HomeMy WebLinkAbout20120416 Ver 1_CAMA Permit Application_20120425Apn120 2012 MEMORANDUM TO Cyndi Karoly Supervisor 401 Oversight & Express Permits Unit Division of Water Quality Surface Water Protection FROM Doug Huggett NC DENR DCM Mayor Permits Coordinator 400 Commerce Ave Morehead City NC 28557 (Courier 11- 12 -09) SUBJECT CAMA Permit Application Review Applicant Dowd Frank IV (c /o J North Agent) Project Location 3 Little Neck Rd adjacent to a man made cove within Banks channel & Middle Sound on Figure 8 Island, New Hanover Co Proposed Project Applicant proposes to install a single pole boatlift to accommodate an additional vessel at an existing private docking facility into Banks Channel Please indicate below your agency s position or viewpoint on the proposed project and return this form by May 16, 2012 If you have any questions regarding the proposed project contact Rob Mairs (910)796 7423 when appropriate in depth comments with supporting data is requested REPLY This agency has no objection to the project as proposed SIGNED This agency has no comment on the proposed project This agency approves of the project only if the recommended changes are incorporated See attached This agency objects to the project for reasons described in the attached comments A 400 Commerce Ave Morehead City NC 28557 3421 Phone, 252 808 2808 \ FAX 252 247 3330 Internet www nccoastalmanagement I An Equal Opportunity \ Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME Frank Dowd 2 LOCATION OF PROJECT SITE 3 Little Neck Road adjacent to a man made cove within Banks Channel and Middle Sound on Figure Eight Island New Hanover County Photo Index - 2006 24 7409 M 18 2000 24 310 L 7 1995 24 292 N 18 State Plane Coordinates X 2373527 Y 184192 Latitude 34'14 58 88415 'N Longitude 77 °45 50 48402 W 3 INVESTIGATION TYPE CAMA ROVER FILE # O 041015A 4 INVESTIGATIVE PROCEDURE Dates of Site Visit - 04/10/2012 Was Applicant Present - No 5 PROCESSING PROCEDURE Application Received - 04/19/2012 (Completed) Office - Wilmington 6 SITE DESCRIPTION (A) Local Land Use Plan New Hanover County Land Classification From LUP Conservation (B) AEC(s) Involved EW PT (C) Water Dependent Yes (D) Intended Use Private (E) Wastewater Treatment Existing - Septic System Planned - None (F) Type of Structures Existing - Single family house private pier platform floating dock and boatlift Planned - New single pole boatlift (G) Estimated Annual Rate of Erosion N/A Source N/A 7 HABITAT DESCRIPTION [AREA] DRFD FD MITT) ()T -TFR (A) Vegetated Wetlands (B) Non Vegetated Wetlands (Open water) 48 sq ft (Incorporate-) (C) Other (Highground) (D) Total Area Disturbed 48 sq ft (E) Primary Nursery Area No (F) Water Classification SA ORW Open Yes 8 PROJECT SUMMARY The applicant proposes to install a single pole boatlift to accommodate an additional vessel at an existing private docking facility into Banks Channel Frank Dowd Page 2 9 PROJECT DESCRIPTION The project site is located at 3 Little Neck Road on Figure Eight Island adjacent to a man made cove within Banks Channel and Middle Sound in New Hanover County The island is accessed from the mainland at the end of Edgewater Club Road (SR 1402) by a private bridge over the Atlantic Intracoastal Waterway (AIWW) and an earthen causeway which traverses Middle Sound Heading east on the causeway turn right on Beach Road South and travel south approximately 2 miles until you reach Little Neck Road which will be located on the right Turn right onto Little Neck Road and the property of interest will be located on the left The applicant currently maintains a two story single family residence on the property The lot is approximately 0 5 acres in size and averages 8 feet above normal high water (NHW) Upland vegetation on the property consists of maintained lawn grass and ornamental landscaping The 76 feet of shoreline of the property is currently stabilized with vegetation approximately 25 in width which consist of §404 type vegetation and Coastal Wetlands such as Sea Oxeye (Borrichia frutescens) and Salt Meadow Grass (Spartina patens) Waterward of the area of vegetation at the approximate NHW boundary is an area of low marsh which consists primarily of Glasswort (Sakcornia spp ) and Salt Meadow Grass (Spartina patens) Waterward of the NHW boundary in this area of the existing docking facility is an mtertidal strip of sand which is approximately 20 feet in width The existing access pier extends into the cove and measures approximately 60 feet in length by 6 feet in width The pier terminates onto an uncovered L head platform measuring approximately 16 feet in length by 18 feet in width An access ramp leads from the platform onto a floating dock measuring approximately 32 feet in length by 6 feet in width which runs in the same alignment as the access pier There is an existing boatlift, measuring approximately 13 feet in length by 13 feet in width which is located on the eastern side of the existing floating dock The existing docking facility was modified under CAMA General Permit No 25286 D on 8/11/2000 and currently appears to accommodate up to three (3) vessels (See Sheet 1 of 3) The New Hanover County 2006 Land Use Plan classifies adjacent waters and high ground portion of the property as Conservation. The waters of Banks Channel and Middle Sound are classified SA ORW by the Division of Water Quality They are NOT designated as a Primary Nursery Area (PNA) by the N C Division of Marine Fisheries and they are OPEN to the harvest of shellfish PROPOSED PROJECT The applicant proposes to install a single pole boatlift to accommodate an additional vessel at an existing private docking facility into Banks Channel A new single pole boatlift would be installed on the landward side of the existing platform measuring approximately 8 feet in length by 6 feet in width The application states that the existing water depth in the area of the proposed structure is approximately 0 at normal low water (NLW) The application states that the proposed structure would accommodate a personal water craft and would provide docking space for an additional vessel at this facility Further the application states that an additional docking space would be designated on the western side of the existing floating dock which would allow for up to a total of four (4) vessels at this docking facility (See Sheets 1 of 3 through 3 of 3) 10 ANTICIPATED HAPACTS The proposed structure would mcorporate approximately 48 sq ft of Estuarine Waters and Pubic Trust Area The existing docking facility currently extends approximately 95 feet into a waterbody which measures approximately 385 feet across This distance appears to conform with both the 1/4 width rule and the established pier lengths in this man made canal Due to the limited amount of water at the location for the proposed single pole boatlift, approximately 0 feet at NLW located on this side of this man made canal as shown in the attached work plan there will be potential for bottom disturbance and displacement of the substrate kicking by vessel propellers to access the channel of this canal Based on the riparian corridor that was established for this side of the cove the proposed structure would not encroach into the 15 Adjacent Riparian Corridor Setback requirement Minor increases in turbidity should be expected during construction Submitted by Robb Mairs Date 04/20/2012 Office Wilmington Mar-28-2012 01 43pm From - CHARLOTTE PIPE AND FOUNDRY CO T -421 P 001/003 F 382 FROM Jimmy Narth — CJMC FAX NO 9102566357 Ma?- 28 2012 12 33PM P! AMMA North Ca. ohna Department of Enviroiment and Natural Resources DiN Sion of Coastal Management %veHy Eaves Perdue Janes H G%son Des FMrran pry 3ovemor Director AGgNT AWTHORIZATIO? F.0-B Dote Larne of Property Owner lying r Penis I awry Mad/ �r Phone Number "ell - Name of Authorlted AW far thre Proj80 Agene�ss ffMefiing Address� Phone Number 910 '►� 3 f -' I certify that t have authorrted the agent listed above to act on my behalf, for the purpose of apPlyrng for and obt,��mrn al���y t8 ne�a�'� install 0 construct tht fallowing (acilvlty) troy property located) oat Thia cori fatlon is vapid thru (dote) ropAPty Owner 8ignaturs /7-/3 r/1...— ?)eA!5,e F4 x Q 0 Oats 3 �� APR AA 1,7 CM 18) 0 ra l:XS varnatg,m. HC 26404 N ph Cuo � %Ap v,tla09V..A intmrwf v1wK' 'Jasr�,r3'ab3�nan� ^PI A1.«l Ojr.rf. -- -_ c-A -PLD ij tF CXLe ti iT g tl( oc APR 0 2 li t- d-t- _t1, I,,- k- /C — — — - - -- -'� � - .J lo-- 7 d e_ca U-S �- f- be Q-44,e-7-e - 4c, F bt e- 5111.-) -�t) c4l 11) c:__ -COP C,-') 0-c-f- L -- -_ c-A -PLD ij tF CXLe ti iT g tl( oc cp(b -t-0 42-f- e- co AOC e -C�t,cC OCR -C (4 (.D Aj _j C_ AD-10 L-01 Q-(204-f -wCw--A a 15-101 -C-- e- r e- O'Coe- c"i xloo.q5- -j 0,4 C r -e 0- J 0 -mc APR ON MP 1 UPUCATIONfor Major Development Permit (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT <Form continues on back> Form DCM MP 1 (Page 2 of 4) Major Development Permit 3 Project Location County (can be multiple) Street Address State Rd # / f�e� LZr*,;< >O r #! / e A9 eC-1 Subdivision Name City State Zip Phone o Lot No (s) (if many attach additional page with list) Sin a3I 85 /� ext a In which NC river basin is the project located? b Name of body of water nearest to proposed project e- P,— 4Z,- -i�a-�k5 C�a&-)Ne_ I c Is the water body identified in (b) above natural or manmade? d Name the closest major water body to the proposed project site atural Olanmade ❑Unknown 0(0101/e, �o e Is proposed work within city limits or planning jurisdiction? f If applicable list the planning jurisdiction or city limit the proposed Mes ❑No work falls within rZ cre e F Ts'O. ti 5 4 Site Description a Total length of shoreline on the tract (ft ) ") (., r c Size of individual lot(s) (!t many lot saes please attach additional page with a list) b Size of entire tract (sq ft ) �� a Cd r✓ d Approximate elevation of tract above NHW (normal high water) or NW (normal water level) Q 19NHW or ❑NWL e Vegetation on tract e Z ct A scapeal / yordl MWSh Sias s f Man made features and uses now of�n tract r o �� e_ - g Identify and describe the existing land uses adtacent to the proposed project site r fes, r0. h How does local government zone the tract? i Is the proposed project consistent with the applicable zoning? (�/ (Attach zoning compliance certificate if applicable) ( e5 apQ e J 1 I a (-!es ❑No ❑NA j Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes o k Has a professional archaeological assessment been done for the tract? If yes attach a copy If yes by whom? I Is the proposed project located in a National Registered Historic District or does it involve a National Register listed or eligible property? <Form continues on next page> []Yes ❑No IJKNA ❑Yes ❑No MA 4 4t.n 4� _ b Form DCM MP 1 (Pages or 4) Major Development Permit m (i) Are there wetlands on the site? [Yes []No (ii) Are there coastal wetlands on the site? Mes []No (iii) If yes to either (i) or (ii) above has a delineation been conducted? ❑Yes .2fNo (Attach documentation if available) n Describe existing wastewater treatment facilities J��� SysN�� o Descnb existing drinking water supply source p Describe existing storm water management or treatment systems Sttr-TO:Ce f`unoo Tr 5 Activities and Impacts a Will the project be for commercial public or private use? ❑Commercial ❑Public/Govemment t o l e /E&nvate /Community b Give a brief description of purpose use and daily operations of the e- " pr when complete `P3 ,� �� SIGs G17� r„�rI� )GPYo � , f Ou e wC'te� tf� o �toic i� Sc`feILI o2 SCCW 41 c Describe the proposed construction methodology yNca of construction equipment to be used dui ng construction the number of each type of equipment and where it is to be stored d List all development activities you propose A ` l(0, iNS Ci A-,) d a NOL c-1, )- , 0 e Are the proposed activities maintenance of an existing project new work or both? Ne�J cJO� `C qo, ekSsY�NS S��t c.� we I What is the approximate total disturbed land area resulting from the proposed project? ❑Sq Ft or [-]Acres 10, ") e g Will the proposed project encroach on any public easement public accessway or other area ❑Yes ❑No R NA that the public has established use of? h Describe location and type of existing and proposed discharges to waters of the state S ti ^ T a Ce r u,., o� i Will wastewater or stormwater be discharged into a wetland? ❑Yes Mo ❑NA If yes will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA I Is there any mitigation proposed? ❑Yes JSNo ❑NA If yes attach a mitigation proposal IT r F— ! <Form continues on back> 7 p g fi�dit Purm u,-ivi ivir i tr"dlyC 4 u Y/ Major Development Permit 6 Additional Information In addition to this completed application form (MP 1) the following items below if applicable must be submitted in order for the application package to be complete Items (a) — (t) are always applicable to any major development application Please consult the application instruction booklet on how to properly prepare the required items below a A protect narrative b An accurate dated work plat (including plan view and cross sectional drawings) drawn to scale Please give the present status of the proposed protect Is any portion already complete? If previously authorized work clearly indicate on maps plats drawings to distinguish between work completed and proposed c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties e The appropriate application fee Check or money order made payable to DENR f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail Such landowners must be advised that they have 30 days in which to submit comments oft- the proposed protect to the Division of Coastal Management Name Mt*- r S OL °✓'; 5 n Phone No Address -t4 L Hit V9PGL R-0/653's P(A,3&L1.-3Q b t.-11e C�e /W !/ Name M r d Mrs �o u,�," °, $ 1 ri Phone No Address 3f( Ci D r �c ��to�eii %� l� "�' �► 1 -q 33 /00 ?,+C «) Name Phone No Address g A list of previous state or federal permits issued for work on the project tract Jnclude permit numbers permittee and issuing dates &P -sass I h Signed consultant or agent authorization form if applicable i Wetland delineation if necessary I A signed AEC hazard notice for protects in oceanfront and inlet areas (Must be signed by property owner) k A statement of compliance with the N C Environmental Policy Act (N C G S 113A 1 10) if necessary If the protect involves expenditure of public funds or use of public lands attach a statement documenting compliance with the North Carolina Environmental Policy Act 7 Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application The protect will be subject to the conditions and restrictions contained in the permit I certify that I am authorized to grant and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow up monitoring of the project I further certify that the information provided in this application is truthful to the best of my knowledge Date 3 �a� �� Print Name rJi Mh loo Signature Please indicate application attachments pertaining to your proposed project ❑DCM MP 2 Excavation and Fill Information ❑DCM MP 5 Bridges pnd Culverts ❑DCM MP 3 Upland Development MCM MP-4 Structures Information Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit Form DCM MP 1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information 1 DOCKING FACILITY /MARINA CHARACTERISTICS ❑This section not applicable a (i) Is the docking facility /manna b (i) Will the facility be open to the general public? ❑Commercial ❑Public/Government 2�Pnvate /Community ❑Yes 204o c (i) Dock(s) and /or pier(s) d (i) Are Finger Piers included? ❑Yes DfNo (ii) Number _____1 / If yes (iii) Lengthy 32 r (ii) Number (iv) Width � G (m) Length (v) Floating t9yes CKNo (iv) Width (v) Floating ❑Yes []No e (i) Are Platforms included? EgYes ❑No f (i) Are Boatlifts included? D�6es ❑No If yes If yes (u) Number 1 (n) Number _ $ (iii) Length / (r (iii) Length _ (iv) width 14 % (iv) Width % r (v) Floating ❑Yes (ENO Note Roofed areas are calculated from dnpline dimensions g (i) Number of slips proposed h Check all the types of services to be provided —VL ❑ Full service including travel lift and /or rail repair or (u) Number of slips existing maintenance service 02 ❑ Dockage fuel and marine supplies ❑ Dockage ( wet slips ) only number of slips ❑ Dry storage number of boats ❑ Boat ramp(s) number of boat ramps Other please describe ,a ffilson)a I �06y5 G5'001 Iq 1 ,{Jie/ j- 00r i Check the proposed type of siting ❑ Land cut and access channel ❑Open water dredging for basin and /or channel %open water no dredging required ❑Other please describe k Typical boat length _t y d m (i) Will the facility have tie pilings9 []Yes CdNo (n) If yes number of tie pilings? Describe the typical boats to be served (e g open runabout charter boats sail boats mixed types) -t,JC/ f1UA3cL0uw5 I (i) Will the faci�lity, 1be open to the general public? ❑Yes J84o - I N tI I NI, r 2 DOCKING FACILITY /MARINA OPERATIONS �&rs section not applicable a Check each of the following sanitary facilities that will be included in the proposed protect ❑ Office Toilets ❑ Toilets for patrons Number Location ❑ Showers ❑ Boathoiding tank pumpour Give type and location. b Describe treatment type and disposal location for all sanitary wastewater c Describe the disposal of solid waste fish offal and trash d How will overboard discharge of sewage from boats be controlled? e (i) Give the location and number of No Sewage Discharge signs proposed (ii) Give the location and number of Pumpout Available signs proposed f Describe the special design if applicable for containing industrial type pollutants such as paint sandblasting waste and petroleum products g Where will residue from vessel maintenance be disposed of? h Give the number of channel markers and No Wake signs proposed i Give the location of fuel handling facilities and describe the safety measures planned to protect area water quality What will be the manna policy on overnight and live aboard dockage? a k Describe design measures that promote boat basin flushing? I If this protect is an expansion of an existing manna what types of services are currently provided? m is the martnaldticking fadLty proposed within a primtery or accondary nursery area? Dyes ONO n Is the madnWilacking facility proposed within or adjacent to any shellfish harvesting areal OYes ]�da o is the madnalducking facility proposed within or adjacent to coastal rvetlandslmarsh (CW) submerged aquatic vegetation (SAN) shell be tom (SS) or other wetlands (WL)? If any boxes are checked providi3 the number of square feet affected 18CW OSAV OS13 QWL ONone P Is the proposed mmIn ildocking facility located within or within close proximity to any shellfish leases? 0Yes /Zuo If yes give the fame and address of the leaseho.der(s) and give the proximity to the lease 3 BOATHOUSE (Including covered lifts) a (r) Is the boathoise structure(s) ❑Commercial ❑Pubric/Govemmert ❑Prwale /Ccmmunity (it) Number (iii) Length Irv) Width Note Roofed ar as are calcu►ated from driplete dimers ors 4 GROIN (e g svood sheetp la etc If a rock groir use MP 2 Excava for and F71) a 1i) Nuribe (n) Length ui} Width 5 BREAKWATER (e g wood sheetp►le etc) a Length c Maximum distance beyond NNW NWL or wetlands 6 MOORING PILINGS and BUOYS a s the structures i ❑Commercial JPubtictGovemmert ❑Prnate /Commu ily c Distance to be pi iced beyond shoreline Note This shout i be measured from marsh edge if present e Arc of the swirg XT'h►s section not api trcable i 59thrs section not app (cable I9£h ►s section iot app +cable i b Average di once from NNW N 41 or wetlands `This section not app cable I b Number d Description of buoy (color inscription size anchor etc ) 7I u I, 7 GENERAL a Proximity of structure(s) to adjacent riparian property lines b Proximity of structure(s) to adjacent doclvng facdibe& (Vote For buoy or mooring piling use arc of swing including length of vessel c Width of water body /< e (r) Will nawgabonal aids be required as a result of the project? 0Yes fi& ❑NA (n) If yes explain what type and how they will be implemented d Water depth at waterward end of structure at NLW or NWL — �, M- L4-) 18 OTHER [I This section not applicable] a Give complete description Date Project Name /\0 f L Applicant Name c Appli �Xg re ¢lt,� 1 f) Jill J / r t o v ro N — I I I � t 3 41c, 14- 1 1 t-T i 1 I I f I ! I Ot i i ► t 1 i I I 1 I I ! i i t }X a 1� OCk�F I C, f i I I t G -- ��► (o � 11 I I I � I t I rt I � � '� I I ' I t I i i I t I ►i 1 i 1 1 i _ A I f 1 i 1 f I t t t I I 1 I I t t 1 I—, Tt l42e'S. J / i Fr&A -7k -0ow4� IV 3Ash 2 I=_= 30= 30-3 Td WdZS b0 60OZ p£ add oll f vk } b = 19 ` tr 0� h Plf _ t rk = � 1l� de �rr 1 i lb Vo is �! ;� ,r-- Q is r ON XUA 1 r' ra N3 �c )o�� 3�0 — 4 -IaON Fiwwtr WO2W IMO xlgtQ- Dr_ �a'J