HomeMy WebLinkAbout20050588 Ver 2_Stormwater Info_201204274
X1005 - 0� % 8
TO
Annette Lucas PE
NCDENR /DWQ /Wetlands and Stormwater Branch
1650 Mail Service Center (mail)
Raleigh NC 27699 -1650 LAPR FROM Carlton Hunt 2012
Stewart - Proctor PLLC
319 Chapanoke Road Suite 106
Mrs Lucas
This is the submittal I called you about We are proposing to redesign 3 of
the level spreaders for Ferrell Meadows Project # 050588 This site plan s
a whole will not be changed only the level spreaders The level spreaders as
previously approved they are not really buildable With this submittal are
the flow calculations for the li.n per hour storm the level spreader
supplement forms and the details for the spreaders and the splatter boxes
FERRELL MEADOWS
LEVEL SPREADER CONVERSION TO NEW
1001211111=
THE PURPOSE OF THIS CHANGE IS TO SHORTEN THE LENGTH OF THE PROPOSED LEVEL SPREADERS AND
INSTALL BYPASSES FOR FLOW EXCEEDING THE DESIGN STORM
LEVEL SPREADER #1
DRAINAGE AREA - 4 9 ACRES
DESIGN STORM -1 IN /HOUR
C VALUE 0 40
DESIGN STORM Q -196 CFS
DESIGN LENGTH - 98 FEET
LEVEL SPREADER #2
DRAINAGE AREA -16 ACRES
DESIGN STORM -1 IN /HOUR
C VALUE 0 40
DESIGN STORM Q -0 64 CFS
DESIGN LENGTH - 32 FEET
LEVEL SPREADER #3
DRAINAGE AREA - 3 8 ACRES
DESIGN STORM -1 IN /HOUR
C VALUE 0 40
DESIGN STORM Q -152 CFS
DESIGN LENGTH - 76 FEET
SPUTTER BOX DETAILS ATTACHED
oa�F W ATEgOG
y f
_ _ >
HCDENR °
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
LEVEL SPREADER VEGETATED FILTER STRIP (LS VFS) SUPPLEMENT
This form must be completely rifted out printed initialed and submitted
1 PROJECT INFORMATION
sq It Forebay is adequately sized
Project name
Ferrell Meadows
Contact name
Michael Stewart
Phone number
919 7791855
Date
April 17 2012
Drainage area number
1
II DESIGN INFORMATION
it
The purpose of the LS-VFS
Buffer Rule Diffuse Flow
Stormwater enters LS-VFS from
The drainage area
Type of VFS
Protected riparian buffer (slope < 5 %)
Explanation of any Other" responses above
If Stonnwater Enters the LS-VFS from the Drainage Area
Drainage area
Impervious surface area
Percent impervious
Rational C coefficient
Peak flow from the 1 in/hr storm
Time of concentration
Rainfall intensity 10 yr storm
Peak flow from the 10 yr storm
Design storm
Maximum amount of flow directed to the LS VFS
Is a flow bypass system going to be used?
Explanation of any Other responses above
If Stormwater Enters the LS VFS from a BMP
Type of BMP
Peak discharge from the BMP during the design storm
Peak discharge from the BMP during the 10 year storm
Maximum capacity of a 100 foot long LS VFS
Peak flow directed to the LS-VFS
Is a flow bypass system going to be used?
Explanation of any Other responses above
LS VFS Design
Forebay surface area
Depth of forebay at stormwater entry point
Depth of forebay at stormwater exit point
Feet of level lip needed per cis
Computed minimum length of the level lip needed
Length of level lip provided
Width of VFS
Elevation at downslope base of level lip
Elevation at the end of the VFS that is farthest from the LS
213 444 fe
25 613 fe
1200 %
U 4U
196 c(s
500 min
722 in/hr
1415 cfs
10 year storm
196 cis
y (Y or N)
Do not complete this section of the form
cfs
cis Do not complete this section of the form
2 cfs
CIS Do not complete this section of the form
(Y or N)
52
sq It Forebay is adequately sized
12
in
12
in Depth is appropriate
50
ft/cfs
98
ft
98
ft
50
it
34000
fmsl
33900
fmsl
Forrn SW401 LS-VFS 27Ju12011 Rev 9 page 1 of 3
Slope (from level lip to the end of the VFS) 200 %,
Are any draws present in the VFS? N (Y or N) OK
Is there a collector swale at the end of the VFS9 N (Y or N)
Bypass System Design (if applicable)
Is a bypass system provided?
Is there an engineered flow splitting device?
Dimensions of the channel (see diagram below)
M
B
W
y (flow depth for 10 year stone)
freeboard (during the 10 year storm)
Peak velocity in the channel during the 10 yr stone
Channel lining material
Does the bypass discharge through a wetland?
Does the channel enter the stream at an angle?
Explanation of any Other" responses above
Y (Y or N)
Y (Y or N)
300
ft
300
It
900
It
073
It
100
It
376
ft /sec
Pick one
N (Y or N)
Y (Y or N)
Please provide plan details of flow splitter & supporting caics
W
g w
.0
L B 1
III REQUIRED ITEMS CHECKLIST
EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found M incomplete submittal package will
result in a request for additional information This will delay final review and approval of the project Initial in the space provided to indicate the
following design requirements have been met If the applicant has designated an agent the agent may initial below Na requirement has not been
met, attach jusbficabon
Requrled Item
1 Plans (1 50 or larger) of the entire site showing
Design at ultimate build -out
Off site drainage (if applicable)
Delineated drainage basins (include Rational C coefficient per basin)
Forebay (d applicable)
High flow bypass system
Maintenance access
Proposed drainage easement and public right of way (ROW) and
Boundaries of drainage easement.
2 Plan details (1 = 30 or larger) for the level spreader showing
Forebay (if applicable)
High flow bypass system
One foot topo lines between the level lip and top of stream bank
Proposed drainage easement, and
Design at ultimate build -out
Initials Page or plan sheet number and any notes
Form SW401 LS-VFS Mul2011 Rev 9 page 2 of 3
3 Section view of the level spreader (1 - 20 or larger) showing
Underdram system (d applicable)
Level lip
Upslope channel and
Downslope filter fabric
4 Plan details of the flow splitting device and supporting calculations (if applicable)
5 A construction sequence that shows how the level spreader will be protected from
sediment until the entire drainage area is stabilized
6 if a non - engineered VFS is being used then provide a photograph of the VFS showing
that no draws are present
7 The supporting calculations
8 A copy of the signed and notarized operation and maintenance (0&M) agreement
Form SW401 LS-VFS 27M2011 Rev 9 page 3 of 3
SPUTTER BOX DESIGN DETAIL FOR LEVEL SPREADER #1
6 5 FES OUT
FBfJ,:$j="ft,3 X 6 DISSIPATER
WEIR TO BE 0 2 OVER THE 12 OPENING
SPLITTER BOX FLOW OVER THE lm/hr EVENT TO WEIR FLOW OUT SIDE OF BOX INTO CHANNEL
�R DIS SIPqPAP CNgNNEC lN
REINFORCED
VEGETATED CH NEL TO DRAIN TO STREAM BUFFER
6 PIPE OUT /W FES INTO LEVEL SPREADER
If Stormvater Enters the LS•VFS from the Drainage Area
Drainage area
69 696
TA
y r
HCDEHR
y
<
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
1200
401 CERTIFICATION APPLICATION FORM
LEVEL SPREADER
VEGETATED FILTER STRIP (LS VFS) SUPPLEMENT
This form must be completely filled out printed Initialed and submitted
1 PROJECT INFORMATION
064
Project name
Ferrell Meadows
Contact name
Michael Stewart
Phone number
919- 7791855
Date
Apnl 17 2012
Drainage area number
2
11 DESIGN INFORMATION
10 year storm
The purpose of the LS-VFS
Buffer Rule Diffuse Flow
Stormwater enters LS-VFS from
The drainage area
Type of VFS
Protected riparian buffer (slope < 5 %)
Explanation of any Other" responses above
Explanation of any Other" responses above
If Stormvater Enters the LS•VFS from the Drainage Area
Drainage area
69 696
fe
Impervious surface area
8 364
fe
Percent Impervious
1200
A
Rational C coefficient
040
ff/efs
Peak flow from the 1 in/hr storm
064
cis
Time of concentration
500
min
Rainfall intensity 10 yr storm
722
in/hr
Peak flow from the 10 yr storm
462
cis
Design storm
10 year storm
fmsl
Maximum amount of flow directed to the LS VFS
152
cis
Is a flow bypass system going to be used9
Y
(Y or N)
Explanation of any Other" responses above
If Stormwater Enters the LS.VFS from a BMP
Type of BMP
Peak discharge from the BMP during the design storm
Peak discharge from the BMP during the 10 year storm
Maximum capacity of a 100 -foot long LS-VFS
Peak flow directed to the LS VFS
Is a flow bypass system going to be used?
Explanation of any Other" responses above
LS-VFS Design
Do not complete this section of the form
cis
cis Do not complete this section of the form
2 cis
cis Do not complete this section of the form
(Y or N)
Forebay surface area
18
sq ft
Depth of forebay at stormwater entry point
12
in
Depth of forebay at stormwater exit point
12
in
Feet of level hp needed per cis
50
ff/efs
Computed minimum length of the level lip needed
76
ft
Length of level lip provided
76
ft
Width of VFS
50
ft
Elevation at downslope base of level hp
34200
frisl
Elevation at the end of the VFS that is farthest from the LS
34100
fmsl
Forebay is adequately sized
Depth is appropriate
Form SW401 LS-VFS 27Ju12011 Rev 9 page 1 of 3
Slope (from level lip to the end of the VFS)
Are any draws present in the VFS?
Is there a collector swale at the end of the VFS?
Bypass System Design (if applicable)
Is a bypass system provided?
Is there an engineered flow splitting device?
Dimensions of the channel (see diagram below)
M
W
y (flow depth for 10 -year storm)
freeboard (during the 10 year storm)
Peak velocity in the channel during the 10-yr storm
Channel lining material
Does the bypass discharge through a wetland?
Does the channel enter the stream at an angle?
Explanation of any Other" responses above
200 %
N (Y or N)
N (Y or N)
Y (Y or N)
Y (Y or N)
300
ft
300
ft
900
ft
040
It
100
It
272
ft/sec
Pick one
N (Y or N)
Y (Y or N)
W
oil
OK
Please provide plan details of flow sputter & supporting calcs
." W
L B 1
Ill REQUIRED ITEMS CHECKLIST
EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found M incomplete submittal package will
result in a request for additional Information This will delay final review and approval of the project Initial in the space provided to indicate the
following design requirements have been met If the applicant has designated an agent the agent may initial below N a requirement has not been
met, attach justdication
Requned Item
1 Plans (1 50 or larger) of the entire site showing
Design at ultimate build-out,
Off -sde drainage (d applicable)
Delineated drainage basins (include Rational C coefficient per basin)
Forebay (if applicable)
High flow bypass system
Maintenance access
Proposed drainage easement and public right of way (ROW) and
Boundaries of drainage easement
2 Plan details (1 30 or larger) for the level spreader showing
Forebay (if applicable)
High flow bypass system
One foot topo lines between the level lip and top of stream bank
Proposed drainage easement and
Design at ultimate build -out
Initials Page or plan sheet number and any notes
Form SW401 LS-VFS 27M2011 Rev 9 page 2 of 3
3 Section view of the level spreader (1 20 or larger) showing
Underdram system (d applicable)
Level lip
Upslope channel and
Downslope filter fabric
4 Plan detail of the flow splitting device and supporting calculations (d applicable)
5 A construction sequence that shows how the level spreader will be protected from
sediment until the entire drainage area is stabilized
6 If a non -engineered VFS is being used then provide a photograph of the VFS showing
that no draws are present
7 The supporting calculations
8 A copy of the signed and notarized operation and maintenance (08M) agreement
Form SW401 LS-VFS 27M2011 Rev 9 page 3 of 3
SPUTTER BOX DESIGN DETAIL FOR LEVEL SPREADER #2
4 FES OUT
CHANNEL IN
X 6 DISSIPATER
WEIR TO BE 0 2 OVER THE 12 OPENING
SPLITTER BOX FLOW OVER THE 1 in /hr EVENT TO WEIR FLOW OUT SIDE OF BOX INTO CHANNEL
CHgNN f� DISS,Pq RR PAApDP
�N REINFORCED
VEGETATED CH NEL TO DRAIN TO STREAM BUFFER
4 PIPE OUT /W FES INTO LEVEL SPREADER
o�oF warFgoc
h r
_ - y
HCDEHR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
LEVEL SPREADER VEGETATED FILTER STRIP (LS VFS) SUPPLEMENT
This form must be completely filled out printed initialed and submitted
I PROJECT INFORMATION
Project name Ferrell Meadows
Contact name Michael Stewart
Phone number 919 779 -1855
Date April 17 2012
Drainage area number 3
II DESIGN INFORMATION
The purpose of the LS VFS Buffer Rule Diffuse Flow
Stormwater enters LS VFS from The drainage area
Type of VFS Protected riparian buffer (slope < 5 %)
Explanation of any Other" responses above
If Stormwater Enters the LS-VFS from the Drainage Area
Drainage area
165 528
fe
Impervious surface area
19 863
fl
Percent impervious
1200
%
Rational C coefficient
040
Olds
Peak flow from the 1 in/hr stone
152
cfs
Time of concentration
500
min
Rainfall intensity 10 yr stone
722
inthr
Peak flow from the 10 yr storm
1097
CIS
Design storm
10 -year storm
fmsl
Maximum amount of flow directed to the LS VFS
196
CIS
Is a flow bypass system going to be used?
y
(Y or N)
Explanation of any Other" responses above
If Stormwater Enters the LS VFS from a BMP
Type of BMP
Peak discharge from the BMP during the design storm
Peak discharge from the BMP during the 10 -year storm
Maximum capacity of a 100 foot long LS-VFS
Peak flow directed to the LS VFS
Is a flow bypass system going to be used9
Explanation of any Other" responses above
LS-VFS Design
Do not complete this section of the form
cis
Cis Do not complete this section of the form
2 cfs
CIS Do not complete this section of the form
(Y or N)
Forebay surface area
52
sq it
Depth of forebay at stormwater entry point
12
in
Depth of forebay at stormwater exit point
12
in
Feet of level lip needed per cis
50
Olds
Computed minimum length of the level lip needed
98
It
Length of level lip provided
98
it
Width of VFS
50
it
Elevation at downslope base of level lip
34000
5msl
Elevation at the end of the VFS that is farthest from the LS
33900
fmsl
Forebay is adequately sized
Depth is appropnate
Form SW401 LS-VFS 27Ju12011 Rev 9 page 1 of 3
Slope (from level lip to the end of the VFS) 200 %
Are any draws present in the VFS? N (Y or N) OK
Is there a collector swale at the end of the VFS9 N (Y or N)
Bypass System Design (if applicable)
Is a bypass system provided?
Is there an engineered flow splitting device?
Dimensions of the channel (see diagram below)
M
W
y (flow depth for 10 year stone)
freeboard (during the 10 year stone)
Peak velocity in the channel during the 10 yr storm
Channel lining material
Does the bypass discharge through a wefland9
Does the channel enter the stream at an angle9
Explanation of any Other" responses above
(Y or N)
(Y or N)
300
It
300
it
900
ft
073
ft
100
It
376
ftlsec
Pick one
N (Y or N)
Y (Y or N)
Please provide plan details of flow splitter t£ supporting calcs
W
w - - -- —
III REQUIRED ITEMS CHECKLIST
EDIT Please indicate the page or plan sheet numbers when; the supporting documentation can be found An incomplete submittal package veil
result in a request for addibonal information This will delay final review and approval of the project Initial in the space provided to indicate the
following design requirements have been met If the applicant has designated an agent the agent may initial below ff a requirement has not been
met, attach justification
Requried Item
1 Plans (1 50 or larger) of the entire site showing
Design at ultimate build-out
Off site drainage (if applicable)
Delineated drainage basins (include Rational C coefficient per basin)
Forebay (d applicable)
High flow bypass system
Maintenance access
Proposed drainage easement and public right of way (ROW) and
Boundaries of drainage easement
2 Plan details (1 30 or larger) for the level spreader showing
Forebay (if applicable)
High flow bypass system
One foot topo lines between the level lip and top of stream bank
Proposed drainage easement, and
Design at ultimate buddout
Initials Page or plan sheet number and any notes
Form SW401 LS-VFS 27Ju12011 Rev 9 page 2 of 3
3 Section view of the level spreader (1 20' or larger) showing
Underdram system (d applicable)
Level hp
Upslope channel and
Downslope filter fabric
4 Plan details of the flow splitting device and supporting calculations (If applicable)
5 A construction sequence that shows how the level spreader will be protected from
sediment until the entire drainage area is stabilized
6 If a non - engineered VFS is being used then provide a photograph of the VFS showing
that no draws are present
7 The supporting calculations
8 A copy of the signed and notarized operation and maintenance (0 &M) agreement
Forth SW401 LS-VFS 27M2011 Rev 9 page 3 of 3
e
SPUTTER BOX DESIGN DETAIL FOR LEVEL SPREADER #3
6 FES OUT
WEIR TO BE 0 2 OVER THE 12 OPENING
SPLITTER BOX3 FLOW OVER THE tin /hr EVENT TO WEIR FLOW OUT SIDE OF BOX INTO CHANNEL
CH DISS PATER gf ASP
ANNEC �N REINFORCED
VEGETATED CH NEL TO DRAIN TO STREAM BUFFER
6 PIPE OUT /W FES INTO LEVEL SPREADER
cu
D
CO)
VJ
50
9 'r
9
9z
z
m
r
U
m
r
-r-
71 FTI
zC
n
Tr
m
m
r
cri
�D
�v
rn
0
m
r
—0-na
zooz
CIP
w
ropm
�a
xrz
x
MCI
zw
L"
0
aou'o
-<O—
MCA
04gma
s
I-
m
m
Tr
m
m
r
cri
�D
�v
rn
0
m
r
—0-na
zooz
doo�r°n
aou'o
04gma
s
I-
m
N (A OZ
C
r,
m
r
r
�nIr�
nOM
r
.a
mZ G
m
�
a
r
m
o
�
r
a
�
x
oT
om �INW
tart r ='^
w
4:0
M— � "o �
r-
om m�.-.
a
om
A
M
o-< W m
�'
��
��
o
m
r r
m
mrnZ
L
~
00
CA a
CA
� ,
°z
r*t
m
m
D
r,