HomeMy WebLinkAbout20120380 Ver 1_Application_20120417b�
oaoF wArFR °� APR 1
w zo�z
0 1
�'VDSANDST�AUIy
'ArAq.-
Office Use Only
Corps action ID no
DWQ project no
Form Version 1 3 Dec 10 2008
Page 1 of 10
PCN Form — Version 1 3 December 10 2008 Version
Pre - Construction Notification PCN Form
A Applicant Information
1
Processing
la
Type(s) of approval sought from the
Corps
®Section 404 Permit N Section 10 Permit
1 b
Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number
1 c
Has the NWP or GP number been verified by the Corps?
® Yes
❑ No
1 d
Type(s) of approval sought from the DWQ (check all that apply)
® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
le
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification
❑ Yes N No
For the record only for Corps Permit
❑ Yes ® No
1f
Is payment into,a mitigation bank or in lieu fee program proposed for mitigation
of impacts? If so attach the acceptance letter from mitigation bank or in lieu
fee program
❑ Yes
® No
1g
Is the project located in any of NC s twenty coastal counties If yes answer 1h
below
N Yes
❑ No
1h
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2
Project Information
2a
Name of project
BMU 1511 OR Carteret 110 Bridge Preservation WBS Element Number 43326
2b
County
Carteret
2c
Nearest municipality / town
Moorehead City
2d
Subdivision name
N/A
2e
NCDOT only T I P or state
project no
43326
3
Owner Information
3a
Name(s) on Recorded Deed
North Carolina Department of Transportation
3b
Deed Book and Page No
N/A
3c
Responsible Party (for LLC if
applicable)
N/A
3d
Street address
105 Pactolus Highway NC 33 P O Box 1587
3e
City state zip
Greenville NC 27835
3f
Telephone no
252 8303490
3g
Fax no
252 830 3341
3h
Email address
jbjohnson @ncdot gov
Page 1 of 10
PCN Form — Version 1 3 December 10 2008 Version
4
Applicant Information (if different from owner)
4a
Applicant is
❑ Agent ® Other specify Division 2 Environmental Officer
4b
Name
Jay B Johnson
4c
Business name
(if applicable)
North Carolina Depratment of Transportation
4d
Street address
P O Box 1587
4e
City state zip
Greenville NC 27835
4f
Telephone no
252 830 3490
4g
Fax no
252 830 3341
4h
Email address
jbjohnson @ncdot gov
5
Agent/Consultant Information (if applicable)
5a
Name
N/A
5b
Business name
(if applicable)
5c
Street address
5d
City state zip
5e
Telephone no
5f
Fax no
5g
Email address
Page 2 of 10
PCN Form — Version 1 3 December 10 2008 Version
B
Project Information and Prior Project History
1
Property Identification
1a
Property identification no (tax PIN or parcel ID)
BMU 15110R Carteret 110 Bridge Preservation WBS
Element Number 43326
1 b
Site coordinates (in decimal degrees)
Latitude N 34 720390 Longitude W
7669370
(DD DDDDDD) ( DD DDDDDD)
1c
Property size
N/A acres
2
Surface Waters
2a
Name of nearest body of water (stream river etc) to
proposed project
Newport River
2b
Water Quality Classification of nearest receiving water
SA HQW
2c
River basin
Newport river
3
Project Description
3a
Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
Bridge preservation
3b
List the total estimated acreage of all existing wetlands on the property
N/A
3c
List the total estimated linear feet of all existing streams (intermittent
N/A
and perennial) on the property
3d
Explain the purpose of the proposed project
Bridge preservation
3e
Describe the overall project in detail including the type of equipment to be used
Refer to narrative
4
Jurisdictional Determinations
4a
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the pasty
Comments
El Yes ®No ❑ Unknown
4b
If the Corps made the jurisdictional determination what type
of determination was made?
❑ preliminary ❑ Final
4c
If yes who delineated the jurisdictional areas?
Name (if known)
Agency /Consultant Company
Other
4d
If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
5
Project History
5a
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
® Yes ❑ No ❑ Unknown
5b
If yes explain in detail according to help file instructions
6
Future Project Plans
6a
Is this a phased project?
❑ Yes ® No
6b
If yes explain
Page 3 of 10
PCN Form — Version 1 3 December 10 2008 Version
C Proposed Impacts Inventory
1 Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands ❑ Streams tributaries ❑ Buffers
® Open Waters ❑ Pond Construction L
2 Wetland Impacts
If there are wetland impacts proposed on the site then complete this question for each wetland area impacted
2a
2b
2c
2d
2e
2f
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps 404 10
Area of impact
Permanent (P) or
(if known)
DWQ — non 404 other)
(acres)
Temporary T
❑ Yes
❑ Corps
W1 ❑ P ❑ T
❑ No
❑ DWQ
❑ Yes
❑ Corps
W2 ❑ P ❑ T
❑ No
❑ DWQ
❑ Yes
❑ Corps
W3 ❑ P ❑ T
❑ No
❑ DWQ
❑ Yes
❑ Corps
W4 ❑ P ❑ T
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ No
❑ Corps
❑ DWQ
❑ Yes
❑ Corps
W6 ❑ P ❑ T
❑ No
❑ DWQ
2g Total wetland impacts
2h Comments
3 Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this
question for all stream sites impacted
3a
3b
3c
3d
3e
3f
3g
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number
(PER) or
(Corps 404 10
stream
length
Permanent (P) or
intermittent
DWQ — non 404
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
❑ PER
❑ Corps
S1 ❑ P ❑ T
❑ INT
❑ DWQ
❑ PER
❑ Corps
S2 ❑ P ❑ T
❑ INT
❑ DWQ
❑ PER
❑ Corps
S3 ❑ P ❑ T
❑ INT
❑ DWQ
❑ PER
❑ Corps
S4 ❑ P ❑ T
❑ INT
❑ DWQ
❑ PER
❑ Corps
S5 ❑ P ❑ T
❑ INT
❑ DWQ
❑ PER
❑ Corps
S6 ❑ P ❑ T
❑ INT
❑ DWQ
3h Total stream and tributary impacts
31 Comments
Page 4 of 10
PCN Form — Version 1 3 December 10 2008 Version
4 Open Water Impacts
If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of
the U S then individually list all open water impacts below
4a
4b
4c
4d
4e
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary
01 ❑ P ® T
Cable trenching
Newport River
115 X10
02 ❑P ❑T
03 ❑P ❑T
04 ❑P ❑T
4f Total open water impacts
04 ac
4g Comments 04 Open Water Impacts
5 Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below
5a
5b
5c
5d
5e
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose
(acres)
number
of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f Total
None
5g Comments None
5h Is a dam high hazard permit required?
❑ Yes ❑ No If yes permit ID no
51 Expected pond surface area (acres)
5j Size of pond watershed (acres)
5k Method of construction
6 Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts
below If any impacts require mitigation then you MUST fill out Section D of this form
6a
❑ Neuse ❑ Tar Pamlico ® Other White Oak
Project is in which protected basin'
❑ Catawba ❑ Randleman
6b
6c
6d
6e
6f
6g
Buffer impact
number—
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary
im act
required?
131 ❑P [IT
❑Yes
❑ No
B2 ❑P ❑T
El Yes
❑ No
B3 ❑P❑T
El Yes
❑ No
6h Total butter impacts
61 Comments
Page 5 of 10
PCN Form —Version 1 3 December 10 2008 Version
D Impact Justification and Mitigation
1 Avoidance and Minimization
1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
here is no ground disturbance associated with this project only open water impacts from the trenching of a power cable to the
existing bascule control house
1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
Turbidity curtains will be used to contain turbidity during the trenching operation
2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State
2a Does the project require Compensatory Mitigation for
impacts to Waters of the U S or Waters of the State?
❑ Yes ® No
2b If yes mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
2c If yes which mitigation option will be used for this
project?
❑ Mitigation bank
El Payment to in lieu fee program
❑ Permittee Responsible Mitigation
3 Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type
Quantity
3c Comments
4 Complete if Making a Payment to In lieu Fee Program
4a Approval letter from in lieu fee program is attached
❑ Yes
0 Stream mitigation requested
linear feet
4c If using stream mitigation stream temperature
❑ warm ❑ cool ❑cold
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non riparian wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5 Complete if Using a Permittee Responsible Mitigation Plan
Fa If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 1 3 December 10 2008 Version
6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
❑ Yes ® No
buffer mitigation?
6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
6c
6d
6e
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5
6f Total buffer mitigation required
None
6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank
permittee responsible riparian buffer restoration payment into an approved in lieu fee fund)
N/A
6h Comments
Page 7 of 10
PCN Form — Version 1 3 December 10 2008 Version
E
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1
Diffuse Flow Plan
1 a
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b
If yes then is a diffuse flow plan included? If no explain why
❑ Yes ®No
Comments
2
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
N/A Bridge Preservation Project %
2b
Does this project require a Stormwater Management Plan?
❑ Yes ® No
2c
If this project DOES NOT require a Stormwater Management Plan explain why There is no ground disturbance
associated with this project only open water impacts from the trenching of a power cable to the existing bascule control
house
2d
If this project DOES require a Stormwater Management Plan then provide a brief narrative
description of the plan
❑ Certified Local Government
2e
Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3
Certified Local Government Stormwater Review
3a
In which local government s jurisdiction is this project?
N/A
❑ Phase II
3b
Which of the following locally implemented stormwater management programs
❑ NSW
❑ USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other N/A
3c
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4
DWQ Stormwater Program Review
❑ Coastal counties
❑ HQW
4a
Which of the following state implemented stormwater management programs apply
❑ ORW
(check all that apply)
❑ Session Law 2006 246
❑ Other NPDES Permit
4b
Has the approved Stormwater Management Plan with proof of approval been
❑Yes ❑ No
attached'?
5
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1 3 December 10 2008 Version
F
Supplementary Information
1
Environmental Documentation (DWQ Requirement)
la
Does the project involve an expenditure of public (federal /state /local) funds or the
® Yes
❑ No
use of public (federal /state) land?
lb
If you answered yes to the above does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c
If you answered yes to the above has the document review been finalized by the
State Clearing House? (If so attach a copy of the NEPA or SEPA final approval
❑ Yes
❑ No
letter )
Comments
2
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated
Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards
❑ Yes
® No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after the fact permit application?
❑ Yes
® No
2c
If you answered yes to one or both of the above questions provide an explanation of the violation(s)
3
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes
® No
additional development which could impact nearby downstream water quality?
3b
If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered no provide a short narrative description
4
Sewage Disposal (DWQ Requirement)
4a
Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from
the proposed project or available capacity of the subject facility
N/A
Page 9 of 10
PCN Form — Version 1 3 December 10 2008 Version
5 Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
habitat?
❑ Yes ® No
5b Have you checked wdh the USFWS concerning Endangered Species Act
impacts?
❑ Yes ® No
5c If yes indicate the USFWS Field Office you have contacted
❑ Raleigh
❑ Asheville
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6 Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b What data sources did you use to determine whether your site would Impact Essential Fish Habitat?
7 Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state federal or tribal
governments have designated as having historic or cultural preservation
status (e g National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
❑ Yes ® No
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
8 Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA designated 100 year floodplain?
❑ Yes ❑ No
8b If yes explain how protect meets FEMA requirements
8c What source(s) did you use to make the floodplain determination?
J
Jay B Johnson
Applicant/Agent s Printed Name
April 12 2012
Date
Ap i an gent s Signature
(Agent s signal is val on if an authorization letter from the applicant
is provided
Page 10 of 10
PCN Form —Version 13 December 10 2008 Version
1
1
t
\E7F
,
.
p23�
\/�
m
°
"
u��_
§�/
37@()_
/LuU�/
E
g
§
§
4) Q.
0
�
&
7
(\E
IL
_
G
4) 7
\
N C
}
§§k
�p
7
a� }�
9 u
§ E
§\
§
_§
&`\
—
I
�
LU
33E —
E=§;
}I \7
]
E
3
kf
_
k/
Iƒ
i)
\
e
NA 3PP vftaAE 454 W stm
ti
y� D
m
n
s
i A
L
Z
n
ti
a
m
Z
O
I I
mm
�N
\
C)
D
r
m
0D
II
I
I
I
` I
I
D`^
ZC)
m
I
I
\I
x
I
I H
I
o
Z�
I
�i I MM
cxl n
cn
I
I
I
C)
z
v, K
�o
ti I
cm
I I
F-
I
--I
nD
m I
I
rrl
o
mA
I
X I
I
I
n�
m
C I
I
Ln
--4 I
I
m
W I
I I
m i
m
II
X�
V)
m
I I
I I
ti
y� D
m
n
s
i A
L
Z
n
ti
a
m
Z
O
O
o
\
C)
D
r
m
ti
y� D
m
n
s
i A
L
Z
n
ti
a
m