . 1 PAR if if 41 Oki ROW a) O 04 M + p 00 fil frf ui �00 O REMOVE 306 LF f O - >> ZZ FORMER! Y OF EXIST 8" SEWER \. N I^};q'�} - �R} !„t {..., t.F t.F 1... $'Y� PARK, { tf; �� ,? A 13f 046 40 { Viz.. Dpi 062`9 ,f`f G 51'6 1 jf t 1 i2 v o `- 40 S}HIm„..„. ON Ii ROW OF 6' STU3 i TOP= 70229 t tt F .t 4 47 �tW r� f 1w 7 PROP MH - •• NCDOT STD 1525.01 �N C STA 3 +16.49 �........... SS RIM = 703.37 w --. ` �� INV OUT (8" DIP) = 690.45 =� 5" DIP �e� /C R��g SeaINV IN (8" DIP) = 690.65 IG w SS SS 2 +50 3 +00 3 +50 U — MISSION HILLS SEWER PROFILE 4+00 s. m SEE SHEET 11 FOR STORM SEWER IMPROVEMENTS 4+50 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN -OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 9. CONTRACTOR SHALL RECONNECT ALL WATER SERVICE LATERALS TO PROPOSED WATER LINE PER CMU STD 17. Know what's below. Call before you dig. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' CALL NC ONECALL-N BEFORE YOU DIG T O'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION .. LO - O co 0) to o rn co LCi.. II a- 8 a) O 04 M + p 00 ui �00 O �. II ... D0 — a_ p OC) D U�- 0 Z(n� O - >> ZZ - +co CI . 0 � - O 0 Q c'UI —» a_ZV) — ZZ _ SEE SHEEI 13 PROP 6' X 4' " RCBC - _ 7 ��������� %�f ��� =7 770=777777 7 PROP 166' OF PROP 46' 8" PC 350 1)IP 0.53% .. a" PC Q 0460% 558 DIP .. 2 +50 3 +00 3 +50 U — MISSION HILLS SEWER PROFILE 4+00 s. m SEE SHEET 11 FOR STORM SEWER IMPROVEMENTS 4+50 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN -OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. 9. CONTRACTOR SHALL RECONNECT ALL WATER SERVICE LATERALS TO PROPOSED WATER LINE PER CMU STD 17. Know what's below. Call before you dig. 0 4 8 Vertical Scale: 1" = 4' 0 20 40 Horizontal Scale: 1" = 20' CALL NC ONECALL-N BEFORE YOU DIG T O'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN- NOT RELEASED FOR CONSTRUCTION z J Lv J Q p O p Q Lv c 0 c aT 0 c 0 E 0 0 Q U Q O! O O ro N N O O O N / o% Q � U 0 Cn z mQ 0 O_ %moo O U O_ 43 17 „d <= OAK NOW OR F1.1RMERI...Y BANK 1.1i`1E 135 - 00,31 -44. 12 73 /'PG 271 8216 WSSiON ::ILLS IUD LAP NOW OR FORMER! Y K10€... €1TtN"M ED {, I l i AI 135-051! -45 � f,34€�t /P1:x 'i , .� 8210 1t11;>1ho,N HIE:..1...S RE) / ,/ ° / / ' r �t / ;/ / PROP MH- lt / x / x .1 _......� � .../ ZI NCDOT STD 1525.01' / Ai s (D 0 STA 6 +22.38 /x / i.... I RIM = 704.25 ,. INV OUT (8" DIP) = 693.32 INV IN (EXIST 8" VCP) = 693.62 ? P1I° S ~3 } rn. gat• v ti { } .... � ................ I i CATCH M q T TOP M #O }A #$ aE - BC . a ci as R (A)RCP 3¢ 1 J # ... 6,7h 10 OA {: }A � 2 1C a)OCP >` INV, INi Aa,o5 606,6A C} C 17" INV, s 1 A t i iAA t3 t F 12" OA 8k AR �ADFORD PE: LiJ OAK z ' ^w µ B EI_M 7 A 1C Cv3 #P t k.1 Ab PI:NE z j 'OR °K#;t.tFtf"t D''E MEN } } t i A„ rrR d 1 720 718 716 714 712 710 708 706 704 702 700 698 696 694 692 690 688 686 684 682 680 N r� NOW 1' k1:R -MI iwa(.. Y IF K FIAMME:; °['; i::1 i -A %OSF AN DB 05758/PG 904 M RF =t „E SS MANHOLE TOP RIM= 705.29 (A)INV IN= 698.39 (B)INV IN= 698.34 (C)INV our = 698.14 � ;sv jSU IV(AP }..s TOP R M= 70 82 TOP GPAT 705,66 B0 TON1 GRATE-- 7{)5,19 (A)RC : 36 .tr#tra. IN . 699J'7C (B)RCP 36 " INV, OUT— 699,71 \,. r`J 1A 13' MAPLE o ' (V 0) n L 10' LOCUST W CEDAR`"- r) II rn YOP RIM= 705,01 TOP GRATE —. 704,70 BOT.QM CRATIE= 704'. (()RCP 15" INV. OUT- jSU IV(AP }..s TOP R M= 70 82 TOP GPAT 705,66 B0 TON1 GRATE-- 7{)5,19 (A)RC : 36 .tr#tra. IN . 699J'7C (B)RCP 36 " INV, OUT— 699,71 \,. r`J 1A 13' MAPLE o ' 5 +00 5 +50 6 +00 720 718 716 714 712 710 708 706 704 702 700 698 696 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12” IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN —OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. now what's below. 0111 before you dig. 694 0 4 8 Vertical Scale: 1" = 4- 692 690 0 20 40 Horizontal Scale: 1" = 20' 688 686 684 682 680 6 +50 MEAD OWDALE LANE SANITARY SEWER PROFILE SEE SHEET 11 FOR STORM SEWER IMPROVEMENTS CALL NC ONECALL-N BEFORE YOU DIG T 0 'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN-. NOT RELEASED FOR CONSTRUCTION (V 0) n L r) II rn � LO LO � o Oa c0 Qa. N r = p 00 H (n X d II aO� II p? _ N oaa —^ a'UH— o -CO a Z cn of ZZ p M00 °v - ao't 11O? ofU -- — � - PROP 6' X 4'' RC13C SEE ii /777/iii�.�iiii iai i%riiii�i iiii% %iii % %iiii %i %% E— 8" PC 350 DIP @ 1.05 5 +00 5 +50 6 +00 720 718 716 714 712 710 708 706 704 702 700 698 696 NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE- MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 3. ALL SHORING SHALL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926, SUBPART P, AS AMENDED TO DATE, 4. ANY NECESSARY LANE CLOSURES SHALL FOLLOW GUIDELINES OUTLINED IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND /OR C.D.O.T. WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). 5. IF THE PROPOSED SEWER MAIN IS INSTALLED WITHIN 12” IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM A GAS MAIN, THEN THE CONTRACTOR SHALL CALL THE APPROPRIATE GAS COMPANY AND INFORM THEM. 6. THE CONTRACTOR SHALL SEED AND MULCH AT THE END OF EACH DAY. 7. ALL WATER METERS, WATER LATERALS, SEWER CLEAN —OUTS, AND SEWER LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS PRIOR TO CONSTRUCTION. 8. PLEASE REFER TO THE REPORT OF SUBSURFACE INVESTIGATION PREPARED BY S &ME, INC. FOR DEWATERING, PIPE BEDDING, AND BACKFILL RECOMMENDATIONS. SOIL TEST BORING AND ROCK PROBE LOCATIONS SHOWN ON PLANS ARE APPROXIMATE. SEE S &ME PROJECT NO. 1351 -10 -064. now what's below. 0111 before you dig. 694 0 4 8 Vertical Scale: 1" = 4- 692 690 0 20 40 Horizontal Scale: 1" = 20' 688 686 684 682 680 6 +50 MEAD OWDALE LANE SANITARY SEWER PROFILE SEE SHEET 11 FOR STORM SEWER IMPROVEMENTS CALL NC ONECALL-N BEFORE YOU DIG T 0 'rn- 1- 800 - 632 -4949 ,AVOID UTILITY DAMAGE, CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE MECKLENBURG UTILITY DEPARTMENT STANDARD SPECIFICATIONS. -PRELIMINARY DESIGN-. NOT RELEASED FOR CONSTRUCTION