HomeMy WebLinkAbout20120076 Ver 1_Staff Comments_20120418Lucas, Annette
From Lucas Annette
Sent Wednesday April 18 2012 2 44 PM
To Turlmgton Chad
Subject 12 0076 Unihealth Post Acute Care — SW CONDITION
Attachments 12 0076 Unihealth Post Acute Care — SW CONDITION docx
Chad
They have met all of the requests in our last letter Here is some suggested wording for a SW condition in their
approval Let me know if you have questions
Thanks
Annette
Annette M Lucas PE
Environmental Engineer
NCDENR I DWQ I Wetlands and StormAater Branch
1650 Mail Service Center Raleigh NC 27699 1650 (Mail)
512 N Salisbury St Raleigh NC 27604 1 90 Floor (Loc -ation & P ircels)
Phone (919) 807 6381 1 Fax (919) 807 6494 1 Email Annette I u(as;u ncdeni gov
Website http / /portal ncdenr org /web /wq /swp/ws /401
`.A Befoie pnntin, this email please consider vour bud &et -ind the environment
E mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties
12 0076 Unihealth Post Acute Care — SW CONDITION
AML comments
April 18 2012
1 Stormwater Management Plan (SMP) Approval by DWQ
The SMP approved by this office consists of one bioretention cell and all associated stormwater
conveyances detention structure and the grading and drainage patterns depicted on plan sheets dated
January 23 2012 and March 1 2012 No changes to the two stormwater wetlands shall be made
without written authorization from the DWQ The two stormwater wetlands shall have maintenance
access and at least a 10 foot drainage easement on each side to allow for the ability to maintain the
structures and to perform corrective actions The stormwater easements shall be recorded to provide
protection of the structures from potential alterations by future property owners
The approved SMP must be maintained in perpetuity in accordance with bioretention cell operation
and maintenance (O & M) agreement signed by Mr Nick Williams (Senior Vice President
Development) on February 27 2012 The O & M agreement must transfer with the sale of the
property or transfer of ownership /responsibility for the BMP facilities DWQ must be notified
promptly of every transfer After the protect is completed the owner shall submit a Certificate of
Completion Form to the DWQ Webscape Unit at 1650 Mail Service Center Raleigh NC 27699
1650 The Certification of Completion Form may be found at
hap / /poitii ncdenr oig/xxe b /wq /swpAvs/ X101 /certsandpermrts /applN /forms
N