Loading...
HomeMy WebLinkAbout20120076 Ver 1_Staff Comments_20120418Lucas, Annette From Lucas Annette Sent Wednesday April 18 2012 2 44 PM To Turlmgton Chad Subject 12 0076 Unihealth Post Acute Care — SW CONDITION Attachments 12 0076 Unihealth Post Acute Care — SW CONDITION docx Chad They have met all of the requests in our last letter Here is some suggested wording for a SW condition in their approval Let me know if you have questions Thanks Annette Annette M Lucas PE Environmental Engineer NCDENR I DWQ I Wetlands and StormAater Branch 1650 Mail Service Center Raleigh NC 27699 1650 (Mail) 512 N Salisbury St Raleigh NC 27604 1 90 Floor (Loc -ation & P ircels) Phone (919) 807 6381 1 Fax (919) 807 6494 1 Email Annette I u(as;u ncdeni gov Website http / /portal ncdenr org /web /wq /swp/ws /401 `.A Befoie pnntin, this email please consider vour bud &et -ind the environment E mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties 12 0076 Unihealth Post Acute Care — SW CONDITION AML comments April 18 2012 1 Stormwater Management Plan (SMP) Approval by DWQ The SMP approved by this office consists of one bioretention cell and all associated stormwater conveyances detention structure and the grading and drainage patterns depicted on plan sheets dated January 23 2012 and March 1 2012 No changes to the two stormwater wetlands shall be made without written authorization from the DWQ The two stormwater wetlands shall have maintenance access and at least a 10 foot drainage easement on each side to allow for the ability to maintain the structures and to perform corrective actions The stormwater easements shall be recorded to provide protection of the structures from potential alterations by future property owners The approved SMP must be maintained in perpetuity in accordance with bioretention cell operation and maintenance (O & M) agreement signed by Mr Nick Williams (Senior Vice President Development) on February 27 2012 The O & M agreement must transfer with the sale of the property or transfer of ownership /responsibility for the BMP facilities DWQ must be notified promptly of every transfer After the protect is completed the owner shall submit a Certificate of Completion Form to the DWQ Webscape Unit at 1650 Mail Service Center Raleigh NC 27699 1650 The Certification of Completion Form may be found at hap / /poitii ncdenr oig/xxe b /wq /swpAvs/ X101 /certsandpermrts /applN /forms N